Corrective Action Plan - Tennessee Valley Authority
Corrective Action Plan - Tennessee Valley Authority
Corrective Action Plan - Tennessee Valley Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Kingston Ash Release March 2009<br />
<strong>Corrective</strong> <strong>Action</strong> <strong>Plan</strong><br />
SECTION TITLE PAGE<br />
5.0 PLAN FOR THE MANAGEMENT OF COAL ASH 5-1<br />
5.1 SHORT-TERM COAL ASH MANAGEMENT 5-1<br />
5.1.1 DREDGING OF THE EMORY RIVER 5-1<br />
5.1.2 DEWATERING AND TEMPORARY STORAGE OF<br />
5-4<br />
RECOVERED ASH<br />
5.1.3 SHORT-TERM DISPOSITION OF ASH GENERATED FROM 5-7<br />
INITIAL RECOVERY ACTIONS<br />
5.1.4 MANAGEMENT OF SURFACE WATER RUN-OFF AND<br />
5-7<br />
DRAINAGE FROM THE SWAN POND EMBAYMENT AREA<br />
5.2 LONG-TERM COAL ASH MANAGEMENT 5-8<br />
5.3 MANAGEMENT OF FUTURE ASH PRODUCTION 5-9<br />
5.4 PRELIMINARY SCHEDULE AND REPORTING 5-9<br />
6.0 PLAN TO ADDRESS ANY HEALTH OR SAFETY HAZARDS 6-1<br />
POSED BY THE ASH TO WORKERS AND THE PUBLIC<br />
6.1 INITIAL ASSESSMENTS AND RESPONSE 6-1<br />
6.1.1 PUBLIC HEALTH AND SAFETY 6-1<br />
6.1.2 OCCUPATIONAL HEALTH & SAFETY 6-3<br />
6.2 CURRENT AND FUTURE CLEANUP ACTIONS 6-4<br />
6.2.1 PUBLIC HEALTH AND SAFETY 6-4<br />
6.2.2 WORKER HEALTH AND SAFETY 6-6<br />
7.0 PATH FORWARD 7-1<br />
8.0 REFERENCES 8-1<br />
iii