View in *.pdf - Kandhamal
View in *.pdf - Kandhamal
View in *.pdf - Kandhamal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Balliguda Forest Division, <strong>Kandhamal</strong><br />
EXPENDITURE STATEMENT UNDER STATE CAMPA (GENERAL) (APO-2009-10)<br />
Sl Items of works. Allotment<br />
received<br />
so far<br />
1 Afforestation / Reforestation activities.<br />
Amount<br />
<strong>in</strong>curred<br />
dur<strong>in</strong>g<br />
2009-10<br />
Amount<br />
<strong>in</strong>curred<br />
dur<strong>in</strong>g<br />
2010-11<br />
Total<br />
Physical achievement<br />
c)Forest area to be created by soil and water<br />
conservation measures/<br />
1551482 651266 582512 1233778 SMC work done over 672.23<br />
ha<br />
d). Forest Area to be treated 1551610 662050 785235 1447285 ANR clean<strong>in</strong>g done over<br />
810.46 ha<br />
Silv. for regeneration<br />
e) Bamboo Forest Regeneration 594721 219700 375021 594721 Bamboo regeneration done<br />
over 659.62 ha<br />
f) Up root<strong>in</strong>g of <strong>in</strong>vasive weed species like 99000 81360 8400 89760 Weed eradication done over<br />
199.46 ha<br />
g) Block plantation 11513289 4111152 6548684 10659836 Block plantation done over<br />
535 ha<br />
h) Entry Po<strong>in</strong>t Activities 545648 24000 287544 311544 Constructed of signboard,<br />
water hole, dry<strong>in</strong>g yard etc.<br />
i) Rais<strong>in</strong>g of sapl<strong>in</strong>gs for supply to<br />
beneficiaries under from Agro Forestry<br />
840000 156760 558725 715485 Raised of sapl<strong>in</strong>gs over<br />
185000 nos<br />
j) Avenue Plantation 9700 8377 0 8377 Rais<strong>in</strong>g of seedl<strong>in</strong>gs.<br />
Total Afforestation and deforestation 16705450 5914665 9146121 15060786<br />
2 Infrastructure Development<br />
a) Improvement of Forest Road 394940 394940 0 394940 Road repaired done over<br />
14.94 km<br />
b) construction of Build<strong>in</strong>g 2400000 92408 1430302 1522710 Constructed 7 nos of<br />
build<strong>in</strong>gs.<br />
c) Seizure Yard. ( Malkhana) 460210 0 243512 243512 1 no constructed seizure yard<br />
at Kotagarh Range.<br />
d) Provision of four wheel Drive vehicle with 0 0 0 0<br />
Accessories<br />
e) Provision of Fiber Glass Boat 0 0 0 0<br />
f) Provision of Motor Cycle 0 0 0 0<br />
g) Provision of Computer 74400 0 74400 74400 Purchased 1no computer for<br />
us<strong>in</strong>g Division office.<br />
h) Provision of GPS. 120000 120000 0 120000 Purchased 1 no GPS read<strong>in</strong>g.<br />
i) provision of DGPS 0 0 0 0<br />
j) provision of Revolver 0 0 0 0<br />
k) Skill staff for service Provider 0 0 0 0<br />
Total Infrastructure Development 3449550 607348 1748214 2355562<br />
G.Total 20155000 6522013 10894335 17416348
Balliguda Forest Division, <strong>Kandhamal</strong><br />
CAMPA-Physical and f<strong>in</strong>ancial progress for 2009-10, 2010-11 and 2011-12. 2009-10 & 2010-11 (APO-2009-10)<br />
APO-2009-10<br />
Sl<br />
N<br />
o<br />
Item of works<br />
1 Wild life Protection<br />
Squad<br />
(Anti Smug)<br />
Allotment<br />
received<br />
Expr.<br />
Incurred<br />
dur<strong>in</strong>g<br />
2009-10<br />
Expr.<br />
Incurred<br />
dur<strong>in</strong>g 2010-<br />
11<br />
Total<br />
Expr.<br />
APO-<br />
2009-10<br />
3,50,000/- 1,50,000/- 1,63,800/- 3,13,800/-<br />
Balance<br />
as on<br />
01.04.201<br />
1<br />
Physical target<br />
<strong>in</strong> ha<br />
Physical<br />
achievement <strong>in</strong><br />
ha<br />
2 Anti- depredation<br />
squad<br />
1,50,000/- 1,47,504/- 2,496/- 1,50,000/- --- 2 squads Paid wages of A.S<br />
squad<br />
(15 members<br />
each)<br />
i)Tracker Engagement 1,25,000/- 1,25,000/- --- 1,25,000/- --- 2 squads 2 squads<br />
(4 members<br />
each)<br />
3 Communication &<br />
Infrastructure<br />
i) VHF Mobile Phone 50,000/- --- 50,000/- 50,000/- --- Ma<strong>in</strong>t. of VHF<br />
ma<strong>in</strong>tenance<br />
tower etc<br />
ii) Mobility vehicles 75,000/- 14,387/- 60,303/- 74,690/- 310/- For hire<br />
charges of<br />
vehicle<br />
iii) Quarter /<br />
Barracks/ watcher<br />
shed etc.<br />
v) Interpretation<br />
Centre<br />
vi) Road cross dra<strong>in</strong>age<br />
structure<br />
vii) Creation of<br />
Harvest<strong>in</strong>g structure<br />
Viii) Communication &<br />
Infrastructure Dev.<br />
4 GIS mapp<strong>in</strong>g of at PS.<br />
5 Fire Control &<br />
preventive measure<br />
6 Afforestation and<br />
reforestation<br />
i) Invasive weed<br />
Eradication<br />
7 Tra<strong>in</strong><strong>in</strong>g and capacity<br />
build<strong>in</strong>g of staff.<br />
2,00,000/-<br />
--- 1,97,717/- 1,97,717/- 1,02,283/<br />
-<br />
(+)<br />
1,00,000/-<br />
8,00,000/- 1,74,034/- 11,402/- 1,85,436/- 6,14,564/<br />
-<br />
1 No barrack at<br />
Pipadi<br />
Construction<br />
of 1 No of I.P<br />
Center at<br />
Kotagarh<br />
Ma<strong>in</strong>t. of forest<br />
road<br />
7,00,000/- 3,00,058/- 98,247/- 3,98,305/- 3,01,695/<br />
-<br />
1,25,000/- 1,09,120/- --- 1,09,120/- 15,880/- Improvement<br />
of WHS at<br />
Pipadi<br />
2,50,000/- --- 2,19,557/- 2,19,557/- 30,443/- Construction<br />
of AP gate &<br />
VHF tower at<br />
Pipadi<br />
---<br />
--- --- --- 50,000/- --- ---<br />
1,50,000/-<br />
(-)<br />
1,00,000/-<br />
1,25,000/- 90,180/- 3,550/- 93,730/- 31,270/- Fire <strong>in</strong>centive<br />
to VSSs/EDC<br />
75,000/- 7,200/- 39,405/- 46,605/- 28,395/- 475 16<br />
25,000/- --- 10,000/- 10,000/- 15,000/- One tra<strong>in</strong><strong>in</strong>g/<br />
awareness<br />
camp<br />
---<br />
25,000/- --- 15,000/- 15,000/- 10,000/- One tra<strong>in</strong><strong>in</strong>g to ---<br />
Public<br />
1,25,000/- --- --- --- 1,25,000/ --- ---<br />
-<br />
8 Conduct<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g<br />
people<br />
9 Fenc<strong>in</strong>g and erection of<br />
barberries aga<strong>in</strong>st<br />
elephant<br />
10 IEC material 25,000/- --- 25,000/- 25,000/- --- --- ---<br />
Total 02-Wild Life<br />
Management<br />
33,75,000/<br />
-<br />
11,17,483/- 8,96,477/- 20,13,960/<br />
-<br />
13,61,040<br />
/-<br />
(4 members each<br />
---<br />
Hire charges of<br />
Vehicle on<br />
mobility<br />
Work <strong>in</strong> under<br />
progress.<br />
Work is under<br />
progress.<br />
11 Km road cross<br />
dra<strong>in</strong>age<br />
Under Progress<br />
Fire <strong>in</strong>centive<br />
made to 18 Nos<br />
VSSs /EDC
Balliguda Forest Division, <strong>Kandhamal</strong><br />
2011-12 (APO-2010-11)<br />
Sl<br />
No<br />
Item of works<br />
1 Protection Activities<br />
APO-2010-<br />
11<br />
Allotment<br />
received<br />
APO-2010-<br />
11<br />
Expr. Upto<br />
June-2011<br />
Balanc<br />
e<br />
1(i Wildlife protection squads <strong>in</strong>clud<strong>in</strong>g Anti smuggl<strong>in</strong>g operations at<br />
6,00,000/- --- 6,00,0 ---<br />
) specified location <strong>in</strong>clud<strong>in</strong>g river squads for twelve months<br />
00/-<br />
2 Anti-depredation Activities 0 --- 0 ---<br />
3 Communication<br />
(i) VHF, Mobile phones ma<strong>in</strong>tenance 1,00,000/- --- 1,00,0<br />
00/-<br />
(ii) Mobility vehicles, Boats, POL etc 1,00,000/- --- 1,00,0<br />
00/-<br />
(iii Roads, Cross dra<strong>in</strong>age structure 5,00,000/- --- 5,00,0<br />
)<br />
00/-<br />
4 Infrastructure Development<br />
(i)<br />
Quarters, barrack, watch shed, antipoach<strong>in</strong>g shed, Malkhana, seizure yard,<br />
check gates, Beat & Section forest offices<br />
5 Habitat Improvement<br />
10,00,000/- 10,00,<br />
000/-<br />
---<br />
(i) Creation of water harvest<strong>in</strong>g structure, phone, improv<strong>in</strong>g exist<strong>in</strong>g water<br />
ponds, dra<strong>in</strong>agae l<strong>in</strong>e treatment<br />
3,00,000/- --- 3,00,0<br />
00/-<br />
(iii Fire control & preventive measures <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>centives to local<br />
1,25,000/- --- 1,25,0<br />
) communities<br />
00/-<br />
(vi Invassive weed eradication 2,00,000/- --- 2,00,0<br />
i)<br />
00/-<br />
(vi Medow development 2,00,000/- --- 2,00,0<br />
ii)<br />
00/-<br />
6 Management of protected areas & zoos<br />
(iii<br />
)<br />
Bio-diversity assessment & upgrad<strong>in</strong>g the management plans of the<br />
protected areas and eco development plan<br />
1,00,000/- --- 1,00,0<br />
00/-<br />
Physical<br />
achievement <strong>in</strong><br />
ha<br />
---<br />
---<br />
---<br />
---<br />
---<br />
---<br />
---<br />
---<br />
---<br />
Sl<br />
No<br />
Item of works APO-2010-11 Physical achievement<br />
<strong>in</strong> ha<br />
Allotment Expr. Upto June- Balance<br />
received 2011<br />
APO-2010-11<br />
7 Eco-development programme 1,00,000/- --- 1,00,000 ---<br />
/-<br />
8 Eco-Tourism programme 0 --- 0 ---<br />
9 Capacity build<strong>in</strong>g<br />
(i) Tra<strong>in</strong><strong>in</strong>g & capacity build<strong>in</strong>g of staff 1,00,000/- --- 1,00,000<br />
/-<br />
(iii) Engagement of research fellows for specific period of 1,00,000/- ---- 1,00,000<br />
adaptive research<br />
/-<br />
Total 35,25,000/- 35,25,00<br />
0/-<br />
---<br />
---
Balliguda Forest Division, <strong>Kandhamal</strong><br />
STATEMENT SHOWING COST OUTLAY, ALLOTMENT RECEIVED AND EXPENDITURE INCURRED UNDER CAMPA APO-2010-<br />
11(GENERAL).<br />
Budget Sub-Head<br />
Intensive management of Natural Forest<br />
Cost outlay<br />
for 2010-<br />
11(<strong>in</strong> lakh)<br />
Allotment received<br />
so far<br />
Expenditure up to June<br />
2011( Rs. <strong>in</strong> lakh)<br />
Achievement<br />
Regeneration of degraded forest<br />
SMC 37.8 0<br />
Silv. Operation 37.8 0.9 ANR clean<strong>in</strong>g<br />
done over 50 ha<br />
Regeneration of bamboo forest 27 0<br />
Total I.M.N.F 102.6 0.9<br />
Forest protection<br />
Forest protection squad <strong>in</strong> valnerable pockets 0<br />
Para forest staffs 10.22 0<br />
Control room ma<strong>in</strong>t. & other charges 2.826 0<br />
T.E & legal charge of study export 0.5 0<br />
Total Forest Protection 13.546 0<br />
Fire prevention <strong>in</strong> vulnerable areas 16.938 0<br />
Total 16.938 0<br />
Infrastructure Development<br />
Infrastructure development<br />
Infrastructure development <strong>in</strong> Range Offices 25.663 0<br />
Construction of residential Qtrs 10.5 0<br />
Creation of Tube well 0.6 0<br />
Ma<strong>in</strong>t. of road 3.75 0<br />
Construction of culverts 2 0<br />
Construction of cause ways 3.5 0<br />
Total Infrastructure development 46.013 0<br />
Theme based tra<strong>in</strong><strong>in</strong>g 2.536 0<br />
Total 2.536 0<br />
Internal communication<br />
Observation of important days 0.08 0<br />
Awareness meet<strong>in</strong>gs 0.5 0<br />
Total Internal Communication 0.58 0<br />
Ma<strong>in</strong>tenance of Afforestation<br />
Ma<strong>in</strong>t. of afforestation <strong>in</strong> APO-<br />
2009-10<br />
Block plantation (Formation-1st year) 53.46106 0<br />
EPA on block plantation area 5.23 0<br />
Total-Afforestation APO- 58.69106 0<br />
2009-10<br />
Grand Total 240.9041 68.91 0.9