UNITED STATES DEPARTMENT OF THE INTERIOR<br />

OFFICE OF HEARINGS AND APPEALS<br />

INTERIOR BOARD OF INDIAN APPEALS<br />

CONFEDERATED TRIBES OF THE )<br />

WARM SPRINGS RESERVATION OF )<br />

OREGON, and ANITA JACKSON, )<br />

CHARLES JACKSON, DEBORAH ) Docket Nos. IBIA 12-142 and<br />

JACKSON, AND MARK JACKSON, ) IBIA 12-143<br />

)<br />

Appellants, )<br />

)<br />

v. ) DECLARATION OF ROBERT<br />

) F. MCCULLOUGH<br />

NORTHWEST REGIONAL )<br />

DIRECTOR, BUREAU OF INDIAN )<br />

AFFAIRS, ) January 25, 2013<br />

Appellee. )<br />

I <strong>hereby</strong> <strong>declare</strong> <strong>that</strong> I <strong>am</strong> <strong>Robert</strong> <strong>McCullough</strong>, <strong>manager</strong> <strong>of</strong> <strong>McCullough</strong> Research, LLC,<br />

an economic consulting firm located in Portland, Oregon. My firm is the economic consultant to<br />

the Jackson appellants in this case and I, personally, <strong>am</strong> the expert who has submitted economic<br />

testimony on their behalf for the past four years. My credentials are filed in BIA No. 1A.<br />

Under full awareness <strong>of</strong> the penalty for perjury, I say as follows:<br />

Executive Summary<br />

1. The answering briefs from the BIA and the Tribe reveal a very poor command <strong>of</strong> the<br />

literature and calculation <strong>of</strong> utility economics. The BIA’s understanding <strong>of</strong> depreciation, for<br />

ex<strong>am</strong>ple, shows a lack <strong>of</strong> understanding <strong>of</strong> FERC record keeping and basic accounting theory.<br />

The complex steps to allow comparison <strong>of</strong> the base load Port Westward plant with the Pelton<br />

Projection also show little understanding <strong>of</strong> electric operations. Overall, the many errors in the<br />

Cardno analysis have understated the estimated impact by $22.3 million dollars.<br />

1<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 1 <strong>of</strong> 27


Introduction<br />

2. On July 27, 2009, PGE, WSPE (the Warm Springs Power Enterprise), and the<br />

Jacksons met at the WSPE conference room to discuss the appropriate remuneration for the use<br />

<strong>of</strong> the Jackson land under the Reregulation d<strong>am</strong> and reservoir. The meeting was not successful.<br />

PGE proposed, <strong>am</strong>ong other evaluation methods, the use <strong>of</strong> the “power site [net benefits]<br />

formula.” The Jacksons’ representatives counseled the Tribe and PGE <strong>that</strong> the large number <strong>of</strong><br />

assumptions would prove error prone and contentious. The Jacksons recommended a simpler<br />

approach <strong>of</strong> valuing the specific contribution their land made to the Project. 1<br />

A variety <strong>of</strong> materials were presented to BIA staff in the following four years after the<br />

initial meeting. Some <strong>of</strong> these materials are included in the current record, others, apparently<br />

primarily those provided by the Jacksons, have apparently been lost at Cardno or the BIA. 2<br />

In<br />

2009, Jennifer Frozena discouraged submission <strong>of</strong> additional materials since “[they] will simply<br />

delay the process further.” 3<br />

Cardno, as demonstrated in its report, chose to pursue the more complex calculations<br />

recommended by PGE and the Tribe, although no effort over the intervening four years was<br />

made to contact the Jacksons for explanations <strong>of</strong> any issues <strong>that</strong> were not understood in the<br />

materials it had received.<br />

1 The Jackson land is occupied by half the Reregulation D<strong>am</strong> and one third <strong>of</strong> the storage in the Reregulation Pool.<br />

The Reregulation D<strong>am</strong> was built in 1957 to protect the downstre<strong>am</strong> environment from peaking operations at Pelton.<br />

Absent them, Pelton would not be able to increase generation during on-peak hours.<br />

2 The Cardno report references a number <strong>of</strong> places where it could not understand calculations provided by the<br />

Jacksons. The detailed calculations provided to Cardno in November 2008 were apparently not available to the<br />

writer <strong>of</strong> the Cardno report, nor included in the BIA record. The Cardno report only referenced the November 2008<br />

presentation and the September 2009 review <strong>of</strong> the 2009 PGE/Tribal presentation by the Jacksons as attachments.<br />

No reference was made to later documents <strong>that</strong> are in the record such as BIA No. 18 Rebuttal Testimony <strong>of</strong> <strong>Robert</strong><br />

<strong>McCullough</strong>, dated November 18, 2009 with Attachments (BIA No. 18A through BIA No. 18D).<br />

3 Email from Jennifer Frozena [BIA counsel] to John Gould [Jackson counsel], October 1, 2009. PBIA No. 7<br />

2<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 2 <strong>of</strong> 27


Not surprisingly, the more complex calculations in the Cardno report have proven error<br />

prone and contentious. So much so, it is necessary to provide a careful calculation by calculation<br />

summary to understand where the specific calculations need to be corrected.<br />

The basic structure <strong>of</strong> the Cardno calculation can be confusing. The basic concept is to<br />

compare costs between Pelton and Port Westward, escalate the difference to the present, and then<br />

calculate the present value. And then, finally, use the Jacksons’ share <strong>of</strong> project lands to<br />

calculate the condemnation payment.<br />

This can be summarized in the following formulas:<br />

2012 <br />

where<br />

and<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

4 <br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

The final step is:<br />

<br />

2012 <br />

<br />

4 “Original cost net <strong>of</strong> accumulated depreciation” is a standard accounting phrase which means the original cost<br />

minus accumulated depreciation from previous time periods.<br />

3<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 3 <strong>of</strong> 27


3. The first step in the power site formula is to set a date for the comparison and to select<br />

a comparison power project. The logic <strong>of</strong> the power site formula stems from an era before the<br />

development <strong>of</strong> the wholesale power markets in the marketing <strong>of</strong> electricity in the late 1980s.<br />

Before the adoption <strong>of</strong> wholesale market pricing, the only reliable way to estimate value was to<br />

review the costs <strong>of</strong> the most recent comparable plant built by the utility. In 2009 – when PGE<br />

and the Tribe made their presentation – the most recent plant was Port Westward. PGE and the<br />

Tribe proposed the date <strong>of</strong> the comparison as December 31, 2007. 5<br />

Port Westward is not terribly<br />

comparable to Pelton Round Butte, but it was the most recent plant in 2009. 6<br />

Among the adjustments required to make the calculation “apples to apples” is to adjust<br />

the capacity factor – the percentage <strong>of</strong> operations to capacity (more fully explained below) – to<br />

make sure <strong>that</strong> the number <strong>of</strong> kilowatt-hours produced do not prejudice the comparison, by<br />

inflating the denominator <strong>of</strong> the calculation <strong>of</strong> dollars divided by megawatt-hours. This is just<br />

one <strong>of</strong> the areas where corrections to the Cardno report have been recommended by both the<br />

Jacksons and the Tribe. 7<br />

Chart I summarizes the tables in the Cardno analysis and its primary material errors.<br />

Under the Jackson Methodology column, we have shown the significantly less-complex<br />

calculations recommended to value the Jackson Project lands.<br />

///<br />

///<br />

5 BIA No. 69, Attachment 5, page 19.<br />

6 As <strong>of</strong> 2011, the most recent plant is the far more comparable (and more expensive) Biglow project since it is most<br />

recent, renewable, has a low capacity factor, and a similar geographical location.<br />

7 The Tribe has noted <strong>that</strong> the value chosen by Cardno was in error. However, it has recommended comparing the<br />

base load operation <strong>of</strong> Port Westward in 2007 with the peaking operations <strong>of</strong> Pelton, which is also an error.<br />

4<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 4 <strong>of</strong> 27


Chart I<br />

Steps Cardno Methodology Line Numbers Errors<br />

Jackson Methodology<br />

Table 4‐1 Calculate Port Westward $/MWh 1 1 Capital cost omitted 7 months <strong>of</strong><br />

depreciation<br />

Use market data for energy, capacity, and Renewable Energy<br />

Credits<br />

2 2 Incorrect cost <strong>of</strong> capital<br />

2 3 Home mortgage calculation<br />

3 4 Ommitted depreciation cost<br />

6 5 Incorrect MWh numerator<br />

Table 4‐2 Calculate Pelton and Round Butte 8,9 1 Incorrect capital <strong>am</strong>ount Not needed<br />

$/MWh<br />

11 2 Incorrect cost <strong>of</strong> capital<br />

12 3 Omitted depreciation<br />

8,9 4 Double counted capital and operating<br />

costs<br />

23 5 Omitted Renewable Energy Credits<br />

Table 4‐2 Reregulation Project $/MWh 16 1 Incorrect cost <strong>of</strong> capital Use Tribe's actual interest rate<br />

16 2 Omitted interest<br />

23 3 Omitted Renewable Energy Credits Include Renewable Energy Credits<br />

Table 4‐4 Escalation and Present Valuation 36,37 1 Use <strong>of</strong> the wrong evaluation date Use 2013 since this would be the year <strong>of</strong> the condemnation<br />

36,37 2 Use <strong>of</strong> the wrong Handy Whitman Use the correct Handy Whitman index<br />

Index<br />

39,40 3 Use <strong>of</strong> the incorrect discount rate Use discount rate set out by law for Department <strong>of</strong> Interior<br />

hydro projects<br />

39,40 4 Used the wrong dsicount formula Use the standard financial formula for perpetual assets<br />

Table 4‐5 Adjustment for using the wrong<br />

period in the present value<br />

1 Incorrect financial formula Not Needed<br />

Attachment A 8 to this Declaration consists <strong>of</strong> several tables which discuss the Cardno<br />

calculations on a line by line basis. The calculations on the left were taken from the original<br />

Cardno tables, with their errors displayed in bold and red. The column to the right <strong>of</strong> the Cardno<br />

values notates the corrected calculations in green italics. The column on the far right notes each<br />

error and describes the correction made. Each row can be identified by the row number on the<br />

left <strong>of</strong> the table. Excerpts from Attachment A have been included in the text and references to<br />

Attachment A have been footnoted to make following these computations easier.<br />

Calculation <strong>of</strong> Port Westward’s 2007 Dollars per Megawatt-hour in Table 4-1<br />

4. Cardno’s first determination was to accept the selection <strong>of</strong> Port Westward as the<br />

comparison resource and to calculate a cost per megawatt-hour. This was summarized in Table<br />

4-1 <strong>of</strong> their report.<br />

8 By this reference incorporated herein.<br />

5<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 5 <strong>of</strong> 27


Cardno made a number <strong>of</strong> errors in Table 4-1. First, Cardno assumed <strong>that</strong> the value taken<br />

from the 2007 FERC Form 1 was net <strong>of</strong> accumulated depreciation. 9<br />

Second, without<br />

documentation or explanation, <strong>that</strong> the cost <strong>of</strong> capital for PGE and Tribes was 9%. 10<br />

Third, it<br />

applied PGE’s assumed cost <strong>of</strong> capital to the original cost as though it were a home mortgage<br />

payment. 11<br />

Fourth, Cardno did not include depreciation as an operating cost. 12 Fifth, it used<br />

seven months <strong>of</strong> baseload generation as a denominator in calculating their dollars per megawatthour.<br />

13 The methodology which should be used in estimating cost <strong>of</strong> generation is based on<br />

generally accepted accounting principles. Any number <strong>of</strong> references are available <strong>that</strong> describe<br />

how to calculate those costs. A standard industry reference is The Regulation <strong>of</strong> Public Utilities<br />

by Charles Phillips. The basic formula for cost is given as:<br />

R = 0 + (V - D)r<br />

where R is the total revenue required,<br />

0 is the operating costs,<br />

V is the gross value <strong>of</strong> the tangible and intangible property,<br />

D is the accrued depreciation <strong>of</strong> the tangible and reproducible property, and<br />

r is the allowed rate <strong>of</strong> return. 14<br />

9 Cardno’s value is located in line one <strong>of</strong> Attachment A.<br />

10 This value, compared to our correction, can be found in line two <strong>of</strong> Attachment A.<br />

11 The conventional home mortgage sets a constant repayment <strong>am</strong>ount over the life <strong>of</strong> the mortgage. Repayment <strong>of</strong><br />

the debt starts at a very low level and increases over the life <strong>of</strong> the mortgage. But this is very rare circumstance in<br />

industry practice. In the case <strong>of</strong> Port Westward, the plant was financed by a portfolio <strong>of</strong> debt and equity. The<br />

repayment <strong>of</strong> debt issues is set out in their <strong>of</strong>fering memoranda and would show no resemblance to a fixed-rate<br />

home mortgage.<br />

12 This error, along with its correction, is notated on line 3 <strong>of</strong> Attachment A.<br />

13 Cardno’s values, along with corrections for Port Westward as on-peak generation are listed in line 6 <strong>of</strong><br />

Attachment A.<br />

14 Phillips, Charles F., THE REGULATION OF PUBLIC UTILITIES: Theory and Practice, (Public Utilities<br />

Reports, 1988), p 169.<br />

6<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 6 <strong>of</strong> 27


Operating costs includes “all types <strong>of</strong> operating expenses (wages, salaries, fuel,<br />

maintenance, advertising, research, and charitable contributions) plus annual charges for<br />

depreciation and operating taxes.” 15 (Emphasis added.) Depreciation – wear and tear,<br />

colloquially – is a cost <strong>of</strong> operations and a standard part <strong>of</strong> cost determination.<br />

Cardno may have been unaware <strong>that</strong> the FERC Form 1 does not include depreciation in<br />

its Ste<strong>am</strong>-Electric Generating Plant Statistics (Large Plants) data. Instead, depreciation data is<br />

separately shown in the pages entitled “Depreciation and Amortization <strong>of</strong> Electric Plant.”<br />

Similarly, the Director’s lack <strong>of</strong> experience with FERC Form 1’s organization must lead one to<br />

disregard his statement on depreciation, <strong>that</strong> “[g]iven <strong>that</strong> all d<strong>am</strong>s' costs were already<br />

depreciated; there was no need to depreciate them further.” 16<br />

In this case, the “2007 Capital<br />

Cost” for Port Westward neither adjusted for accumulated depreciation, nor included<br />

depreciation as an operating cost, both errors.<br />

In fact, the term “depreciation” represents a cost <strong>of</strong> operation. It reflects a determination<br />

<strong>of</strong> “wear and tear” <strong>of</strong> the equipment over time. The f<strong>am</strong>ily car, for ex<strong>am</strong>ple, “depreciates” over<br />

its expected lifetime from a subject <strong>of</strong> pride to a broken down jalopy. The term “net <strong>of</strong><br />

depreciation” means the capital cost with accumulated depreciation removed. In the case <strong>of</strong> the<br />

f<strong>am</strong>ily car, the value <strong>of</strong> the car is the original cost minus the accumulated wear and tear.<br />

The Director’s Answer continues to note <strong>that</strong> “Cardno requested additional information<br />

directly from the licensees and used this data at face value as provided.” 17<br />

This implies <strong>that</strong><br />

Cardno could not be expected to apply common accounting rules unless it was specifically<br />

15 Id.<br />

16 Director’s Answer, at 20.<br />

17 Id.<br />

7<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 7 <strong>of</strong> 27


instructed by its data source. A kinder view, favored by the Jacksons, is <strong>that</strong> Cardno simply<br />

forgot to add these costs for Pelton and Port Westward, since they were included in Cardno’s<br />

analysis <strong>of</strong> the Reregulation costs – although in the Reregulation cost analysis Cardno also<br />

forgets to include interest costs. 18<br />

The Tribe’s Answering Brief further muddies the depreciation waters. It says,<br />

“The Tribe understands <strong>that</strong> the nine percent (9%) cost <strong>am</strong>ortization rate used by<br />

Cardno likely includes a component for a return on capital, i.e., depreciation. The<br />

Tribe is not certain because Cardno provides no explanation <strong>of</strong> what is included in<br />

its cost <strong>am</strong>ortization rate.” 19<br />

Although the 9% value is undocumented, the Director’s Answer indicates <strong>that</strong> it was provided by<br />

PGE. 20 This seems reasonable, since the correct value for PGE’s nominal cost <strong>of</strong> capital, 9.03%,<br />

is calculated in the document cited in Patrick Hager’s September 30, 2009 Declaration. 21<br />

But<br />

the source (PGE’s 2009 Integrated Resource Plan) for the correct value (9.03%) makes it clear<br />

<strong>that</strong> the nominal cost <strong>of</strong> capital does not include depreciation:<br />

22<br />

18 Cardno’s reregulation costs and the inclusion <strong>of</strong> interest rates can be found in line seventeen <strong>of</strong> Attachment A.<br />

19 Tribe’s Answering Brief at 29, fn 12.<br />

20 Director’s Answer, at 15.<br />

21 BIA No. 16H.<br />

22 2009 Integrated Resource Plan Addendum, PGE, April 9, 2010, page 12.<br />

8<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 8 <strong>of</strong> 27


Note <strong>that</strong> this table was used to derive both the nominal cost <strong>of</strong> capital and the after-tax real cost<br />

<strong>of</strong> capital. The nominal value (9.03%) is the actual <strong>am</strong>ount <strong>that</strong> PGE expects to pay its bond<br />

holders and stock holders for capital. This corresponds to the interest rate one’s bank pays on a<br />

deposit. The after-tax real cost <strong>of</strong> capital, 5.59%, is the value <strong>that</strong> reflects the impact <strong>of</strong> taxes<br />

and inflation. Patrick Hager’s 23 declaration recommends <strong>that</strong> this be used as PGE’s discount<br />

rate:<br />

“This real rate <strong>of</strong> return is the s<strong>am</strong>e as the Tribe and PGE have used in their<br />

current net benefits analysis. Such a utility rate <strong>of</strong> return is appropriate here, since<br />

a) it reflects the risks <strong>of</strong> the majority owner <strong>of</strong> the Project (i.e. PGE); b) it reflects<br />

future long-term debt costs <strong>that</strong> PGE will issue, as well as the cost <strong>of</strong> equity; and<br />

c) it reflects PGE's long-term capital structure goal <strong>of</strong> 50 percent equity and 50<br />

percent debt. Further the long-term 5.59% weighted after-tax cost <strong>of</strong> capital is<br />

what is used in PGE's current IRP [Integrated Resource Plan] for long-term<br />

analyses, including net present value calculations.” 24 (Emphasis added.)<br />

Thus, the first correction is to use original cost net accumulated depreciation for the Port<br />

Westward. 25<br />

The second correction to Cardno’s analysis is to use the correct PGE nominal cost<br />

<strong>of</strong> capital instead <strong>of</strong> Cardno’s 9%. 26,27<br />

The third correction is to multiply the cost <strong>of</strong> capital<br />

against original cost net <strong>of</strong> accumulated depreciation. The fourth correction is to include<br />

depreciation on Port Westward as set out in the standard cost formula quoted above. Port<br />

23 PGE’s regulatory affairs <strong>manager</strong> at the time.<br />

24 BIA No. 16H.<br />

25 This value can be found in Attachment A at line one, incorporating seven months <strong>of</strong> depreciation.<br />

26 This allows the analysis to use actual values from original sources – in this case PGE’s Declaration and their<br />

Integrated Resource Plan.<br />

27 The value with this cost <strong>of</strong> capital is located at line two <strong>of</strong> Attachment A. This value includes the 9.03% cost <strong>of</strong><br />

capital over seven months.<br />

9<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 9 <strong>of</strong> 27


Westward has an expected lifetime <strong>of</strong> 35 years, so straight line depreciation would be 1/35 <strong>of</strong> the<br />

original cost each year. 28<br />

The fifth error concerns the correct number <strong>of</strong> megawatt-hours to use as the denominator<br />

<strong>of</strong> the calculation <strong>of</strong> 2007 dollars per megawatt-hour for both plants, and takes us to the<br />

baseload/peaking load debate. In order to compare Port Westward, a base load unit, to Pelton, a<br />

peaking resource, it is necessary to consider the difference in operations between the two<br />

resources.<br />

To take a simple ex<strong>am</strong>ple, assume <strong>that</strong> you wanted to use this approach to figure out the<br />

rental value <strong>of</strong> a limousine and used the f<strong>am</strong>ily car as a comparison vehicle. The f<strong>am</strong>ily car<br />

drives 10,000 miles a year and costs $30,000. A limousine can drive 50,000 miles a year and<br />

costs $100,000. If you did not correct for the radically different number <strong>of</strong> miles, this approach<br />

would prove <strong>that</strong> limousines are less expensive than f<strong>am</strong>ily cars. Dividing $100,000 by 50,000<br />

miles would indicate a cost <strong>of</strong> $2/mile. The f<strong>am</strong>ily car “cost” would be $30,000 by 10,000 miles<br />

or $3/mile. Without adjusting for the use the vehicle is to be put, you would have to conclude<br />

<strong>that</strong> limousine owners should pay their clients for the use <strong>of</strong> a limousine, rather than vice versa.<br />

To make an apples to apples comparison, you would choose similar mileage for both vehicles in<br />

your analysis. This is the s<strong>am</strong>e point <strong>that</strong> Judge Lande addressed in the 1980 FERC case, 29 as<br />

discussed in our Opening Brief, at 22.<br />

28 This value <strong>of</strong> depreciation can be found in line three <strong>of</strong> Attachment A. We have taken the 2007 Capital Costs and<br />

found the depreciation by year over thirty-five years.<br />

29 BIA No. 14R Initial Decision Adjusting Annual Charges for Use <strong>of</strong> Indian Lands, Allen C. Lande, Presiding<br />

Administrative Law Judge, September 23, 1980, 12 FERC 63.055. at page 16, 6th full paragraph.<br />

10<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 10 <strong>of</strong> 27


For reasons still unclear, Cardno assumed <strong>that</strong> Pelton /Round Butte was a base load<br />

plant. 30 The fact sheet describing the project on PGE’s web site – created by the licensees –<br />

stresses the peaking nature <strong>of</strong> the plant. 31<br />

The FERC license and the Final Environmental Impact<br />

Study both describe the Pelton Round Butte project as a peaking resource. 32,33<br />

Cardno, in<br />

materials prepared for the Bureau <strong>of</strong> Indian Affairs, described Pelton as a peaking facility in its<br />

comments to FERC in 2003. 34<br />

Dr. McKusick, the author <strong>of</strong> the current Cardno report, stated in<br />

his report to the BIA on the Pelton Project <strong>that</strong>:<br />

30 BIA No. 69 Purchase Price Determination for Certain Indian Land Allotments within the Pelton-Round Butte<br />

Hydroelectric Project Boundary (FERC No. 2030), page 4-2.<br />

31 http://www.portlandgeneral.com/community_environment/initiatives/protecting_fish/deschutes_river/<br />

news_fact_sheets/round_butte_fact_sheet.aspx<br />

32 “The Round Butte and Pelton developments are operated as peaking facilities, typically generating between the<br />

hours <strong>of</strong> 6 a.m. and 11 p.m. daily. Lake Billy Chinook provides seasonal storage and is currently drawn down as<br />

much as 85 feet, to elevation 1,860 feet msl, in the winter, although typically the lake is only drawn down about 10<br />

feet, to elevation 1,935 feet. The lake is typically refilled during the months <strong>of</strong> April and May. During the summer,<br />

the reservoir is held at the highest practicable level with a relatively stable pool elevation <strong>that</strong> usually does not<br />

fluctuate more than 1.0 feet below the normal maximum pool elevation <strong>of</strong> 1,945 feet msl. The surface elevation <strong>of</strong><br />

Lake Simtustus usually fluctuates less than 0.75 feet per day but exceeds 3.5 feet per day about 25 percent <strong>of</strong> the<br />

time due to flow fluctuations produced by Round Butte.” 111 FERC 61,450, “ORDER APPROVING<br />

SETTLEMENT AND ISSUING NEW LICENSE” (June 21, 2005), p. 5.<br />

33 “Typically, PGE dispatches its thermal generating facilities for base-load operations, subject to unit availability<br />

and energy market conditions. PGE's hydroelectric resources, other than the project, are also typically used for baseload<br />

operation, subject to stre<strong>am</strong>flow and reservoir conditions, unit availability, license constraints and regional<br />

coordination <strong>of</strong> hydroelectric operations. These other hydroelectric projects are operated as run-<strong>of</strong>-river projects and<br />

therefore cannot replace the peaking power generated by the Pelton Round Butte Project.<br />

The project is typically operated to provide power during daily load peaks. PGE's other significant load-following<br />

resource, contract power from the mid-Columbia projects, does not have this degree <strong>of</strong> flexibility because <strong>of</strong><br />

environmental and operational constraints. The operational flexibility <strong>of</strong> the project is used by PGE to maintain the<br />

stability and reliability <strong>of</strong> the PGE system.” FINAL ENVIRONMENTAL IMPACT STATEMENT FOR<br />

HYDROPOWER RELICENSING PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC Project No.<br />

2030-036, (June 2004), p. 3.<br />

34 “While the Round Butte and Pelton developments are store-and-release facilities <strong>that</strong> operate in a load following<br />

or peaking mode, the Reregulating D<strong>am</strong> operates to redistribute upstre<strong>am</strong> peaking flows to provide a relatively<br />

steady downstre<strong>am</strong> flow <strong>of</strong> about the s<strong>am</strong>e magnitude as inflow to Lake Billy Chinook.” PELTON-ROUND<br />

BUTTE HYDROELECTRIC PROJECT LOWER DESCHUTES RIVER INSTREAM FLOW REPORT Prepared<br />

for UNITED STATE DEPARTMENT OF INTERIOR BUREAU OF INDIAN AFFAIRS, Entrix, Inc.. December<br />

2003, page 7.<br />

11<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 11 <strong>of</strong> 27


“Operation <strong>of</strong> the Project involves the generation <strong>of</strong> electricity in a "peaking<br />

mode" through powerhouses at the Round Butte and Pelton developments.” 35<br />

BIA counsel has invented a new utility resource classification in Regional Director’s Answer<br />

<strong>that</strong> has not otherwise been used in the industry. 36 Further, this new classification contradicts the<br />

Cardno report which states <strong>that</strong> base-load plants operate during 70 to 80 percent <strong>of</strong> the hours in a<br />

year, 37 a magnitude <strong>that</strong> Pelton could not hope to attain in the future nor has ever attained in the<br />

past.<br />

Energy economists and engineers call this concept “capacity factor” – the number <strong>of</strong><br />

megawatt-hours generated during a period (usually a year) divided by the maximum number <strong>of</strong><br />

megawatt-hours the plant could operate. In its first twelve months <strong>of</strong> operation, Port Westward<br />

had a capacity factor <strong>of</strong> 80%. 38<br />

The capacity factor for Pelton, Round Butte, and Reregulation<br />

was 45%. 39 The point is, if an apples to apples analysis is to be conducted between these two<br />

very dissimilar plants in order to compare costs per MWh <strong>of</strong> generation, it would be necessary to<br />

adjust Port Westward’s megawatt-hours for 2007 to reflect its dispatch in 2007 as a peaking<br />

resource.<br />

35 Substantial Evidence in Support <strong>of</strong> Section 4(e) Conditions for the Pelton Round Butte Hydroelectric Project<br />

FERC Project No. 2030, Prepared for Bureau <strong>of</strong> Indian Affairs Portland Area Office, Dr. <strong>Robert</strong> McKusick et al,<br />

November 11, 2002, page 17.<br />

36 “The Pelton Project has characteristics <strong>of</strong> both a base-load and peaking facility. Although the Project does have<br />

peaking capabilities and properties, it is a base-load facility in <strong>that</strong> the three d<strong>am</strong>s <strong>of</strong> the Project work together as<br />

one unit, and the Project in its entirety is not regularly turned "on" or "<strong>of</strong>f' or used only when more power is needed.<br />

Hydropower facilities are generally considered base-load facilities whether they are run-<strong>of</strong>-river or shaped due to<br />

their low fuel costs turned "on" or "<strong>of</strong>f' or used only when more power is needed.” Director’s Answer, at 22.<br />

37 BIA No. 69 Purchase Price Determination for Certain Indian Land Allotments within the Pelton-Round Butte<br />

Hydroelectric Project Boundary (FERC No. 2030), p. 4-2.<br />

38 Megawatt-hours are from the Energy Information Administration at<br />

http://www.eia.gov/electricity/data/eia923/index.html. The capacity value was from the 2007 PGE FERC Form 1,<br />

page 403.<br />

39 Megawatt-hours are from the Energy Information Administration at<br />

http://www.eia.gov/electricity/data/eia923/index.html. The capacity value was from the Final EIS.<br />

12<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 12 <strong>of</strong> 27


Cardno uses average generation for the hydroelectric facilities in its analysis, but relies on<br />

only seven months <strong>of</strong> Port Westward generation in Table 4-1. The use <strong>of</strong> these seven monthly<br />

values is highly misleading because they reflect base load operation <strong>of</strong> the resource.<br />

The Western Energy Coordinating Council defines peak hours as those after the first six<br />

hours <strong>of</strong> the day and before the last two hours <strong>of</strong> the day from Monday through Saturday. New<br />

Year’s Day, President’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving, and<br />

Christmas are defined as <strong>of</strong>f-peak days. Since Port Westward’s hourly generation is available<br />

from the Environmental Protection Agency, it is easy to calculate the number <strong>of</strong> megawatt-hours<br />

Port Westward generated on-peak in 2007. 40 In 2007, Port Westward only produced 1,013,787<br />

megawatt-hours on peak. This constituted 58% <strong>of</strong> total generation in 2007. Pelton (comprising<br />

all three d<strong>am</strong>s) produced 72.0% megawatt hours on peak. 41<br />

There is no uncomplicated way to adjust the values in Cardno. The correct approach<br />

would be to use market prices – the revenue approach – which Cardno rejected. In this case, we<br />

have used the average generation from June 2007 through September 2012 (six years <strong>of</strong> data) to<br />

maintain comparability with their similar calculation for the Pelton Project. This adjustment is<br />

made on line 6 <strong>of</strong> Attachment A. 42<br />

The Tribe’s Answering Brief cites two studies to prove <strong>that</strong> Port Westward is a peaking<br />

facility 43<br />

– one describing plants using different technology than used at Port Westward, and a<br />

second, purely theoretical, article deriving the mathematics for a hypothetical plant <strong>that</strong> could<br />

dispatch its component generators independently <strong>of</strong> each other. These are unavailing to remake<br />

40 http://<strong>am</strong>pd.epa.gov/<strong>am</strong>pd/<br />

41 Generation By Development for Pelton Project 2007, 2007 Licensee’s Report to FERC<br />

42 The value in line 6 is the average monthly generation for June 2007 through September 2012 multiplied by seven.<br />

43 Tribe’s Answering Brief, at p. 30, fn. 14.<br />

13<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 13 <strong>of</strong> 27


the facts. The record is clear: The Oregon Energy Facility Siting Council’s Site Certificate<br />

references Port Westward as a “base load gas plant” throughout its pages and must be treated<br />

accordingly. 44<br />

The following excerpt from Attachment A illustrates the corrections discussed above:<br />

Chart II<br />

Table 4‐1 Benefits per MWh<br />

Line Alternative Project ‐ Port Westward Data Cardno Corrected Values Corrections<br />

1 2007 Capital Costs $267,015,214 $ 262,564,960.43<br />

2 Calculate capital costs at 9.03% $24,358,962 $ 13,830,609.29<br />

3 Straight Line Depreciation (35 Year Life) $ 4,450,253.57<br />

4 2007 Operating & Maintenance Costs $96,634,896 $ 96,634,896.00<br />

5 2007 Total annual project cost (B + C) $120,993,858 $ 114,915,758.86<br />

6 2007 Power Generation (MWh) $1,721,921 $ 1,367,158.41<br />

7 Cost per MWh (D / E) $70 $ 84.05<br />

Error: The original cost should reflect seven months <strong>of</strong> depreciation.<br />

Cardno neglected the first seven months <strong>of</strong> accumulated depreciation in<br />

calculating original cost less accumulated depreciation. We removed<br />

7/12ths <strong>of</strong> one year's depreciation from the original capital less<br />

accumulated depreciation.<br />

Error: Nominal <strong>am</strong>ortization overstates cost <strong>of</strong> capital. We multiplied<br />

capital cost times the assumed cost <strong>of</strong> capital for seven months. Cardno<br />

has proposed using a home mortgage to represent the interest and<br />

<strong>am</strong>ortization for the Port Westward plant PGE finances on a portfolio<br />

basis using 50% debt and equity. The home mortgage approach slightly<br />

overstates the capital costs. The correct capital costs should be<br />

calculated at 9.03% for PGE. The capital cost for 2007 — for seven<br />

months ‐‐ is 9.03% times $262,564,960" or $13,830,609.<br />

Error: A major area <strong>of</strong> cost was omitted from Port Westward. We<br />

calculated straight line depreciation over 35 years. Depreciation is an<br />

operating cost <strong>that</strong> Cardno neglected to include for three <strong>of</strong> the four<br />

plants under analysis here (Cardno did include depreciation as an<br />

operating cost for the Reregulation D<strong>am</strong>). Since Port Westward has a<br />

lifetime <strong>of</strong> 35 years, straight line depreciation would be 1/35th <strong>of</strong> the<br />

original cost per year for seven months.<br />

Error: Assumption <strong>of</strong> base load operation for 7 months. We calculated<br />

Port Westward's on‐peak generation in 2007. Cardno assumed output<br />

at Port Westward based on their erroneous comparative assumption<br />

<strong>that</strong> Pelton Round Butte, too, is a base load generator. Pelton, however,<br />

is a peak load generator. With this information taken into account, Port<br />

Westward on‐peak generation plus the comparable share <strong>of</strong> <strong>of</strong>f‐peak<br />

generation to Pelton's is used as the denominator.<br />

The errors in the Port Westward calculation <strong>of</strong> 2007 cost per megawatt-hour are injurious to the<br />

Jacksons since the numerator was diminished by the omission <strong>of</strong> depreciation and the<br />

denominator assumed base load operation.<br />

Calculation <strong>of</strong> Pelton Cost in 2007 Dollars per Megawatt-hour in Table 4-2<br />

5. Cardno Table 4-2 (Pelton costs) is loosely based on the methodology in Cardno Table<br />

4-1 (Port Westward costs). The errors include using total cost instead <strong>of</strong> cost-net-<strong>of</strong>-<br />

44 SITE CERTIFICATE FOR THE PORT WESTWARD GENERATING PROJECT<br />

ISSUED BY OREGON ENERGY FACILITY SITING COUNCIL (NOVEMBER 8, 2002), pp. 26, 27, and 30,<br />

http://www.oregon.gov/energy/Siting/Pages/PWG.aspx<br />

14<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 14 <strong>of</strong> 27


depreciation, omitting depreciation costs, double counting capital and operating costs, using the<br />

wrong cost <strong>of</strong> capital, and using a home fixed-rate mortgage calculation instead <strong>of</strong> multiplying<br />

the cost-net-<strong>of</strong>-depreciation times the cost-<strong>of</strong>-capital.<br />

As guidance to third parties for the calculation <strong>of</strong> cost-net-<strong>of</strong>-depreciation at jointlyowned<br />

plants such as Pelton, PGE provides a specific table to describe the original cost and<br />

accumulated depreciation. In 2007, this table was found on page 123.29, Note 10, <strong>of</strong> the PGE<br />

FERC Form 1:<br />

Cost-net-<strong>of</strong>-depreciation should subtract accumulated depreciation. As mentioned above, this<br />

calculation should only have been made once for each plant. In Cardno’s table the capital costs<br />

had been mistakenly multiplied by 1 2 /3. Cardno had misread PGE’s 2007 FERC Form 1 and<br />

included 1 2 /3 the correct costs for Pelton’s capital 45 (before the adjustment required for<br />

accumulated net depreciation). PGE reports two columns in their Form 1 for Pelton and Round<br />

Butte – one at 100% and one at 66.67%. This is explained clearly in the footnotes to the<br />

columns in the Form 1, and in our Opening Brief, at 20.<br />

Referring again to the standard regulatory cost formula from Phillips, the cost <strong>of</strong> capital<br />

should only have been multiplied against cost-net-<strong>of</strong>–accumulated-depreciation -- (V-D)r.<br />

45 Both Pelton and Round Butte values are located in Attachment A at lines nineteen and twenty, respectively.<br />

15<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 15 <strong>of</strong> 27


Cardno’s approach – a home mortgage paying <strong>of</strong>f the original cost – was error, the harm <strong>of</strong><br />

which is to over-estimate the cost <strong>of</strong> Pelton, to the detriment <strong>of</strong> the Jacksons.<br />

Cardno Table 4-2 includes several additional errors: omitting depreciation, overstating<br />

operating costs by a factor <strong>of</strong> 1 2 /3 due to their misreading for the Form 1, and miscalculating the<br />

cost <strong>of</strong> capital by 1.21%.<br />

As discussed above, it seems likely <strong>that</strong> Cardno’s undocumented cost <strong>of</strong> capital was taken<br />

from PGE’s cost <strong>of</strong> capital calculation in its Integrated Resource Plan. This is a standard<br />

approach for the calculation <strong>of</strong> capital costs. As PGE explained in Note 10, above, “Each joint<br />

owner has provided its own financing.” 46<br />

PGE finances on a corporate basis, blending low risk<br />

investments like Pelton and Round Butte with high risk investments in other areas. The Tribe’s<br />

financing is on a project basis. In 2003, the Tribe issued $50 million in taxable auction rate<br />

securities. 47<br />

At the time <strong>of</strong> issue, the assumed interest rate was approximately 5.40%. 48 The<br />

correct melded cost <strong>of</strong> capital is, therefore, 9.03% for the 2 /3 PGE share, and 5.40% for the 1 /3<br />

Warm Springs share, or 7.82%. 49<br />

Credits for Renewable Operations<br />

6. Cardno also neglected to consider the renewable nature <strong>of</strong> the Pelton/ Round Butte<br />

Project and its redounding benefit to the Jacksons. In 2007, after the Oregon legislature passed<br />

the Renewable Energy Act <strong>of</strong> 2007 (Senate Bill 838), the state <strong>of</strong> Oregon established a<br />

renewable portfolio standard (RPS) for electric utilities and retail electricity suppliers. Different<br />

46 2007 PGE FERC Form 1, page 123.29.<br />

47 FINAL LIMITED OFFERING MEMORANDUM $50,000,000 The Confederated Tribes <strong>of</strong> the Warm Springs<br />

Reservation <strong>of</strong> Oregon Hydroelectric Revenue Bonds, Series 2003 (Pelton-Round Butte Project) (Taxable Auction<br />

Rate Securities), (October 7, 2003)<br />

48 Id., page 20.<br />

49 The correction to the cost <strong>of</strong> capital is on line eleven <strong>of</strong> Attachment A.<br />

16<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 16 <strong>of</strong> 27


RPS targets apply depending on a utility's size. Electricity service suppliers must meet the<br />

requirements applicable to the electric utilities <strong>that</strong> serve the territories in which the electricity<br />

service supplier sells electricity to retail consumers. Large utilities, like PGE-- those with 3% or<br />

more <strong>of</strong> the state's load -- must ensure <strong>that</strong> a percentage <strong>of</strong> the electricity sold to retail customers<br />

in-state be derived from newer eligible renewable energy resources according to the following<br />

schedule:<br />

5% by 2011<br />

15% by 2015<br />

20% by 2020<br />

25% by 2025<br />

Renewable Energy Credits are provided by a variety <strong>of</strong> resources, including hydro projects built<br />

before 1995. At Pelton/Round Butte, the credits are limited to 50 megawatts. At $3.00 per<br />

megawatt-hour, the revenue impact is 50 times 8,760 hours times $3.00 or $1,314,000. 50<br />

This is<br />

a credit against costs at Pelton /Round Butte and has, accordingly, been netted against (a<br />

reduction in) costs on line 23 on Attachment A.<br />

Calculation <strong>of</strong> Reregulation Cost in 2007 Dollars per Megawatt-hour in Table 4-2<br />

7. Cardno made fewer errors in the analysis <strong>of</strong> the Reregulation D<strong>am</strong> and Reservoir than<br />

it had in the analysis <strong>of</strong> Pelton and Round Butte but added one significant new error. For the<br />

Reregulation D<strong>am</strong>, it correctly added depreciation to the costs, but then omitted interest costs.<br />

This was apparently due to the omission <strong>of</strong> interest costs from the Tribe’s response to Cardno’s<br />

50 2007 PGE renewable tariff at http://edocs.puc.state.or.us/efdocs/UAA/3134uaa12351.pdf<br />

17<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 17 <strong>of</strong> 27


equest for capital costs. 51<br />

Cardno had asked for a full set <strong>of</strong> costs, but seemingly did not notice<br />

any omissions in the Tribe’s response. 52<br />

The Tribe listed the original value <strong>of</strong> the reregulation d<strong>am</strong> and powerhouse as<br />

$31,796,575 in their 1990 FERC Form 1. 53 Assuming 25 years <strong>of</strong> straight line depreciation from<br />

1982 through 2007, the original cost net <strong>of</strong> depreciation would be 25/50ths <strong>of</strong> the original cost,<br />

or $15,898,287. The financing cost for the 2003 bonds was 5.40%, so the cost <strong>of</strong> capital is<br />

$858,508. 54 This is corrected on line 16 <strong>of</strong> Attachment A.<br />

The following excerpt from Attachment A summarizes the corrections to Table 4-2.<br />

///<br />

///<br />

///<br />

///<br />

///<br />

///<br />

///<br />

51 BIA No. 69 Re: Confidential Information: Costs and Alternative Power Costs <strong>of</strong> Reregulating D<strong>am</strong><br />

and Powerhouse, November 29, 2011.<br />

52 “1. Itemized actual annual costs <strong>of</strong> the Reregulating portion <strong>of</strong> the Project, including all operating & maintenance<br />

costs and all capital costs (including capital additions and capital carrying costs, broken out as appropriate), for the<br />

most recent 10 years available;” BIA No. 47.<br />

53 1990 Warm Springs Power Enterprises FERC Form 1, page 406, line 19.<br />

54 FINAL LIMITED OFFERING MEMORANDUM $50,000,000 The Confederated Tribes <strong>of</strong> the Warm Springs<br />

Reservation <strong>of</strong> Oregon Hydroelectric Revenue Bonds, Series 2003 (Pelton-Round Butte Project) (Taxable Auction<br />

Rate Securities) ( October 7, 2003), p. 20.<br />

18<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 18 <strong>of</strong> 27


Chart III<br />

Table 4‐2 Net Benefits per MWh<br />

Line Pelton Round Butte Project Costs Cardno Corrected Values Corrections<br />

Error: Capital costs have been double counted. In PGE's 2007 FERC Form<br />

8 2007 Pelton Capital Costs $57,160,309<br />

1, there are two columns dedicated to capital costs. One <strong>of</strong> these<br />

$20,991,211<br />

represents the total value, while the other presents two thirds <strong>of</strong> total<br />

value to represent PGE's ownership <strong>of</strong> the d<strong>am</strong>. Cardno incorrectly<br />

summed these values, and then failed to net accumulated depreciation.<br />

9 2007 Round Butte Capital Costs $121,310,087 $44,549,193 We used the correct 2007 values from PGE FERC Form 1.<br />

10 2007 Total Pelton Round Butte Capital Costs (A + B) $178,470,396 $65,540,404<br />

11 Correct Cost <strong>of</strong> Capital<br />

Error: Capital Costs are overstated. PGE financed 66.67% <strong>of</strong> the project<br />

at its cost <strong>of</strong> capital <strong>of</strong> 9.03% while the Tribe financed at a rate <strong>of</strong> 5.4%.<br />

Taking the weighted average these two values yields an average cost <strong>of</strong><br />

7.82% capital <strong>of</strong> 7.82%.<br />

12<br />

Original Cost Net Accumulated Depreciation Times Cost<br />

<strong>of</strong> Capital $16,281,295 $5,125,260<br />

Error: Nominal <strong>am</strong>ortization overstates the cost <strong>of</strong> capital. Cardno<br />

applied a formula for a home mortgage instead <strong>of</strong> multiplying the<br />

original cost net accumulated depreciation times the melded cost <strong>of</strong><br />

capital.<br />

13 2007 Pelton Straight Line Depreciation (50 Year Life) $685,910 Error: (lines 13 and 14): Missing depreciation for Pelton Round Butte.<br />

14 2007 Round Butte Straight Line Depreciation (50 Year Life) $1,455,692 Straight line depreciation assuming a fifty year life<br />

15 Depreciation from Warm Springs data $627,868 Depreciation from Warm Springs data.<br />

16 Tribe's Cost <strong>of</strong> Capital at 5.4% $858,508<br />

ERROR: Depreciation only ‐ no cost <strong>of</strong> capital. This value is the product<br />

<strong>of</strong> the Tribal cost <strong>of</strong> capital, 5.40%, and the undepreciated balance <strong>of</strong><br />

the Reregulation D<strong>am</strong> taken from 1990 WSPE FERC Form 1.<br />

17 2007 Annual Re‐Reg Capital Costs $627,868 $1,486,376<br />

18 Total Annual Project Capital Costs (D + E) $16,909,163 $8,753,237<br />

19 2007 Pelton Operating & Maintenance Costs $2,596,538 $1,811,108 Error (lines 19 and 20): Pelton Operating and Maintenance costs were<br />

20 2007 Round Butte Operating & Maintenance Costs $6,999,414 $3,919,303 double counted. Correct 2007 values from PGE FERC Form 1.<br />

21 2007 Re‐Reg Operating & Maintenance Costs $1,137,183 $1,137,183<br />

22 2007 Project Operating & Maintenance Costs (G + H + I) $10,733,135 $6,867,594<br />

23 Credit for Renewable Energy Certificates<br />

Error: Missing Value <strong>of</strong> REC credits. The product <strong>of</strong> these = 50<br />

megawatts, 8760 hours in a year, and $3 per megawatt‐hour from<br />

$1,314,000 PGE's contemporaneous tariff.<br />

24 2007 Total annual project cost (F + J) $27,642,298 $14,306,831<br />

25 2007 Power Generation (MWh) $1,464,949 $1,464,949<br />

26 Cost per MWh (2007 $/MWh) (K / L) $18.87 $9.77<br />

27 Net Benefit per MWh (Table 4‐1 F – Table 4‐2 M) $51.40 $74.29<br />

The calculation <strong>of</strong> Pelton Project costs disadvantaged the Jacksons since depreciation was<br />

omitted on both the Pelton D<strong>am</strong> and the Round Butte d<strong>am</strong>. Depreciation was included for the<br />

Reregulation d<strong>am</strong>, but in this case Cardno neglected to include interest. The calculation also<br />

neglected to use the tribal cost <strong>of</strong> capital for Tribal assets. The sum <strong>of</strong> these and other errors was<br />

to overstate significantly the average cost per megawatt-hour in 2007.<br />

///<br />

///<br />

///<br />

19<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 19 <strong>of</strong> 27


Use <strong>of</strong> the Handy Whitman Index in Table 4-4<br />

8. Cardno does not explain the use <strong>of</strong> the wrong Handy Whitman index for the wrong<br />

plant type at the wrong location for the wrong year. The Director <strong>of</strong>fers <strong>that</strong><br />

“In order to limit the number <strong>of</strong> unspecified variables and to improve<br />

transparency, Cardno used data and information provided by the licensees and<br />

publicly available information to assess each <strong>of</strong> the calculations provided.<br />

Unfortunately, neither the Jacksons nor the licensees provided a complete or<br />

excerpted Handy-Whitman Index for Cardno's use during this effort even though<br />

both were asked to provide all information necessary to derive a fair market value.<br />

Contrary to the Jacksons' assertions, the Handy-Whitman Index is not readily or<br />

publicly available. A prospective user must purchase the right to use the Index,<br />

and the cost is quite significant.” 57<br />

It must be noted <strong>that</strong> neither the BIA nor Cardno contacted the Jacksons on this issue – or, in<br />

fact, on any factual issue after September, 2009. The correct Handy Whitman index is available<br />

next door to the BIA <strong>of</strong>fices at the Bonneville Power Administration library. The access number<br />

is 1092-955x. There is no charge for its use. The purchase cost <strong>of</strong> the Handy Whitman index is<br />

$175 and can be purchased like any other reference material – over the phone or the internet.<br />

Since Port Westward is a gas fueled turbogenerator in Oregon, Pelton/Round Butte are<br />

hydroelectric d<strong>am</strong>s in Oregon, it is inappropriate to use the Handy Whitman index for a ste<strong>am</strong><br />

unit in New England.<br />

The Director continues:<br />

“The BIA maintains <strong>that</strong> escalation to 2011 was appropriate. Cardno's analysis<br />

was completed in late 2011, and the Regional Director's decision was issued<br />

approximately seven months later. It was not necessary to re-index the purchase<br />

price to account for the time period between December 2011 and July 2012.” 58<br />

55 We have corrected this error by multiplying the cost <strong>of</strong> depreciation in line ten by the cost <strong>of</strong> capital in line eleven.<br />

56 Each <strong>of</strong> these values takes the Pelton capital costs in line eight and the Round Butte capital costs in line nine and<br />

multiplies them by two percent.<br />

57 Director’s Answer, at 23.<br />

58 Id., at 25.<br />

20<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 20 <strong>of</strong> 27


The Cardno report was delivered to the BIA on April 17, 2012 and Mr. Dach summarized the<br />

report in a memo on May 30, 2012. 59,60<br />

Under no circumstance would it have been reasonable<br />

to assume the condemnation could have taken place in the year preceding the completion <strong>of</strong> the<br />

report since the condemnation could only take place after the valuation was complete. The<br />

Handy Whitman corrections are on lines 36 through 40 <strong>of</strong> Attachment A.<br />

Calculation <strong>of</strong> Present Value in Table 4-4<br />

9. The selection <strong>of</strong> a discount rate is an important – perhaps the most important – part <strong>of</strong><br />

an economic analysis, especially so in the reduction <strong>of</strong> a column <strong>of</strong> income to its present value.<br />

In the case <strong>of</strong> the Director’s Decision, every mention <strong>of</strong> the discount rate to be used in the<br />

Cardno study indicates <strong>that</strong> the correct real rate is 3.00%. 61,62,63<br />

There is no support in the record<br />

for the use <strong>of</strong> 9.00%. Nine percent is even more inexplicable when the record contains a<br />

declaration by PGE rejecting this value in favor <strong>of</strong> the use <strong>of</strong> PGE’s real discount rate, 5.59%. 64<br />

Even the Tribe mentions correcting this error, but goes on to argue <strong>that</strong> unspecified risks should<br />

then be used to increase the value. 65<br />

This argument is new to the Tribe and specifically<br />

contradicts its previously held position in this record. In September, 2009, it wrote to BIA,<br />

59 BIA No. 69 Memorandum from Bob Dach to Greg Argel, dated May 30, 2012, RE: Transmittal <strong>of</strong> Purchase Price<br />

Determination for Certain Indian Land Allotments within the Pelton-Round Butte Hydroelectric Project Boundary<br />

(FERC No. 2030) prepared by Cardno ENTRIX, dated April 2012 (Attachment)<br />

60 BIA No. 69 Purchase Price Recommendation for Certain Indian Land Allotments within the Pelton<br />

- Round Butte Hydroelectric Project Boundary.<br />

61 BIA No. 70 Re: Tribal request to purchase interests in Allotments 528, 532, and 292, page 6.<br />

62 BIA No. 69 Purchase Price Recommendation for Certain Indian Land Allotments within the Pelton<br />

- Round Butte Hydroelectric Project Boundary, May 30, 2012, pages 3 and 6.<br />

63 BIA No. 21 RE Response to Request for Information dated March 9, 2010.<br />

64 BIA No. 16H Declaration <strong>of</strong> Patrick Hager, September 30, 2009.<br />

65 Tribe’s Answering Brief, at 22.<br />

21<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 21 <strong>of</strong> 27


“The Tribe and PGE have revised the capitalization factor used in the GSA<br />

income approach to convert the annual revenues to a purchase price. The new<br />

capitalization factor is 17.89, reflecting a real weighted after-tax cost <strong>of</strong> capital (or<br />

rate <strong>of</strong> return) <strong>of</strong> 5.59 percent (1 divided by .0559). This real rate <strong>of</strong> return is the<br />

s<strong>am</strong>e as the Tribe and PGE have used in their current net benefits analysis. ***<br />

Such a utility rate <strong>of</strong> return is what FERC used in determining annual charges in<br />

the PGE case, see 12 FERC 63055, WL at 14, and is appropriate here since it<br />

reflects: a) the risks <strong>of</strong> the majority owner <strong>of</strong> the Project (i.e., PGE); and b) future<br />

long-term debt costs <strong>that</strong> PGE will issue, as well as the cost <strong>of</strong> equity; and c)<br />

reflects PGE's long-term capital structure goal <strong>of</strong> 50 percent equity and 50 percent<br />

debt.” 66 (Emphasis added.)<br />

At the heart <strong>of</strong> the problem is a fund<strong>am</strong>ental misunderstanding <strong>of</strong> the use <strong>of</strong> a discount rate. The<br />

Bureau <strong>of</strong> Indian Affairs’ role in this proceeding was to set a price for the taking <strong>of</strong> a specific<br />

property owned by the Jacksons. To do this, the Director found a rental rate in dollars per<br />

megawatt-hour and then applied it to the share <strong>of</strong> Pelton Round Butte owned by the Jacksons.<br />

To reimburse the Jacksons for the loss <strong>of</strong> this stre<strong>am</strong> <strong>of</strong> income, the Jacksons need to<br />

receive a lump sum payment, prudently invested, <strong>that</strong> would provide a comparable income<br />

stre<strong>am</strong>. The Cardno report has not done this: First, Cardno has ignored the Jacksons (and their<br />

appropriate discount rate) as the recipient <strong>of</strong> the lump sum sought to be calculated. Second,<br />

having selected PGE, not the Jacksons, as the apparently appropriate focus, Cardno has<br />

disregarded PGE’s pr<strong>of</strong>fered testimony on the subject, as shown above. Third, even assuming<br />

utility focus is warranted (which it is not), Cardno has ignored the tabulated results <strong>of</strong> a<br />

contemporaneous survey on the very subject <strong>of</strong> the inquiry, conducted by the Northwest<br />

Regional Power Council, and included in the record:<br />

66 BIA No. 16, Letter from Ellen Grover to Stanley Speaks, dated September 30. 2009 RE ILCA Proceeding in<br />

Purchase <strong>of</strong> Allotments 292, 528 and 532 with Attachments, p. 13.<br />

22<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 22 <strong>of</strong> 27


67<br />

In short, the Cardno report has used a real discount rate higher than discount rate used by any<br />

utility in the Pacific Northwest – or any other alternative -- as if the Jacksons could expect this<br />

rate <strong>of</strong> return in today’s markets. A real discount rate <strong>of</strong> 9% would certainly does not reflect a<br />

prudent investment open to the Jacksons in 2013.<br />

The Bureau <strong>of</strong> Indian Affairs filed a declaration in this case in October demonstrating<br />

<strong>that</strong> interest rates – nominal, before the adjustment for inflation – were 3.64% for individual<br />

Indians with money deposited (in IMMs) with the Federal Trustee. 68<br />

Adjusted for inflation, this<br />

would indicate a real discount rate below 2.00% -- lower than the discount rate adopted in the<br />

Decision. 69<br />

Tribal counsel has repeatedly averred, without evidence, <strong>that</strong> a 3.00% real discount rate is<br />

“risk-free.” 70 This assertion is factually incorrect. It is generally accepted <strong>that</strong> the risk-free rate<br />

is best approximated by securities <strong>of</strong> the United States federal government. Use <strong>of</strong> these rates<br />

for economic analysis is set out in Circular A-94 Appendix C, updated annually by the Office <strong>of</strong><br />

67 BIA No.1G, Sixth Northwest Conservation and Electric Power Plan, Northwest Power and Conservation Council,<br />

February 2010, page N-8.<br />

68 Declaration <strong>of</strong> Catherine Rugen re bond <strong>am</strong>ount, October 10, 2012, page 1.<br />

69 At page 6.<br />

70 Tribe’s Answering Brief, at 22, for ex<strong>am</strong>ple.<br />

23<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 23 <strong>of</strong> 27


Management and Budget and published on the White House web site. The most recent risk-free<br />

rates are:<br />

71<br />

BIA counsel has opined “The reasonableness <strong>of</strong> this number [<strong>of</strong> 9% for PGE’s discount rate] is<br />

reinforced by FERC itself - in its economic analyses FERC typically assumes a discount rate <strong>of</strong><br />

10% during relicensing. See, e.g., <strong>Robert</strong> Black, Bruce McKenney and <strong>Robert</strong> Unsworth, U.S.<br />

Fish and Wildlife Service, Economic Analysis for Hydropower Project Relicensing: Guidance<br />

and Alternative Methods.” 72<br />

This fifteen year old document, circa 1998, is incorrect. FERC<br />

does not use 10% for all reviews, nor did it do so in its review <strong>of</strong> the Pelton Round Butte project<br />

for relicensing in 2004. 73<br />

The Director confides <strong>that</strong>, “Cardno was not aware <strong>of</strong> any case <strong>that</strong> used a rate as low as<br />

5.59 percent, and indeed, a 5.59 percent rate was not used by the licensees in their net benefits<br />

calculations ***,” 74 but this is wrong. <strong>Robert</strong> McKusick, the author <strong>of</strong> the Cardno report, was<br />

also one <strong>of</strong> the authors <strong>of</strong> a recent environmental analysis, dated August 11, 2010, <strong>that</strong> used<br />

71 http://www.whitehouse.gov/omb/circulars_a094/a94_appx-c<br />

72 Regional Director’s Answer, December 21, 2012, page 16.<br />

73 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR HYDROPOWER RELICENSING PELTON<br />

ROUND BUTTE HYDROELECTRIC PROJECT FERC Project No. 2030-036, (June 2004), p. 271.<br />

74 Director’s Answer, at 16.<br />

24<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 24 <strong>of</strong> 27


3.00%, 75 and PGE and the Tribe did use the 5.59%, as they said explicitly in a September 2009<br />

letter to the Director:<br />

“The Tribe and PGE have revised the capitalization factor used in the GSA<br />

income approach to convert the annual revenues to the purchase price. The new<br />

capitalization factor is 17.89, reflecting a real weighted after-tax cost <strong>of</strong> capital (or<br />

rate <strong>of</strong> return) <strong>of</strong> 5.59 percent (1 divided by .0559). This real rate <strong>of</strong> return is the<br />

s<strong>am</strong>e as the Tribe and PGE have used in their current net benefits analysis. ***<br />

Further, the long-term 5.59 percent weighted after-tax cost <strong>of</strong> capital is what is<br />

used in PGE's current Integrated Resources Plan for long-term analyses, including<br />

net present value calculations. 76 (Emphasis added.)<br />

Finally, the Director avers, without justification, <strong>that</strong> the Jacksons support use <strong>of</strong> PGE’s discount<br />

rate in the present value <strong>of</strong> rent to be paid to the Jacksons. 77<br />

This is simply incorrect. The<br />

Jacksons’ position is the s<strong>am</strong>e as the Director’s, “<strong>that</strong> a 3 percent discount rate is most<br />

appropriate.” 78<br />

The following excerpt is from Attachment A.<br />

///<br />

///<br />

///<br />

///<br />

///<br />

75 Final Regulatory Impact Statement (RIR) /4(b)(2), Preparatory Assessment/FRFA for the Critical Habitat<br />

Designation <strong>of</strong> Cook Inlet Beluga Whale, Michael Nagy, <strong>Robert</strong> McKusick, Krieg Brown, and Rabia Ahmed,<br />

August 11, 2010, pp. 7-12, 9-4, and 9-5.<br />

http://www.fakr.noaa.gov/protectedresources/whales/beluga/chabitat/cib_economicanalysis0810.pdf<br />

76 BIA No. 16, Letter from Ellen Grover to Stanley Speaks, dated September 30, 2009, RE ILCA Proceeding in<br />

Purchase <strong>of</strong> Allotments 292, 528 and 532 with Attachments, p. 13.<br />

77 Director’s Answer, at 14.<br />

78 Id., at 41.<br />

25<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 25 <strong>of</strong> 27


Chart IV<br />

Table 4‐4<br />

Line Calculation <strong>of</strong> Net Benefits Cardno Corrected Values Corrections<br />

28 Net Benefit per MWh (2007 $/MWh) (Table 4‐2, N) $51.00 $<br />

74.29<br />

29 Average annual power generation (MWh) (Table 4‐3) 1,447,986 1,447,986<br />

30 Port Westward Value $ 121,709,678.44 Cost per MWh taken from Table 4‐1 (Corrected)<br />

31 Pelton Round Butte Value $ 14,141,168.74 Cost per MWh taken from Table 4‐2 (Corrected)<br />

32 Total Annual Net Benefits (2007 $) (A * B) $74,423,119.00 $ 107,568,509.71<br />

33 Port Westward Value (Present Value at 3%) $ 4,056,989,281.43<br />

34 Pelton Round Butte Value (Present Value at 3%) $ 471,372,291.23<br />

35<br />

Total Project Net Benefits (Present value C over 50 years<br />

with 9% rate) $815,802,633.00 $<br />

Cardno used the wrong formula (present value at 50 years) and the<br />

3,585,616,990.19<br />

wrong discount rate (9%)<br />

36 Handy‐Whitman Index (Pacific Turbo Generator to 2012)<br />

Error: Wrong Handy Whitman index used in line 38. We used the<br />

appropriate Handy‐Whitman index for a turbogenerator on the Pacific<br />

1.49 coast calculated from 2007 to 2012.<br />

37 Handy‐Whitman Index (Pacific Hydro Generator to 2012)<br />

Error: Wrong Handy Whitman index used in line 38. We used the<br />

appropriate Handy‐Whitman index for a hydroelectric plant on the<br />

1.13 Pacific coast calculated from 2007 through 2012.<br />

38 Handy‐Whitman Index (convert 2007 dollars to 2011 dollar 1.15<br />

Error: Wrong Handy Whitman Index for the wrong plant at the wrong<br />

location for the wrong plant type and the wrong year.<br />

39<br />

Port Westward Value (Present Value at 3%) Indexed to<br />

2012 (million $) $ 6,034.48 Indexed to 2012<br />

40<br />

Pelton Round Butte Value (Present Value at 3%) Indexed<br />

to 2012 (million $) $ 530.29 Indexed to 2012<br />

2012 Total Project Net Benefits (Difference between Port<br />

41 Westward and Pelton Round Butte) (million $) $ 936.54 $ 5,504.18 Calculated Difference.<br />

The choice <strong>of</strong> the 9% undocumented and erroneous discount rate is deeply disadvantageous to<br />

the Jacksons. The Jacksons are assumed to be able to invest their dollars at a rate much higher<br />

than the evidence filed by the BIA for an individual Indian’s investments. Adding to the bias<br />

against the Jacksons is the use <strong>of</strong> the wrong handy Whitman index for the wrong location, the<br />

wrong technology, and the wrong time period.<br />

Calculated using rate from Regional Director Speaks decision by using<br />

the rate <strong>of</strong> 3% and applying the standard financial calculation for<br />

investment stre<strong>am</strong>s without a maturation date<br />

Calculation <strong>of</strong> Condemnation Value in Table 4-5<br />

10. The calculation <strong>of</strong> the <strong>am</strong>ount owed to the Jacksons is found in line 52 <strong>of</strong> Attachment A.<br />

This value is .052% <strong>of</strong> project land times the net present value <strong>of</strong> $5,504.18 million from line<br />

47. The cumulative effect <strong>of</strong> the corrections described above is to increase the appropriate<br />

payment to the Jacksons for Project plans from $6.3 million to $28.6 million.<br />

11. This completes my declaration.<br />

///<br />

///<br />

26<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 26 <strong>of</strong> 27


Done this 25 th day <strong>of</strong> January, 2013.<br />

___________________________________<br />

<strong>Robert</strong> <strong>McCullough</strong><br />

27<br />

Exhibit A to Jackson<br />

Appellants' Reply Brief<br />

Page 27 <strong>of</strong> 27


ATTACHMENT A TO MCCULLOUGH DECLARATION<br />

Original Tables from Cardno<br />

Corrected Cardno Tables<br />

Line Table 4-1 Benefits per MWh Errors (Shown in red) Solutions (Shown in Green) Table 4-1 Benefits per MWh Line<br />

Alternative Project - Port Westward Data<br />

Alternative Project - Port Westward Data<br />

1 2007 Capital Costs $267,015,214 The original cost should reflect seven months <strong>of</strong> depreciation 2007 Capital Costs $ 262,564,960.43<br />

1<br />

2 Amortized 2007 Capital Costs (<strong>am</strong>ortize A over 50 years at 9%) $24,358,962 Nominal <strong>am</strong>ortization overstates cost <strong>of</strong> capital Multiply capital cost times assumed cost <strong>of</strong> capital for seven months Calculate capital costs at 9.03% $ 13,830,609.29<br />

2<br />

3 A major area <strong>of</strong> cost was omitted from Port Westward Straight line depreciation over 35 years Straight Line Depreciation (35 Year Life) $ 4,450,253.57<br />

3<br />

4 2007 Operating & Maintenance Costs $96,634,896 2007 Operating & Maintenance Costs $ 96,634,896.00<br />

4<br />

5 2007 Total annual project cost (B + C) $120,993,858 2007 Total annual project cost (B + C) $ 114,915,758.86<br />

5<br />

6 2007 Power Generation (MWh) 1,721,921 Assumption <strong>of</strong> base load operation for 7 months Port Westward on-peak generation in 2007 2007 Power Generation (MWh) 1,367,158 6<br />

7 Cost per MWh (D / E) $ 70.27<br />

Cost per MWh (D / E) $ 84.05<br />

7<br />

Table 4-2 Net Benefits per MWh<br />

Table 4-2 Net Benefits per MWh<br />

Pelton Round Butte Project Costs<br />

Pelton Round Butte Project Costs<br />

8 2007 Pelton Capital Costs $57,160,309 Capital costs have been double counted Use correct 2007 values from PGE FERC Form 1 2007 Pelton Capital Costs $20,991,211 8<br />

9 2007 Round Butte Capital Costs $121,310,087 Capital costs have been double counted Use correct 2007 values from PGE FERC Form 1 2007 Round Butte Capital Costs $44,549,193 9<br />

10 2007 Total Pelton Round Butte Capital Costs (A + B) $178,470,396 2007 Total Pelton Round Butte Capital Costs (A + B) $65,540,404 10<br />

11 Capital costs are overstated PGE's share at 9.03% and Tribe's share at 5.4% Correct Cost <strong>of</strong> Capital 7.82% 11<br />

12 Amortized 2007 Pelton Round Butte Capital Costs (<strong>am</strong>ortize C over 50 years at 9%) $16,281,295 Nominal <strong>am</strong>ortization overstates cost <strong>of</strong> capital Multiply capital cost times assumed cost <strong>of</strong> capital Original Cost Net Accumulated Depreciation Times Cost <strong>of</strong> Capital $5,125,259.56 12<br />

13 Missing depreciation for Pelton and Round Butte Calculate straight line depreciation at 2% 2007 Pelton Straight Line Depreciation (50 Year Life) $685,910 13<br />

14 Missing depreciation for Pelton and Round Butte Calculate straight line depreciation at 2% 2007 Round Butte Straight Line Depreciation (50 Year Life) $1,455,692 14<br />

15 Depreciation from Warm Springs data Depreciation from Warm Springs data $627,868 15<br />

16 Cost <strong>of</strong> capital (5.4%) times undepreciated balance from 1990 WSPE FERC Form 1 Tribe's Cost <strong>of</strong> Capital at 5.4% $858,508 16<br />

17 2007 Annual Re-Reg Capital Costs $627,868 Depreciation only - no cost <strong>of</strong> capital Add in cost <strong>of</strong> capital at 9% 2007 Annual Re-Reg Capital Costs $1,486,376 17<br />

18 Total Annual Project Capital Costs (D + E) $16,909,163 Total Annual Project Capital Costs (D + E) $8,753,237 18<br />

19 2007 Pelton Operating & Maintenance Costs $2,596,538 O&M Costs have been double counted Use correct 2007 values from PGE FERC Form 1 2007 Pelton Operating & Maintenance Costs $1,811,108 19<br />

20 2007 Round Butte Operating & Maintenance Costs $6,999,414 O&M Costs have been double counted Use correct 2007 values from PGE FERC Form 1 2007 Round Butte Operating & Maintenance Costs $3,919,303 20<br />

21 2007 Re-Reg Operating & Maintenance Costs $1,137,183 2007 Re-Reg Operating & Maintenance Costs $1,137,183 21<br />

22 2007 Project Operating & Maintenance Costs (G + H + I) $10,733,135 2007 Project Operating & Maintenance Costs (G + H + I) $6,867,594 22<br />

23 Credit for Renewable Energy Certificates Credit for Renewable Energy Certificates $1,314,000 23<br />

24 2007 Total annual project cost (F + J) $27,642,298 2007 Total annual project cost (F + J) $14,306,831 24<br />

25 2007 Power Generation (MWh) 1,464,949 2007 Power Generation (MWh) 1,464,949 25<br />

26 Cost per MWh (2007 $/MWh) (K / L) $ 18.87<br />

Cost per MWh (2007 $/MWh) (K / L) $ 9.77 26<br />

27 Net Benefit per MWh (Table 4-1 F – Table 4-2 M) $ 51.40<br />

Net Benefit per MWh (Table 4-1 F – Table 4-2 M) $ 74.29 27<br />

Table 4-4 Calculation <strong>of</strong> Net Benefits<br />

Table 4-4 Calculation <strong>of</strong> Net Benefits<br />

28 Net Benefit per MWh (2007 $/MWh) (Table 4-2, N) $51 Net Benefit per MWh (2007 $/MWh) (Table 4-2, N) $ 74.29<br />

28<br />

29 Average annual power generation (MWh) (Table 4-3) 1,447,986 Average annual power generation (MWh) (Table 4-3) 1,447,986 29<br />

30 Cost per MWh taken from Table 4-1 (Corrected) Port Westward Value $121,709,678 30<br />

31 Cost per MWh taken from Table 4-2 (Corrected) Pelton Round Butte Value $14,141,169 31<br />

32 Total Annual Net Benefits (2007 $) (A * B) $74,423,119 Total Annual Net Benefits (2007 $) (A * B) $107,568,510 32<br />

33 Use rate from Regional Director Speaks decision Port Westward Value (Present Value at 3%) $4,056,989,281 33<br />

34 Use rate from Regional Director Speaks decision Pelton Round Butte Value (Present Value at 3%) $471,372,291 34<br />

35 Total Project Net Benefits (Present value C over 50 years with 9% rate) $815,802,633 Discounted at incorrect rate Calculate Difference Total Project Net Benefits (Present value C over 50 years with 9% rate) $3,585,616,990 35<br />

36 Use Handy Whitman Index for Pacific Turbogenerator Handy-Whitman Index (Pacific Turbo Generator to 2012) 1.487 36<br />

37 Wrong Handy Whitman index used Use handy Whitman Index for Pacific Hydro Handy-Whitman Index (Pacific Hydro Generator to 2012) 1.125 37<br />

38 Handy-Whitman Index (convert 2007 dollars to 2011 dollars) 1.148 Wrong date for evaluation 38<br />

39 Index to 2012 Port Westward Value (Present Value at 3%) Indexed to 2012 (million $) $6,034 39<br />

40 Index to 2012 Pelton Round Butte Value (Present Value at 3%) Indexed to 2012 (million $) $530.29 40<br />

41 Total Project Net Benefits (Million 2011 $) (D * E) $936.54 Calculate Difference 2012 Total Project Net Benefits (Difference between Port Westward and Pelton Round Butte) (million $) $5,504 41<br />

Table 4-5 Results for Sharing <strong>of</strong> Net Benefits Method Alternatives<br />

Sharing <strong>of</strong> Net Benefits Analysis<br />

Table 4-5 Results for Sharing <strong>of</strong> Net Benefits Method Alternatives<br />

Sharing <strong>of</strong> Net Benefits Analysis<br />

50/50 split (million<br />

$)<br />

Up to 100% to<br />

land (million $)<br />

50/50 split (million $)<br />

Up to 100% to land<br />

(million $)<br />

42 Analysis Assumptions Analysis Assumptions 42<br />

43 Allotments 528 and 532 acres within Project area 86.9 86.9 Allotments 528 and 532 acres within Project area 86.9 86.9 43<br />

44 Allotment 292 acres within Project area 10.8 10.8 Allotment 292 acres within Project area 10.8 10.8 44<br />

45 Total acres within Project area for three allotments 97.7 97.7 Total acres within Project area for three allotments 97.7 97.7 45<br />

46 Total project area acres (approximate) 5,878.50 5,878.50 Total project area acres (approximate) 5,878.50 5,878.50 46<br />

47 Net Benefits (million $) $936.54 $936.54 Net Benefits (million $) $5,504.18 $5,504.18 47<br />

48 Allotment Interest Share <strong>of</strong> Total Project Net Benefits 0.80% 1.70% Allotment Interest Share <strong>of</strong> Total Project Net Benefits 0.80% 1.70% 48<br />

49 Jackson Interest Share <strong>of</strong> Total Project Net Benefits 0.26% 0.52% Jackson Interest Share <strong>of</strong> Total Project Net Benefits 0.26% 0.52% 49<br />

50 Results Results 50<br />

51 50/50 split (million $) $468.27 N/A Cost per MWh taken from Table 4-4 (Corrected) 50/50 split (million $) $2,752.09 N/A 51<br />

52 Share to Jacksons (million $) $2.45 $4.90 Cost per MWh taken from Table 4-4 (Corrected) Share to Jacksons (million $) $14.31 $28.62 52<br />

53 Remainder to licensees (million $) $934.09 $931.64 Cost per MWh taken from Table 4-4 (Corrected) Remainder to licensees (million $) $5,489.87 $5,475.56 53