1 Executive Summary ...........................................................................................................4<br />
2 Introduction.........................................................................................................................7<br />
2.1 PEL <strong>238</strong> Background .................................................................................................. 7<br />
2.2 CSG <strong>Project</strong> Structure................................................................................................. 8<br />
2.3 Existing Activities Within PEL <strong>238</strong> .............................................................................. 8<br />
2.3.1 Coonarah <strong>Gas</strong> Field and Wilga Park Power Station ........................................... 8<br />
2.3.2 Coal Seam <strong>Gas</strong> <strong>Exploration</strong> ................................................................................ 9<br />
3 Proposed <strong>Gas</strong> <strong>Utilisation</strong> <strong>Project</strong> .....................................................................................11<br />
3.1 <strong>Project</strong> Outline and Cost ........................................................................................... 11<br />
3.2 Components of the Major <strong>Project</strong> ............................................................................. 12<br />
3.2.1 <strong>Gas</strong> Gathering System ...................................................................................... 12<br />
3.2.2 Nodal Compression ........................................................................................... 12<br />
3.2.3 Flow Line (Bibblewindi to Wilga Park) ............................................................... 12<br />
3.2.4 Power Station Expansion................................................................................... 13<br />
3.2.5 Substation Upgrade ........................................................................................... 13<br />
4 Facilitating Initiatives ........................................................................................................14<br />
4.1.1 <strong>Petroleum</strong> Assessment Lease........................................................................... 14<br />
4.2 Long-lead Items ........................................................................................................ 14<br />
5 Legislative Considerations ...............................................................................................15<br />
5.1 Proposed Major <strong>Project</strong> - Why Part 3A?................................................................... 15<br />
5.2 Applicability of Part 3A to Proposed Major <strong>Project</strong> ................................................... 15<br />
5.3 <strong>Petroleum</strong> <strong>Exploration</strong> Activities in NSW .................................................................. 16<br />
5.4 Government Consultation ......................................................................................... 16<br />
5.5 Community Consultation........................................................................................... 17<br />
5.6 Commonwealth Legislation....................................................................................... 17<br />
5.7 Regional Planning Instruments ................................................................................. 18<br />
5.8 Local Planning Instruments....................................................................................... 18<br />