QR-74-04-02 Rev A DRS COMMON SUPPLIER QUALITY CLAUSES
QR-74-04-02 Rev A DRS COMMON SUPPLIER QUALITY CLAUSES
QR-74-04-02 Rev A DRS COMMON SUPPLIER QUALITY CLAUSES
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>DRS</strong> TECHNOLOGIES<br />
Title: Common Supplier Quality Clauses<br />
Document Number: <strong>QR</strong>-<strong>74</strong>-<strong>04</strong>-<strong>02</strong> <strong>Rev</strong>ision: A Page 10 of 15<br />
manufacture of components or assemblies, whether purchased by the supplier or of<br />
supplier manufacture, meet the requirements and/or specifications. The supplier must<br />
furnish copies of these reports with the initial shipment and make available subsequent<br />
reports as found necessary by <strong>DRS</strong> IMS. For materials, such as aluminum, high alloy<br />
steel castings, forging, etc., test reports as required for the initial shipment of materials<br />
and subsequent shipments when there was a process change; however, a statement to<br />
the effect that Chemical/Physical Test Reports have been submitted to <strong>DRS</strong> IMS with the<br />
initial shipment must be noted on the applicable shipping document and certification<br />
referencing the applicable Chemical/Physical Report previously submitted.<br />
C3PA401 - Verification of Purchased Product: During the performance of this order, <strong>DRS</strong><br />
IMS, <strong>DRS</strong> IMS’ Customers, and/or a regulatory agency including an authorized<br />
government representative reserve the right to attend, review, verify and participate in<br />
the Supplier’s Quality Systems and associated manufacturing processes including<br />
inspection and testing of any work related to this contract. This activity must be<br />
performed in such a manner to not disrupt normal processing and shall be conducted on<br />
a non-interference basis. The customer may provide an assessment of requirements<br />
and processes related to the performance of this contract. <strong>DRS</strong> IMS’ shall be afforded<br />
the right to verify at the suppliers premises (or supplier’s subcontractor’s premises) that<br />
the supplier’s product (or supplier’s subcontracted product) conforms to all specified<br />
requirements. Any <strong>DRS</strong> IMS’ customer shall be afforded the same right.<br />
C3PA4<strong>02</strong> - Supplier Identification: Supplier shall mark all deliverable products and<br />
documents. The Supplier shall apply the actual date of manufacture/assembly (or date<br />
code) to all deliverable hardware. Information must be applied adjacent to the<br />
hardware’s identification markings and must be traceable to Supplier’s build<br />
documentation. Hardware produced in lots, batches, groups, etc. shall have respective<br />
traceable control information applied. When size of hardware does not permit<br />
application to individuals deliverables, the information shall be similarly placed on bags,<br />
tags or labels as applicable. Examples of traceable information include, but, are not<br />
limited to: Date of manufacture, Serial Number, Lot Number, Control Number, Final<br />
Inspection Sequence Date, Batch Number, Work Order Number, etc.<br />
C3PA403 - Preliminary Material <strong>Rev</strong>iew Board (MRB) Authority: The supplier is delegated<br />
Preliminary Material <strong>Rev</strong>iew Board authority for hardware nonconformances. This<br />
authority is limited to dispositions of rework to engineering requirements, return to<br />
previous operation for reprocessing, scrap (unless material was supplied by <strong>DRS</strong> IMS),<br />
repair to a <strong>DRS</strong> IMS approved standard repair instruction and return to Sub-tier supplier.<br />
This authority does not extend to the use of a Material <strong>Rev</strong>iew Board (MRB) for the<br />
purpose of changing engineering criteria which can only be accomplished by drawing<br />
change. This delegation of Preliminary Material <strong>Rev</strong>iew Board authority may be<br />
rescinded at any time by written notification from <strong>DRS</strong> IMS Quality Assurance.<br />
DISCLOSURE OF THE DATA ON THIS PAGE IS SUBJECT TO THE DISTRIBUTION AUTHORIZATION, PROPRIETARY DATA AND EXPORT CONTROL<br />
RESTRICTIONS ON THE TITLE PAGE OF THIS DOCUMENT.