16.03.2015 Views

View in *.pdf - Kandhamal

View in *.pdf - Kandhamal

View in *.pdf - Kandhamal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Balliguda Forest Division, <strong>Kandhamal</strong><br />

EXPENDITURE STATEMENT UNDER STATE CAMPA (GENERAL) (APO-2009-10)<br />

Sl Items of works. Allotment<br />

received<br />

so far<br />

1 Afforestation / Reforestation activities.<br />

Amount<br />

<strong>in</strong>curred<br />

dur<strong>in</strong>g<br />

2009-10<br />

Amount<br />

<strong>in</strong>curred<br />

dur<strong>in</strong>g<br />

2010-11<br />

Total<br />

Physical achievement<br />

c)Forest area to be created by soil and water<br />

conservation measures/<br />

1551482 651266 582512 1233778 SMC work done over 672.23<br />

ha<br />

d). Forest Area to be treated 1551610 662050 785235 1447285 ANR clean<strong>in</strong>g done over<br />

810.46 ha<br />

Silv. for regeneration<br />

e) Bamboo Forest Regeneration 594721 219700 375021 594721 Bamboo regeneration done<br />

over 659.62 ha<br />

f) Up root<strong>in</strong>g of <strong>in</strong>vasive weed species like 99000 81360 8400 89760 Weed eradication done over<br />

199.46 ha<br />

g) Block plantation 11513289 4111152 6548684 10659836 Block plantation done over<br />

535 ha<br />

h) Entry Po<strong>in</strong>t Activities 545648 24000 287544 311544 Constructed of signboard,<br />

water hole, dry<strong>in</strong>g yard etc.<br />

i) Rais<strong>in</strong>g of sapl<strong>in</strong>gs for supply to<br />

beneficiaries under from Agro Forestry<br />

840000 156760 558725 715485 Raised of sapl<strong>in</strong>gs over<br />

185000 nos<br />

j) Avenue Plantation 9700 8377 0 8377 Rais<strong>in</strong>g of seedl<strong>in</strong>gs.<br />

Total Afforestation and deforestation 16705450 5914665 9146121 15060786<br />

2 Infrastructure Development<br />

a) Improvement of Forest Road 394940 394940 0 394940 Road repaired done over<br />

14.94 km<br />

b) construction of Build<strong>in</strong>g 2400000 92408 1430302 1522710 Constructed 7 nos of<br />

build<strong>in</strong>gs.<br />

c) Seizure Yard. ( Malkhana) 460210 0 243512 243512 1 no constructed seizure yard<br />

at Kotagarh Range.<br />

d) Provision of four wheel Drive vehicle with 0 0 0 0<br />

Accessories<br />

e) Provision of Fiber Glass Boat 0 0 0 0<br />

f) Provision of Motor Cycle 0 0 0 0<br />

g) Provision of Computer 74400 0 74400 74400 Purchased 1no computer for<br />

us<strong>in</strong>g Division office.<br />

h) Provision of GPS. 120000 120000 0 120000 Purchased 1 no GPS read<strong>in</strong>g.<br />

i) provision of DGPS 0 0 0 0<br />

j) provision of Revolver 0 0 0 0<br />

k) Skill staff for service Provider 0 0 0 0<br />

Total Infrastructure Development 3449550 607348 1748214 2355562<br />

G.Total 20155000 6522013 10894335 17416348


Balliguda Forest Division, <strong>Kandhamal</strong><br />

CAMPA-Physical and f<strong>in</strong>ancial progress for 2009-10, 2010-11 and 2011-12. 2009-10 & 2010-11 (APO-2009-10)<br />

APO-2009-10<br />

Sl<br />

N<br />

o<br />

Item of works<br />

1 Wild life Protection<br />

Squad<br />

(Anti Smug)<br />

Allotment<br />

received<br />

Expr.<br />

Incurred<br />

dur<strong>in</strong>g<br />

2009-10<br />

Expr.<br />

Incurred<br />

dur<strong>in</strong>g 2010-<br />

11<br />

Total<br />

Expr.<br />

APO-<br />

2009-10<br />

3,50,000/- 1,50,000/- 1,63,800/- 3,13,800/-<br />

Balance<br />

as on<br />

01.04.201<br />

1<br />

Physical target<br />

<strong>in</strong> ha<br />

Physical<br />

achievement <strong>in</strong><br />

ha<br />

2 Anti- depredation<br />

squad<br />

1,50,000/- 1,47,504/- 2,496/- 1,50,000/- --- 2 squads Paid wages of A.S<br />

squad<br />

(15 members<br />

each)<br />

i)Tracker Engagement 1,25,000/- 1,25,000/- --- 1,25,000/- --- 2 squads 2 squads<br />

(4 members<br />

each)<br />

3 Communication &<br />

Infrastructure<br />

i) VHF Mobile Phone 50,000/- --- 50,000/- 50,000/- --- Ma<strong>in</strong>t. of VHF<br />

ma<strong>in</strong>tenance<br />

tower etc<br />

ii) Mobility vehicles 75,000/- 14,387/- 60,303/- 74,690/- 310/- For hire<br />

charges of<br />

vehicle<br />

iii) Quarter /<br />

Barracks/ watcher<br />

shed etc.<br />

v) Interpretation<br />

Centre<br />

vi) Road cross dra<strong>in</strong>age<br />

structure<br />

vii) Creation of<br />

Harvest<strong>in</strong>g structure<br />

Viii) Communication &<br />

Infrastructure Dev.<br />

4 GIS mapp<strong>in</strong>g of at PS.<br />

5 Fire Control &<br />

preventive measure<br />

6 Afforestation and<br />

reforestation<br />

i) Invasive weed<br />

Eradication<br />

7 Tra<strong>in</strong><strong>in</strong>g and capacity<br />

build<strong>in</strong>g of staff.<br />

2,00,000/-<br />

--- 1,97,717/- 1,97,717/- 1,02,283/<br />

-<br />

(+)<br />

1,00,000/-<br />

8,00,000/- 1,74,034/- 11,402/- 1,85,436/- 6,14,564/<br />

-<br />

1 No barrack at<br />

Pipadi<br />

Construction<br />

of 1 No of I.P<br />

Center at<br />

Kotagarh<br />

Ma<strong>in</strong>t. of forest<br />

road<br />

7,00,000/- 3,00,058/- 98,247/- 3,98,305/- 3,01,695/<br />

-<br />

1,25,000/- 1,09,120/- --- 1,09,120/- 15,880/- Improvement<br />

of WHS at<br />

Pipadi<br />

2,50,000/- --- 2,19,557/- 2,19,557/- 30,443/- Construction<br />

of AP gate &<br />

VHF tower at<br />

Pipadi<br />

---<br />

--- --- --- 50,000/- --- ---<br />

1,50,000/-<br />

(-)<br />

1,00,000/-<br />

1,25,000/- 90,180/- 3,550/- 93,730/- 31,270/- Fire <strong>in</strong>centive<br />

to VSSs/EDC<br />

75,000/- 7,200/- 39,405/- 46,605/- 28,395/- 475 16<br />

25,000/- --- 10,000/- 10,000/- 15,000/- One tra<strong>in</strong><strong>in</strong>g/<br />

awareness<br />

camp<br />

---<br />

25,000/- --- 15,000/- 15,000/- 10,000/- One tra<strong>in</strong><strong>in</strong>g to ---<br />

Public<br />

1,25,000/- --- --- --- 1,25,000/ --- ---<br />

-<br />

8 Conduct<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g<br />

people<br />

9 Fenc<strong>in</strong>g and erection of<br />

barberries aga<strong>in</strong>st<br />

elephant<br />

10 IEC material 25,000/- --- 25,000/- 25,000/- --- --- ---<br />

Total 02-Wild Life<br />

Management<br />

33,75,000/<br />

-<br />

11,17,483/- 8,96,477/- 20,13,960/<br />

-<br />

13,61,040<br />

/-<br />

(4 members each<br />

---<br />

Hire charges of<br />

Vehicle on<br />

mobility<br />

Work <strong>in</strong> under<br />

progress.<br />

Work is under<br />

progress.<br />

11 Km road cross<br />

dra<strong>in</strong>age<br />

Under Progress<br />

Fire <strong>in</strong>centive<br />

made to 18 Nos<br />

VSSs /EDC


Balliguda Forest Division, <strong>Kandhamal</strong><br />

2011-12 (APO-2010-11)<br />

Sl<br />

No<br />

Item of works<br />

1 Protection Activities<br />

APO-2010-<br />

11<br />

Allotment<br />

received<br />

APO-2010-<br />

11<br />

Expr. Upto<br />

June-2011<br />

Balanc<br />

e<br />

1(i Wildlife protection squads <strong>in</strong>clud<strong>in</strong>g Anti smuggl<strong>in</strong>g operations at<br />

6,00,000/- --- 6,00,0 ---<br />

) specified location <strong>in</strong>clud<strong>in</strong>g river squads for twelve months<br />

00/-<br />

2 Anti-depredation Activities 0 --- 0 ---<br />

3 Communication<br />

(i) VHF, Mobile phones ma<strong>in</strong>tenance 1,00,000/- --- 1,00,0<br />

00/-<br />

(ii) Mobility vehicles, Boats, POL etc 1,00,000/- --- 1,00,0<br />

00/-<br />

(iii Roads, Cross dra<strong>in</strong>age structure 5,00,000/- --- 5,00,0<br />

)<br />

00/-<br />

4 Infrastructure Development<br />

(i)<br />

Quarters, barrack, watch shed, antipoach<strong>in</strong>g shed, Malkhana, seizure yard,<br />

check gates, Beat & Section forest offices<br />

5 Habitat Improvement<br />

10,00,000/- 10,00,<br />

000/-<br />

---<br />

(i) Creation of water harvest<strong>in</strong>g structure, phone, improv<strong>in</strong>g exist<strong>in</strong>g water<br />

ponds, dra<strong>in</strong>agae l<strong>in</strong>e treatment<br />

3,00,000/- --- 3,00,0<br />

00/-<br />

(iii Fire control & preventive measures <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>centives to local<br />

1,25,000/- --- 1,25,0<br />

) communities<br />

00/-<br />

(vi Invassive weed eradication 2,00,000/- --- 2,00,0<br />

i)<br />

00/-<br />

(vi Medow development 2,00,000/- --- 2,00,0<br />

ii)<br />

00/-<br />

6 Management of protected areas & zoos<br />

(iii<br />

)<br />

Bio-diversity assessment & upgrad<strong>in</strong>g the management plans of the<br />

protected areas and eco development plan<br />

1,00,000/- --- 1,00,0<br />

00/-<br />

Physical<br />

achievement <strong>in</strong><br />

ha<br />

---<br />

---<br />

---<br />

---<br />

---<br />

---<br />

---<br />

---<br />

---<br />

Sl<br />

No<br />

Item of works APO-2010-11 Physical achievement<br />

<strong>in</strong> ha<br />

Allotment Expr. Upto June- Balance<br />

received 2011<br />

APO-2010-11<br />

7 Eco-development programme 1,00,000/- --- 1,00,000 ---<br />

/-<br />

8 Eco-Tourism programme 0 --- 0 ---<br />

9 Capacity build<strong>in</strong>g<br />

(i) Tra<strong>in</strong><strong>in</strong>g & capacity build<strong>in</strong>g of staff 1,00,000/- --- 1,00,000<br />

/-<br />

(iii) Engagement of research fellows for specific period of 1,00,000/- ---- 1,00,000<br />

adaptive research<br />

/-<br />

Total 35,25,000/- 35,25,00<br />

0/-<br />

---<br />

---


Balliguda Forest Division, <strong>Kandhamal</strong><br />

STATEMENT SHOWING COST OUTLAY, ALLOTMENT RECEIVED AND EXPENDITURE INCURRED UNDER CAMPA APO-2010-<br />

11(GENERAL).<br />

Budget Sub-Head<br />

Intensive management of Natural Forest<br />

Cost outlay<br />

for 2010-<br />

11(<strong>in</strong> lakh)<br />

Allotment received<br />

so far<br />

Expenditure up to June<br />

2011( Rs. <strong>in</strong> lakh)<br />

Achievement<br />

Regeneration of degraded forest<br />

SMC 37.8 0<br />

Silv. Operation 37.8 0.9 ANR clean<strong>in</strong>g<br />

done over 50 ha<br />

Regeneration of bamboo forest 27 0<br />

Total I.M.N.F 102.6 0.9<br />

Forest protection<br />

Forest protection squad <strong>in</strong> valnerable pockets 0<br />

Para forest staffs 10.22 0<br />

Control room ma<strong>in</strong>t. & other charges 2.826 0<br />

T.E & legal charge of study export 0.5 0<br />

Total Forest Protection 13.546 0<br />

Fire prevention <strong>in</strong> vulnerable areas 16.938 0<br />

Total 16.938 0<br />

Infrastructure Development<br />

Infrastructure development<br />

Infrastructure development <strong>in</strong> Range Offices 25.663 0<br />

Construction of residential Qtrs 10.5 0<br />

Creation of Tube well 0.6 0<br />

Ma<strong>in</strong>t. of road 3.75 0<br />

Construction of culverts 2 0<br />

Construction of cause ways 3.5 0<br />

Total Infrastructure development 46.013 0<br />

Theme based tra<strong>in</strong><strong>in</strong>g 2.536 0<br />

Total 2.536 0<br />

Internal communication<br />

Observation of important days 0.08 0<br />

Awareness meet<strong>in</strong>gs 0.5 0<br />

Total Internal Communication 0.58 0<br />

Ma<strong>in</strong>tenance of Afforestation<br />

Ma<strong>in</strong>t. of afforestation <strong>in</strong> APO-<br />

2009-10<br />

Block plantation (Formation-1st year) 53.46106 0<br />

EPA on block plantation area 5.23 0<br />

Total-Afforestation APO- 58.69106 0<br />

2009-10<br />

Grand Total 240.9041 68.91 0.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!