Dear Mayor Wheeler and Council Members:<br />

In accordance with Section 79 <strong>of</strong> the <strong>City</strong> Charter, submitted herewith is the 2009-2013<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>). Pursuant to Section 80 <strong>of</strong> the Charter, Council is<br />

required to adopt a <strong>CIP</strong> on or before October 15.<br />

In review <strong>of</strong> the 2009-2013 <strong>CIP</strong> city staff made efforts to consider our capital needs, what<br />

the community wants, the age and condition <strong>of</strong> our infrastructure, the status <strong>of</strong> current<br />

projects, and how we could add the necessary new infrastructure and equipment in the<br />

most cost effective manner.<br />

You will see our estimates for the <strong>City</strong>’s general fund allocation to the <strong>CIP</strong> is fairly<br />

conservative with increases averaging 1.8% over the 5 year period. Technology and<br />

equipment purchases consume the majority <strong>of</strong> this revenue followed by transportation<br />

and street maintenance. Debt service paid by the general fund for the streetscape<br />

improvements, Ross Street Park, and pool improvements consumes an average <strong>of</strong> 35% <strong>of</strong><br />

general fund income right <strong>of</strong>f the top. The remaining amount <strong>of</strong> $6.1 million is what is<br />

left to spend on capital improvements.<br />

We have scaled back significantly in the transportation and street maintenance areas in<br />

order to preserve and target street maintenance dollars to the “The Point” project.<br />

Realignment and signalization <strong>of</strong> the intersection is planned for 2009. This project is<br />

being partially funded by the Ohio Public Works Commission and will address the <strong>City</strong>’s<br />

Point related congestion.<br />

You may recall the state <strong>of</strong> Ohio passed an “economic stimulus” bill in late spring <strong>of</strong> this<br />

year in an effort to spur economic development, growth, and generate jobs throughout the<br />

state. One <strong>of</strong> their targets was increasing funding for several Ohio Public Works<br />

Commission programs. The city has successfully completed several OPWC projects in<br />

the past and was eager to take advantage <strong>of</strong> this opportunity. Of course, these grants<br />

require a <strong>City</strong> commitment <strong>of</strong> funds as a match. The total project cost for all proposed<br />

OPWC projects is $3,437,600 with the <strong>City</strong>’s share being $1,754,447. We have also been<br />

fortunate in the past to receive a $50,000 contribution from the County for each <strong>of</strong> these<br />

projects. We anticipate that commitment to continue. You will see the “Point Phase 1”<br />

project in the Street Maintenance category and the other OPWC projects in the<br />

Transportation <strong>Improvement</strong> category.<br />

The downside to focusing resources on “The Point” in 2009 is a reduction in the <strong>City</strong>’s<br />

resurfacing dollars. Since the <strong>City</strong>’s contribution to the Point is $506,744 this added cost<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

1


<strong>City</strong> <strong>of</strong><br />

<strong>Delaware</strong><br />

Ohio<br />

could not be directly absorbed. Therefore, we had to review our options. During our <strong>CIP</strong><br />

discussions we reviewed our resurfacing program and the overall condition <strong>of</strong> our roads.<br />

As you may be aware, the industry standard for gauging the overall condition <strong>of</strong><br />

roadways is the pavement condition index, or PCI. We have included some additional<br />

narrative on the city’s PCI. Overall, the <strong>City</strong>’s road conditions are considered “good”<br />

(68-81 PCI) based on this index. Our goal has been to maintain at least at 70 PCI average<br />

on all our roads. Therefore, city staff felt that by reducing some <strong>of</strong> the resurfacing dollars<br />

in 2009 we could shift this resource to the Point without overly impacting the quality <strong>of</strong><br />

our roadways. This will result in a resurfacing program <strong>of</strong> $226,718 in 2009. In 2010 this<br />

amount will be increased to $798,000 and increase to $850,000 by 2013.<br />

Another important topic in the <strong>CIP</strong> is the <strong>City</strong>’s overall debt position. Currently our total<br />

outstanding debt is $76 million. We have included a complete summary <strong>of</strong> the <strong>City</strong>’s debt<br />

position in the introductory material that outlines our outstanding debt, our annual<br />

payments, and maturity dates. By using debt-financing we have been able to add<br />

substantial infrastructure to the <strong>City</strong> such as a new wastewater treatment facility, the<br />

Southeast Highland Sewer, sections <strong>of</strong> Glenn Road, and a new Public Works facility and<br />

Justice Center Expansion. These investments were necessary given the <strong>City</strong>’s expansion<br />

and growth over the years. When development increases we will recoup our investment<br />

from the South East Highland Sewer and Glenn Road through capacity fee income and<br />

community charges, respectively.<br />

Some <strong>of</strong> the new capital investments in the <strong>CIP</strong> that will be financed over the long-term<br />

include the water treatment plant expansion, Hills-Miller transmission line, and the<br />

upground reservoir. These are all out <strong>of</strong> the Water Capacity Fund. The debt for these<br />

projects will be paid from Water Capacity Funds and increases in water rates, given the<br />

current income stream from capacity fees. You will see that projects in the Sewer<br />

Capacity Fund are very limited and are programmed largely in 2009.<br />

One <strong>of</strong> the major equipment purchases in the plan is a $1.25 million ladder truck for the<br />

<strong>City</strong>’s fire department. The current truck was purchased in 1981 and has reached its<br />

useful life. Many <strong>of</strong> the parts for the vehicle are no longer made and/or difficult to find.<br />

The Public Works Department has had to fabricate several parts on the truck in order to<br />

keep it running. This truck cannot be purchased with impact fee funds since it is a<br />

replacement vehicle; therefore the city will purchase it with General Fund money. Our<br />

plan is to lease the truck and make annual interest payments over a 15-year period.<br />

Some <strong>of</strong> the other important topics <strong>of</strong> discussion we will have over the next few weeks is<br />

the disposition <strong>of</strong> revenue from the recent recreation levy, our plan for adding more fire<br />

stations, and issues associated with inflow and infiltration. You will see in the Fire<br />

Impact Fee fund the plan shows construction <strong>of</strong> station #3 and #4 and the annual debt<br />

service requirements to construct these facilities. During our review we will focus on our<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

2


<strong>City</strong> <strong>of</strong><br />

<strong>Delaware</strong><br />

Ohio<br />

current need for these stations and our strategic approach. Also, we will discuss the<br />

amount <strong>of</strong> recreation levy dollars that will be available from the levy and the timing and<br />

possible projects that may be funded by this source <strong>of</strong> revenue. As we discuss public<br />

utilities projects we will focus on our current problems with storm water infiltrating our<br />

sewer system and impacting our wastewater operation and how we are addressing this<br />

issue.<br />

As you review the <strong>CIP</strong> you will see that the format <strong>of</strong> the 2009-2013 <strong>CIP</strong> is somewhat<br />

different compared to past years. <strong>City</strong> staff felt the need to include additional information<br />

in this year’s plan to serve as reference material as <strong>City</strong> Council reviews and understands<br />

the issues surrounding this year’s plan. We have included three new sections that we may<br />

have only briefly touched on in the past. These new sections include: Glenn Road; tax<br />

increment financing improvements; and the Project Trust Fund. Given the <strong>City</strong>’s<br />

considerable infrastructure investment in Glenn Road we felt the appropriate forum to<br />

discuss the status <strong>of</strong> the parkway was <strong>CIP</strong> review. During our subsequent <strong>CIP</strong> meetings<br />

we will discuss the details <strong>of</strong> what the <strong>City</strong> has spent on Glenn Road, the current<br />

financing mechanisms in place, and our future strategic and financial plan moving<br />

forward. Given the current state <strong>of</strong> the economy and its effect on the residential housing<br />

market the <strong>City</strong> is taking a cautious and focused spending approach to the Glenn Road<br />

project until future development commitments are made and identifiable sources <strong>of</strong><br />

revenue are apparent. <strong>City</strong> staff will also be discussing projects that are financially<br />

supported by a portion <strong>of</strong> developer contributions deposited into the Project Trust Fund<br />

and the operation <strong>of</strong> this fund. We also want to discuss the city’s involvement with tax<br />

increment financing, what it is, how it works, and what projects are associated with it.<br />

In summary the 2009-2013 <strong>CIP</strong> is an attempt to balance the very important needs <strong>of</strong> a<br />

growing community with its limited resources. Over the course <strong>of</strong> the next several weeks,<br />

city staff and I look forward to reviewing this important proposal with Council.<br />

Yours Sincerely,<br />

R. Thomas Homan<br />

<strong>City</strong> Manager<br />

1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />

3


12 4


2009-2013<br />

CAPITAL IMPROVEMENT PLAN<br />

CITY OF DELAWARE, OHIO<br />

CITY COUNCIL MEMBERS<br />

Windell Wheeler, Mayor<br />

Carolyn Riggle, Vice-Mayor<br />

Andrew Brush<br />

Joe Di Genova<br />

Lisa Keller<br />

Gary Milner<br />

Jim Moore<br />

STAFF<br />

<strong>City</strong> Manager, R. Thomas Homan<br />

Assistant <strong>City</strong> Manager, Allen Rothermel<br />

Finance Director, Dean Stelzer<br />

5


22 6


Executive Summary<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>)<br />

<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013<br />

PART I. OVERVIEW<br />

Each annual <strong>CIP</strong> that is adopted covers a five-year period. In 2008, the <strong>City</strong> prepared the<br />

2009-2013 <strong>CIP</strong>. The <strong>CIP</strong> includes a listing <strong>of</strong> all the projects, equipment, land purchases,<br />

and vehicles that departments plan to purchase or construct in each <strong>of</strong> the five years. The<br />

plan also includes detail on available revenue sources to fund the capital expenditures, as<br />

well as explanations on debt levels and debt service commitments. The 2009-2013 <strong>CIP</strong><br />

also includes reference to previously approved projects that are carried forward and their<br />

completion schedules.<br />

The <strong>City</strong> is making strategic efforts with the 2009-2013 <strong>CIP</strong> to establish clear linkages to<br />

all other business plans, budgets, policies, and day-to-day operations and to develop and<br />

implement a strategic approach to capital planning.<br />

Purpose<br />

The <strong>CIP</strong> is a planning document that presents a five-year overview <strong>of</strong> the scheduled<br />

capital projects and equipment needs <strong>of</strong> the <strong>City</strong>. The purpose <strong>of</strong> capital improvement<br />

planning is to review, prioritize and form the link between proposed needs, limited<br />

financial resources, and the guidance in the <strong>City</strong>’s Comprehensive plan, adopted master<br />

plans, and insight from <strong>City</strong> Council and the community. A properly prepared capital<br />

plan is essential to the future financial health <strong>of</strong> the <strong>City</strong> and continued delivery <strong>of</strong><br />

services to citizens and businesses.<br />

<strong>Capital</strong> planning also positions the <strong>City</strong> to react strategically to changing dynamics such<br />

as the economy, new development opportunities, changes in the city’s financial<br />

condition, and unforeseen emergency infrastructure problems. The city’s strategic<br />

reaction involves adjusting project costs, project timelines, and possibly adding additional<br />

projects if necessary.<br />

Definition <strong>of</strong> a <strong>Capital</strong> <strong>Improvement</strong><br />

A capital improvement is a major fiscal expenditure associated with maintaining the<br />

city’s infrastructure. In many cases, these expenditures are project related and typically<br />

are non-recurring. However, in some cases the <strong>City</strong> does dedicate financial resources on a<br />

recurring basis for capital projects such as road resurfacing, IT equipment;<br />

police/fire/public works vehicles; and sidewalk repairs.<br />

7


A capital expenditure differs from operating budget expenditures. Operating expenditures<br />

include personnel expenses, materials and supplies, and small equipment that involve day<br />

to day operations <strong>of</strong> the <strong>City</strong>.<br />

Examples <strong>of</strong> capital improvements include:<br />

- Acquisition <strong>of</strong> land;<br />

- Construction or expansion <strong>of</strong> public facilities, streets, or utility lines;<br />

- Non-recurring rehabilitation <strong>of</strong> a facility;<br />

- Design work or planning study related to an individual project;<br />

- An item that typically has a useful life <strong>of</strong> 5 or more years; and<br />

- Replacement and purchase <strong>of</strong> vehicles<br />

Financial Policies and Guidelines<br />

The city adopted several financial policies and guidelines that serve as a foundation for<br />

capital improvement planning. These policies cover all capital categories in the <strong>CIP</strong>. The<br />

financial policies related to <strong>CIP</strong> planning include the following:<br />

The budget will provide for adequate maintenance and repair <strong>of</strong> capital assets for<br />

their orderly replacement;<br />

The city will develop a five-year capital improvements program on an annual<br />

basis;<br />

The city will enact an annual capital improvement budget based on the multi-year<br />

capital improvements program;<br />

The city will coordinate development <strong>of</strong> the capital improvement budget with<br />

development <strong>of</strong> the operating budget;<br />

The city will confine long-term borrowing to capital improvement projects;<br />

When the city finances capital projects by issuing debt, it will repay the debt<br />

within a period not to exceed the expected useful life <strong>of</strong> the project;<br />

The city will evaluate issuing debt and pay-as-you-go financing to maintain<br />

flexibility for the future;<br />

The city will continually seek to maintain and improve its current bond rating to<br />

minimize borrowing costs and to ensure that access to credit is preserved.<br />

<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong>ning Process<br />

The <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>’s process <strong>of</strong> preparing the annual <strong>CIP</strong> involves the following<br />

departments: Finance, Engineering, Public Works, Public Utilities, Police, Fire, Parks and<br />

8


Recreation, and Information Technology. Prior to the start <strong>of</strong> the annual <strong>CIP</strong> planning<br />

process the Finance Department reviews the city’s financial condition and evaluates the<br />

status <strong>of</strong> projects in the present <strong>CIP</strong> plan. Concurrently, departments are requested to<br />

submit individual project sheets that cover the project’s description and purpose, provide<br />

justification for the project, and detail project cost estimates.<br />

When developing projects departments do the following: 1) assess the needs for new<br />

facilities or upgrades <strong>of</strong> existing facilities and infrastructure; 2) review current<br />

regulations and compliance; 3) translate needs into prioritized project proposals and<br />

develop cost estimates; 4) review existing master plans; and 5) develop financing<br />

strategies.<br />

As departments develop their annual <strong>CIP</strong> submission they are asked to provide a<br />

summary <strong>of</strong> their project requests and their strategic approach. This involves<br />

summarizing how their projects achieve and align with the long-term goals <strong>of</strong> the<br />

community, the recommendations <strong>of</strong> adopted master plans, and how their strategies<br />

address their short-term initiatives that result from operating in a dynamic environment.<br />

9


34 10


PART II. FINANCIAL SUMMARY<br />

Revenues<br />

Projects in the <strong>CIP</strong> are funded from a variety <strong>of</strong> sources including general fund income<br />

tax revenues, gas tax revenues, grants, utility fees as well as other revenue sources. The<br />

<strong>CIP</strong>’s general fund allocation was approximately $1.63 million in 2008. In 2009 the<br />

allocation is $1.7 million, 4.2% higher.<br />

Chart 1.<br />

General Fund Income Tax Transfer to the <strong>CIP</strong><br />

$2,000,000<br />

$1,800,000<br />

$1,600,000<br />

$1,400,000<br />

$1,200,000<br />

$1,000,000<br />

$800,000<br />

$600,000<br />

$400,000<br />

$200,000<br />

$0<br />

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013<br />

est. est. est. est.<br />

Over the 5 year period from 2009-2013, the total planned general fund allocation is $6.07<br />

million. In 2009, as with all years in the <strong>CIP</strong>, the majority <strong>of</strong> city income tax supports<br />

equipment replacement and technology improvements. Equipment replacement includes<br />

vehicles for the Police, Fire, Parks and Recreation, Airport, and Public Works<br />

departments. This can be seen in both Charts 2 and 3 below. Technology improvements<br />

largely include annual computer and copier replacements, network improvements and<br />

dollars allocated for fiber infrastructure.<br />

Chart 2.<br />

2009 General Fund Allocation to the <strong>CIP</strong><br />

Technology<br />

<strong>Improvement</strong>s<br />

20%<br />

Building<br />

Maintenance<br />

6%<br />

Airport<br />

<strong>Improvement</strong>s<br />

6%<br />

Street Maintenance<br />

16%<br />

Equipment<br />

Replacement<br />

31%<br />

Park <strong>Improvement</strong>s<br />

0%<br />

Transportation<br />

<strong>Improvement</strong>s<br />

21%<br />

11


Chart 3.<br />

Total General Fund Allocation to the <strong>CIP</strong> 2009-2013<br />

900,000<br />

800,000<br />

700,000<br />

600,000<br />

500,000<br />

400,000<br />

300,000<br />

2009<br />

2010<br />

2011<br />

2012<br />

2013<br />

200,000<br />

100,000<br />

0<br />

Airport<br />

<strong>Improvement</strong>s<br />

Street<br />

M aintenance<br />

Transportation<br />

<strong>Improvement</strong>s<br />

Park<br />

<strong>Improvement</strong>s<br />

Equipment<br />

Replacement<br />

Technology<br />

<strong>Improvement</strong>s<br />

Building<br />

M aintenance<br />

Expenditures<br />

Chart 4 below shows <strong>CIP</strong> expenditures by fund for all projects across all funds, including<br />

the general fund. Note in this table total project expenditures do not include debt service<br />

payments in order for the reader to see what costs are actually spent on projects and<br />

equipment. Chart 4 also shows that water fund capacity projects comprise a large<br />

majority <strong>of</strong> the project dollars in the five-year plan. This is due to the planned expansion<br />

<strong>of</strong> the water treatment plant. Also across the five-year period notable expenditures are in<br />

the transportation improvement category. This is due primarily for planned expenditures<br />

for the Veteran’s Parkway road project – design which started in 2008.<br />

Chart 4.<br />

2009-2013 CAPITAL IMPROVEMENT PLAN SUMMARY<br />

*Excludes Debt Service in total Expenditures<br />

FUND 2009 2010 2011 2012 2013<br />

Airport <strong>Improvement</strong> Fund 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

Street Maintenance and Repair Fund 1,514,118 1,183,600 1,208,529 1,235,000 1,235,000<br />

Transportation <strong>Improvement</strong>s 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

Park <strong>Improvement</strong> Fund 315,000 52,200 29,000 32,500 25,000<br />

Equipment Replacement Fund 206,200 815,500 813,500 586,000 896,500<br />

Technology <strong>Improvement</strong>s 177,000 347,000 262,000 287,000 212,000<br />

Building Maintenance 51,100 106,300 54,500 25,200 0<br />

Park Impact Fee <strong>Improvement</strong> Fund 5,000 20,000 0 0 0<br />

Police Impact Fee <strong>Improvement</strong> Fund 0 65,000 0 0 0<br />

Fire Impact Fee <strong>Improvement</strong> Fund 100,000 208,750 0 0 0<br />

Municipal Services Impact Fee Fund 0 0 0 0 0<br />

Water Fund Maintenance Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

Water Fund Capacity Projects 1,355,000 680,000 10,915,000 175,000 785,000<br />

Sewer Fund Maintenance Projects 365,000 625,000 150,000 605,000 690,000<br />

Sewer Fund Capacity Projects 890,000 150,000 3,000,000 0 0<br />

12


Refuse Fund 457,476 428,876 470,276 466,276 436,276<br />

Storm Sewer Fund 360,000 460,000 770,000 540,000 460,000<br />

TOTAL PROJECT<br />

EXPENDITURES 16,370,339 $20,404,971 $20,433,550 $11,597,721 $50,916,521<br />

Chart 5 below shows what percentage <strong>of</strong> the <strong>CIP</strong> in 2009 goes for street maintenance and<br />

transportation improvements. The majority <strong>of</strong> funding for street maintenance comes from<br />

license taxes and motor fuel taxes. The monies are used for general maintenance on the<br />

<strong>City</strong>’s roads as well as the sidewalk repair program. A large portion <strong>of</strong> funding for<br />

transportation improvements also comes from Ohio Department <strong>of</strong> Transportation<br />

(ODOT) funds, Mid-Ohio Regional <strong>Plan</strong>ning Commission (MORPC) allocations, and<br />

federal earmarks.<br />

Chart 5.<br />

2009 <strong>CIP</strong> Funding for Street Maintenance & Transportation<br />

<strong>Improvement</strong>s<br />

Street <strong>Improvement</strong>s<br />

35%<br />

Street Resurfacing<br />

Program<br />

Issue II<br />

11%<br />

<strong>Improvement</strong>s<br />

15%<br />

Other <strong>Improvement</strong>s<br />

10%<br />

MORPC<br />

Transportation<br />

<strong>Plan</strong>ning<br />

29%<br />

Chart 6 below shows the <strong>City</strong>’s planned allocation <strong>of</strong> resurfacing dollars over the 5-year<br />

period. In 2009 the allocation is considerably less that the out-years in order to target<br />

more street maintenance dollars to the Point – Phase 1 project.<br />

Chart 6.<br />

Resurfacing Dollars 2009-2010<br />

900,000<br />

800,000<br />

700,000<br />

600,000<br />

500,000<br />

400,000<br />

300,000<br />

200,000<br />

100,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Resurfacing Dollars<br />

13


Chart 7 shows transportation and street maintenance funds from 2009 to 2013. The chart<br />

shows MORPC funding increasing from 2009 to 2013 due to the Veteran’s Parkway<br />

project. Issue II projects that the <strong>City</strong> will be undertaking in 2009 include the Point Phase<br />

1 and the US-36 & Houk turn lane improvement project.<br />

Chart 7.<br />

Transportation and Street Funding<br />

2009-2013<br />

*Does not include funding for Veteran's Parkway Construction<br />

3,500,000<br />

3,000,000<br />

2,500,000<br />

2,000,000<br />

1,500,000<br />

1,000,000<br />

500,000<br />

-<br />

2009 2010 2011 2012 2013<br />

Street Resurfacing Program<br />

Issue II <strong>Improvement</strong>s<br />

M ORPC Transportation <strong>Plan</strong>ning<br />

Other <strong>Improvement</strong>s<br />

Street <strong>Improvement</strong>s<br />

The Police and Fire Impact Fee Funds are supported by impact fees charged per<br />

development unit. These fees provide funding for vehicles, special equipment, and debt<br />

service on capital construction projects. The <strong>CIP</strong> shows from 2011-2013 dollars being<br />

allocated for debt service for the construction <strong>of</strong> additional fire station #3 and #4. No<br />

decision on future construction or location <strong>of</strong> these fire stations has been made. As seen<br />

in Chart 8 below, police impact fee expenditures over the years are estimated to be fairly<br />

steady. This is due to approximately $88,000 in funds being allocated to pay the debt<br />

service on the Justice Center renovation.<br />

Chart 8.<br />

2009-2013 Funding<br />

Police Impact Fee Fund & Fire Impact Fee Fund<br />

350,000<br />

300,000<br />

250,000<br />

200,000<br />

150,000<br />

100,000<br />

50,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Fire<br />

Police<br />

Over the 2009-2013 period, the revenue in the Water Capacity Fund will begin service<br />

primarily debt obligations from projects such as the water treatment plant expansion,<br />

14


Kingman hill water tower, and the Westside transmission line. Though these are<br />

important projects looking in the future there is very little funding for projects unless<br />

development picks up and the city sees and increase in capacity fee revenue. This can be<br />

seen in Chart 9 below. Three large projects programmed out <strong>of</strong> this fund, mainly in 2009<br />

and 2010, are the Penry Road waterline projects, west side transmission line project, and<br />

the water treatment plant expansion. The case is the same for the Sewer Capacity Fund<br />

where the majority <strong>of</strong> revenues coming into the fund are going to service debt rather than<br />

projects. Very few projects are programmed in this fund over the 2009-2013 period given<br />

this dynamic.<br />

Chart 9.<br />

Water Fund Capacity Revenues and Expenditure 2009-2013<br />

14,000,000<br />

12,000,000<br />

10,000,000<br />

8,000,000<br />

6,000,000<br />

4,000,000<br />

2,000,000<br />

0<br />

2009 2010 2011 2012 2013<br />

Revenues 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />

Expenditures -Debt 239,405 240,805 1,731,791 1,732,791 1,732,791<br />

Expenditures -Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

Revenues Expenditures -Debt Expenditures -Projects<br />

15


PART III. GUIDING STRATEGIES<br />

Streets and Transportation<br />

Resurface city streets using a 70/30 split approach - 70% is applied to mill and fill<br />

and overlays and 30% is applied toward crack seal, slurry seal, and rejuvenator<br />

coatings.<br />

Maintain all arterial roadways, collectors, and local roadways at 70 PCI<br />

(Pavement Condition Index) or above.<br />

Upgrade all public sidewalks intersecting with roads scheduled to be resurfaced to<br />

current American Disabilities Act (ADA) standards which require access for the<br />

physically impaired.<br />

Use the Thoroughfare <strong>Plan</strong> and the <strong>City</strong>’s Comprehensive <strong>Plan</strong> as a guiding vision<br />

and source <strong>of</strong> several street and transportation projects.<br />

Pursue additional funding both locally and through the state and federal<br />

government.<br />

Assess the current street infrastructure by monitoring the pavement condition<br />

index (PCI) as a baseline, conducting windshield surveys, and monitoring where<br />

ongoing road maintenance efforts and condition changes.<br />

Maintain and improve upon the city current “good” PCI rating <strong>of</strong> (68-81).<br />

Implement the use <strong>of</strong> intermediate pavement maintenance operations such as<br />

slurry seals and asphalt rejuvenator applications to extend the estimated life<br />

expectancy <strong>of</strong> the pavement surface.<br />

Monitor input from citizen surveys related to road infrastructure and work to<br />

alleviate traffic congestion and maintain streets.<br />

Limit the use <strong>of</strong> MORPC funds to fund major federal and state route highway<br />

projects.<br />

Municipal Airport<br />

Promote the economic benefit <strong>of</strong> aviation to the community and strive for self<br />

sustaining operations.<br />

Work to increase the number <strong>of</strong> based aviation businesses and corporate general<br />

aviation aircrafts utilizing the airfield.<br />

Use the city’s $150,000 annual entitlement funds from the FAA and roll any<br />

unused balances into future years for up to 3 years.<br />

Continue seeking FAA State <strong>of</strong> Ohio apportionment funds (via ODOT) for<br />

general aviation projects.<br />

Consider future applications to ODOT’s $2 million state aviation grant program.<br />

Continue administering an airport TIF fund that accounts for the tax increment<br />

financing real estate payments the city receives from property taxes paid in the<br />

corporate hanger and the private T-hangers constructed at the airport.<br />

17


Implement the recommendations <strong>of</strong> the Airport Master <strong>Plan</strong> which include high<br />

priority projects such as expanding the existing apron, constructing T-hangers,<br />

and acquiring land for airport development.<br />

Focus on establishing protection areas to insure continued use <strong>of</strong> the airfield in the<br />

future.<br />

Seek funding for additional security fencing to protect both public and private<br />

investments as well as reduce wildlife runway incursions.<br />

Continue working on development <strong>of</strong> a drainage master plan that will be required<br />

by existing storm water regulations to support any additional expansions at the<br />

airport.<br />

Building Maintenance<br />

Continue heat pump replacements at the Justice Center based on industry standard<br />

life cycles.<br />

Reduce facility energy consumption.<br />

Continue to consider centralizing all building maintenance functions so as to<br />

minimize operation resources and establish consistent practices throughout<br />

facility infrastructure.<br />

Equipment Replacement<br />

Maintain and disposal <strong>of</strong> the majority <strong>of</strong> city vehicles, trailers and motorized<br />

equipment.<br />

Ensure all department vehicles and motorized equipment are operational and safe<br />

so that they provide routine and emergency services to citizens.<br />

Administer a preventive maintenance program and provide specification services<br />

for new equipment.<br />

Operate a rotary fund and bill city departments for vehicle services rendered;<br />

parts, fuel and materials supplied; and overhead.<br />

Maintain a vehicle replacement schedule that details the original purchase date,<br />

replacement year schedule, and estimated replacement year cost.<br />

Continued consideration <strong>of</strong> a comprehensive review <strong>of</strong> the entire fleet inventory<br />

to determine if departmental fleet sizes are greater than required to provide<br />

current services.<br />

Continued consideration <strong>of</strong> standardizing fleet purchases to assist in reducing<br />

organization fuel consumption, parts inventory, and mechanic training demands.<br />

Parks and Recreation<br />

Focus on construction <strong>of</strong> Glen Ross Park.<br />

Focus on neighborhood park improvements.<br />

Target general fund dollars for parking lot resurfacing in Mingo, Eastside, and<br />

Smith Park.<br />

18


Use the majority <strong>of</strong> park exaction dollars in the early years <strong>of</strong> the <strong>CIP</strong> plan given<br />

the potential for declining exaction fees considering the current development<br />

climate.<br />

Impact Fee Projects<br />

Collect and spend impact fees in accordance with the <strong>City</strong>’s ordinance and be<br />

aware <strong>of</strong> remaining collections that are close to the 5-year rebate provision.<br />

Make required debt service payments in each fund and be aware that without<br />

increasing development levels General Fund dollars may eventually be needed to<br />

cover these payments.<br />

Public Utilities<br />

Consider project finance options from Ohio Public Works Commission (OPWC)<br />

and the Ohio Water Development Authority (OWDA).<br />

Prioritize water and sewer mains rehabilitation and replacement projects through<br />

the CMMS <strong>City</strong>Works s<strong>of</strong>tware.<br />

Improve fire flow protection by installing 8” minimum water mains in new<br />

developments and replacing existing lines <strong>of</strong> less than 8” when water mains are in<br />

need <strong>of</strong> replacement or upgrades.<br />

Continue small main replacements to improve water quality issues and dead end<br />

water mains by looping water mains in areas that have been determined to have<br />

water quality issues.<br />

Flush dead end water mains to ensure water quality.<br />

Prioritize projects based on those identified in the 2000 Collection System Master<br />

<strong>Plan</strong>, 1986 Water System Master <strong>Plan</strong> Study, the 2006 Water Master <strong>Plan</strong>, the<br />

1998 Storm Sewer Task Force Report/Recommendations, from CCTV data, and<br />

from flooding/basement backup complaints.<br />

Complete the 5 remaining fire flow improvement projects identified in the 1986<br />

Water Master <strong>Plan</strong>.<br />

Meet the sanitary sewer needs for future development.<br />

Provide extension <strong>of</strong> water and sewer mains to the <strong>City</strong>’s southwest corridor to<br />

help facilitate commercial and industrial development.<br />

Take a proactive approach to identifying future water supply and resources<br />

Meet USEPA Stage 2 Disinfectants and Disinfection Byproducts Rule compliance<br />

by October 1, 2013 by upgrading the water treatment plant rehabilitation and<br />

using membrane plant technology.<br />

Consider the cost associated with the construction <strong>of</strong> new sewer lines and related<br />

facilities, such as lift stations and force mains – and how much <strong>of</strong> this cost will be<br />

borne by developers.<br />

Consider the extension <strong>of</strong> new public sewers to new development areas and the<br />

<strong>City</strong>’s ability to provide required city services to the new areas.<br />

Comply with the OEPA MS4 Permit.<br />

19


Minimize leachate from the closed landfill that enters the storm water pipe<br />

through the pipe joints in order to minimize notice <strong>of</strong> violations from the EPA.<br />

Information Technology<br />

Provide system support for all <strong>City</strong> Departments by determining IT needs,<br />

capabilities, and feasibility.<br />

Coordinate the purchasing, installation, upgrading and monitoring <strong>of</strong> all<br />

information technology s<strong>of</strong>tware and hardware.<br />

Maintain an IT rotary fund where each department contributes a determined<br />

amount based on their IT usage and demands.<br />

Maintain a 5-year server replacement schedule and 7-year network equipment<br />

replacement schedule.<br />

Produce bigger servers, but divide the use <strong>of</strong> the servers into virtual servers,<br />

capable <strong>of</strong> providing more capacity in fewer machines.<br />

Maintain a data back plan to keep personal information private, have the<br />

capability to recover deleted files, and recover files in the event <strong>of</strong> a disaster.<br />

Maintain a 4-year PC replacement schedule in order to keep productivity as high<br />

as possible from a technology point <strong>of</strong> view.<br />

Purchase a combination <strong>of</strong> PCs and Servers/thin client computers within the PC<br />

replacement line item.<br />

Build a city-wide fiber infrastructure for use by the <strong>City</strong> and as an economic<br />

development tool<br />

Continue the plan <strong>of</strong> purchasing and maintaining technology copiers.<br />

20


CITY OF DELAWARE<br />

CAPITAL IMPROVEMENT PLAN<br />

GENERAL FUND SUMMARY<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCE FORWARD 50,000 320,202 151,667 9,003 10,196<br />

REVENUES:<br />

INCOME TAX 1,700,000 1,737,500 1,770,000 1,815,000 1,800,000<br />

BALANCE PLUS REVENUE 1,750,000 2,057,702 1,921,667 1,824,003 1,810,196<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds<br />

2002 Issue ($5,655,000) 422,428 424,528 425,778 426,287 426,287<br />

2006 Ross St. ($475,000) 61,237 59,438 57,637 60,838 60,838<br />

2006 Pool Maint. ($550,000 10yrs.) 68,276 68,129 67,909 67,621 67,621<br />

TOTAL DEBT SERVICE 551,941 552,095 551,324 554,746 554,746<br />

AMOUNT AVAILABLE FOR CAPITAL<br />

IMPROVEMENTS AFTER DEBT 1,198,059 1,505,607 1,370,343 1,269,257 1,255,450<br />

OTHER EXPENDITURES<br />

AIRPORT IMPROVEMENTS 56,500 10,750 66,750 58,500 69,500<br />

STREET MAINTENANCE 136,768 176,906 189,090 170,561 168,761<br />

TRANSPORTATION IMPROVEMENTS 181,489 175,784 0 0 0<br />

PARK IMPROVEMENTS 0 37,200 14,000 17,500 10,000<br />

EQUIPMENT REPLACEMENT 275,000 500,000 775,000 700,000 765,000<br />

TECHNOLOGY IMPROVEMENTS 177,000 347,000 262,000 287,000 212,000<br />

BUILDING MAINTENANCE 51,100 106,300 54,500 25,500 0<br />

TOTAL OTHER EXPENDITURES 877,857 1,353,940 1,361,340 1,259,061 1,225,261<br />

ENDING BALANCE 320,202 151,667 9,003 10,196 30,189<br />

21


CAPITAL IMPROVEMENT PLAN<br />

AIRPORT IMPROVEMENT FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCE FORWARD 0 0 0 0 0<br />

REVENUES:<br />

FAA AIP Allocation 123,500 204,250 42,750 142,500 71,250<br />

FAA Discretionary Grant 950,000 325,500 969,000 1,249,250<br />

TIF Collections 25,745 25,745 25,745 25,745 25,745<br />

<strong>CIP</strong> - <strong>City</strong> FAA AIP Grant Match 6,500 10,750 2,250 7,500 3,750<br />

<strong>CIP</strong> - <strong>City</strong> FAA Discretionary Grant Match 50,000 64,500 51,000 65,750<br />

TOTAL REVENUES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

EXPENDITURES:<br />

<strong>City</strong> AIP-Grant<br />

Drainage Master <strong>Plan</strong> 80,000<br />

Drainage <strong>Improvement</strong>s 45,000 150,000<br />

Avigation Survey & Easement - East 130,000<br />

Avigation Survey & Easement - West 135,000<br />

Taxiway A Rehabilitation - East End 75,000<br />

<strong>City</strong> Discretionary-Grant<br />

Airport Rd. Relocation - Sawmill Pkwy. 1,000,000<br />

Ramp Expansion 90,000 900,000<br />

Runway Rehabilitation 120,000 1,315,000<br />

Terminal Building <strong>Improvement</strong>s 300,000<br />

GF Advance Payback 25,745 25,745 25,745 25,745 25,745<br />

TOTAL EXPENDITURES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />

AIRPORT IMPR. FUND BALANCE 0 0 0 0 0<br />

PURPOSE: The Airport <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements to the <strong>Delaware</strong><br />

Municipal Airport.<br />

FUNDING SOURCE: Funding for these projects comes primarily from FAA grant funds.<br />

The FAA AIP grant represents federal aviation funding which has been allocated to general<br />

aviation airports. <strong>Delaware</strong>'s allocation has been $150,000 per year. It is not known how far into<br />

the future this grant funding will be available. This <strong>City</strong> also applies for FAA discretionary grant<br />

funds for airport improvements. We do not currently have any discretionary grant funded projects.<br />

The <strong>City</strong>'s general fund covers our share <strong>of</strong> the grants and other projects that do not receive grant<br />

funding.<br />

23


THIS PAGE INTENTIONALLY LEFT BLANK<br />

24


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Taxiway A East End Rehabilitation<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the Taxiway A surface and safety area to accommodate<br />

increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $75,000 $75,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $0<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $0 $75,000 $75,000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $3,750 $3,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A AI P G rant $71,250 $71,250<br />

$0<br />

Totals $0 $0 $0 $0 $75,000 $75,000<br />

25


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Runway 28 Avigational Survey & Easement<br />

Description and Purpose:<br />

Avigational survey & easement on the property to the west (National Limestone)<br />

<strong>of</strong> the runway. This will prevent future construction from entering into flight<br />

path that would have adverse effects on the airport.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO M M ENDE D FUN DIN G<br />

Est im a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Tra ff ic $0<br />

Envir on m enta l $0<br />

Prelim in a ry E n gineer ing $0<br />

Fina l En gineer ing $15 ,000 $15,000<br />

R/W Con sulta nt $0<br />

R/W Pur cha se $120 ,000 $120,000<br />

Ad m instra tive $0<br />

Co nstru ctio n $0<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />

Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $6, 750 $6,750<br />

O th er C ity Fu nds $0<br />

M un icipa l Bon ds $0<br />

Priva te F un din g $0<br />

FA A AI P G ra nt $128 ,250 $128,250<br />

$0<br />

Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />

26


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Navigational Survey & Easement - East<br />

Description and Purpose:<br />

Navigational survey & easement on the property to the east (Jegs) <strong>of</strong> the<br />

runway. This will prevent future construction from entering into flight path<br />

that would have adverse effects on the airport<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic $ 0<br />

E nvir on m ent a l $ 0<br />

P re lim in a ry E n gine er ing $ 0<br />

Fina l E n ginee r ing $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

R / W C on sult a nt $ 0<br />

R / W P ur cha s e $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

Ad m inst ra t ive $ 0<br />

C o nst ru ct io n $ 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0<br />

C o nst ru ct io n En ginee ring $ 0<br />

In s p ec t ion $ 0<br />

T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 6 ,5 0 0 $ 6 ,5 0 0<br />

O th e r C ity Fu nd s $ 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

FA A AI P G ra nt $ 1 2 3 ,5 0 0 $ 1 2 3 ,5 0 0<br />

$ 0<br />

T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />

27


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Runway 10-28 Rehabilitation<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the runway surface and runway safety area to accommodate<br />

increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $120,0 00 $120,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $1,31 5,000 $1,315, 000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $6,00 0 $65,750 $71,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A Federal D iscre tio nary $114,0 00 $1,24 9,250 $1,363, 250<br />

$0<br />

Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />

28


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Ramp Expansion<br />

Description and Purpose:<br />

Design main ramp expansion to accommodate increased aviation traffic.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $0<br />

Final En gineer ing $90, 000 $90,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $900,0 00 $900,000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $0 $0 $0 $ 0 $0<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $4, 500 $45,0 00 $49,500<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A Federal D iscre tio nary $85, 500 $855,0 00 $940,500<br />

$0<br />

Totals $0 $0 $90, 000 $900,0 00 $ 0 $990,000<br />

29


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Drainage Master <strong>Plan</strong>/Engineering/Construction<br />

Description and Purpose:<br />

Design Master Drainage <strong>Plan</strong> for current and future expansion needs.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

This plan will ensure that all drainage facilities located on the airfield meet or<br />

exceed FAA criteria. This plan will address the overall drainage issues at the<br />

airport to ensure that any existing development and planned development will<br />

not adversely affect any waterways downstream from the airport property.<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Traff ic $0<br />

Envir on menta l $0<br />

Prelimin a ry En gineer ing $80 ,000 $80,000<br />

Final En gineer ing $45, 000 $45,000<br />

R/W Con sulta nt $0<br />

R/W Pur chase $0<br />

Ad minstra tive $0<br />

Co nstru ctio n $150,0 00 $150,000<br />

Ch an ge O rd er/Co ntingen cy $0<br />

Co nstru ctio n En ginee ring $0<br />

In spection $0<br />

Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />

Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $4, 000 $2, 250 $7,50 0 $13,750<br />

O th er C ity Fu nds $0<br />

M un icipal Bon ds $0<br />

Private F un din g $0<br />

FA A AI P G rant $76 ,000 $42, 750 $142,5 00 $261,250<br />

$0<br />

Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />

30


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Airport Road Relocation – Sawmill Parkway<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> phase-I <strong>of</strong> Sawmill Parkway to address Airport Road<br />

vacating from runway relocation.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

The consultant notes that the original arrangement was to extend the existing<br />

Airport Road to US-42 which was to be funded through an FAA grant. This was<br />

proposed until the Master <strong>Plan</strong> and ALP update was completed and the<br />

disposition <strong>of</strong> the crosswind runway determined. The master plan and ALP<br />

update is not complete. The crosswind runway was eliminated from the ALP<br />

and Airport road is now shown to be relocated south to a new location. This<br />

schedule is to relocate Airport Rd. in 2009/2010. FAA will fund the Airport<br />

Road relocation in an amount equal to the cost to extend Airport Road as<br />

originally planned, which is estimated at $1,000,000.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

P re lim in a ry E n gine er ing $ 0<br />

Fina l E n ginee r ing $ 0<br />

R / W C on sult a nt $ 0<br />

R / W P ur cha s e $ 0<br />

Ad m inst ra t ive $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

C o nst ru ct io n $ 9 9 0 ,0 0 0 $ 9 9 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0<br />

C o nst ru ct io n En ginee ring $ 0<br />

In s p ec t ion $ 0<br />

T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

O th e r C ity Fu nd s $ 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

FA A Fed e ra l D is ret ion a ry $ 9 5 0 ,0 0 0 $ 9 5 0 ,0 0 0<br />

$ 0<br />

T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />

31


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Terminal Building <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Expansion <strong>of</strong> existing pilot lounge and install <strong>of</strong> sleep room for pilots, re-side<br />

and re-ro<strong>of</strong> existing building.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Airport <strong>Improvement</strong> Fund<br />

Justification:<br />

N/A<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n gineer ing $ 0<br />

R / W P ur cha se $ 0<br />

Ad m inst ra t ive $ 0<br />

C o nst ru ct io n $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />

In sp ection $ 0<br />

T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 0<br />

FA A Fed era l D iscre tio na ry $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s $ 0<br />

P riva t e F un d in g $ 0<br />

Sta te /F ed era l $ 0 $ 0<br />

$ 0<br />

T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />

32


CAPITAL IMPROVEMENT PLAN<br />

STREET MAINTENANCE IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

PERMISSIVE TAX (License Fee Fund) 360,000 370,000 380,000 390,000 390,000<br />

STATE LICENSE FEES 17,755 17,755 0 20,000 20,000<br />

STATE GASOLINE TAXES 79,500 79,500 80,000 85,000 85,000<br />

NEW GAS TAXES 340,000 380,000 400,000 410,000 410,000<br />

CDBG BLOCK GRANT (FORMULA FUNDS) 85,000 85,000 85,000 85,000 85,000<br />

SIDEWALK PROGRAM ASSESSMENTS 150,000 150,000 150,000 150,000 150,000<br />

ISSUE II POINT PHASE 1 370,656 0 0 0 0<br />

COUNTY ISSUE II POINT 50,000 0 0 0 0<br />

<strong>CIP</strong> Allocation 136,768 176,906 189,090 170,561 168,761<br />

TOTAL REVENUE 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds - S. Houk Road ($600,000, 10yrs) 75,561 75,561 75,561 75,561 73,761<br />

TOTAL DEBT SERVICE 75,561 75,561 75,561 75,561 73,761<br />

STREET RESURFACING PROGRAM<br />

CDBG Rehabilitation 85,000 85,000 85,000 85,000 85,000<br />

<strong>City</strong> Street Resurfacintg/Maintenance 226,718 798,600 823,529 850,000 850,000<br />

TOTAL STREET RESURFACING PROGRAM 311,718 883,600 908,529 935,000 935,000<br />

STREET IMPROVEMENTS<br />

Point Phase 1 927,400 0 0 0 0<br />

TOTAL STREET IMPROVEMENTS 927,400 0 0 0 0<br />

OTHER IMPROVEMENTS<br />

CSX <strong>Improvement</strong> (Crossing Pavement)<br />

Traffic Signalization 50,000 50,000 50,000 50,000 50,000<br />

Sidewalk and ADA access 25,000 50,000 50,000 50,000 50,000<br />

Sidewalk Program <strong>City</strong> Repairs 50,000 50,000 50,000 50,000 50,000<br />

Sidewalk Program Property Owner Repairs 150,000 150,000 150,000 150,000 150,000<br />

TOTAL OTHER IMPROVEMENTS 275,000 300,000 300,000 300,000 300,000<br />

TOTAL EXPENDITURES 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />

33


THIS PAGE INTENTIONALLY LEFT BLANK<br />

34


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Sidewalk Program<br />

Description and Purpose:<br />

Repair & replacement <strong>of</strong> existing sidewalks in various sections <strong>of</strong> the<br />

community through an annual sidewalk capital program initiative.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Repairs are required, per city code section 909, by property owners; however<br />

the city can completed the repairs at the election <strong>of</strong> the property owner, and<br />

invoice the property owner for the cost <strong>of</strong> the work.<br />

Pictures and Drawings:<br />

35


Recommended Funding:<br />

Reimbursement to the city is either by direct payment, an agreed upon<br />

payment plan, or by tax assessment if required for uncooperative property<br />

owners.<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

Sid ew a lk & A DA A ccess $ 2 5 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 2 5 ,0 0 0<br />

Sid ew a lk P rg m C it y R ep a irs $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

Sid ew a lk P rg m P r op O w ner $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />

T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

Sid ew a lk P ro gr am As sm nt s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />

O th er C ity Fu nd s $ 7 5 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 4 7 5 ,0 0 0<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />

36


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Annual Street Resurfacing<br />

Description and Purpose:<br />

Annual program to maintain the surface course <strong>of</strong> pavement through mill & fill,<br />

overlay, slurry seal, and asphalt rejuvenator applications to select city streets.<br />

Without adequate funding, the focus <strong>of</strong> the program continues to be on<br />

preventative maintenance processes on local streets, deferring necessary<br />

surface course replacement until future years.<br />

Department:<br />

Engineering Services & Public Works<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

License Fee (Fund 202)<br />

Inflow/Infiltration (Fund 541)<br />

Justification:<br />

To improve the integrity <strong>of</strong> city streets for the safety <strong>of</strong> the traveling public, and<br />

to protect the city from unaffordable projects that involve total replacement <strong>of</strong><br />

roadways that results from the lack <strong>of</strong> adequate preventative maintenance<br />

operations.<br />

Pictures/Images<br />

37


Recommended Funding:<br />

It is recommended that the funding for this program be gradually increased to<br />

a level that coincides with the calculated amount necessary to properly<br />

maintain the city street network as a whole (according to the city’s pavement<br />

maintenance s<strong>of</strong>tware and recommendations from experts). Small percentage<br />

<strong>of</strong> funding is recommended to come from Fund 541 for manhole casting<br />

improvements that are traditionally made part <strong>of</strong> this project.<br />

R EC OM M EN D ED F UN D IN G<br />

Es tim a te d Expe nditure s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />

Res urfacing P ro gram $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

S o urc e o f F unds 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />

General Fund<br />

CDBG Rehabilitatio n $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 425,000<br />

Other <strong>City</strong> Funds /Gas Tax $ 226,718 $ 798,600 $ 823,529 $ 850,000 $ 850,000 $ 3,548,847<br />

P rivate Funding<br />

State/Federal<br />

To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />

38


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Annual Traffic Signalization <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The traffic signalization program provides annual funding for major signal<br />

equipment upgrades and installations for the over 58 existing and proposed<br />

signalized intersection locations in the city.<br />

Department:<br />

Public Works & Department <strong>of</strong> Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Advances upgrades to signal system equipment including L.E.D. bulb<br />

changeover, battery back-up installation, and closed loop interconnect<br />

improvements.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E s tim a te d E x p e n d itu r e s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />

T r a ffic S ig n a liz a tio n $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

S o u r c e o f F u n d s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />

C a p ita l Im p r o v e m e n ts $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

39


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

The Point Intersection - Phase I <strong>Improvement</strong>s<br />

Description and Purpose:<br />

This project is Phase I <strong>of</strong> a two phase project. It consists <strong>of</strong> the realignment <strong>of</strong><br />

SR 37 in the eastbound direction to a proposed intersection on US 36<br />

approximately 300 feet west <strong>of</strong> the existing US 36/SR 37 “The Point”<br />

intersection. As part <strong>of</strong> the realignment, an eastbound left turn lane will be<br />

included for EBLT to Moore Street. The newly configured intersection on US 36<br />

will include the installation <strong>of</strong> a mast arm traffic signal, which will replace the<br />

existing traffic signal located at the existing intersection. The intersection will<br />

also include the alignment <strong>of</strong> a future public road (south leg <strong>of</strong> the intersection)<br />

along with the necessary widening on US 36 to install a westbound left turn<br />

lane.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant for 44%<br />

$50,000 County Engineer Funds<br />

Pictures/Images:<br />

40


Justification:<br />

The existing intersection operates at a LOS <strong>of</strong> E and has an intersection delay<br />

<strong>of</strong> 69.2 seconds during the peak hours. With these improvements, the LOS will<br />

improve to a C and the intersection delay will be reduced to 29.1 seconds<br />

during the peak hours. The 95 th % Queue Length for westbound US 36/SR 37<br />

will be reduced from 1175’ to 400’ and for eastbound SR 37 it will be reduced<br />

from 720’ to 500’. The installation <strong>of</strong> the traffic signal at the newly configured<br />

intersection to the west and the removal <strong>of</strong> the existing traffic signal at the<br />

existing intersection will provide additional westbound US 36 stacking allowing<br />

for the free flow <strong>of</strong> the westbound SR 37 traffic during most hours <strong>of</strong><br />

operation. The improvements will also provide a signalized access point along<br />

with a left turn lane for ODOT, the <strong>City</strong> Public Works Facility, future business<br />

property, and a future public street connection.<br />

Recommended Funding:<br />

Project was submitted for OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant funding<br />

assistance. Requested OPWC amount funding is 44% <strong>of</strong> project cost.<br />

<strong>Delaware</strong> County has verbally committed $50,000 towards the project.<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

T ra ff ic<br />

E nv ir on m ent a l<br />

P relim in a ry E n gine ering<br />

Fina l E n gineer ing $ 8 5 ,0 0 0 $ 8 5 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha se $ 5 ,0 0 0 $ 5 ,0 0 0<br />

Ad m instra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ction $ 6 9 7 ,0 0 0 $ 6 9 7 ,0 0 0<br />

C h an ge O r d er/ C o nt ing enc y $ 6 9 ,7 0 0 $ 6 9 ,7 0 0<br />

C o nst ru ction E ngin eering $ 1 7 ,4 2 5 $ 1 7 ,4 2 5<br />

In sp ect ion $ 5 2 ,2 7 5 $ 5 2 ,2 7 5<br />

T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

O th er C ity Fu nd s $ 5 0 6 ,7 4 4 $ 5 0 6 ,7 4 4<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l $ 3 7 0 ,6 5 6 $ 3 7 0 ,6 5 6<br />

In H ou se (E ng ineer in g) $ 0<br />

C o un ty Fu nd s $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />

42


CAPITAL IMPROVEMENT PLAN<br />

TRANSPORTATION IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

<strong>CIP</strong> ALLOCATION 181,489 175,784 0 0 0<br />

COUNTY CONTRIBUTION - ISSUE II 50,000 50,000 0 0 0<br />

STATE ISSUE II<br />

Belle Avenue Intersection<br />

US36/Houk Rd. Turn Lane <strong>Improvement</strong>s 160,151<br />

William/Cheshire/Channing Intersection 27,060 221,216<br />

US23/SR315 INTERSECTION<br />

ODOT 25,000 125,000 100,000 250,000 1,611,000<br />

MORPC ALLOCATION<br />

US 23/Pennsylvania Interchange 200,000 150,000 0 0 0<br />

VETERAN'S PARKWAY<br />

Federal Funds 400,000 3,000,000 6,000,000 42,950,000<br />

TOTAL REVENUE 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

EXPENDITURES:<br />

MORPC TRANSPORTATION PLANNING<br />

Veteran's Parkway - Alt. 16 400,000 3,000,000 6,000,000 42,950,000<br />

US23/Pennsylvania Intersection 200,000 150,000 0 0 0<br />

DEVELOPMENT IMPROVEMENT PROJECTS<br />

GRADY BLVD. IMPROVEMENTS 0<br />

Intersection <strong>Improvement</strong>s 0<br />

ISSUE II IMPROVEMENTS<br />

BELLE AVENUE INTERSECTION<br />

US36/HOUK RD. TURN LANE IMPROVEMENTS 357,200<br />

WILLIAM & CHESHIRE/CHANNING INTERSECT. 61,500 447,000<br />

CHANNING ST. INTERSECTION 0 0 0<br />

OLENTANGY ST. INTERSECTION/BIKE PATH 0 0 0<br />

US 36 CURTIS ST. TURN LANE INTERSECTION 0 0<br />

US 23/SR 315 INTERSECTION 25,000 125,000 100,000 250,000 1,611,000<br />

TOTAL EXPENDITURES 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />

PURPOSE: The Transportation <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements/expansion <strong>of</strong> the<br />

<strong>City</strong>'s public works infrastructure.<br />

FUNDING SOURCE: Funding for these projects comes primarily from the Federal and State<br />

governments in the form <strong>of</strong> grants and allocated federal and state revenues. The <strong>City</strong>'s matching<br />

contributions and funding for projects not receiving grant funding comes from the same sources<br />

used for street maintenance projects.<br />

43


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 36 & Houk Road Turn Lane <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Construction <strong>of</strong> dedicated southbound right turn lane and lengthening <strong>of</strong> the<br />

existing southbound left turn lane on Houk Road at US-36. Project involves<br />

widening <strong>of</strong> an existing culvert and signal modifications to accommodate the<br />

new lane configuration.<br />

Department:<br />

Engineering Services<br />

Fund and Account:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC LTIP Grant ($160,151)<br />

<strong>Delaware</strong> County Engineer ($50,000)<br />

Justification:<br />

Project was prioritized based on previous <strong>City</strong> Council concerns over this<br />

intersection. The project has been awarded OPWC LTIP Grant funds for design<br />

and construction.<br />

Recommended Funding:<br />

Funding was awarded by OPWC LTIP grant for this project in Round 22 (2008),<br />

in addition to a contribution from the County. Final engineering for the project<br />

commenced in 2008. Recommended funding slightly higher than OPWC<br />

estimates in an attempt to cover anticipated rise in material prices.<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />

R / W P ur cha s e $ 3 ,7 0 0 $ 3 ,7 0 0<br />

Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 3 0 ,0 0 0 $ 3 0 ,0 0 0<br />

C o nst ru ct io n En ginee ring $ 2 ,5 0 0 $ 2 ,5 0 0<br />

In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

O th e r C ity Fu nd s $ 1 4 7 ,0 4 9 $ 1 4 7 ,0 4 9<br />

Sta te /F ed e ra l $ 1 6 0 ,1 5 1 $ 1 6 0 ,1 5 1<br />

D e law a re C ou nt y $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />

45


Pictures and Drawings:<br />

46


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 36 & Cheshire-Channing Intersection <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The project involves widening US 36 to provide left turn lanes for traffic from<br />

US 36 westbound to Ann Street and Cheshire Street and US 36 eastbound to<br />

Channing Street. Also included is the conversion <strong>of</strong> Channing Street to “oneway”<br />

to the north and the establishment <strong>of</strong> a dedicated bus loading zone on the<br />

east side <strong>of</strong> Channing Street for the adjacent school. The traffic signal at Ann<br />

Street will be removed and a new mast arm signal will be installed at Cheshire<br />

Street and coordinated with an updated mast arm signal at Channing Street.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

OPWC S<strong>CIP</strong>/LTIP Grant Funding (44% <strong>of</strong> construction)<br />

$50,000 County Engineer Funds<br />

Justification:<br />

Recent traffic analysis indicates that a signal is warranted at US 36 and<br />

Cheshire Street and a signal is no longer warranted at US 36 and Ann Street.<br />

Left turn movements from US 36 to both Cheshire Street and Channing Street<br />

obstruct through traffic movements, especially during the peak traffic hours.<br />

Travel direction and access changes along Channing Street, between US 36<br />

and Winter Street, are included to improve the safety <strong>of</strong> the school bus loading<br />

zone and the signal operation at US 36. Most importantly, with the<br />

consideration <strong>of</strong> other roadway improvements to The Point, the traffic demand<br />

on this intersection will be greater.<br />

Pictures and Drawings: See drawing on next page<br />

47


Recommended Funding:<br />

The project was submitted for OPWC S<strong>CIP</strong>/LTIP Round 23/24 grant funding<br />

assistance. Requested amount <strong>of</strong> funding is $221,216. <strong>Delaware</strong> County has<br />

verbally committed $50,000 towards the project.<br />

R E C O MM E N D E D F U N D IN G<br />

E st im a t e d E x p e nd it ur e s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />

T ra f f ic<br />

E n vi r on m ent al<br />

P re li m ina r y E n gi nee r ing<br />

F in a l E ng in eer in g $ 6 0 ,0 0 0 $ 6 0 , 0 0 0<br />

R / W C on su lta n t<br />

R / W P ur ch a se $ 1 , 5 0 0 $ 1 , 5 0 0<br />

A d m i nst ra ti ve $ 1 , 0 0 0 $ 1 , 0 0 0<br />

C on str u cti on $ 3 8 5 , 0 0 0 $ 3 8 5 , 0 0 0<br />

C ha n ge O rd er / C o nti ng enc y $ 3 8 ,5 0 0 $ 3 8 , 5 0 0<br />

C on str u cti on E n gi ne er in g $ 2 , 5 0 0 $ 2 , 5 0 0<br />

In sp e cti on $ 2 0 ,0 0 0 $ 2 0 , 0 0 0<br />

T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />

S o u rc e o f F un d s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />

G en er a l F u nd<br />

O th er C ity F u nd s $ 3 4 ,4 4 0 $ 1 7 5 , 7 8 4 $ 2 1 0 , 2 2 4<br />

M u ni cip a l B o nd s<br />

P ri va te F un d i ng<br />

S ta te / F ed e ra l $ 2 7 ,0 6 0 $ 2 2 1 , 2 1 6 $ 2 4 8 , 2 7 6<br />

D el a w a r e C o un ty $ 5 0 ,0 0 0 $ 5 0 , 0 0 0<br />

T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />

49


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 23 – SR 315 Intersection <strong>Improvement</strong>s<br />

Description and Purpose:<br />

The project will begin with the preparation <strong>of</strong> a safety study that will include<br />

the U. S. Route 23/State Route 315/Stratford Road Intersection and the U. S.<br />

Route 23/Pollock Road. The realignment <strong>of</strong> State Route315 and Stratford Road<br />

intersection will be evaluated along with signal retiming for the existing<br />

intersections. If the safety study results in a conclusion that requires<br />

additional preliminary engineering and planning, the consultant will then be<br />

scoped to complete the Steps <strong>of</strong> the Minor Project Development Process as<br />

directed by the <strong>City</strong> and ODOT.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

HSP (Highway Safety Program Funds) – $1,156,003<br />

Federal Earmark for US 23 – $850,850<br />

TRC (ODOT Toll Revenue Credits) - $128,445<br />

Justification:<br />

The safety and efficiency <strong>of</strong> this intersection is critical to the entire US 23<br />

corridor through the city. The project was initially identified by ODOT’s US 23<br />

Access Management <strong>Plan</strong> as an intersection requiring improvement.<br />

Recommended Funding:<br />

Funding is from a combination <strong>of</strong> state Highway Safety Project (HSP) Funds,<br />

ODOT earmark funds and Toll Revenue Credits (TRC’s) which are to be applied<br />

to <strong>of</strong>fset the city’s required 20% cost <strong>of</strong> the R/W and construction costs, and<br />

100% <strong>of</strong> the design. Project start has been delayed due to ODOT’s requirement<br />

to repeat the consultant selection process. All design expenses are<br />

reimbursable on an as-invoiced basis through ODOT. <strong>City</strong> will have to fund PE<br />

portion directly, though reimbursement is 100%. R/W, utility relocation and<br />

construction is 100% city funded. Documented TRC, earmark, and HSP funds<br />

allocated to the project total $2,135,298.<br />

50


Recommended Funding Cont’d.:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

E nvir on m ent a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />

P re lim in a ry E n gine er ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 0 0 , 0 0 0 $ 1 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />

C o nst ru ct io n $ 1 ,4 0 0 ,0 0 0 $ 1 ,4 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

C o nst ru ct io n En ginee ring $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

In s p ec t ion $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />

51


Pictures and Drawings:<br />

52


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

US 23-Pennsylvania Avenue Interchange <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Project includes the study, design, and construction <strong>of</strong> a modified interchange<br />

to provide full movement access between Pennsylvania Avenue and US-23.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

MORPC STP Sub-allocation Funds<br />

Pictures and Drawings:<br />

Justification:<br />

Ongoing study <strong>of</strong> interchange modifications which commenced in 2005 and<br />

administered through the ODOT 10-Step Minor PDP process. Initial project<br />

study costs are being funded utilizing State STP-M funding through the annual<br />

MORPC allocation toward <strong>Delaware</strong>.<br />

53


Recommended Funding:<br />

Project continues under preliminary development in the ODOT PDP process for<br />

minor projects. All design expenses are 100% reimbursable through ODOT.<br />

Construction could begin in 2012 and is a candidate for funding split <strong>of</strong> 80%<br />

MORPC funds (STP) and 20% <strong>City</strong> funds (as is right-<strong>of</strong>-way purchase). Based<br />

on the projected 2012 STP available funds to cover remaining environmental<br />

and engineering costs (this project only), approximately $2,600,000 should be<br />

available for right-<strong>of</strong>-way and construction cost reimbursement. Our current<br />

estimate for right-<strong>of</strong>-way and construction is $2,875,000 (80% <strong>of</strong> this amount<br />

is $2,300,000).<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

T ra ff ic<br />

E nv ir on m ent a l $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

P relim in a ry E n gine ering $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

Fina l E n gineer ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha se<br />

Ad m instra t ive<br />

C o nst ru ction<br />

C h an ge O r d er/ C o nt ing ency<br />

C o nst ru ction E ngin eering<br />

In sp ect ion<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />

T ot a ls $ 3 5 0 ,0 0 0<br />

54


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Veterans Parkway<br />

Description and Purpose:<br />

<strong>Plan</strong>ning, design, and construction <strong>of</strong> a limited access highway from the US 23<br />

to the intersection <strong>of</strong> Glenn Road and Mill Run Crossing (as recently defined in<br />

determining the study area with ODOT). Identified as a Tier II project on<br />

ODOT’s TRAC list (PID 80824) – called the <strong>Delaware</strong> Southeast By-Pass. Project<br />

AKA Alternate #16 from the 2001 Thoroughfare <strong>Plan</strong>.<br />

Department:<br />

Engineering Services<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

Project is identified as a high priority project on the <strong>City</strong>’s thoroughfare plan by<br />

both the <strong>City</strong> and County. $4.48 million in federal earmark funds were<br />

authorized in the current SAFETEA-LU Transportation bill supported by U.S.<br />

House <strong>of</strong> Representative Patrick Tiberi’s <strong>of</strong>fice, with up to $4,082,813 Million<br />

available for the project study and design. The <strong>City</strong>’s 20% matching obligation<br />

for the federal earmark funds is to be <strong>of</strong>fset by ODOT assigned TRC’s (Toll<br />

Revenue Credits).<br />

Recommended Funding:<br />

Project must follow the ODOT 14-Step Project Development Process (PDP).<br />

Project negotiations were completed with pr<strong>of</strong>essional service contract approved<br />

in June 6, 2008 for $356,491 which has been encumbered through ODOT.<br />

<strong>City</strong> to front cost <strong>of</strong> all design work with reimbursement on an as-invoiced<br />

basis. Also, Senator Voinovich, Congressman Tiberi, and Senator Brown all<br />

submitted an appropriation questionnaire for FY 2009 for $38 million in<br />

additional federal earmark request for construction funding, though approval is<br />

unlikely.<br />

Recommended funding for construction is based on assumptions made during<br />

pre-planning process, absent <strong>of</strong> a preferred alignment. Estimates are provided<br />

only to illustrate the magnitude <strong>of</strong> the construction costs. Estimates based on<br />

2.6 miles <strong>of</strong> two-lane “super-two” highway and four (4) bridges.<br />

2013+ costs are shown to capture the magnitude <strong>of</strong> future additional funds<br />

required for the project construction and it is anticipated that the actual<br />

schedule for construction will be revised to subsequent years.<br />

55


Recommended Funding Cont’d:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 4 0 0 ,0 0 0 $ 4 0 0 ,0 0 0<br />

Fina l E n ginee r ing $ 3 ,0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e $ 6 , 0 0 0 ,0 0 0 $ 6 ,0 0 0 , 0 0 0<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 3 7 ,0 0 0 ,0 0 0 $ 3 7 ,0 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 3 ,7 0 0 ,0 0 0 $ 3 ,7 0 0 , 0 0 0<br />

C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

In s p ec t ion $ 2 ,0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 0<br />

O th e r C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 3 ,4 0 0 , 0 0 0<br />

Fu tu re Fed er era l Fu nd in g $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 4 8 ,9 5 0 ,0 0 0<br />

T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />

56


Pictures and Drawings:<br />

This pictures shows the study area for Veteran’s Parkway.<br />

57


REVENUES:<br />

CAPITAL IMPROVEMENT PLAN<br />

PARKS IMPROVEMENT FUND<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

Neighborhood Park Exaction Fees 315,000 15,000 15,000 15,000 15,000<br />

ODNR Grant<br />

<strong>CIP</strong> Allocation 0 37,200 14,000 17,500 10,000<br />

TOTAL REVENUES 315,000 52,200 29,000 32,500 25,000<br />

EXPENDITURES:<br />

COMMUNITY PARKS<br />

MINGO PARK<br />

- Gym Floor Replacement 36,000<br />

GLEN ROSS PARK<br />

- Park Construction 240,000<br />

SMITH PARK<br />

- Field <strong>Improvement</strong>s 0 10,000<br />

NEIGHBORHOOD PARK IMPROVEMENTS 75,000 15,000 15,000 15,000 15,000<br />

PARKING LOT RESURFACING/SEAL COATING<br />

- Eastside Park 1,200<br />

- Smith Park 14,000<br />

- Mingo and Blue Limestone 17,500<br />

TOTAL EXPENDITURES 315,000 52,200 29,000 32,500 25,000<br />

PURPOSE: The Parks <strong>Improvement</strong> Fund/ Non-Impact Fee <strong>Plan</strong> identifies future improvements<br />

to the <strong>City</strong>'s parks and recreation system that cannot be funded from parks impact fees.<br />

FUNDING SOURCES: The projects in this plan are funded by an allocation <strong>of</strong> the general fund<br />

income tax proceeds. Grant funds are also leveraged when possible to <strong>of</strong>fset the cost to the<br />

general fund. The <strong>City</strong> also has a parks exaction policy that requires new developers to dedicate<br />

parkland for public recreational purposes <strong>of</strong> approximately 10% <strong>of</strong> the acreage developed. In<br />

lieu <strong>of</strong> the required land dedication, Council may accept cash equivalent to the value <strong>of</strong> the land<br />

otherwise required to be dedicated. These funds are allocated in this plan.<br />

59


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Parking Lot/Pavement Resurfacing<br />

Description and Purpose:<br />

Seal coating parking lots/pavement in parks to extend the life <strong>of</strong> the existing<br />

pavement.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

Park <strong>Improvement</strong> Fund<br />

Justification:<br />

Seal coating extends the life <strong>of</strong> the pavement, improves aesthetics <strong>of</strong> the parks,<br />

and eliminates safety hazards from holes or cracks.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

M ingo a nd B lue L im est on e<br />

E a st Sid e P a r k / R heem St . $ 1 ,2 0 0 $ 1 ,2 0 0<br />

Sm ith P a rk $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />

M ingo a nd B lue L im est on e $ 1 7 ,5 0 0 $ 1 7 ,5 0 0<br />

T ot a ls $ 3 2 ,7 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 0 $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />

61


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Gym Floor Replacement<br />

Description and Purpose:<br />

Replace existing gym floor with new tiles, underlayment and molding.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The flooring tiles currently in the gym are original to the facility. They are<br />

worn, coming loose in places, and are beginning to pose safety concerns. The<br />

gym has received a large increase in usage with the upgrades at Mingo Park<br />

and the gym floor won’t hold up as is much longer. In order to upgrade<br />

programming, increase the number <strong>of</strong> activities in the gym, and to maintain<br />

safety the floor needs to be addressed within the next 2 years.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ym F loor $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riv at e F un d ing<br />

St a t e/ Fed era l<br />

T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />

62


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Smith Park Field <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Improve the fields at Smith Park to improve field conditions and drainage on<br />

each <strong>of</strong> the four fields. Field improvements needed include bringing in soil and<br />

regarding the infields on each <strong>of</strong> the four fields. Install dugouts at each <strong>of</strong> the<br />

four fields (8 dugouts). The dugouts would be built in-house and would be<br />

built using a concrete pad and concrete blocks, with posts going up to a ro<strong>of</strong>.<br />

Currently we only have benches with no dugout fencing or separation. Build<br />

SST Waterless restrooms on the site to provide improved restroom facilities and<br />

to alleviate the on-going rentals <strong>of</strong> the port-a-johns currently in use. The<br />

waterless restrooms could then be converted once city water reaches Smith<br />

Park.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong>s Fund (Fund 410)<br />

Justification:<br />

Smith Park is one <strong>of</strong> our three community parks in <strong>Delaware</strong>. As a community<br />

park, the appearance and functionality <strong>of</strong> the park reflects on our entire park<br />

system and image <strong>of</strong> the city as a whole. It is the home <strong>of</strong> our adult s<strong>of</strong>tball<br />

fields and has the potential to become more <strong>of</strong> a destination for teams and<br />

tournaments. The field conditions are below average due to drainage issues<br />

and the site as a whole is in need <strong>of</strong> improvements (dugouts, restrooms) to<br />

provide an environment competitive with those found at other similar facilities<br />

that our players and potential players can access.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

V ar iou s im p r ovem ent s $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

O th er C ity Fu nd s<br />

T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

63


CAPITAL IMPROVEMENT PLAN<br />

EQUIPMENT REPLACEMENT FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 303,598 372,398 56,898 18,398 132,398<br />

REVENUES:<br />

<strong>CIP</strong> Allocation 275,000 500,000 775,000 700,000 765,000<br />

TOTAL REVENUE 275,000 500,000 775,000 700,000 765,000<br />

EXPENDITURES:<br />

PUBLIC WORKS<br />

Pickup Trucks 0 115,000 20,000 15,000<br />

2 Ton Dump Truck 0 95,000 97,000 0 104,000<br />

1 Ton Dump Truck 99,000<br />

1 Ton Sign Truck 46,000<br />

Street Sweeper (3yr. Lease) 55,000 55,000 55,000<br />

Tandem Axle Dump Truck 116,000<br />

Backhoe 91,500<br />

Loader 110,000<br />

Skid Steer 33,000<br />

Crack Seal Machine 55,000<br />

Asphalt Roller 38,000<br />

Asphalt Saw 32,000<br />

Asphalt <strong>Plan</strong>ner 10,500<br />

Utility Van 21,500<br />

TOTAL PUBLIC WORKS 55,000 330,500 419,500 168,500 290,000<br />

PARKS AND RECREATION<br />

3/4 Ton Pickup Truck 0 24,000 25,000<br />

72" Outfront Mower 9,200 13,000 14,000 15,000 15,000<br />

45 HP 4WD Tractor 24,000<br />

55 HP Tractor 28,000<br />

1 Ton Dump Truck 55,000<br />

TOTAL PARKS AND RECREATION 9,200 61,000 67,000 70,000 15,000<br />

AIRPORT<br />

Rebuilt Tug 5,500<br />

Ground Power Unit 12,000<br />

Utility Vehicle 14,000<br />

Jet A Truck 56,500<br />

TOTAL AIRPORT 14,000 0 12,000 56,500 5,500<br />

POLICE DEPARTMENT<br />

Police Cruiser Replacements 128,000 134,000 140,000 146,000 146,000<br />

Detective Vehicle 25,000<br />

Chief Car 25,000<br />

Weight Enforcement Truck 25,000<br />

Parking Control Vehicle 20,000<br />

TOTAL POLICE 128,000 159,000 190,000 166,000 146,000<br />

FIRE DEPARTMENT<br />

EMS Medic Vehicle Replacement 240,000 250,000<br />

Vehicle Replacement 25,000<br />

Engine Truck Replacement (Lease Payment) 65,000<br />

Fire Ladder Replacement (Lease Payment) 125,000 125,000 125,000<br />

TOTAL FIRE 0 265,000 125,000 125,000 440,000<br />

TOTAL EXPENDITURES 206,200 815,500 813,500 586,000 896,500<br />

CARRY OVER BALANCE 372,398 56,898 18,398 132,398 898<br />

PURPOSE: The Equipment Replacement Fund schedules replacement <strong>of</strong> existing equipment<br />

utilized in the Public Works, Parks and Recreation, and Airport. The fund also schedules<br />

replacement <strong>of</strong> Police and Fire vehicles not covered by impact fees.<br />

FUNDING SOURCE: Funding for these equipment purchases comes from the general income<br />

tax allocation.<br />

65


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Public Works Equipment Replacement<br />

Description and Purpose:<br />

The Public Works Department vehicles are used for variety <strong>of</strong> roadway and<br />

public works projects. Vehicles and equipment is replaced based on a vehicle<br />

replacement schedule based on the number <strong>of</strong> hours <strong>of</strong> operations and mileage<br />

and service needs.<br />

Department:<br />

Public Works Department<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

The Public Works Department uses a replacement schedule to minimize the<br />

overall maintenance costs and depreciation loss to the <strong>City</strong> for equipment<br />

expenditures. The proposed purchases will replace items that range from 8 to<br />

12 years old.<br />

Recommended Funding:<br />

RE CO M M E ND ED F UND ING<br />

E st im a t ed Expe n dit ur e s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />

U tility V a n $21 ,500 $21,5 00<br />

Picku p tru cks $115,00 0 $ 20,000 $15 ,000 $150,0 00<br />

2 To n D u m p $95,000 $ 97,000 $104, 000 $296,0 00<br />

1 To n D u m p $99 ,000 $99,0 00<br />

1 To n S ign Tru ck $ 46,000 $46,0 00<br />

Stre et Sw eeper (3 yr. Leas e $55 ,000 $55,000 $ 55,000 $165,0 00<br />

Ta ndem A xle D u m p $116, 000 $116,0 00<br />

Ba ckh oe $ 91,500 $91,5 00<br />

Loa der $ 110,000 $110,0 00<br />

Skid Steer $33 ,000 $33,0 00<br />

Cr ack Sea l M a chin e $55,000 $55,0 00<br />

As pha lt Ho t Bo x $0<br />

As pha lt <strong>Plan</strong> ner $10,500 $10,5 00<br />

As pha lt Roller $38,0 00 $38,0 00<br />

As pha lt Sa w $32,0 00 $32,0 00<br />

Tota ls $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />

So ur ce <strong>of</strong> Fu nd s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />

Tra n sfer fro m CI P $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />

67


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Police Equipment Replacement<br />

Description and Purpose:<br />

The Police Department’s vehicles are typically replaced before the vehicle<br />

mileage exceeds 90,000 miles and an estimated use <strong>of</strong> approximately 27,000<br />

miles per year. The Department usually replaces one or two vehicles a year to<br />

avoid large capital expenditures. This incremental approach minimizes down<br />

time for cruiser transition, excessive maintenance expenses and a more<br />

systematic approach to fleet replacement. Also, the addition <strong>of</strong> new cruisers is<br />

consistent with anticipated increases in the work load and work force. In<br />

addition to standard cruiser replacement, the Department plans to replace the<br />

Chief’s vehicle and CSO Vehicle in 2009, and one <strong>of</strong> the current detective<br />

vehicles in 2010.<br />

Department:<br />

Police Department<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

Replacement <strong>of</strong> police vehicles based on estimated useful life, service needs,<br />

and mileage limits.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a t ed<br />

E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />

P olice C ru is ers $ 1 2 8 ,0 0 0 $ 1 3 4 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 6 9 4 ,0 0 0<br />

D e te ctiv e V e hic le $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

C h ie f C a r $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

C S O V ehicle $ 0<br />

T ru ck W e igh t E n f. $ 2 5 , 0 0 0 $ 2 5 ,0 0 0<br />

P a rk in g C o nt ro l $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

T ot a ls $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />

So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />

T ra n sfe r fro m C I P $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />

68


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fire Fleet Vehicle Replacement<br />

Description and Purpose:<br />

- Replacement <strong>of</strong> Existing Fleet Vehicles<br />

o Vehicle Replacement Schedule<br />

o Insurance Services Report – October 22, 1998<br />

o T.G. Fire/EMS Services Inc., 2001 Study<br />

o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

Goal #2 - Improve Facilities to Match Resource to Risk<br />

Reduce Response Times<br />

o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

Meet international benchmarks and standard <strong>of</strong> care<br />

Upgrade and modernize existing facilities<br />

Deployment analysis to identify appropriate location <strong>of</strong><br />

facilities to meet the standards <strong>of</strong> coverage.<br />

Department:<br />

Fire Department<br />

Fund and Account:<br />

General Fund (Fund 101)<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />

a staff vehicle due to mechanical problems, and it has not been replaced. The<br />

purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />

a command vehicle and a training vehicle through Impact Fees. The<br />

Department has proposed a plan to develop a rotation based on the<br />

Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />

Department to be prepared for Fire Department operations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

E M S M e d ic V eh R eplcm t $ 2 4 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

V ehicle R ep lac em ent $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

E ng in e R ep lcm t (Le ase) $ 6 5 ,0 0 0 $ 6 5 ,0 0 0<br />

L a d d er R ep lcm t (L ea se) $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 3 7 5 ,0 0 0<br />

T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

T ra n sfer fro m C I P $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />

69


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Airport Equipment Replacement<br />

Description and Purpose:<br />

Similar to other departments, the Airport uses a vehicle replacement schedule<br />

to replace its vehicles and or airport equipment based on estimated useful life,<br />

service needs, and mileage limits.<br />

Department:<br />

Public Works – Airport<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

In 2009 the Department plans to add an all terrain vehicle to service airfield<br />

perimeter maintenance areas and drainage areas. The remaining equipment<br />

will be utilized to address increased demand for service.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E st im a t ed<br />

E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />

R eb u ilt T ug $ 5 ,5 0 0 $ 5 ,5 0 0<br />

G rou n d P ow e r Un it $ 1 2 ,0 0 0 $ 1 2 ,0 0 0<br />

U tilit y V eh icle $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />

3 / 4 T o n P ick up $ 0<br />

J e t A T ru ck $ 5 6 ,5 0 0 $ 5 6 ,5 0 0<br />

T ot a ls $ 1 4 ,0 0 0 $ 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 8 8 ,0 0 0<br />

So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />

T ra n s fe r fro m C I P $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />

T ot a ls $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />

70


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Parks and Recreation Equipment Replacement<br />

Description and Purpose:<br />

The Parks and Recreation Department uses various pieces <strong>of</strong> equipment for<br />

special park projects as well as park mowing. Prudent replacement <strong>of</strong><br />

equipment allows for optimum usage and minimizes lost time in repairs and<br />

service issues with damaged or inoperable equipment.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

Equipment Replacement Fund (Fund 440)<br />

Justification:<br />

Replacement <strong>of</strong> parks and recreation department vehicles and equipment is<br />

based on estimated useful life, service needs, and mileage limits. Out-front<br />

mowers are highly maneuverable and designed to meet the varied and<br />

demanding conditions found in the <strong>City</strong>’s park system. Many <strong>of</strong> these models<br />

include hydraulic mower lifts, have shaft driven mowers and transmission and<br />

have power steering. In most conditions, they out-mow larger decked mowers<br />

due to their mowing speed tolerance, maneuverability (less trimming) and<br />

versatility. The purchase <strong>of</strong> a fourth mower is the result <strong>of</strong> increasing mowing<br />

acreage and the loss <strong>of</strong> productivity in loading and unloading mowers,<br />

transporting across town, etc. Having a fourth mower will allow for split<br />

mowing crews when efficiency would benefit. The 45 HP and 55 HP tractors<br />

have high powered engines with high torque and will be used for a variety <strong>of</strong><br />

projects such as excavation, hauling, leveling, plowing, etc. The ¾ Ton Pick-up<br />

and 1 Ton Dump Truck purchases are replacement for current inventory that<br />

will all be 10 years old or older at time <strong>of</strong> replacement.<br />

71


Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

3 / 4 To n P ick -u p $ 2 4 ,0 0 0 $ 2 5 ,0 0 0 $ 4 9 ,0 0 0<br />

7 2 " O ut fr on t M ow er $ 9 ,2 0 0 $ 1 3 ,0 0 0 $ 1 4 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 6 6 ,2 0 0<br />

4 5 H P 4 W D T r act or $ 2 4 ,0 0 0 $ 2 4 ,0 0 0<br />

5 5 H P T ra cto r $ 2 8 ,0 0 0 $ 2 8 ,0 0 0<br />

1 T o n D u m p T ru ck $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />

T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 2 0 7 ,2 0 0 $ 2 2 2 ,2 0 0<br />

72


REVENUES:<br />

CAPITAL IMPROVEMENT PLAN<br />

TECHNOLOGY IMPROVEMENTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

<strong>CIP</strong> Allocation 177,000 347,000 262,000 287,000 212,000<br />

TOTAL REVENUE 177,000 347,000 262,000 287,000 212,000<br />

EXPENDITURES:<br />

Telephone System Lease (5yrs. $250,000) 60,000 60,000 60,000 60,000 60,000<br />

<strong>Plan</strong>ning S<strong>of</strong>tware (5yrs. $200,000) 47,000 47,000 47,000 47,000 47,000<br />

Fiber/Infrastructure 0 35,000 35,000 35,000 35,000<br />

Servers/Server Hardware 15,000 15,000 15,000 15,000 15,000<br />

PC Replacement 35,000 35,000 35,000 35,000 35,000<br />

Copier Replacement 20,000 20,000 20,000 20,000 20,000<br />

S<strong>of</strong>tware Systems 50,000 75,000<br />

AS 400 PD 85,000<br />

PD Call Logger (see telephone sys. Sheet) 50,000<br />

TOTAL EXPENDITURES 177,000 347,000 262,000 287,000 212,000<br />

PURPOSE: The Technology <strong>Improvement</strong>s <strong>CIP</strong> identifies significant technology improvements<br />

necessary to address <strong>City</strong>wide technology systems.<br />

FUNDING SOURCES: General fund income tax allocation.<br />

73


34 74


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Annual Server and Network Equipment Purchases and Replacements<br />

Description and Purpose:<br />

Annual Server and Network Equipment Purchases and Replacements. The IT Department maintains a<br />

scheduled replacement <strong>of</strong> all servers in the <strong>City</strong> <strong>of</strong> a maximum <strong>of</strong> 5 years <strong>of</strong> service to the <strong>City</strong> for front-line<br />

services. Once a server reaches this age, the machine may be utilized in a reserve role, or its service to the <strong>City</strong><br />

terminated, depending upon the condition <strong>of</strong> the hardware. A similar plan is in effect for Network equipment,<br />

although that equipment may be used effectively for up to 7 years, at present.<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

In 2009, we have scheduled the removal from service <strong>of</strong> 6 servers. The functionality <strong>of</strong> each <strong>of</strong> these servers will<br />

require replacement. The <strong>City</strong>’s server capacity strategy is to purchase bigger servers, but to divide the use <strong>of</strong><br />

the servers into virtual servers, capable <strong>of</strong> providing more capacity in fewer machines. The servers targeted for<br />

retirement in 2008, 6 in all, were replaced by 2 physical servers. Those two physical servers still have capacity to<br />

provide more services, and are being utilized in the implementation <strong>of</strong> additional s<strong>of</strong>tware systems, such as that<br />

for the <strong>Plan</strong>ning/Development Department.<br />

In this category also comes additional disk capacity within the <strong>City</strong>. The <strong>City</strong> currently has 13 terabytes <strong>of</strong> data<br />

storage capacity. Of this, more than 50% is currently in use in some way. IT intends to extend the <strong>City</strong>’s data<br />

storage capacity, and evaluate disaster recovery systems, and <strong>of</strong>f-site storage in order to continue to provide<br />

adequate file storage to the <strong>City</strong>.<br />

With respect to Network Equipment, the <strong>City</strong> continues to build some network redundancy, particularly between<br />

<strong>City</strong> Hall and the Justice Center. This requires the purchase <strong>of</strong> an additional router, so that connectivity can be<br />

mirrored across the fiber. With 911 consolidation, it may become critical to have two different pathways to the<br />

Justice Center by fiber, so that remote operations are possible.<br />

Backup <strong>of</strong> <strong>City</strong> Data, including High Value Data. The <strong>City</strong> now has a strategic plan for the consolidated storage<br />

<strong>of</strong> general information, and for High Value Data—so that all data in the <strong>City</strong> can reside, in a backup form, in one<br />

location. There are two synergistic goals <strong>of</strong> this strategy: (1) the desire to keep High Value Data (SSNs, personal<br />

information, etc.) private, and (2) to have a reliable <strong>of</strong>f-site storage mechanism with an easy method to both<br />

recover deleted files, and to recover in the event <strong>of</strong> a disaster (DR). This strategy calls for the implementation <strong>of</strong><br />

a mirrored hard drive solution at the new Public Works facility, and/or a major robotic tape library installed at the<br />

new Public Works facility.<br />

Changes and Updates:<br />

Public Records laws will require greater availability <strong>of</strong> information to the public. Without some sort <strong>of</strong><br />

consolidation <strong>of</strong> information, the <strong>City</strong> may have difficulty in complying with these new laws.<br />

Recommended Funding<br />

E s tim a te d<br />

E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 + T o ta ls<br />

S e rv e r R e p la c e m e n t<br />

N e t w o rk E q u ip m e n t<br />

$ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

$ 1 5 ,0 0 0 $ 7 5 ,0 0 0<br />

T o ta ls $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 0 $ 7 5 ,0 0 0<br />

Source <strong>of</strong> Funds<br />

S o u r c e o f F u n d s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 To ta ls<br />

G e n e ra l F u nd $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />

O th e r C ity F un d s $0<br />

M u n ic ip al B on d s $0<br />

P riv a te Fu n d in g $0<br />

S tate /F ed e ral $0<br />

O th e r G ra n ts $0<br />

T o ta l $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />

75


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Police Department AS/400 Replacement<br />

Description and Purpose:<br />

Police Department AS/400 Replacement. The <strong>City</strong>’s Police Department currently utilizes the CHIEFS s<strong>of</strong>tware<br />

system, which can only successfully reside on IBM AS/400 mid-range computers. The current AS/400 is<br />

approximately 7 years old.<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

In 2007, the <strong>City</strong> spent approximately $8,000 in order to extend the life <strong>of</strong> the <strong>City</strong>’s AS/400 computer system.<br />

The system, which is now beyond end-<strong>of</strong>-life from a manufacturer’s perspective (IBM no longer supports the<br />

machine), will eventually fail. While these machines are true workhorses among computers, if the Police<br />

Department intends to continue to use the CHIEFS s<strong>of</strong>tware system, will need to be replaced.<br />

Changes and Updates:<br />

Recommended Funding<br />

E s tim a ted<br />

E x p en d itu re s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 2 0 1 4 + T o tals<br />

S erve r<br />

R ep la c e m e n t $ 7 0 ,00 0 $ 7 0,0 0 0<br />

E qu ip m e n t<br />

U pg ra de s $ 0<br />

D R /C o nso lid a tio n $ 1 5 ,00 0 $ 1 5,0 0 0<br />

T o ta ls $ 8 5 ,00 0 $ 0 $ 0 $ 0 $ 0 $ 8 5,0 0 0<br />

Source <strong>of</strong> Funds<br />

So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2013+ T o tals<br />

G e neral F und $ 85,000 $0 $0 $ 85,000<br />

O ther C ity F unds $0<br />

M u nicipal B onds $0<br />

P riva te Fu nding $0<br />

S tate/F edera l $0<br />

O ther G ra nts $0<br />

T otal $ 0 $ 85,000 $0 $0 $0 $0 $ 85,000<br />

76


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

PC Replacements<br />

Description and Purpose:<br />

PC Replacements<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

Commonly, technology used by users in the <strong>City</strong> will last 3 to 5 years, with those using 5 years having<br />

significantly fewer abilities to get high productivity out <strong>of</strong> their pcs as those using 3 year or younger equipment.<br />

We attempt to replace all pcs within a 4 year cycle in order to keep productivity as high as possible from a<br />

technology point <strong>of</strong> view.<br />

Changes and Updates:<br />

Each year, the <strong>City</strong> typically identifies from 30 to 40 computers which are the highest need candidates for<br />

replacement.<br />

The <strong>City</strong> is currently investigating installation <strong>of</strong> “Thin Client” computers, rather than pcs for most departmental<br />

users. The primary advantages to this approach are: (1) lower cost <strong>of</strong> replacement (at a certain point), (2)<br />

lower cost <strong>of</strong> deployment, (3) standardized user experiences, (4) lower cost <strong>of</strong> antivirus and other<br />

management s<strong>of</strong>tware systems, (4) lower energy cost, (5) longer lifecycle, (6) lower maintenance cost <strong>of</strong><br />

machines (no moving parts). In order to achieve this, we have to acquire additional servers (about 1 for each<br />

25 users). In the long term, it should mean overall lower operating cost for all departments except<br />

Engineering, and possibly planning and GIS, where high-end graphics capabilities are required.<br />

For the next several years, the IT Department will be purchasing a combination <strong>of</strong> PCs and Servers/thin client<br />

computers within the PC Replacement line item. This will permit the <strong>City</strong> to take as large an advantage from<br />

the thin client implementation perspective, while still taking into consideration the trade-<strong>of</strong>fs associated with<br />

thin client computing.<br />

Also included in this Project are Laptops, Monitors, Peripherals, and Projectors.<br />

Not included in this Project, are replacements for printers, which are not contained in any <strong>CIP</strong> Project.<br />

Recommended Funding<br />

E stim ate d<br />

E xp e nd itur e s 2 0 09 2 0 10 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4+ T ota ls<br />

P C s/T hi n<br />

L a p top s<br />

P rin ters<br />

M o n itors<br />

$ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 17 5 ,0 00<br />

$ 0<br />

P e rip h e ra ls $ 0<br />

P ro je ctors $ 0<br />

T o ta ls $ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 0 $ 17 5 ,0 00<br />

Source <strong>of</strong> Funds<br />

So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />

G e nera l F u nd $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $175,000<br />

O th er C ity F unds $0<br />

M unicipal B on ds $0<br />

P rivate Fu nding $0<br />

S tate/F ederal $0<br />

O th er G rants $0<br />

T ota l $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $ 0 $175,000<br />

77


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Fiber Infrastructure<br />

Description and Purpose:<br />

Fiber Infrastructure; <strong>City</strong> and Consortium fiber infrastructure projects. This project is meant to develop fiber optic<br />

infrastructure in furtherance <strong>of</strong> the <strong>City</strong>’s IT needs, and economic development.<br />

Department:<br />

Information Technology<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

The <strong>City</strong> has committed to building a city-wide fiber infrastructure for use by the <strong>City</strong>, and as an economic<br />

development tool. <strong>City</strong> Council agreed that the fiber optic infrastructure should be considered on the same level as<br />

other infrastructure assets here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Cities which are currently experiencing growth, typically<br />

have made significant investment in fiber technology.<br />

Changes and Updates:<br />

To date, 2008 has seen little change in the fiber optic infrastructure itself, here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Legal<br />

documents for the formation <strong>of</strong> the Consortium entity, <strong>Delaware</strong> Area Super Highway (D.A.S.H.) have been drafted.<br />

However, absent external funding <strong>of</strong> some kind from DASH members, the infrastructure will not be able to be<br />

completed.<br />

In 2009 and beyond, we hope to work closely with the Public Works Department to develop in-house expertise at<br />

creating fiber-ready infrastructure. That is, we hope to be able to perform all aspects <strong>of</strong> building fiber infrastructure,<br />

from burying conduit, installing handholes, and pushing fiber, except for fiber terminations.<br />

Recommended Funding<br />

E stim ated<br />

Expenditures 2009 2010 2011 2012 2013 2014+ T otals<br />

N etwork<br />

R edundancy $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />

Total $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />

Source <strong>of</strong> Funds<br />

So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />

G e nera l F u nd $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />

O th er C ity F unds $0<br />

M unicipal B on ds $0<br />

P rivate Fu nding $0<br />

S tate/F ederal $0<br />

O th er G rants $ 0 $0<br />

T ota l $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />

78


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Copier Replacement<br />

Description and Purpose:<br />

Copier Replacement<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

With the implementation <strong>of</strong> the fiber optic network, the new telephone system, and unified messaging, it is paramount<br />

that we maintain current technology in our copier systems. We now utilize copiers as printers and scanners, as well as<br />

photocopy machines. IT’s plan for maintaining current technology was primarily implemented in 2007 with the purchase<br />

<strong>of</strong> 14 current technology copiers. These copiers permit the <strong>City</strong> to take advantage <strong>of</strong> the power <strong>of</strong> the unified<br />

messaging systems we have in place by permitting all users in the <strong>City</strong> to use copiers as scanners, saving files to the<br />

network, and faxing directly from their PCs.<br />

By implementing these changes, the <strong>City</strong> has begun to experience lower operational maintenance cost.<br />

The funding in this project is to pay the payments on a <strong>Capital</strong> Lease, which is the method used to make the purchase<br />

<strong>of</strong> the copiers in 2007.<br />

Changes and Updates:<br />

Recommended Funding<br />

E stim ate d<br />

E xp e nd itur e s 2 0 09 2 0 1 0 2 0 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />

P rin te r/C o pie r/S ca n n ers $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />

$ 0<br />

$ 0<br />

$ 0<br />

$ 0<br />

T o ta ls $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />

Source <strong>of</strong> Funds<br />

So u rce o f Fu n ds 2009 2010 2011 2012 201 3 2014+ T o tals<br />

G e neral F und $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />

O ther C ity F unds $ 0<br />

M unicip al B onds $ 0<br />

P rivate Fundin g $ 0<br />

S tate/F ed eral $ 0<br />

O ther G rants $ 0<br />

T otal $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />

79


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project Detail<br />

Telephone System <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Telephone System <strong>Improvement</strong>s<br />

Department:<br />

IT Department<br />

References, Appendices, Images:<br />

Justification: Please list any supporting goals, principles, objectives and strategies:<br />

This project represents the payment for the telephone system for which implementation began in 2006, and was<br />

completed in 2007.<br />

Changes and Updates:<br />

The <strong>City</strong> did make additional telephone system investment in 2007 to add additional capacity and redundancy for the<br />

Police Department. Additional capacity will be added when the telephone system is expanded to include service at the<br />

new Public Works facility on E. William Street. In conjunction with 911 consolidation, the <strong>City</strong> will need to invest in the<br />

replacement <strong>of</strong> the Police Department’s call logging system. This cost is expected to be about $50,000.<br />

Recommended Funding<br />

E s tim a te d<br />

E x p e nd itur es 2 0 09 20 1 0 20 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />

T e le p ho n e S y stem $ 6 0 ,00 0 $ 6 0,0 0 0 $ 60 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 3 6 0,0 0 0<br />

P .D . C a ll Lo g g er $ 50 ,0 0 0 $ 5 0 ,0 0 0<br />

$ 0<br />

$ 0<br />

$ 0<br />

T o ta ls $ 6 0 ,00 0 $ 6 0,0 0 0 $ 1 10 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 4 1 0,0 0 0<br />

Source <strong>of</strong> Funds<br />

So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2014+ T o tals<br />

G e neral F und $60,0 00 $60,0 00 $ 60,000 $ 60,000 $60,0 00 $60,00 0 $360 ,0 00<br />

O ther C ity F unds $ 50,000 $ 50,000<br />

M u nicipal B o nds $0<br />

P riva te Funding $0<br />

S tate/F edera l $0<br />

O ther G ra nts $0<br />

T otal $60,0 00 $60,0 00 $110 ,000 $ 60,000 $60,0 00 $60,00 0 $410 ,0 00<br />

80


CAPITAL IMPROVEMENT PLAN<br />

BUILDING MAINTENANCE<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

REVENUES:<br />

<strong>CIP</strong> Allocation 51,100 106,300 54,500 25,500 0<br />

TOTAL REVENUE 51,100 106,300 54,500 25,500 0<br />

EXPENDITURES:<br />

Carpet Replacement <strong>City</strong> Hall 10,000<br />

<strong>City</strong> Hall HVAC Replacement 0 60,000<br />

Justice Center Boiler Replacement 28,000 30,000<br />

Justice Center HVAC Overhaul 23,100 23,800 24,500 25,200 0<br />

HVAC Hilborn Room Mingo 12,500<br />

TOTAL EXPENDITURES 51,100 106,300 54,500 25,200 0<br />

PURPOSE: To plan for major building maintenance projects.<br />

FUNDING SOURCES: General fund income tax allocation.<br />

81


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: <strong>City</strong> Hall Carpet Replacement<br />

Description and Purpose:<br />

<strong>City</strong> Hall Carpet Replacement – 1 S. Sandusky Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

<strong>City</strong> Hall renovation occurred 14 years ago and the carpeting is in need <strong>of</strong><br />

replacement. 2010 funding will replace flooring in Council Chambers<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

C a rp e t R e p la ce m ent $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />

T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />

83


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Justice Center HVAC Overhaul<br />

Description and Purpose:<br />

Aging heat pump replacement program for Justice Center – 70 N. Union Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The Justice Center currently has 43 heat pumps that are 15 years old. The<br />

average operation expectation for these units is 12-15 years. The proposed 5<br />

year plan would replace approximately 9 units per year.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

H V A C R e p lac e m en t $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />

84


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Justice Center Boiler Replacement<br />

Description and Purpose:<br />

Aging heating system boilers replacement program for Justice Center – 70 N.<br />

Union Street<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The Justice Center currently has 3 boilers that are 16 years old. The average<br />

operation expectation for these units is 12-15 years. The proposed 5 year plan<br />

would replace approximately 2 units over the next three years. One boiler was<br />

replaced during the recent renovations however another unit is inoperable.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

H e a t Sy ste m B oiler $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />

T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />

So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />

G e n e ra l F u n d $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />

T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />

85


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: <strong>City</strong> Hall HVAC Upgrade<br />

Description and Purpose:<br />

Replacement <strong>of</strong> Johnson Control HVAC Management System to reduce annual<br />

<strong>City</strong> Hall HVAC operating cost<br />

Department:<br />

Public Works – Building Maintenance Division<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

The HVAC system in <strong>City</strong> Hall HVAC system is 15 years old. The HVAC<br />

management system is a proprietary system and requires a non-competitive<br />

parts & pr<strong>of</strong>essional service arrangement with Johnson Controls to maintain. A<br />

replacement system will be chosen that is a LonMark certified system to insure<br />

the HVAC system control components will be open to allow competitive<br />

purchasing <strong>of</strong> parts and service.<br />

Recommended Funding:<br />

RE C OM M E N D E D FU N DIN G<br />

E s t im a te d E x p e nd it ur es 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

H V AC M an a ge m e n t Syst e m $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />

T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />

So ur c e o f F un d s 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G e ner al F un d $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />

T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />

86


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: AC/Furnace in Hilborn Room<br />

Description and Purpose:<br />

HVAC replacement in Hilborn Room at Recreation Center.<br />

Department:<br />

Parks and Recreation<br />

Fund:<br />

<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />

Justification:<br />

HVAC replacement program schedule.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

H ilb o rn R m HV A C R e p lace $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

O th er C ity Fu nd s<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed era l<br />

T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />

87


22 88


CAPITAL IMPROVEMENT PLAN<br />

PARK IMPACT FEE IMPROVEMENT FUND<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCE FORWARD 965,984 156,968 103,912 70,856 37,800<br />

REVENUES:<br />

Impact Fees 85,000 85,000 85,000 85,000 85,000<br />

TOTAL REVENUES 85,000 85,000 85,000 85,000 85,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Bonds<br />

Pool Imprvmnts ($450,000 10yrs., 2006 Issue) 55,927 55,927 55,927 55,927 55,322<br />

2006 Mingo Expansion ($500,000 10yrs.) 62,129 62,129 62,129 62,129 61,462<br />

Pool Imprvmts ($425,000 notes) 451,942 0 0 0 0<br />

Skate Park (Net) ($300,000 notes.) 319,018 0 0 0 0<br />

TOTAL DEBT SERVICE 889,016 118,056 118,056 118,056 116,784<br />

BIKEWAYS<br />

Henry St. Trail Enhancements 5,000 20,000<br />

TOTAL EXPENDITURES 894,016 138,056 118,056 118,056 116,784<br />

IMPACT FEE BALANCE 156,968 103,912 70,856 37,800 6,016<br />

PURPOSE: The Parks <strong>Improvement</strong> Fund/ Impact Fee <strong>Plan</strong> identifies future projects intended<br />

to increase the capacity <strong>of</strong> the <strong>City</strong>'s community parkland and recreation systems. In 2001 the<br />

<strong>City</strong> enacted a parks and recreation facilities development impact fee <strong>of</strong> $1,226 per new<br />

residential development unit. All revenue collected from this fee must be used for system<br />

improvements<br />

FUNDING SOURCES: Parks and Recreation Development Impact Fees<br />

89


THIS PAGE INTENTIONALLY LEFT BLANK<br />

90


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Henry Street Pedestrian Crossing Enhancements<br />

Description and Purpose:<br />

Safety improvements and enhancements to the existing Springfield Branch<br />

bike path crossing at Henry Street. <strong>Improvement</strong>s may include pedestrian<br />

crossing warning signage mounted on a mast-arm, lighting, brick pavers or<br />

stamped concrete crossing, directional signage (using remnant stone from the<br />

demolished tunnel), landscape beds, and possibly benches.<br />

Department:<br />

Engineering Services and Parks & Recreation<br />

Fund:<br />

Park Impact Fee <strong>Improvement</strong> Fund (Fund 491)<br />

Justification:<br />

<strong>Improvement</strong>s are necessary to make the crossing more noticeable and<br />

attractive. <strong>Improvement</strong>s should make the crossing utilized more <strong>of</strong>ten. This<br />

work was originally part <strong>of</strong> a final phase <strong>of</strong> the bike path project that was<br />

cancelled.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy $ 0 $ 0<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d $ 0<br />

O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />

Sta te /F ed e ra l<br />

In H ou se (E ng in ee rin g) $ 5 ,0 0 0<br />

T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />

91


THIS PAGE INTENTIONALLY LEFT BLANK<br />

92


CAPITAL IMPROVEMENT PLAN<br />

POLICE IMPACT FEE FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 290,000 387,000 359,000 371,000 383,000<br />

REVENUES<br />

Police Impact Fees 185,000 125,000 100,000 100,000 383,000<br />

Bond/Note Proceeds<br />

TOTAL REVENUE 185,000 125,000 100,000 100,000 383,000<br />

IMPACT FEE EXPENDITURES<br />

Police Cruiser ( 14th unit) 40,000<br />

Early Warning System Expansion 25,000<br />

DEBT SERVICE<br />

Justice Center ($1,100,000 20yrs.) 88,000 88,000 88,000 88,000 88,000<br />

TOTAL IMPACT FEE EXPENDITURES 88,000 153,000 88,000 88,000 88,000<br />

IMPACT FEE BALANCE 387,000 359,000 371,000 383,000 678,000<br />

PURPOSE: The Police <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Police Department. In 2001 the <strong>City</strong> enacted a Police<br />

Facilities Development Impact Fee <strong>of</strong> $162 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Police<br />

equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />

spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />

impact fee resources. Replacement vehicles for the Police Department are included in the <strong>CIP</strong><br />

replacement fund.<br />

FUNDING SOURCES: Police Impact Fees<br />

93


THIS PAGE INTENTIONALLY LEFT BLANK<br />

94


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Equipment: Early Warning System<br />

Description and Purpose:<br />

Purchase <strong>of</strong> complete digital Early Warning Siren unit including pole to add to<br />

the current system.<br />

Department:<br />

Police Department<br />

Fund:<br />

Police Impact Fee Fund (Fund 492)<br />

Justification:<br />

Previously slated for 2009; pushed back to 2010 based on system capacity.<br />

Recommended Funding:<br />

R E C O M M E N DE D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />

Sir en $2 5 ,0 0 0 $2 5 ,0 0 0<br />

T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />

So u rc e o f F un ds 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />

P olice Im pa ct Fee s $2 5 ,0 0 0 $2 5 ,0 0 0<br />

T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />

95


THIS PAGE INTENTIONALLY LEFT BLANK<br />

96


CAPITAL IMPROVEMENT PLAN<br />

FIRE IMPACT FEE FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 388,914 488,914 445,164 445,164 445,164<br />

REVENUES:<br />

Fire Impact Fees 200,000 165,000 140,000 140,000 0<br />

Bond Issue<br />

TOTAL REVENUE 200,000 165,000 140,000 140,000 0<br />

IMPACT FEE EXPENDITURES:<br />

Command Vehicle 25,000<br />

Training Vehicle 83,750<br />

Land Acquisition Area Substation 100,000 100,000<br />

Construction Station #3 $1,750,000<br />

Annual Debt Service 20yrs. 140,000 140,000 140,000<br />

Construction Station #4 $2,000,000<br />

Annual Debt Service 20yrs. 160,000<br />

TOTAL IMPACT FEE EXPENDITURES: 100,000 208,750 140,000 140,000 300,000<br />

IMPACT FEE BALANCE 488,914 445,164 445,164 445,164 145,164<br />

PURPOSE: The Fire <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Fire/EMS Department. In 2001 the <strong>City</strong> enacted a Fire<br />

Facilities Development Impact Fee <strong>of</strong> $314 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Fire/EMS<br />

equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />

spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />

impact fee resources.<br />

FUNDING SOURCES: Fire Impact Fees.<br />

97


THIS PAGE INTENTIONALLY LEFT BLANK<br />

98


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fleet Vehicle Replacement<br />

Description and Purpose:<br />

- Replacement <strong>of</strong> Existing Fleet Vehicles<br />

o Vehicle Replacement Schedule<br />

o Insurance Services Report – October 22, 1998<br />

o T.G. Fire/EMS Services Inc., 2001 Study<br />

o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

Goal #2 - Improve Facilities to Match Resource to Risk<br />

Reduce Response Times<br />

o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

Meet international benchmarks and standard <strong>of</strong> care<br />

Upgrade and modernize existing facilities<br />

Deployment analysis to identify appropriate location <strong>of</strong><br />

facilities to meet the standards <strong>of</strong> coverage.<br />

Department:<br />

Fire Department<br />

Fund:<br />

General Fund (Fund 101)<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />

a staff vehicle due to mechanical problems, and it has not been replaced. The<br />

purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />

a command vehicle and a training vehicle through Impact Fees. The<br />

Department has proposed a plan to develop a rotation based on the<br />

Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />

Department to be prepared for Fire Department operations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

C o m m a nd V ehicle $ 2 5 ,0 0 0 $ 0 $ 2 5 ,0 0 0<br />

T ra inin g V eh icle $ 8 3 ,7 5 0 $ 8 3 ,7 5 0<br />

T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />

Fire Im p act F ees $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />

99


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: New Fire Stations<br />

Description and Purpose:<br />

-Fire Station #303 – new building in the <strong>City</strong>’s NW quadrant<br />

• Fire Station located on <strong>City</strong> owned property on Lexington Blvd<br />

between W. Central Ave. and W. William St.<br />

• Decrease response times in the <strong>City</strong>’s NW quadrant<br />

• Provide for current and projected growth<br />

• <strong>City</strong> currently owns the associated land for new fire station<br />

• Approximately 10,000 sq ft building<br />

-Fire Station #304 – new building in the <strong>City</strong>’s SE quadrant<br />

• Fire Station is proposed to be located at/in the <strong>City</strong> water tower<br />

located on Cheshire Rd.<br />

• Decrease response times in the <strong>City</strong>’s SE quadrant<br />

• Provide for current and projected growth<br />

• <strong>City</strong> currently owns the associated land for new fire station<br />

• Build out the interior finish <strong>of</strong> the water tower<br />

• Fire Apparatus Bay area attached to the building<br />

-Fire Station #301 – new building in the <strong>City</strong>’s East side<br />

• Fire Station 301 is proposed to be relocated near the<br />

intersection <strong>of</strong> E Winter St. and Lake St.<br />

• Decrease response times in the <strong>City</strong>’s East side<br />

• The Fire Station would serve as the main headquarters and<br />

administrative <strong>of</strong>fices for the Fire Department<br />

• Ohio Wesleyan University has expressed interest in purchasing<br />

the property that Fire Station 301 is located<br />

• Provide for current and projected growth<br />

• Fire Station could serve as the catalyst for redevelopment on the<br />

East side <strong>of</strong> the <strong>City</strong><br />

• <strong>City</strong> currently does not own the associated land for new fire<br />

station<br />

-Fire Station construction costs are currently running @ $200/ sq ft.<br />

-T.G. Fire/EMS Services Inc., 2001 Study<br />

-Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />

• Goal #2 – Improve Facilities to Match Resource to Risk Reduce<br />

Response Times<br />

-Fire Department Strategic <strong>Plan</strong> – Service Gap<br />

• Meet international benchmarks and standard <strong>of</strong> care<br />

• Upgrade and modernize existing facilities<br />

• Deployment analysis to identify appropriate location <strong>of</strong> facilities<br />

to meet the standards <strong>of</strong> coverage.<br />

100


Department:<br />

Fire Department<br />

Fund:<br />

Fire Impact Fee Fund (Fund 493)<br />

Justification:<br />

-Fire Department is currently responding to 57% <strong>of</strong> the calls within 4-<br />

minutes <strong>of</strong> drive time<br />

-<strong>City</strong> Comprehensive <strong>Plan</strong> states within 4-minutes 90% <strong>of</strong> the time<br />

-GIS Studies, indicate that this would increase our response times to<br />

77% within 4-minutes<br />

-2007-2012 Fire Department Strategic <strong>Plan</strong> identified internal and<br />

external stakeholders as one <strong>of</strong> the most important issues facing<br />

the Fire Department. This relates specifically to Goal # 2<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N D IN G<br />

E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

C o nst ru ction St a tio n 3 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 4 2 0 ,0 0 0<br />

C o nst ru ction St a tio n 4 $ 1 6 0 ,0 0 0 $ 1 6 0 ,0 0 0<br />

L a nd A cq . S ub sta t ions $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />

T ot a ls $ 0 $ 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />

G ener al Fun d $ 0<br />

Im p ac t F ees/ B o nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

M un icip a l B on d s $ 0<br />

P riv at e F un d ing (O W U) $ 0<br />

St a t e/ Fed era l $ 0<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />

101


THIS PAGE INTENTIONALLY LEFT BLANK<br />

102


CAPITAL IMPROVEMENT PLAN<br />

MUNI<strong>CIP</strong>AL SERVICES IMPACT FEE FUND<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCE FORWARD 466,766 467,266 417,766 343,266 268,766<br />

REVENUES:<br />

Impact Fees 200,000 150,000 125,000 125,000 125,000<br />

Bond/Note Proceeds - Justice Center -<br />

Bond/Note Proceeds - Public Works Garage<br />

TOTAL REVENUES 200,000 150,000 125,000 125,000 125,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Public Works Facility ($1,404,000 20yrs.) 103,500 103,500 103,500 103,500 103,500<br />

Justice Center ($1,200,000 20yrs.) 96,000 96,000 96,000 96,000 96,000<br />

TOTAL EXPENDITURES 199,500 199,500 199,500 199,500 199,500<br />

IMPACT FEE BALANCE 467,266 417,766 343,266 268,766 194,266<br />

PURPOSE: The Municipal Services Fund identifies future projects and equipment purchases<br />

necessary for operation <strong>of</strong> the <strong>City</strong>'s Various Departments. In 2006 the <strong>City</strong> enacted a Municipal<br />

Services Development Impact Fee <strong>of</strong> $366 per single family residential unit and approximately<br />

$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Municipal<br />

facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be spent on<br />

replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with impact fee<br />

resources.<br />

FUNDING SOURCES: Municipal Facilities Impact Fees.<br />

103


104


CAPITAL IMPROVEMENT PROGRAM<br />

WATER FUND CAPACITY PROJECTS<br />

2009-2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 1,487,102 2,077,697 2,724,392 2,355,101 2,179,810<br />

REVENUES:<br />

Water Capacity Fees 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000<br />

Water Rate Increase 10% 2010 187,500 375,000 382,500 390,000<br />

Water Rate Increase 10% 2011 187,500 375,000 382,500<br />

Water Rate Increase 0% 2012 0 0<br />

JRS Grant 2,000,000<br />

Bond Proceeds 8,205,000 11,000,000 0<br />

TOTAL REVENUES 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Westside Trans. Line ($4,500,000 25 yrs.) 361,520 361,520 361,520<br />

Kingman Hill Tower ($3,545,000 25 yrs.) 239,405 240,805 242,005 243,005 243,005<br />

<strong>Plan</strong>t Expansion ($15,230,000 25yrs.) 1,128,266 1,128,266 1,128,266<br />

TOTAL DEBT SERVICE 239,405 240,805 1,731,791 1,732,791 1,732,791<br />

PLANT CAPACITY PROJECTS<br />

Treatment <strong>Plan</strong>t Expansion<br />

Design 850,000<br />

Construction 500,000 11,000,000<br />

WATER SUPPLY PROJETS<br />

Penry Rd. Wellfield 2,385,000<br />

DISTRIBUTION CAPACITY PROJECTS<br />

Westside Transmission Line 4,000,000<br />

Sawmill Parkway Waterline 100,000 100,000 2,000,000<br />

Panhandle Rd. Waterline (lowhead dam) 340,000<br />

New Line Oversizing 200,000 200,000 200,000 200,000 200,000<br />

TOTAL WATER CAPACITY PROJECTS 8,375,000 11,300,000 2,200,000 200,000 200,000<br />

ENDING FUND BALANCE 2,077,697 2,724,392 2,355,101 2,179,810 2,019,519<br />

105


106


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sawmill Parkway Waterline Extension<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> a waterline with the Sawmill Parkway Extension.<br />

Department:<br />

Public Utilities & Engineering Departments<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Provide potable water service to the SW area <strong>of</strong> the <strong>City</strong> with a possible Jobs<br />

Ready Grant.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

Job s Re a dy Gr a nt $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />

T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />

107


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Penry Road Raw Water Line<br />

Description and Purpose:<br />

Construction <strong>of</strong> the water transmission line from the Penry Wellfield to the<br />

Water Treatment <strong>Plan</strong>t. The transmission line will double the <strong>City</strong>’s well water<br />

supply from the current 2MGD to 4MGD. The additional well water will help in<br />

lowering nitrates, atrazine, and stage 2 disinfectant by-product levels because<br />

<strong>of</strong> the lower levels <strong>of</strong> organic material in the well water as opposed to the river<br />

water supply.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Fund Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Necessary for additional water treatment capacity. Easements & design work<br />

are currently under way and construction is needed in order to supply water to<br />

the new proposed membrane plant pilot study scheduled as part <strong>of</strong> the Water<br />

Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

E s t im a te d E x p e n d it u r es 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />

T ra ff ic<br />

E n v ir o n m e n t a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />

R / W C on s u lt a n t $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />

R / W P u r c h a s e $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

A d m in s t ra t iv e<br />

C o n s t ru c t io n $ 1 ,9 0 0 , 0 0 0 $ 1 ,9 0 0 , 0 0 0<br />

C h an g e O rd e r/ C o n t in g e n c y<br />

R E C O M M E N D E D F U N D I N G<br />

C o n s t ru c t io n En g in e e rin g $ 1 9 0 ,0 0 0 $ 1 9 0 ,0 0 0<br />

In s p e c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

S o u r c e o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />

G e n e r al F u n d<br />

O th e r C ity F u n d s $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

M u n ic ip a l B o n d s<br />

T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />

108


Pictures and Drawings:<br />

109


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Panhandle Road Waterline<br />

Description and Purpose:<br />

Project involves construction <strong>of</strong> a 12” water line crossing the river at the<br />

Panhandle Road low-head dam.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536) – Design in 2008 <strong>CIP</strong><br />

Justification:<br />

Larger water line needed to serve existing customers and additional capacity<br />

for future development in our service area. Water line construction is in<br />

conjunction with the removal <strong>of</strong> the low-head dam.<br />

Recommended Funding:<br />

Estim a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Ad minstra tive<br />

Co nstru ctio n $3 00,000 $300,000<br />

Ch an ge O rd er/Co ntingen cy<br />

Co nstru ctio n En ginee ring $ 25,000 $25,000<br />

In spection $ 15,000 $15,000<br />

Tota ls $3 40,000 $340,000<br />

Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d<br />

O th er C ity Fu nds $3 40,000 $340,000<br />

M un icipa l Bon ds<br />

Priva te F un din g<br />

Sta te /F edera l<br />

Tota ls $3 40,000 $340,000<br />

110


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Groundwater Membrane <strong>Plan</strong>t<br />

Description and Purpose:<br />

The construction <strong>of</strong> a rated 3MGD Groundwater Membrane <strong>Plan</strong>t which<br />

will treat the water coming from all the well fields and then blend it with<br />

the river water being treated by the existing plant. This will increase the<br />

total water treatment capacity by an additional 3 million gallons per day.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

The membrane plant will increase water treatment capacity and help the water<br />

quality by reducing the Stage II Disinfectant by-products, nitrate and atrazine<br />

levels and helping to produce a s<strong>of</strong>ter and higher quality water able to meet the<br />

increasing EPA regulations<br />

Recommended Funding:<br />

Price estimated by engineering firm.<br />

R E C O M M E N DE D FU N D IN G<br />

E s t im a te d E x p e nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Stu d y $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

E nvir on m ent a l $ 9 0 ,0 0 0 $ 9 0 ,0 0 0<br />

P re lim in a ry E n gine er ing $ 1 5 5 ,0 0 0 $ 1 5 5 ,0 0 0<br />

F ina l E n ginee r ing $ 6 0 5 ,0 0 0 $ 5 5 5 ,0 0 0<br />

C o nst ru ct io n $ 1 0 ,6 3 5 ,0 0 0 $ 1 0 ,6 3 5 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />

In s p ec t ion $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

C a p a city F ee s/ B ond s $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />

Sta te /F ed e ra l<br />

T ot a ls $ 8 0 0 ,0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />

111


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Hills-Miller Road 24-inch Water Line Extension<br />

Description and Purpose:<br />

Construction <strong>of</strong> a 13,000 LF extension <strong>of</strong> the 24-inch distribution main along<br />

Hills-Miller Road, west <strong>of</strong> the CSX railway, east and then north along US23 to<br />

the Water <strong>Plan</strong>t.<br />

Department:<br />

Department <strong>of</strong> Engineering Services & Utility Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Project is the final phase <strong>of</strong> a necessary improvement to the distribution system<br />

and when complete, provides required redundancy in the system over the 100<br />

year old 16-inch line parallel to US23.<br />

Updates/Changes:<br />

A 400 ft portion <strong>of</strong> this project from Merrick Blvd. to Hills-Miller Rd was<br />

constructed in 2005 in conjunction with the TSC development project on the<br />

west side <strong>of</strong> US-23. Engineering will continue in early 2008 with R/W for<br />

approximately 30 properties. Construction <strong>of</strong> remaining portion <strong>of</strong> extension<br />

estimated to begin in 2009.<br />

Recommended Funding:<br />

RE C O M M E N D E D F U N DI N G<br />

E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls<br />

C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls<br />

W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />

112


Pictures and Drawings:<br />

113


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Waterline Oversizing<br />

Description and Purpose:<br />

Extensions and oversizing <strong>of</strong> water lines per development agreements<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Capacity Fee Fund (Fund 536)<br />

Justification:<br />

Proper over sizing <strong>of</strong> waterlines as needed per development agreements<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

Municipal Bonds<br />

Private Funding<br />

State/Federal<br />

Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />

114


CAPITAL IMPROVEMENT PROGRAM<br />

WATER FUND MAINTENANCE PROJECTS<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 383,750 506,350 11,026,350 1,656,350 1,796,558<br />

REVENUES:<br />

Transfer from Water Fund 677,600 700,000 745,000 790,000 825,000<br />

Transfer from Water Fund Reserve 800,000<br />

Add'l Transfer 10% Rate Increase 2012 0 365,000 370,000<br />

Bond/Note Proceeds 800,000 10,500,000<br />

TOTAL REVENUES 1,477,600 11,200,000 1,545,000 1,155,000 1,195,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Treatment <strong>Plan</strong>t ($10,500,000 - 25 yrs) 0 839,792 839,792<br />

WATER TREATMENT PROJECTS<br />

Treatment <strong>Plan</strong>t Rehabilitation 800,000 10,500,000<br />

Lagoon Cleaning 450,000<br />

TREATMENT PLANT SUB-TOTAL 800,000 0 10,500,000 0 450,000<br />

WATER DISTRIBUTION PROJECTS<br />

Water Meter Replacement 25,000 25,000 25,000 25,000 25,000<br />

Water Meter New Installation 25,000 25,000 25,000 25,000 25,000<br />

Chlorine Booster Tank for SE Highland Tower<br />

Backhoe 90,000<br />

Dump Truck 105,000<br />

Water Line <strong>Improvement</strong>s<br />

Small Main/Service Replacement 50,000 50,000 50,000 50,000 50,000<br />

Fire Flow <strong>Improvement</strong> 75,000 75,000 75,000 75,000 75,000<br />

Hillside Dr. Orchard Lane Waterline 140,000<br />

Blymer St. Waterline 160,000<br />

Fair Ave. Waterline 115,000<br />

Eastwood Ave. Waterline Replacement 100,000<br />

US23 Waterline Replacement 400,000<br />

ODOT William St. Culvert Waterline Relocation 175,000<br />

WATER DISTRIBUTION SUB-TOTAL 555,000 680,000 415,000 175,000 335,000<br />

TOTAL WATER REPAIR AND MAINT. 1,355,000 680,000 10,915,000 1,014,792 1,624,792<br />

ENDING FUND BALANCE 506,350 11,026,350 1,656,350 1,796,558 1,366,766<br />

115


116


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Water Meter New Installation (New Residential)<br />

Description and Purpose:<br />

Purchase <strong>of</strong> water meters for new residential installs.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water meters for new installations. These costs are reimbursed by the builder.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 To tals<br />

R/W Purchase<br />

Ad minstrative<br />

Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Construction Enginee ring<br />

Inspection<br />

RECOMM ENDE D FUNDING<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General Fund<br />

Other <strong>City</strong> Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Municipal Bonds<br />

Totals $ 20,000 $20 ,000 $20,000 $20,0 00 $20,000 $125,000<br />

117


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: US 23 Waterline Replacement<br />

Description and Purpose:<br />

Construction <strong>of</strong> an 8” water line on Route US-23 North.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water line to fill in gaps <strong>of</strong> water service along Rt. 23 N to allow taking the old<br />

16” water transmission main out <strong>of</strong> service. Existing 16” water main has been<br />

in continuous service since 1889 and its useful life has been surpassed.<br />

Repairs to this 16 inch main are costly, difficult, and temporarily impairs the<br />

Water <strong>Plan</strong>t capability to provide the necessary flow rates required.<br />

<strong>Improvement</strong>s for this project are defined in the 1986 Water System Master<br />

<strong>Plan</strong> study.<br />

Recommended Funding:<br />

R ECO MM ENDE D FUN DIN G<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Prelimin ary En gineer ing<br />

Final En gineer ing $45 ,000 $45,000<br />

R/W Pur chase<br />

Ad minstrative<br />

Co nstru ctio n $355 ,000 $355,000<br />

Co nstru ctio n En ginee ring<br />

In spection<br />

Totals $400 ,000 $400,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $400 ,000 $400,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $400 ,000 $400,000<br />

118


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Treatment <strong>Plan</strong>t Rehabilitation<br />

Description and Purpose:<br />

Rehabilitation <strong>of</strong> existing water treatment plant. This project is part <strong>of</strong> the new<br />

Water Master <strong>Plan</strong> to help extent the life <strong>of</strong> the existing water plant.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Program is needed to increase life <strong>of</strong> existing plant. The water plant was built<br />

in 1930’s and has been upgraded several times. A recent condition assessment<br />

showed that the current facilities are not suited for expansion or upgrade. The<br />

original concrete structures will require partial repair / reconstruction due to<br />

age, several unit processes do not meet current EPA design standards, building<br />

code violations have been identified, and the current plant is located within the<br />

Olentangy River flood plain.<br />

Recommended Funding:<br />

Est im a te d Expe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />

Tra ff ic<br />

E nv ir on m enta l $120,000 $12 0,000<br />

Prelim in a ry E n gine ering $210,000 $21 0,000<br />

Fina l E n gineer ing $470,000 $47 0,000<br />

Co nstru ction $10,160 ,000 $ 10,160, 000<br />

Ch an ge O r der/ Co nting ency<br />

RE CO M M E ND ED F UND ING<br />

Co nstru ction E ngin eering $ 225,000 $22 5,000<br />

In spection $ 115,000 $11 5,000<br />

Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />

Sou rc e <strong>of</strong> F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />

G ener al Fun d<br />

O th er <strong>City</strong> Fu nds $800,000 $10,500 ,000 $ 11,300, 000<br />

M un icipa l Bon ds<br />

Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />

119


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Small Main Replacement<br />

Description and Purpose:<br />

Replacement <strong>of</strong> small (4 inch and less) water mains that have been prone to<br />

failures, represent water quality issues.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Will improve reliability <strong>of</strong> the water system, reduce water loss, and improve<br />

water quality issues in the water distribution system. This is a 1986 Water<br />

System Master <strong>Plan</strong> recommendation.<br />

Recommended Funding:<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Ad minstrative<br />

Construction $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

RECOMM ENDE D FUN DIN G<br />

Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

Municipal Bonds<br />

Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />

120


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : ODOT Culvert Waterline Relocation Project<br />

Description and Purpose:<br />

Relocation <strong>of</strong> the water main at William St. & Liberty St. prior to the ODOT<br />

Culvert replacement.<br />

Department:<br />

Engineering & Public Utilities Departments<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water main is in conflict with the ODOT culvert project and must be relocated.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />

121


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Lime Lagoon Cleaning<br />

Description and Purpose:<br />

Removal <strong>of</strong> lime sludge from lagoons at the Water Treatment <strong>Plan</strong>t. The lagoons<br />

temporarily store the lime sludge, but when they reach its holding capacity<br />

they must be cleaned.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Sludge lagoons will have reached their holding capacity.<br />

Recommended Funding:<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Ad minstrative<br />

Construction $450,000 $450,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $450,000 $450,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $450,000 $450,000<br />

Municipal Bonds<br />

Private F unding<br />

State /F ederal<br />

Totals $450,000 $450,000<br />

122


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Hillside Dr / Orchard Lane Waterline<br />

Description and Purpose:<br />

Replacement <strong>of</strong> the existing 2” water line on a section <strong>of</strong> Hillside Drive with an<br />

8” water main. No water main exists on Orchard Lane.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Fire flow capacity improvement and water quality issue resolution. Refer to<br />

recommendations established by the 1986 Water System Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

E s t im a t e d E xp e n d it u re s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />

A d m in s tra tiv e<br />

C o n s truc tio n $ 140 ,00 0 $ 140 ,00 0<br />

C h a ng e O rde r/C o n ting e nc y<br />

C o n s truc tio n E n gin e e ring<br />

Ins p e c tio n<br />

R E C O M M E N D E D F U N D IN G<br />

T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />

S o u rc e o f F u n d s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />

G e n e ra l F u n d<br />

O th e r C ity F u n ds $ 140 ,00 0 $ 140 ,00 0<br />

M u nic ip a l B o n d s<br />

S ta te /F e d e ra l<br />

T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />

123


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fire Flow <strong>Improvement</strong>s<br />

Description and Purpose:<br />

<strong>Improvement</strong> <strong>of</strong> fire flow capacity for existing water mains.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Funds to help increase size <strong>of</strong> water lines for fire flow capacity purposes. This<br />

is a 1986 Water System Master <strong>Plan</strong> recommendation.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

Municipal Bonds<br />

State/Federal<br />

Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />

124


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Fair Ave. & East St. Waterlines<br />

Description and Purpose:<br />

Replacement <strong>of</strong> existing water small main to improve fire flow capability. No<br />

water main exists on East Street.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Improves fire flow capabilities, and upgrades service line connections. Refer to<br />

recommendation established by the 1986 Water System Master <strong>Plan</strong> study.<br />

Recommended Funding:<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Prelimin ary En gineer ing<br />

Final En gineer ing<br />

Ad minstrative<br />

Co nstru ctio n $1 15,000 $115,000<br />

Ch an ge O rd er/Co ntingen cy<br />

In spection<br />

R ECO MM ENDE D FUN DIN G<br />

Totals $1 15,000 $115,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $1 15,000 $115,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $1 15,000 $115,000<br />

125


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Eastwood Ave. Waterline<br />

Description and Purpose:<br />

Replacement <strong>of</strong> an existing aged 6” water main with a history <strong>of</strong> both main and<br />

service line failure, with a new 8” ductile iron main, new service lines and<br />

meter pit connections.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Eliminates frequent repairs to this water main that is prone to failure and<br />

improves fire flow capacity.<br />

Recommended Funding:<br />

Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Final En gineer ing<br />

Ad minstrative<br />

Co nstru ctio n $100, 000 $100,000<br />

Ch an ge O rd er/Co ntingen cy<br />

Co nstru ctio n En ginee ring<br />

In spection<br />

R ECO MM ENDE D FUN DIN G<br />

Totals $100, 000 $100,000<br />

Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Fu nds $100, 000 $100,000<br />

Mun icipal Bon ds<br />

State /F ederal<br />

Totals $100, 000 $100,000<br />

126


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Dump Truck<br />

Description and Purpose:<br />

Purchase <strong>of</strong> a Water Distribution Tandem Axle Dump Truck<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Replacement <strong>of</strong> the existing 2 ton dump truck that has exceeded its useful life<br />

and is prone to repairs.<br />

Recommended Funding:<br />

Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />

Adminstrative<br />

Construction<br />

Change Order/Contingency<br />

Construction Engineering<br />

Inspection<br />

RECOMMENDED FUNDING<br />

Totals $105,000 $105,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />

General Fund<br />

Other <strong>City</strong> Funds $105,000 $105,000<br />

Municipal Bonds<br />

Private Funding<br />

State/Federal<br />

Totals $105,000 $105,000<br />

127


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Blymer St Water Main<br />

Description and Purpose:<br />

Construction <strong>of</strong> an 8” water main on Blymer St. from E. Lincoln Ave. to<br />

Fountain Ave. then west on Fountain to N. Union St.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

<strong>Improvement</strong> <strong>of</strong> fire flow capacity with the replacement <strong>of</strong> the existing 4”<br />

waterline. Project defined in the 1986 Water System Master <strong>Plan</strong>.<br />

Recommended Funding:<br />

RECOMM ENDE D FUN DIN G<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Final Engineering<br />

Ad minstrative<br />

Construction $160,000 $160,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $160,000 $160,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $160,000 $160,000<br />

Municipal Bonds<br />

State /F ederal<br />

Totals $160,000 $160,000<br />

128


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Backhoe<br />

Description and Purpose:<br />

Replacement <strong>of</strong> the Water Distribution existing “front line” backhoe that has<br />

reached the end <strong>of</strong> its current functional life cycle. A reliable properly<br />

configured backhoe is an indispensable piece <strong>of</strong> equipment for the water<br />

distribution daily system maintenance function.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

The existing “front line” back hoe will be retained to replace the existing<br />

“backup” backhoe. The “backup” unit serves to replace the “front line” unit as<br />

needed and as the aggregate loader at the stockpile location. The “backup” unit<br />

has long since been incapable <strong>of</strong> serving as a replacement for the “front line”<br />

unit, and has been prone to many failures.<br />

Recommended Funding:<br />

R ECOMM ENDE D FUN DIN G<br />

Estim ated Expend itures 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Ad minstrative<br />

Construction<br />

Ch an ge Ord er/Contingen cy<br />

Construction En ginee ring<br />

In spection<br />

Totals $ 90,000 $90,000<br />

Source <strong>of</strong> Funds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />

Gener al F un d<br />

Oth er C ity Funds $ 90,000 $90,000<br />

Mun icipal Bon ds<br />

Totals $ 90,000 $90,000<br />

129


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Water Meter Replacement<br />

Description and Purpose:<br />

Replacement <strong>of</strong> aged inaccurate water meters. Some <strong>of</strong> these meter<br />

installations are also not remoted.<br />

Department:<br />

Public Utilities Department<br />

Fund:<br />

Water Construction Fund (Fund 531)<br />

Justification:<br />

Water fund and Waste Water fund share this cost. Inaccurate meters and nonremoted<br />

meters represent income stream and operational inefficiencies. These<br />

meter conditions are being improved on a continuous basis (there are 11,000+<br />

meters <strong>of</strong> various size in the system) for the benefit <strong>of</strong> both Utilities (Water &<br />

Sewer) hence the funding from both.<br />

Recommended Funding:<br />

RECOMM ENDE D FUN DIN G<br />

Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />

Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Change Ord er/Contingency<br />

Construction Enginee ring<br />

Inspection<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />

General F und<br />

Other C ity Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

Municipal Bonds<br />

Private F unding<br />

State /F ederal<br />

Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />

130


CAPITAL IMPROVEMENT PROGRAM<br />

SEWER FUND CAPACITY PROJECTS<br />

2009 - 2013<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

BALANCES FORWARD 500,000 227,264 (70,007) (190,672) (272,854)<br />

REVENUES:<br />

Sewer Capacity Fees 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000<br />

SE Highland Sewer ERU Fees 68,250 71,663 75,246 78,000 78,000<br />

Sewer Fees Transfer - 15% 2007 619,000 631,380 644,000 656,890 670,025<br />

Sewer Fees Transfer - 15% 2008 619,000 631,380 644,000 656,890 670,025<br />

Sewer Fees Transfer - 15% 2009 389,600 631,380 644,000 656,890 670,025<br />

JRS Grant 3,000,000<br />

Bond Proceeds - SE Highland Sewer<br />

TOTAL REVENUES 2,795,850 3,065,803 6,107,246 3,148,670 3,188,075<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Land Armstrong Rd./23 N. Sewer $4,715,000 20yrs. 350,815 349,315 352,140 349,293 349,293<br />

230 North Sewer 67,132 66,132 70,132 68,932 68,932<br />

SE Highland Sewer $15,000,000, 5.5%, 25 yrs. 1,036,988 1,045,000 1,051,988 1,051,988<br />

SE Highland Sewer $2,800,000, 20 yrs. OWDA 204,879 204,879 204,879 204,879 204,879<br />

<strong>Plan</strong>t Expansion $21,262,000, 20 yrs. OWDA 1,555,760 1,555,760 1,555,760 1,555,760 1,555,760<br />

TOTAL DEBT SERVICE 2,178,586 3,213,074 3,227,911 3,230,852 3,230,852<br />

COLLECTION CAPACITY PROJECTS<br />

Pr<strong>of</strong>essional Services<br />

US23/US42 30" Sewer Belle Ave. to Cherry St. 490,000<br />

Sawmill Parkway Sewer Extension 150,000 150,000 3,000,000<br />

Columbus Pike Sanitary Sewer 100,000<br />

East St. Sewer 150,000<br />

TOTAL SEWER CAPACITY PROJECTS 890,000 150,000 3,000,000 0 0<br />

ENDING FUND BALANCE 227,264 (70,007) (190,672) (272,854) (315,631)<br />

131


132


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Columbus Pike Sanitary Sewer<br />

Description and Purpose:<br />

The project extends a sanitary sewer along Columbus Pike just north <strong>of</strong><br />

Cheshire Road. Currently, the existing homes on septic systems and the<br />

residents have requested the <strong>City</strong> extend sanitary sewer service to the area.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

This project eliminates the septic systems and provides sanitary sewer service<br />

in the area. The residents would be required to pay a front footage fee and<br />

applicable capacity fees.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />

133


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sawmill Parkway Sanitary Sewer Extension<br />

Description and Purpose:<br />

Design and construction <strong>of</strong> a sanitary sewer main as a part <strong>of</strong> the Sawmill<br />

Parkway project.<br />

Department:<br />

Public Utilities & Engineering Departments<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

Project will provide sanitary sewer services to the SW area <strong>of</strong> the <strong>City</strong> with the<br />

Sawmill Parkway extension. Part <strong>of</strong> the <strong>City</strong>’s Jobs Ready Grant application.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

Fina l E n ginee r ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

Job s Re a dy Gr a nt $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />

134


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: US23/RT 42 30-inch Belle Ave/Cherry St Sanitary Sewer<br />

Description and Purpose:<br />

Construction <strong>of</strong> the 30-inch sewer at Belle Ave under US23/RT42 to tie into the<br />

42-inch sewer on Stratford Rd to Cherry St. to provide additional sewer<br />

capacity to the SW area <strong>of</strong> the <strong>City</strong>.<br />

Department:<br />

Public Utilities & Engineering Department<br />

Fund:<br />

Wastewater Capacity fee fund (Fund 546)<br />

Justification:<br />

Project currently in the design phase, field investigations <strong>of</strong> the Stratford<br />

Rd/Cherry St sewer revealed the sewer is deteriorated due to H2S from the<br />

force main. This project is the first phase <strong>of</strong> improvements for the Industrial<br />

Park area as recommended in the 2007 report.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />

In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />

T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />

135


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: East Street Sewer<br />

Description and Purpose:<br />

The project extends a sanitary sewer along East Street. Currently, existing<br />

homes along East Street use long laterals that connect to existing sewer on<br />

adjacent streets. In addition, there are buildable lots along East Street that do<br />

not have access to sanitary sewer.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Capacity Fee Fund (Fund 546)<br />

Justification:<br />

This project eliminates the existing long laterals and provides sanitary sewer<br />

service to the area. In addition, long laterals are potentially a high infiltration<br />

source.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />

136


CAPITAL IMPROVEMENT PROGRAM<br />

SEWER FUND MAINTENANCE PROJECTS<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 1,000,000 1,496,008 1,732,016 2,497,017 1,853,458<br />

REVENUES:<br />

Transfer from Sewer Fund 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />

TOTAL REVENUES 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />

EXPENDITURES:<br />

DEBT SERVICE<br />

Current Debt Service 357,120 357,120 357,120 357,120 357,120<br />

<strong>Plan</strong>t Rehabilitation ($1,800,000 20 yrs. 3.52%) 131,709 131,709 131,709 131,709 131,709<br />

TOTAL DEBT SERVICE 488,829 488,829 488,829 488,829 488,829<br />

WASTEWATER TREATMENT PROJECTS<br />

Sludge Transport Truck 125,000<br />

Tertiary Filter Building Equipment 500,000<br />

Disinfection 50,000 55,000<br />

WASTEWATER COLLECTION PROJECTS<br />

Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />

Toledo Street Sewer Rehab 80,000<br />

Columbus Avenue Sewer Rehab 115,000<br />

Weselyan Woods 150,000<br />

William & Liberty Sewer Relocation 220,000<br />

Wastewater Service Area Facilities <strong>Plan</strong> 50,000<br />

Sewer Camera Truck Equipment 20,000<br />

Sewer Jet Truck 300,000<br />

Sewer Cleaning Unit 180,000<br />

Backhoe 90,000<br />

TOTAL SEWER REPAIR/MAINTENANCE 365,000 625,000 150,000 605,000 690,000<br />

ENDING FUND BALANCE 1,496,008 1,732,016 2,497,017 2,828,188 2,099,629<br />

137


138 34


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Toledo Street Sewer Rehabilitation<br />

Description and Purpose:<br />

The sanitary sewer is broken down in several areas and is a significant source<br />

<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />

grouting and lining <strong>of</strong> the manholes.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

A CCTV inspection in February 2008 revealed numerous deficiencies allowing<br />

heavy infiltration to enter the sanitary sewer main. These flows decrease<br />

capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />

139


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Sewer Jet Truck<br />

Description and Purpose:<br />

These funds would be used to replace the existing 1999 combination sewer<br />

cleaning truck. This unit is used to perform preventive maintenance and<br />

remove blockages from the collection systems.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The current primary unit (1999 unit) has past its effective life cycle and needs<br />

replaced.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

O th e r $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

140


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Sewer Camera Truck Equipment<br />

Description and Purpose:<br />

These funds would be used to replace the existing computer, video capturing<br />

system, and s<strong>of</strong>tware in the collection systems CCTV sewer inspection unit.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

These updates would allow for easier access to the inspection video and would<br />

integrate with our CMMS.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $2 0 ,0 0 0 $ 2 0, 00 0<br />

T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $2 0 ,0 0 0 $ 2 0, 00 0<br />

T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />

141


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Inflow/Infiltration Remediation<br />

Description and Purpose:<br />

The project consists <strong>of</strong> securing pr<strong>of</strong>essional services to locate, identify, and<br />

repair various sources <strong>of</strong> infiltration and inflow found in the sanitary sewer<br />

system. Infiltration and inflow cause’s sanitary sewer backups into homes and<br />

increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />

cause OEPA permit violations. This program has been in effect for the past 4<br />

years and has made significant reductions in local infiltration and inflow<br />

problems. (grouting, sliplining)<br />

Department:<br />

Public Utilities – Sewer Fund – Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The <strong>City</strong>’s CCTV inspection program has identified numerous areas <strong>of</strong><br />

infiltration located within the <strong>City</strong>’s collection system. These areas include<br />

Sunbury Road (405’), William Street (245’), Central Avenue (769’), Smith Street<br />

(214’), Chamberlain Street (245’), Parson Avenue (184’), Winter Street (2521’),<br />

Milo Street (340’) any many others.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

I & I $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />

142


Pictures and Drawings:<br />

The impact <strong>of</strong> inflow and infiltration on our network is represented in the following diagram.<br />

Dry weather flows - low inflow / infiltration<br />

Wet weather flows - high inflow / infiltration<br />

Off peak network load Peak network load Off peak network load Peak network load<br />

Wastewater pipes are underground and invisible. Most people do not consider that these pipes need maintenance<br />

like the rest <strong>of</strong> their property. Infiltration is an unseen problem and does not usually alert property owners that<br />

something may be wrong with their wastewater pipes.<br />

143


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Combination Sewer Cleaning Unit<br />

Description and Purpose:<br />

These funds would be used to replace the existing 1988 combination sewer<br />

cleaning truck with a combination sewer cleaning unit. This new smaller unit<br />

would service as the secondary unit to the existing 1999 combination sewer<br />

cleaning truck (replacement 2012). These units are used to perform preventive<br />

maintenance and remove blockages from the collection systems.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The current secondary unit (1988 unit) has past its effective life cycle and is<br />

prone to failures and inefficiencies.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

O th e r $ 1 8 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />

144


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Columbus Avenue Sewer Rehabilitation<br />

Description and Purpose:<br />

The sanitary sewer is broken down in several areas and is a significant source<br />

<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />

grouting and lining <strong>of</strong> the manholes.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

A CCTV inspection in March 2008 revealed numerous deficiencies allowing<br />

heavy infiltration to enter the sanitary sewer main. These flows decrease<br />

capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D I N G<br />

E s t im a t ed<br />

E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />

C o n s t ru c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

S o u r ce o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />

O th e r C ity F u n d s $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />

145


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Backhoe<br />

Description and Purpose:<br />

These funds would be used to replace the 2004 Case 590 Backhoe.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

The existing unit has reached its functional life cycle and will need to be<br />

replaced.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 9 0 ,0 00 $ 9 0, 00 0<br />

T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 9 0 ,0 00 $ 9 0, 00 0<br />

T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />

146


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : UV Disinfection Equipment<br />

Description and Purpose:<br />

Replacement <strong>of</strong> existing UV ballasts and lamps for the UV disinfection<br />

equipment.<br />

Department:<br />

Public Utilities<br />

Fund and Account:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Replacement <strong>of</strong> the high intensity lamps that are at the end their recommended<br />

life cycle for meeting the <strong>City</strong>’s NPDES permit requirements.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

O th e r $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />

147


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Tertiary Filter Building Equipment<br />

Description and Purpose: Replacement <strong>of</strong> existing filter media and pumps to<br />

continue to meet more stringent NPDES requirements.<br />

Department: Public Utilities<br />

Fund and Account: Wastewater Construction Fund (Fund 541)<br />

Justification: Existing filter media will be at the end <strong>of</strong> its recommended life<br />

cycle and will have to be replaced to ensure the <strong>City</strong> will be able to meet its<br />

NPDES requirements.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />

148


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Sludge Transport Truck<br />

Description and Purpose:<br />

Purchase <strong>of</strong> a new quad axle roll-<strong>of</strong>f hoist truck to transport WWTP sludge from<br />

plant to the landfill.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Replace the existing 1995 sludge truck that currently has 515,000 miles.<br />

Existing truck has been prone to costly repairs and we have to use a private<br />

hauler when the truck is down for repairs.<br />

Recommended Funding:<br />

E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

O th er $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

C o nst ru ct io n En ginee ring<br />

In sp ection<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G ener al F un d<br />

O th er C ity Fu nd s $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed era l<br />

T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />

149


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Facilities <strong>Plan</strong>ning Report<br />

Description and Purpose:<br />

Facilities planning document for updating the wastewater service area <strong>of</strong> the<br />

<strong>City</strong>.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Need to update the 2000 wastewater service area document.<br />

Recommended Funding:<br />

R E C O M M E N DE D FU N DIN G<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />

150


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />

Project: Wesleyan Woods Sanitary Sewer<br />

Description and Purpose:<br />

Several sources <strong>of</strong> infiltration/inflow and severe root intrusion into the sanitary<br />

sewer have been located in the Wesleyan Woods area. The project consists <strong>of</strong><br />

trenchless methods <strong>of</strong> infiltration/inflow removal and some limited spot<br />

repairs.<br />

Department:<br />

Public Utilities – Sewer Fund - Maintenance<br />

Fund:<br />

Wastewater Construction Fund (Fund 541)<br />

Justification:<br />

Infiltration and inflow cause’s sanitary sewer backups into homes and<br />

increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />

cause OEPA permit violations.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />

151


152


CAPITAL IMPROVEMENT PLAN<br />

STORM SEWER FUND<br />

2009 - 2013<br />

2009 2010 2011 2012 2013<br />

BALANCES FORWARD 253,500 408,500 473,500 243,500 253,500<br />

REVENUES:<br />

Storm Sewer Fees 515,000 525,000 540,000 550,000 570,000<br />

TOTAL REVENUE 515,000 525,000 540,000 550,000 570,000<br />

EXPENDITURES:<br />

Catch Basin Replacement 10,000 10,000 10,000 10,000 10,000<br />

Miscellaneous Repair 30,000 30,000 30,000 30,000 30,000<br />

Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />

N. Sandusky St. to N. Liberty St. 380,000<br />

East Winter Street (Lake St. to Wade St.) 220,000<br />

Bernard Avenue (US 23 to Liberty St.) 75,000<br />

Cherry St. Stormwater Replacement 200,000<br />

Vernon Ave. 535,000<br />

W. William St/Liberty Culvert Replacement 300,000<br />

I & I Report 0 100,000<br />

NPDES Costs 20,000 20,000 20,000 20,000<br />

TOTAL EXPENDITURES 360,000 460,000 770,000 540,000 460,000<br />

UNRESERVED FUND BALANCE 408,500 473,500 243,500 253,500 363,500<br />

PURPOSE: The Storm Sewer <strong>CIP</strong> identifies future projects and studies necessary for<br />

improving and maintaining the <strong>City</strong>'s storm sewer system. The <strong>City</strong> will begin a master plan<br />

process in 2006 to identify issues related to compliance with recently adopted storm sewer<br />

regulations.<br />

FUNDING SOURCES: Storm sewer projects are funded primarily by the previously enacted<br />

storm sewer fees. These fees are assessed to all single and two family residential units<br />

at the rate <strong>of</strong> $2.50 per month. Non-residential and apartments are assesssed a fee based on<br />

an impervious surface calaculation performed on their property.<br />

153


154 12


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Public Works Storm Water Replacement<br />

Description and Purpose:<br />

This project replaces the existing storm water system that is currently located<br />

within the closed landfill located at 241 Cherry Street. The proposed storm<br />

water system would be located and the pipe joints would be water tight.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The <strong>City</strong> received a Notice <strong>of</strong> Violation for the discharge <strong>of</strong> pollutants to “water<br />

<strong>of</strong> the state” without an NPDES permit. The pollutant is the leachate from the<br />

closed landfill that enters the storm water pipe through the pipe joints.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

C o n s tru ct io n $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />

O t h e r C it y F u n d s $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />

155


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Storm Sewers from N. Sandusky to N. Liberty St.<br />

Description and Purpose:<br />

<strong>Improvement</strong>s <strong>of</strong> existing storm sewers and installations <strong>of</strong> new storm sewers<br />

and catch basins from N. Sandusky St. to N. Liberty St<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (B-1) to<br />

improve the storm water drainage from N. Sandusky St. to N. Liberty St and<br />

reduction in known I&I.<br />

Recommended Funding:<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th e r C ity Fu nd s $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />

156


<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />

2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />

Project: Storm Sewers Miscellaneous Repairs<br />

Description and Purpose:<br />

Fees for miscellaneous repairs to the <strong>City</strong>’s Storm sewer system.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Costs to provide repairs to the <strong>City</strong>’s storm sewer system as needed to maintain<br />

the system.<br />

Recommended Funding:<br />

R E C O M M EN D E D F U N D I N G<br />

E st im a te d<br />

E xp e n d it u re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />

M is c ell an e o u s Re p airs $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />

O t h e r C it y F u n d s $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />

157


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: East Winter Street Storm Sewer <strong>Improvement</strong>s<br />

Description and Purpose:<br />

Storm sewer improvements on East Winter St. from Lake St. to Wade St<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (O-2) to<br />

improve the storm water drainage on East Winter St. from Lake St. to Wade St<br />

and reduction in known I&I.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />

158


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : I&I Report <strong>of</strong> the Storm Sewer System<br />

Description and Purpose:<br />

Comprehensive I&I report <strong>of</strong> the <strong>City</strong>’s storm sewer system. Includes flow<br />

monitoring, smoke & dye testing and modeling to locate sources <strong>of</strong> I&I within<br />

the <strong>City</strong>.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Need to locate sources <strong>of</strong> I&I in the <strong>City</strong> to help reduce amount <strong>of</strong> storm water<br />

at the UOWRC. This report is recommended in the 2000 wastewater report.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

159


Description and Purpose:<br />

CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Catch Basin Replacement<br />

Fees for replacement <strong>of</strong> catch basins within the <strong>City</strong>’s storm water system. A<br />

catch basin (a.k.a., storm drain inlet, curb inlet) is an inlet to the storm drain<br />

system that typically includes a grate or curb inlet where stormwater enters the<br />

catch basin and a sump to capture sediment, debris and associated pollutants.<br />

Catch basins act as pretreatment for other treatment practices by capturing<br />

large sediments. The performance <strong>of</strong> catch basins at removing sediment and<br />

other pollutants depends on the design <strong>of</strong> the catch basin (e.g., the size <strong>of</strong> the<br />

sump), and routine maintenance to retain the storage available in the sump to<br />

capture sediment.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Replacement <strong>of</strong> inoperable catch basins.<br />

Recommended Funding:<br />

R E C O M M EN D E D F U N D I N G<br />

E st im a te d E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />

C at ch B as i n Re p la c e m e n t $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />

O t h e r C it y F u n d s $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />

160


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Bernard Ave. Storm Sewer<br />

Description and Purpose:<br />

<strong>Improvement</strong>s to the storm sewer on Bernard Ave. from US 23 to Liberty Street<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (F-3) to<br />

improve the storm water drainage along Bernard Ave. from US 23 to Liberty<br />

Street.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x p e n d it ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th e r C ity F u nd s $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />

161


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project : Fees for MS4 Storm Water Management <strong>Plan</strong><br />

Description and Purpose:<br />

Fees for MS4 storm water management plan as required in the OEPA storm<br />

water NPDES permit.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Provide resources for storm water NPDES permit attainment.<br />

Recommended Funding:<br />

E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

T ra ff ic<br />

E nvir on m ent a l<br />

P re lim in a ry E n gine er ing<br />

Fina l E n ginee r ing $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

R / W C on sult a nt<br />

R / W P ur cha s e<br />

Ad m inst ra t ive<br />

C o nst ru ct io n<br />

C h an ge O rd e r/ C o nt inge n cy<br />

C o nst ru ct io n En ginee ring<br />

In s p ec t ion<br />

R E C O M M E N DE D FU N DIN G<br />

T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />

G e ner al F un d<br />

O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

M un icip a l B on d s<br />

P riva t e F un d in g<br />

Sta te /F ed e ra l<br />

T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />

162


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: West William Street/Liberty Street Culvert Replacement<br />

Description and Purpose:<br />

This project is initiated and administered by ODOT District 6 and involves the<br />

open cut replacement <strong>of</strong> the failing <strong>Delaware</strong> Run pipe arch culvert within the<br />

William Street & Liberty Street right <strong>of</strong> way.<br />

Department:<br />

Department <strong>of</strong> Engineering Services & Public Utilities Department<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

Per agreement with ODOT and includes the necessary storm sewer<br />

improvement in keeping with storm sewer master plan.<br />

Recommended Funding:<br />

The city is responsible for project construction costs within the Liberty Street<br />

R/W. The current cost estimate below is provided by ODOT.<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

Stor m S ewe r Fu nd $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />

163


CITY OF DELAWARE<br />

2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />

Project: Vernon Avenue Storm Sewer<br />

Description and Purpose:<br />

Construction <strong>of</strong> a storm sewer from Vernon Ave. southwest along Conrail RR to<br />

Branch St. west under Conrail RR underneath Lake St. to the Olentangy River<br />

and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to Branch St.<br />

Department:<br />

Public Utilities<br />

Fund:<br />

Storm Sewer Fund (Fund 203)<br />

Justification:<br />

The 1990 Storm Water Report update recommended this project (L-1) to<br />

improve the storm water drainage from Vernon Ave. southwest along Conrail<br />

RR to Branch St. west under Conrail RR underneath Lake St. to the Olentangy<br />

River and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to<br />

Branch St.<br />

Recommended Funding:<br />

R E C O M M E N D E D F U N D IN G<br />

E st im a te d<br />

E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

C o nst ru ct io n $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />

O th er C ity Fu nd s $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />

164


CAPITAL IMPROVEMENT PLAN<br />

REFUSE FUND<br />

2009 - 2013<br />

REVENUES:<br />

2009 - 2013 2009 2010 2011 2012 2013<br />

Refuse Fees 457,476 428,876 470,276 466,276 466,276<br />

TOTAL REVENUE 457,476 428,876 470,276 466,276 0<br />

EXPENDITURES:<br />

Debt Service<br />

Curve Rd. Leachate Collection ($475,000 10rs.) 61,238 59,438 57,638 58,638 58,638<br />

Equipment<br />

Rear Load 20-Yard Packer - Commercial 140,000 150,000<br />

8 Yard Dump 113,000<br />

Side Load 20-Yard Packer - Residential 165,000 165,000 170,000<br />

Recycling Vehicle - Recycling 170,000 170,000 350,000<br />

Bulk Pickup Vehicle<br />

Pickup Truck 32,000<br />

Skid Steer 45,000<br />

Landfill<br />

Leachate Collection System-Curve Road 61,238 59,438 57,638 57,638 57,638<br />

TOTAL EXPENDITURES 457,476 428,876 470,276 466,276 436,276<br />