LICHFIELD CANAL WORKING PARTY NEWS<br />

Lock 25 by wash <strong>and</strong> spillway.<br />

Lock 25 off-side Jan,09<br />

The circular drop shaft is now<br />

complete, <strong>and</strong> brick foundation walls<br />

for the bridge over the spillway have<br />

been added. Quotations for the steel<br />

bridge <strong>and</strong> railings for around the drop<br />

shaft are under consideration <strong>and</strong> an<br />

order for this work should be placed in<br />

the New Year. The stone walls each<br />

side of the spillway are well under way,<br />

<strong>and</strong> the laborious task of cutting up the<br />

large stone blocks into suitable sizes<br />

for building continues. Using this stone has created a lot of extra work, but as it was<br />

donated <strong>and</strong> even delivered free,<br />

it will make a considerable saving<br />

over the cost of the nine thous<strong>and</strong><br />

bricks which would have been<br />

required if we had not had the<br />

stone. We hope to complete these<br />

walls within the next few weeks,<br />

<strong>and</strong> then work will begin on<br />

building the new weir for pound<br />

25.<br />

Estimating completion dates for<br />

these projects can be something<br />

of a gamble, as it depends on the weather at this time of the year, <strong>and</strong> even more<br />

importantly the size of the<br />

workforce. We have a great little<br />

team of regulars who turn up<br />

every week even in wet or very<br />

cold weather, <strong>and</strong> this team, along<br />

with the WRG visits is what keeps<br />

the work ticking over throughout<br />

the year. Obviously when working<br />

on a project like this spillway, there<br />

is not room for a large labour<br />

Bywash drop shaft completed Aug,09<br />

Building up the bywash drop shaft Jul,09<br />

force, but a few extra h<strong>and</strong>s to<br />

help in keeping the site <strong>and</strong> yard<br />

buildings tidy <strong>and</strong> h<strong>and</strong>ing tools <strong>and</strong> materials to the bricklayers can speed up the<br />

job considerably. When we have a large labour intensive task, such as mixing <strong>and</strong><br />

laying large areas of concrete, we put out an email appeal for extra workers which<br />

usually bring a good response. Thank you all for that.<br />

Brian Davis<br />

Cut Both Ways 27<br />

<strong>Winter</strong> 2009/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!