RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems
RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems
RFP for Design-Build Services at Eleven DPR Playgrounds ... - fems
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
===================================================================<br />
=======================<br />
70471513B CALYPSO 3 DRUM PANEL (BELOW DECK) 1<br />
704796P1 BELL (POST MOUNT) 2<br />
7049753B CHIME PANEL (BELOW DECK) 1<br />
7049754B XYLOPHONE PANEL (BELOW DECK) 1<br />
------------------------------------------------------------------------------------------<br />
===================================================================<br />
=======================<br />
6063 REFLEX 1<br />
7188522SX 3 1/2" OD ARCH ADD-A-BAY W/2 S/P SEATS MC 1<br />
7188522T 3 1/2"OD ARCH SWG FRAME W/2 360 D TOT ST MC 1<br />
8873 KIDROX-MT. KILIMANJARO ROCK CLIMBER 1<br />
9452 SADDLE SEAT, STRAIGHT POST 2<br />
------------------------------------------------------------------------------------------<br />
===================================================================<br />
=======================<br />
718555 3 1/2" OD X 70" POST FOR PLAY PANELS 4<br />
------------------------------------------------------------------------------------------<br />
F. Site Amenities<br />
1. Benches: Provide and install six (6) benches; Dumor model 58-SER-3AR per<br />
<strong>DPR</strong> standards; layout to be determined by DGS.<br />
2. Table and Bench combo: Provide and install one (1) Dumor model 62-861/92<br />
per <strong>DPR</strong> standards; layout to be determined by DGS.<br />
3. Table and Bench combo: Provide and install one (1) Dumor model 62-861/68<br />
1/92-51 per <strong>DPR</strong> standards; layout to be determined by DGS.<br />
4. Trash Receptacles: Install four (4) Dumor Litter Receptacles with self-closing<br />
dome lid and blue recycle receptacles per <strong>DPR</strong> standards; layout to be<br />
determined by DGS.<br />
5. Park signage: Install one bulletin board and other required playground signage<br />
on the playground fence per the signage standards provided by <strong>DPR</strong>. Signs<br />
and bulletin board to be installed in loc<strong>at</strong>ions determined by DGS.<br />
6. Security lighting: Provide site LED safety lighting throughout the park area;<br />
layout to be determined by DGS.<br />
MODERNIZATION OF HAMILTON RECREATION CENTER<br />
SCOPE OF WORK