Capital Improvement Plan (CIP) - City of Delaware
Capital Improvement Plan (CIP) - City of Delaware
Capital Improvement Plan (CIP) - City of Delaware
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>City</strong> <strong>of</strong><br />
<strong>Delaware</strong><br />
Ohio<br />
August 28, 2008<br />
Dear Mayor Wheeler and Council Members:<br />
In accordance with Section 79 <strong>of</strong> the <strong>City</strong> Charter, submitted herewith is the 2009-2013<br />
<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>). Pursuant to Section 80 <strong>of</strong> the Charter, Council is<br />
required to adopt a <strong>CIP</strong> on or before October 15.<br />
In review <strong>of</strong> the 2009-2013 <strong>CIP</strong> city staff made efforts to consider our capital needs, what<br />
the community wants, the age and condition <strong>of</strong> our infrastructure, the status <strong>of</strong> current<br />
projects, and how we could add the necessary new infrastructure and equipment in the<br />
most cost effective manner.<br />
You will see our estimates for the <strong>City</strong>’s general fund allocation to the <strong>CIP</strong> is fairly<br />
conservative with increases averaging 1.8% over the 5 year period. Technology and<br />
equipment purchases consume the majority <strong>of</strong> this revenue followed by transportation<br />
and street maintenance. Debt service paid by the general fund for the streetscape<br />
improvements, Ross Street Park, and pool improvements consumes an average <strong>of</strong> 35% <strong>of</strong><br />
general fund income right <strong>of</strong>f the top. The remaining amount <strong>of</strong> $6.1 million is what is<br />
left to spend on capital improvements.<br />
We have scaled back significantly in the transportation and street maintenance areas in<br />
order to preserve and target street maintenance dollars to the “The Point” project.<br />
Realignment and signalization <strong>of</strong> the intersection is planned for 2009. This project is<br />
being partially funded by the Ohio Public Works Commission and will address the <strong>City</strong>’s<br />
Point related congestion.<br />
You may recall the state <strong>of</strong> Ohio passed an “economic stimulus” bill in late spring <strong>of</strong> this<br />
year in an effort to spur economic development, growth, and generate jobs throughout the<br />
state. One <strong>of</strong> their targets was increasing funding for several Ohio Public Works<br />
Commission programs. The city has successfully completed several OPWC projects in<br />
the past and was eager to take advantage <strong>of</strong> this opportunity. Of course, these grants<br />
require a <strong>City</strong> commitment <strong>of</strong> funds as a match. The total project cost for all proposed<br />
OPWC projects is $3,437,600 with the <strong>City</strong>’s share being $1,754,447. We have also been<br />
fortunate in the past to receive a $50,000 contribution from the County for each <strong>of</strong> these<br />
projects. We anticipate that commitment to continue. You will see the “Point Phase 1”<br />
project in the Street Maintenance category and the other OPWC projects in the<br />
Transportation <strong>Improvement</strong> category.<br />
The downside to focusing resources on “The Point” in 2009 is a reduction in the <strong>City</strong>’s<br />
resurfacing dollars. Since the <strong>City</strong>’s contribution to the Point is $506,744 this added cost<br />
1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />
1
<strong>City</strong> <strong>of</strong><br />
<strong>Delaware</strong><br />
Ohio<br />
could not be directly absorbed. Therefore, we had to review our options. During our <strong>CIP</strong><br />
discussions we reviewed our resurfacing program and the overall condition <strong>of</strong> our roads.<br />
As you may be aware, the industry standard for gauging the overall condition <strong>of</strong><br />
roadways is the pavement condition index, or PCI. We have included some additional<br />
narrative on the city’s PCI. Overall, the <strong>City</strong>’s road conditions are considered “good”<br />
(68-81 PCI) based on this index. Our goal has been to maintain at least at 70 PCI average<br />
on all our roads. Therefore, city staff felt that by reducing some <strong>of</strong> the resurfacing dollars<br />
in 2009 we could shift this resource to the Point without overly impacting the quality <strong>of</strong><br />
our roadways. This will result in a resurfacing program <strong>of</strong> $226,718 in 2009. In 2010 this<br />
amount will be increased to $798,000 and increase to $850,000 by 2013.<br />
Another important topic in the <strong>CIP</strong> is the <strong>City</strong>’s overall debt position. Currently our total<br />
outstanding debt is $76 million. We have included a complete summary <strong>of</strong> the <strong>City</strong>’s debt<br />
position in the introductory material that outlines our outstanding debt, our annual<br />
payments, and maturity dates. By using debt-financing we have been able to add<br />
substantial infrastructure to the <strong>City</strong> such as a new wastewater treatment facility, the<br />
Southeast Highland Sewer, sections <strong>of</strong> Glenn Road, and a new Public Works facility and<br />
Justice Center Expansion. These investments were necessary given the <strong>City</strong>’s expansion<br />
and growth over the years. When development increases we will recoup our investment<br />
from the South East Highland Sewer and Glenn Road through capacity fee income and<br />
community charges, respectively.<br />
Some <strong>of</strong> the new capital investments in the <strong>CIP</strong> that will be financed over the long-term<br />
include the water treatment plant expansion, Hills-Miller transmission line, and the<br />
upground reservoir. These are all out <strong>of</strong> the Water Capacity Fund. The debt for these<br />
projects will be paid from Water Capacity Funds and increases in water rates, given the<br />
current income stream from capacity fees. You will see that projects in the Sewer<br />
Capacity Fund are very limited and are programmed largely in 2009.<br />
One <strong>of</strong> the major equipment purchases in the plan is a $1.25 million ladder truck for the<br />
<strong>City</strong>’s fire department. The current truck was purchased in 1981 and has reached its<br />
useful life. Many <strong>of</strong> the parts for the vehicle are no longer made and/or difficult to find.<br />
The Public Works Department has had to fabricate several parts on the truck in order to<br />
keep it running. This truck cannot be purchased with impact fee funds since it is a<br />
replacement vehicle; therefore the city will purchase it with General Fund money. Our<br />
plan is to lease the truck and make annual interest payments over a 15-year period.<br />
Some <strong>of</strong> the other important topics <strong>of</strong> discussion we will have over the next few weeks is<br />
the disposition <strong>of</strong> revenue from the recent recreation levy, our plan for adding more fire<br />
stations, and issues associated with inflow and infiltration. You will see in the Fire<br />
Impact Fee fund the plan shows construction <strong>of</strong> station #3 and #4 and the annual debt<br />
service requirements to construct these facilities. During our review we will focus on our<br />
1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />
2
<strong>City</strong> <strong>of</strong><br />
<strong>Delaware</strong><br />
Ohio<br />
current need for these stations and our strategic approach. Also, we will discuss the<br />
amount <strong>of</strong> recreation levy dollars that will be available from the levy and the timing and<br />
possible projects that may be funded by this source <strong>of</strong> revenue. As we discuss public<br />
utilities projects we will focus on our current problems with storm water infiltrating our<br />
sewer system and impacting our wastewater operation and how we are addressing this<br />
issue.<br />
As you review the <strong>CIP</strong> you will see that the format <strong>of</strong> the 2009-2013 <strong>CIP</strong> is somewhat<br />
different compared to past years. <strong>City</strong> staff felt the need to include additional information<br />
in this year’s plan to serve as reference material as <strong>City</strong> Council reviews and understands<br />
the issues surrounding this year’s plan. We have included three new sections that we may<br />
have only briefly touched on in the past. These new sections include: Glenn Road; tax<br />
increment financing improvements; and the Project Trust Fund. Given the <strong>City</strong>’s<br />
considerable infrastructure investment in Glenn Road we felt the appropriate forum to<br />
discuss the status <strong>of</strong> the parkway was <strong>CIP</strong> review. During our subsequent <strong>CIP</strong> meetings<br />
we will discuss the details <strong>of</strong> what the <strong>City</strong> has spent on Glenn Road, the current<br />
financing mechanisms in place, and our future strategic and financial plan moving<br />
forward. Given the current state <strong>of</strong> the economy and its effect on the residential housing<br />
market the <strong>City</strong> is taking a cautious and focused spending approach to the Glenn Road<br />
project until future development commitments are made and identifiable sources <strong>of</strong><br />
revenue are apparent. <strong>City</strong> staff will also be discussing projects that are financially<br />
supported by a portion <strong>of</strong> developer contributions deposited into the Project Trust Fund<br />
and the operation <strong>of</strong> this fund. We also want to discuss the city’s involvement with tax<br />
increment financing, what it is, how it works, and what projects are associated with it.<br />
In summary the 2009-2013 <strong>CIP</strong> is an attempt to balance the very important needs <strong>of</strong> a<br />
growing community with its limited resources. Over the course <strong>of</strong> the next several weeks,<br />
city staff and I look forward to reviewing this important proposal with Council.<br />
Yours Sincerely,<br />
R. Thomas Homan<br />
<strong>City</strong> Manager<br />
1 South Sandusky Street • <strong>City</strong> Hall <strong>Delaware</strong>, OH 43015 p: 740-203-1200 f: 740-203-1224<br />
3
12 4
2009-2013<br />
CAPITAL IMPROVEMENT PLAN<br />
CITY OF DELAWARE, OHIO<br />
CITY COUNCIL MEMBERS<br />
Windell Wheeler, Mayor<br />
Carolyn Riggle, Vice-Mayor<br />
Andrew Brush<br />
Joe Di Genova<br />
Lisa Keller<br />
Gary Milner<br />
Jim Moore<br />
STAFF<br />
<strong>City</strong> Manager, R. Thomas Homan<br />
Assistant <strong>City</strong> Manager, Allen Rothermel<br />
Finance Director, Dean Stelzer<br />
5
22 6
Executive Summary<br />
<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong> (<strong>CIP</strong>)<br />
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013<br />
PART I. OVERVIEW<br />
Each annual <strong>CIP</strong> that is adopted covers a five-year period. In 2008, the <strong>City</strong> prepared the<br />
2009-2013 <strong>CIP</strong>. The <strong>CIP</strong> includes a listing <strong>of</strong> all the projects, equipment, land purchases,<br />
and vehicles that departments plan to purchase or construct in each <strong>of</strong> the five years. The<br />
plan also includes detail on available revenue sources to fund the capital expenditures, as<br />
well as explanations on debt levels and debt service commitments. The 2009-2013 <strong>CIP</strong><br />
also includes reference to previously approved projects that are carried forward and their<br />
completion schedules.<br />
The <strong>City</strong> is making strategic efforts with the 2009-2013 <strong>CIP</strong> to establish clear linkages to<br />
all other business plans, budgets, policies, and day-to-day operations and to develop and<br />
implement a strategic approach to capital planning.<br />
Purpose<br />
The <strong>CIP</strong> is a planning document that presents a five-year overview <strong>of</strong> the scheduled<br />
capital projects and equipment needs <strong>of</strong> the <strong>City</strong>. The purpose <strong>of</strong> capital improvement<br />
planning is to review, prioritize and form the link between proposed needs, limited<br />
financial resources, and the guidance in the <strong>City</strong>’s Comprehensive plan, adopted master<br />
plans, and insight from <strong>City</strong> Council and the community. A properly prepared capital<br />
plan is essential to the future financial health <strong>of</strong> the <strong>City</strong> and continued delivery <strong>of</strong><br />
services to citizens and businesses.<br />
<strong>Capital</strong> planning also positions the <strong>City</strong> to react strategically to changing dynamics such<br />
as the economy, new development opportunities, changes in the city’s financial<br />
condition, and unforeseen emergency infrastructure problems. The city’s strategic<br />
reaction involves adjusting project costs, project timelines, and possibly adding additional<br />
projects if necessary.<br />
Definition <strong>of</strong> a <strong>Capital</strong> <strong>Improvement</strong><br />
A capital improvement is a major fiscal expenditure associated with maintaining the<br />
city’s infrastructure. In many cases, these expenditures are project related and typically<br />
are non-recurring. However, in some cases the <strong>City</strong> does dedicate financial resources on a<br />
recurring basis for capital projects such as road resurfacing, IT equipment;<br />
police/fire/public works vehicles; and sidewalk repairs.<br />
7
A capital expenditure differs from operating budget expenditures. Operating expenditures<br />
include personnel expenses, materials and supplies, and small equipment that involve day<br />
to day operations <strong>of</strong> the <strong>City</strong>.<br />
Examples <strong>of</strong> capital improvements include:<br />
- Acquisition <strong>of</strong> land;<br />
- Construction or expansion <strong>of</strong> public facilities, streets, or utility lines;<br />
- Non-recurring rehabilitation <strong>of</strong> a facility;<br />
- Design work or planning study related to an individual project;<br />
- An item that typically has a useful life <strong>of</strong> 5 or more years; and<br />
- Replacement and purchase <strong>of</strong> vehicles<br />
Financial Policies and Guidelines<br />
The city adopted several financial policies and guidelines that serve as a foundation for<br />
capital improvement planning. These policies cover all capital categories in the <strong>CIP</strong>. The<br />
financial policies related to <strong>CIP</strong> planning include the following:<br />
The budget will provide for adequate maintenance and repair <strong>of</strong> capital assets for<br />
their orderly replacement;<br />
The city will develop a five-year capital improvements program on an annual<br />
basis;<br />
The city will enact an annual capital improvement budget based on the multi-year<br />
capital improvements program;<br />
The city will coordinate development <strong>of</strong> the capital improvement budget with<br />
development <strong>of</strong> the operating budget;<br />
The city will confine long-term borrowing to capital improvement projects;<br />
When the city finances capital projects by issuing debt, it will repay the debt<br />
within a period not to exceed the expected useful life <strong>of</strong> the project;<br />
The city will evaluate issuing debt and pay-as-you-go financing to maintain<br />
flexibility for the future;<br />
The city will continually seek to maintain and improve its current bond rating to<br />
minimize borrowing costs and to ensure that access to credit is preserved.<br />
<strong>Capital</strong> <strong>Improvement</strong> <strong>Plan</strong>ning Process<br />
The <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>’s process <strong>of</strong> preparing the annual <strong>CIP</strong> involves the following<br />
departments: Finance, Engineering, Public Works, Public Utilities, Police, Fire, Parks and<br />
8
Recreation, and Information Technology. Prior to the start <strong>of</strong> the annual <strong>CIP</strong> planning<br />
process the Finance Department reviews the city’s financial condition and evaluates the<br />
status <strong>of</strong> projects in the present <strong>CIP</strong> plan. Concurrently, departments are requested to<br />
submit individual project sheets that cover the project’s description and purpose, provide<br />
justification for the project, and detail project cost estimates.<br />
When developing projects departments do the following: 1) assess the needs for new<br />
facilities or upgrades <strong>of</strong> existing facilities and infrastructure; 2) review current<br />
regulations and compliance; 3) translate needs into prioritized project proposals and<br />
develop cost estimates; 4) review existing master plans; and 5) develop financing<br />
strategies.<br />
As departments develop their annual <strong>CIP</strong> submission they are asked to provide a<br />
summary <strong>of</strong> their project requests and their strategic approach. This involves<br />
summarizing how their projects achieve and align with the long-term goals <strong>of</strong> the<br />
community, the recommendations <strong>of</strong> adopted master plans, and how their strategies<br />
address their short-term initiatives that result from operating in a dynamic environment.<br />
9
34 10
PART II. FINANCIAL SUMMARY<br />
Revenues<br />
Projects in the <strong>CIP</strong> are funded from a variety <strong>of</strong> sources including general fund income<br />
tax revenues, gas tax revenues, grants, utility fees as well as other revenue sources. The<br />
<strong>CIP</strong>’s general fund allocation was approximately $1.63 million in 2008. In 2009 the<br />
allocation is $1.7 million, 4.2% higher.<br />
Chart 1.<br />
General Fund Income Tax Transfer to the <strong>CIP</strong><br />
$2,000,000<br />
$1,800,000<br />
$1,600,000<br />
$1,400,000<br />
$1,200,000<br />
$1,000,000<br />
$800,000<br />
$600,000<br />
$400,000<br />
$200,000<br />
$0<br />
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013<br />
est. est. est. est.<br />
Over the 5 year period from 2009-2013, the total planned general fund allocation is $6.07<br />
million. In 2009, as with all years in the <strong>CIP</strong>, the majority <strong>of</strong> city income tax supports<br />
equipment replacement and technology improvements. Equipment replacement includes<br />
vehicles for the Police, Fire, Parks and Recreation, Airport, and Public Works<br />
departments. This can be seen in both Charts 2 and 3 below. Technology improvements<br />
largely include annual computer and copier replacements, network improvements and<br />
dollars allocated for fiber infrastructure.<br />
Chart 2.<br />
2009 General Fund Allocation to the <strong>CIP</strong><br />
Technology<br />
<strong>Improvement</strong>s<br />
20%<br />
Building<br />
Maintenance<br />
6%<br />
Airport<br />
<strong>Improvement</strong>s<br />
6%<br />
Street Maintenance<br />
16%<br />
Equipment<br />
Replacement<br />
31%<br />
Park <strong>Improvement</strong>s<br />
0%<br />
Transportation<br />
<strong>Improvement</strong>s<br />
21%<br />
11
Chart 3.<br />
Total General Fund Allocation to the <strong>CIP</strong> 2009-2013<br />
900,000<br />
800,000<br />
700,000<br />
600,000<br />
500,000<br />
400,000<br />
300,000<br />
2009<br />
2010<br />
2011<br />
2012<br />
2013<br />
200,000<br />
100,000<br />
0<br />
Airport<br />
<strong>Improvement</strong>s<br />
Street<br />
M aintenance<br />
Transportation<br />
<strong>Improvement</strong>s<br />
Park<br />
<strong>Improvement</strong>s<br />
Equipment<br />
Replacement<br />
Technology<br />
<strong>Improvement</strong>s<br />
Building<br />
M aintenance<br />
Expenditures<br />
Chart 4 below shows <strong>CIP</strong> expenditures by fund for all projects across all funds, including<br />
the general fund. Note in this table total project expenditures do not include debt service<br />
payments in order for the reader to see what costs are actually spent on projects and<br />
equipment. Chart 4 also shows that water fund capacity projects comprise a large<br />
majority <strong>of</strong> the project dollars in the five-year plan. This is due to the planned expansion<br />
<strong>of</strong> the water treatment plant. Also across the five-year period notable expenditures are in<br />
the transportation improvement category. This is due primarily for planned expenditures<br />
for the Veteran’s Parkway road project – design which started in 2008.<br />
Chart 4.<br />
2009-2013 CAPITAL IMPROVEMENT PLAN SUMMARY<br />
*Excludes Debt Service in total Expenditures<br />
FUND 2009 2010 2011 2012 2013<br />
Airport <strong>Improvement</strong> Fund 1,155,745 240,745 460,745 1,195,745 1,415,745<br />
Street Maintenance and Repair Fund 1,514,118 1,183,600 1,208,529 1,235,000 1,235,000<br />
Transportation <strong>Improvement</strong>s 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />
Park <strong>Improvement</strong> Fund 315,000 52,200 29,000 32,500 25,000<br />
Equipment Replacement Fund 206,200 815,500 813,500 586,000 896,500<br />
Technology <strong>Improvement</strong>s 177,000 347,000 262,000 287,000 212,000<br />
Building Maintenance 51,100 106,300 54,500 25,200 0<br />
Park Impact Fee <strong>Improvement</strong> Fund 5,000 20,000 0 0 0<br />
Police Impact Fee <strong>Improvement</strong> Fund 0 65,000 0 0 0<br />
Fire Impact Fee <strong>Improvement</strong> Fund 100,000 208,750 0 0 0<br />
Municipal Services Impact Fee Fund 0 0 0 0 0<br />
Water Fund Maintenance Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />
Water Fund Capacity Projects 1,355,000 680,000 10,915,000 175,000 785,000<br />
Sewer Fund Maintenance Projects 365,000 625,000 150,000 605,000 690,000<br />
Sewer Fund Capacity Projects 890,000 150,000 3,000,000 0 0<br />
12
Refuse Fund 457,476 428,876 470,276 466,276 436,276<br />
Storm Sewer Fund 360,000 460,000 770,000 540,000 460,000<br />
TOTAL PROJECT<br />
EXPENDITURES 16,370,339 $20,404,971 $20,433,550 $11,597,721 $50,916,521<br />
Chart 5 below shows what percentage <strong>of</strong> the <strong>CIP</strong> in 2009 goes for street maintenance and<br />
transportation improvements. The majority <strong>of</strong> funding for street maintenance comes from<br />
license taxes and motor fuel taxes. The monies are used for general maintenance on the<br />
<strong>City</strong>’s roads as well as the sidewalk repair program. A large portion <strong>of</strong> funding for<br />
transportation improvements also comes from Ohio Department <strong>of</strong> Transportation<br />
(ODOT) funds, Mid-Ohio Regional <strong>Plan</strong>ning Commission (MORPC) allocations, and<br />
federal earmarks.<br />
Chart 5.<br />
2009 <strong>CIP</strong> Funding for Street Maintenance & Transportation<br />
<strong>Improvement</strong>s<br />
Street <strong>Improvement</strong>s<br />
35%<br />
Street Resurfacing<br />
Program<br />
Issue II<br />
11%<br />
<strong>Improvement</strong>s<br />
15%<br />
Other <strong>Improvement</strong>s<br />
10%<br />
MORPC<br />
Transportation<br />
<strong>Plan</strong>ning<br />
29%<br />
Chart 6 below shows the <strong>City</strong>’s planned allocation <strong>of</strong> resurfacing dollars over the 5-year<br />
period. In 2009 the allocation is considerably less that the out-years in order to target<br />
more street maintenance dollars to the Point – Phase 1 project.<br />
Chart 6.<br />
Resurfacing Dollars 2009-2010<br />
900,000<br />
800,000<br />
700,000<br />
600,000<br />
500,000<br />
400,000<br />
300,000<br />
200,000<br />
100,000<br />
0<br />
2009 2010 2011 2012 2013<br />
Resurfacing Dollars<br />
13
Chart 7 shows transportation and street maintenance funds from 2009 to 2013. The chart<br />
shows MORPC funding increasing from 2009 to 2013 due to the Veteran’s Parkway<br />
project. Issue II projects that the <strong>City</strong> will be undertaking in 2009 include the Point Phase<br />
1 and the US-36 & Houk turn lane improvement project.<br />
Chart 7.<br />
Transportation and Street Funding<br />
2009-2013<br />
*Does not include funding for Veteran's Parkway Construction<br />
3,500,000<br />
3,000,000<br />
2,500,000<br />
2,000,000<br />
1,500,000<br />
1,000,000<br />
500,000<br />
-<br />
2009 2010 2011 2012 2013<br />
Street Resurfacing Program<br />
Issue II <strong>Improvement</strong>s<br />
M ORPC Transportation <strong>Plan</strong>ning<br />
Other <strong>Improvement</strong>s<br />
Street <strong>Improvement</strong>s<br />
The Police and Fire Impact Fee Funds are supported by impact fees charged per<br />
development unit. These fees provide funding for vehicles, special equipment, and debt<br />
service on capital construction projects. The <strong>CIP</strong> shows from 2011-2013 dollars being<br />
allocated for debt service for the construction <strong>of</strong> additional fire station #3 and #4. No<br />
decision on future construction or location <strong>of</strong> these fire stations has been made. As seen<br />
in Chart 8 below, police impact fee expenditures over the years are estimated to be fairly<br />
steady. This is due to approximately $88,000 in funds being allocated to pay the debt<br />
service on the Justice Center renovation.<br />
Chart 8.<br />
2009-2013 Funding<br />
Police Impact Fee Fund & Fire Impact Fee Fund<br />
350,000<br />
300,000<br />
250,000<br />
200,000<br />
150,000<br />
100,000<br />
50,000<br />
0<br />
2009 2010 2011 2012 2013<br />
Fire<br />
Police<br />
Over the 2009-2013 period, the revenue in the Water Capacity Fund will begin service<br />
primarily debt obligations from projects such as the water treatment plant expansion,<br />
14
Kingman hill water tower, and the Westside transmission line. Though these are<br />
important projects looking in the future there is very little funding for projects unless<br />
development picks up and the city sees and increase in capacity fee revenue. This can be<br />
seen in Chart 9 below. Three large projects programmed out <strong>of</strong> this fund, mainly in 2009<br />
and 2010, are the Penry Road waterline projects, west side transmission line project, and<br />
the water treatment plant expansion. The case is the same for the Sewer Capacity Fund<br />
where the majority <strong>of</strong> revenues coming into the fund are going to service debt rather than<br />
projects. Very few projects are programmed in this fund over the 2009-2013 period given<br />
this dynamic.<br />
Chart 9.<br />
Water Fund Capacity Revenues and Expenditure 2009-2013<br />
14,000,000<br />
12,000,000<br />
10,000,000<br />
8,000,000<br />
6,000,000<br />
4,000,000<br />
2,000,000<br />
0<br />
2009 2010 2011 2012 2013<br />
Revenues 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />
Expenditures -Debt 239,405 240,805 1,731,791 1,732,791 1,732,791<br />
Expenditures -Projects 8,375,000 11,300,000 2,200,000 200,000 200,000<br />
Revenues Expenditures -Debt Expenditures -Projects<br />
15
PART III. GUIDING STRATEGIES<br />
Streets and Transportation<br />
Resurface city streets using a 70/30 split approach - 70% is applied to mill and fill<br />
and overlays and 30% is applied toward crack seal, slurry seal, and rejuvenator<br />
coatings.<br />
Maintain all arterial roadways, collectors, and local roadways at 70 PCI<br />
(Pavement Condition Index) or above.<br />
Upgrade all public sidewalks intersecting with roads scheduled to be resurfaced to<br />
current American Disabilities Act (ADA) standards which require access for the<br />
physically impaired.<br />
Use the Thoroughfare <strong>Plan</strong> and the <strong>City</strong>’s Comprehensive <strong>Plan</strong> as a guiding vision<br />
and source <strong>of</strong> several street and transportation projects.<br />
Pursue additional funding both locally and through the state and federal<br />
government.<br />
Assess the current street infrastructure by monitoring the pavement condition<br />
index (PCI) as a baseline, conducting windshield surveys, and monitoring where<br />
ongoing road maintenance efforts and condition changes.<br />
Maintain and improve upon the city current “good” PCI rating <strong>of</strong> (68-81).<br />
Implement the use <strong>of</strong> intermediate pavement maintenance operations such as<br />
slurry seals and asphalt rejuvenator applications to extend the estimated life<br />
expectancy <strong>of</strong> the pavement surface.<br />
Monitor input from citizen surveys related to road infrastructure and work to<br />
alleviate traffic congestion and maintain streets.<br />
Limit the use <strong>of</strong> MORPC funds to fund major federal and state route highway<br />
projects.<br />
Municipal Airport<br />
Promote the economic benefit <strong>of</strong> aviation to the community and strive for self<br />
sustaining operations.<br />
Work to increase the number <strong>of</strong> based aviation businesses and corporate general<br />
aviation aircrafts utilizing the airfield.<br />
Use the city’s $150,000 annual entitlement funds from the FAA and roll any<br />
unused balances into future years for up to 3 years.<br />
Continue seeking FAA State <strong>of</strong> Ohio apportionment funds (via ODOT) for<br />
general aviation projects.<br />
Consider future applications to ODOT’s $2 million state aviation grant program.<br />
Continue administering an airport TIF fund that accounts for the tax increment<br />
financing real estate payments the city receives from property taxes paid in the<br />
corporate hanger and the private T-hangers constructed at the airport.<br />
17
Implement the recommendations <strong>of</strong> the Airport Master <strong>Plan</strong> which include high<br />
priority projects such as expanding the existing apron, constructing T-hangers,<br />
and acquiring land for airport development.<br />
Focus on establishing protection areas to insure continued use <strong>of</strong> the airfield in the<br />
future.<br />
Seek funding for additional security fencing to protect both public and private<br />
investments as well as reduce wildlife runway incursions.<br />
Continue working on development <strong>of</strong> a drainage master plan that will be required<br />
by existing storm water regulations to support any additional expansions at the<br />
airport.<br />
Building Maintenance<br />
Continue heat pump replacements at the Justice Center based on industry standard<br />
life cycles.<br />
Reduce facility energy consumption.<br />
Continue to consider centralizing all building maintenance functions so as to<br />
minimize operation resources and establish consistent practices throughout<br />
facility infrastructure.<br />
Equipment Replacement<br />
Maintain and disposal <strong>of</strong> the majority <strong>of</strong> city vehicles, trailers and motorized<br />
equipment.<br />
Ensure all department vehicles and motorized equipment are operational and safe<br />
so that they provide routine and emergency services to citizens.<br />
Administer a preventive maintenance program and provide specification services<br />
for new equipment.<br />
Operate a rotary fund and bill city departments for vehicle services rendered;<br />
parts, fuel and materials supplied; and overhead.<br />
Maintain a vehicle replacement schedule that details the original purchase date,<br />
replacement year schedule, and estimated replacement year cost.<br />
Continued consideration <strong>of</strong> a comprehensive review <strong>of</strong> the entire fleet inventory<br />
to determine if departmental fleet sizes are greater than required to provide<br />
current services.<br />
Continued consideration <strong>of</strong> standardizing fleet purchases to assist in reducing<br />
organization fuel consumption, parts inventory, and mechanic training demands.<br />
Parks and Recreation<br />
Focus on construction <strong>of</strong> Glen Ross Park.<br />
Focus on neighborhood park improvements.<br />
Target general fund dollars for parking lot resurfacing in Mingo, Eastside, and<br />
Smith Park.<br />
18
Use the majority <strong>of</strong> park exaction dollars in the early years <strong>of</strong> the <strong>CIP</strong> plan given<br />
the potential for declining exaction fees considering the current development<br />
climate.<br />
Impact Fee Projects<br />
Collect and spend impact fees in accordance with the <strong>City</strong>’s ordinance and be<br />
aware <strong>of</strong> remaining collections that are close to the 5-year rebate provision.<br />
Make required debt service payments in each fund and be aware that without<br />
increasing development levels General Fund dollars may eventually be needed to<br />
cover these payments.<br />
Public Utilities<br />
Consider project finance options from Ohio Public Works Commission (OPWC)<br />
and the Ohio Water Development Authority (OWDA).<br />
Prioritize water and sewer mains rehabilitation and replacement projects through<br />
the CMMS <strong>City</strong>Works s<strong>of</strong>tware.<br />
Improve fire flow protection by installing 8” minimum water mains in new<br />
developments and replacing existing lines <strong>of</strong> less than 8” when water mains are in<br />
need <strong>of</strong> replacement or upgrades.<br />
Continue small main replacements to improve water quality issues and dead end<br />
water mains by looping water mains in areas that have been determined to have<br />
water quality issues.<br />
Flush dead end water mains to ensure water quality.<br />
Prioritize projects based on those identified in the 2000 Collection System Master<br />
<strong>Plan</strong>, 1986 Water System Master <strong>Plan</strong> Study, the 2006 Water Master <strong>Plan</strong>, the<br />
1998 Storm Sewer Task Force Report/Recommendations, from CCTV data, and<br />
from flooding/basement backup complaints.<br />
Complete the 5 remaining fire flow improvement projects identified in the 1986<br />
Water Master <strong>Plan</strong>.<br />
Meet the sanitary sewer needs for future development.<br />
Provide extension <strong>of</strong> water and sewer mains to the <strong>City</strong>’s southwest corridor to<br />
help facilitate commercial and industrial development.<br />
Take a proactive approach to identifying future water supply and resources<br />
Meet USEPA Stage 2 Disinfectants and Disinfection Byproducts Rule compliance<br />
by October 1, 2013 by upgrading the water treatment plant rehabilitation and<br />
using membrane plant technology.<br />
Consider the cost associated with the construction <strong>of</strong> new sewer lines and related<br />
facilities, such as lift stations and force mains – and how much <strong>of</strong> this cost will be<br />
borne by developers.<br />
Consider the extension <strong>of</strong> new public sewers to new development areas and the<br />
<strong>City</strong>’s ability to provide required city services to the new areas.<br />
Comply with the OEPA MS4 Permit.<br />
19
Minimize leachate from the closed landfill that enters the storm water pipe<br />
through the pipe joints in order to minimize notice <strong>of</strong> violations from the EPA.<br />
Information Technology<br />
Provide system support for all <strong>City</strong> Departments by determining IT needs,<br />
capabilities, and feasibility.<br />
Coordinate the purchasing, installation, upgrading and monitoring <strong>of</strong> all<br />
information technology s<strong>of</strong>tware and hardware.<br />
Maintain an IT rotary fund where each department contributes a determined<br />
amount based on their IT usage and demands.<br />
Maintain a 5-year server replacement schedule and 7-year network equipment<br />
replacement schedule.<br />
Produce bigger servers, but divide the use <strong>of</strong> the servers into virtual servers,<br />
capable <strong>of</strong> providing more capacity in fewer machines.<br />
Maintain a data back plan to keep personal information private, have the<br />
capability to recover deleted files, and recover files in the event <strong>of</strong> a disaster.<br />
Maintain a 4-year PC replacement schedule in order to keep productivity as high<br />
as possible from a technology point <strong>of</strong> view.<br />
Purchase a combination <strong>of</strong> PCs and Servers/thin client computers within the PC<br />
replacement line item.<br />
Build a city-wide fiber infrastructure for use by the <strong>City</strong> and as an economic<br />
development tool<br />
Continue the plan <strong>of</strong> purchasing and maintaining technology copiers.<br />
20
CITY OF DELAWARE<br />
CAPITAL IMPROVEMENT PLAN<br />
GENERAL FUND SUMMARY<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCE FORWARD 50,000 320,202 151,667 9,003 10,196<br />
REVENUES:<br />
INCOME TAX 1,700,000 1,737,500 1,770,000 1,815,000 1,800,000<br />
BALANCE PLUS REVENUE 1,750,000 2,057,702 1,921,667 1,824,003 1,810,196<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Bonds<br />
2002 Issue ($5,655,000) 422,428 424,528 425,778 426,287 426,287<br />
2006 Ross St. ($475,000) 61,237 59,438 57,637 60,838 60,838<br />
2006 Pool Maint. ($550,000 10yrs.) 68,276 68,129 67,909 67,621 67,621<br />
TOTAL DEBT SERVICE 551,941 552,095 551,324 554,746 554,746<br />
AMOUNT AVAILABLE FOR CAPITAL<br />
IMPROVEMENTS AFTER DEBT 1,198,059 1,505,607 1,370,343 1,269,257 1,255,450<br />
OTHER EXPENDITURES<br />
AIRPORT IMPROVEMENTS 56,500 10,750 66,750 58,500 69,500<br />
STREET MAINTENANCE 136,768 176,906 189,090 170,561 168,761<br />
TRANSPORTATION IMPROVEMENTS 181,489 175,784 0 0 0<br />
PARK IMPROVEMENTS 0 37,200 14,000 17,500 10,000<br />
EQUIPMENT REPLACEMENT 275,000 500,000 775,000 700,000 765,000<br />
TECHNOLOGY IMPROVEMENTS 177,000 347,000 262,000 287,000 212,000<br />
BUILDING MAINTENANCE 51,100 106,300 54,500 25,500 0<br />
TOTAL OTHER EXPENDITURES 877,857 1,353,940 1,361,340 1,259,061 1,225,261<br />
ENDING BALANCE 320,202 151,667 9,003 10,196 30,189<br />
21
CAPITAL IMPROVEMENT PLAN<br />
AIRPORT IMPROVEMENT FUND<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCE FORWARD 0 0 0 0 0<br />
REVENUES:<br />
FAA AIP Allocation 123,500 204,250 42,750 142,500 71,250<br />
FAA Discretionary Grant 950,000 325,500 969,000 1,249,250<br />
TIF Collections 25,745 25,745 25,745 25,745 25,745<br />
<strong>CIP</strong> - <strong>City</strong> FAA AIP Grant Match 6,500 10,750 2,250 7,500 3,750<br />
<strong>CIP</strong> - <strong>City</strong> FAA Discretionary Grant Match 50,000 64,500 51,000 65,750<br />
TOTAL REVENUES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />
EXPENDITURES:<br />
<strong>City</strong> AIP-Grant<br />
Drainage Master <strong>Plan</strong> 80,000<br />
Drainage <strong>Improvement</strong>s 45,000 150,000<br />
Avigation Survey & Easement - East 130,000<br />
Avigation Survey & Easement - West 135,000<br />
Taxiway A Rehabilitation - East End 75,000<br />
<strong>City</strong> Discretionary-Grant<br />
Airport Rd. Relocation - Sawmill Pkwy. 1,000,000<br />
Ramp Expansion 90,000 900,000<br />
Runway Rehabilitation 120,000 1,315,000<br />
Terminal Building <strong>Improvement</strong>s 300,000<br />
GF Advance Payback 25,745 25,745 25,745 25,745 25,745<br />
TOTAL EXPENDITURES 1,155,745 240,745 460,745 1,195,745 1,415,745<br />
AIRPORT IMPR. FUND BALANCE 0 0 0 0 0<br />
PURPOSE: The Airport <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements to the <strong>Delaware</strong><br />
Municipal Airport.<br />
FUNDING SOURCE: Funding for these projects comes primarily from FAA grant funds.<br />
The FAA AIP grant represents federal aviation funding which has been allocated to general<br />
aviation airports. <strong>Delaware</strong>'s allocation has been $150,000 per year. It is not known how far into<br />
the future this grant funding will be available. This <strong>City</strong> also applies for FAA discretionary grant<br />
funds for airport improvements. We do not currently have any discretionary grant funded projects.<br />
The <strong>City</strong>'s general fund covers our share <strong>of</strong> the grants and other projects that do not receive grant<br />
funding.<br />
23
THIS PAGE INTENTIONALLY LEFT BLANK<br />
24
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Taxiway A East End Rehabilitation<br />
Description and Purpose:<br />
<strong>Improvement</strong>s to the Taxiway A surface and safety area to accommodate<br />
increased aviation traffic.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R ECO MM ENDE D FUN DIN G<br />
Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Traff ic $0<br />
Envir on menta l $0<br />
Prelimin a ry En gineer ing $0<br />
Final En gineer ing $75,000 $75,000<br />
R/W Con sulta nt $0<br />
R/W Pur chase $0<br />
Ad minstra tive $0<br />
Co nstru ctio n $0<br />
Ch an ge O rd er/Co ntingen cy $0<br />
Co nstru ctio n En ginee ring $0<br />
In spection $0<br />
Totals $0 $0 $0 $0 $75,000 $75,000<br />
Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $3,750 $3,750<br />
O th er C ity Fu nds $0<br />
M un icipal Bon ds $0<br />
Private F un din g $0<br />
FA A AI P G rant $71,250 $71,250<br />
$0<br />
Totals $0 $0 $0 $0 $75,000 $75,000<br />
25
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Runway 28 Avigational Survey & Easement<br />
Description and Purpose:<br />
Avigational survey & easement on the property to the west (National Limestone)<br />
<strong>of</strong> the runway. This will prevent future construction from entering into flight<br />
path that would have adverse effects on the airport.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R ECO M M ENDE D FUN DIN G<br />
Est im a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Tra ff ic $0<br />
Envir on m enta l $0<br />
Prelim in a ry E n gineer ing $0<br />
Fina l En gineer ing $15 ,000 $15,000<br />
R/W Con sulta nt $0<br />
R/W Pur cha se $120 ,000 $120,000<br />
Ad m instra tive $0<br />
Co nstru ctio n $0<br />
Ch an ge O rd er/Co ntingen cy $0<br />
Co nstru ctio n En ginee ring $0<br />
In spection $0<br />
Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />
Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $6, 750 $6,750<br />
O th er C ity Fu nds $0<br />
M un icipa l Bon ds $0<br />
Priva te F un din g $0<br />
FA A AI P G ra nt $128 ,250 $128,250<br />
$0<br />
Tota ls $0 $135 ,000 $0 $0 $ 0 $135,000<br />
26
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Navigational Survey & Easement - East<br />
Description and Purpose:<br />
Navigational survey & easement on the property to the east (Jegs) <strong>of</strong> the<br />
runway. This will prevent future construction from entering into flight path<br />
that would have adverse effects on the airport<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic $ 0<br />
E nvir on m ent a l $ 0<br />
P re lim in a ry E n gine er ing $ 0<br />
Fina l E n ginee r ing $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />
R / W C on sult a nt $ 0<br />
R / W P ur cha s e $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
Ad m inst ra t ive $ 0<br />
C o nst ru ct io n $ 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 0<br />
C o nst ru ct io n En ginee ring $ 0<br />
In s p ec t ion $ 0<br />
T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d $ 6 ,5 0 0 $ 6 ,5 0 0<br />
O th e r C ity Fu nd s $ 0<br />
M un icip a l B on d s $ 0<br />
P riva t e F un d in g $ 0<br />
FA A AI P G ra nt $ 1 2 3 ,5 0 0 $ 1 2 3 ,5 0 0<br />
$ 0<br />
T ot a ls $ 1 3 0 ,0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 3 0 ,0 0 0<br />
27
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Runway 10-28 Rehabilitation<br />
Description and Purpose:<br />
<strong>Improvement</strong>s to the runway surface and runway safety area to accommodate<br />
increased aviation traffic.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R ECO MM ENDE D FUN DIN G<br />
Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Traff ic $0<br />
Envir on menta l $0<br />
Prelimin a ry En gineer ing $0<br />
Final En gineer ing $120,0 00 $120,000<br />
R/W Con sulta nt $0<br />
R/W Pur chase $0<br />
Ad minstra tive $0<br />
Co nstru ctio n $1,31 5,000 $1,315, 000<br />
Ch an ge O rd er/Co ntingen cy $0<br />
Co nstru ctio n En ginee ring $0<br />
In spection $0<br />
Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />
Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $6,00 0 $65,750 $71,750<br />
O th er C ity Fu nds $0<br />
M un icipal Bon ds $0<br />
Private F un din g $0<br />
FA A Federal D iscre tio nary $114,0 00 $1,24 9,250 $1,363, 250<br />
$0<br />
Totals $0 $0 $0 $120,0 00 $1,31 5,000 $1,435, 000<br />
28
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Ramp Expansion<br />
Description and Purpose:<br />
Design main ramp expansion to accommodate increased aviation traffic.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R ECO MM ENDE D FUN DIN G<br />
Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Traff ic $0<br />
Envir on menta l $0<br />
Prelimin a ry En gineer ing $0<br />
Final En gineer ing $90, 000 $90,000<br />
R/W Con sulta nt $0<br />
R/W Pur chase $0<br />
Ad minstra tive $0<br />
Co nstru ctio n $900,0 00 $900,000<br />
Ch an ge O rd er/Co ntingen cy $0<br />
Co nstru ctio n En ginee ring $0<br />
In spection $0<br />
Totals $0 $0 $0 $0 $ 0 $0<br />
Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $4, 500 $45,0 00 $49,500<br />
O th er C ity Fu nds $0<br />
M un icipal Bon ds $0<br />
Private F un din g $0<br />
FA A Federal D iscre tio nary $85, 500 $855,0 00 $940,500<br />
$0<br />
Totals $0 $0 $90, 000 $900,0 00 $ 0 $990,000<br />
29
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Drainage Master <strong>Plan</strong>/Engineering/Construction<br />
Description and Purpose:<br />
Design Master Drainage <strong>Plan</strong> for current and future expansion needs.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
This plan will ensure that all drainage facilities located on the airfield meet or<br />
exceed FAA criteria. This plan will address the overall drainage issues at the<br />
airport to ensure that any existing development and planned development will<br />
not adversely affect any waterways downstream from the airport property.<br />
Recommended Funding:<br />
R ECO MM ENDE D FUN DIN G<br />
Est im a ted Expend itur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Traff ic $0<br />
Envir on menta l $0<br />
Prelimin a ry En gineer ing $80 ,000 $80,000<br />
Final En gineer ing $45, 000 $45,000<br />
R/W Con sulta nt $0<br />
R/W Pur chase $0<br />
Ad minstra tive $0<br />
Co nstru ctio n $150,0 00 $150,000<br />
Ch an ge O rd er/Co ntingen cy $0<br />
Co nstru ctio n En ginee ring $0<br />
In spection $0<br />
Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />
Source <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $4, 000 $2, 250 $7,50 0 $13,750<br />
O th er C ity Fu nds $0<br />
M un icipal Bon ds $0<br />
Private F un din g $0<br />
FA A AI P G rant $76 ,000 $42, 750 $142,5 00 $261,250<br />
$0<br />
Totals $0 $80 ,000 $45, 000 $150,0 00 $ 0 $275,000<br />
30
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Airport Road Relocation – Sawmill Parkway<br />
Description and Purpose:<br />
Design and construction <strong>of</strong> phase-I <strong>of</strong> Sawmill Parkway to address Airport Road<br />
vacating from runway relocation.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
The consultant notes that the original arrangement was to extend the existing<br />
Airport Road to US-42 which was to be funded through an FAA grant. This was<br />
proposed until the Master <strong>Plan</strong> and ALP update was completed and the<br />
disposition <strong>of</strong> the crosswind runway determined. The master plan and ALP<br />
update is not complete. The crosswind runway was eliminated from the ALP<br />
and Airport road is now shown to be relocated south to a new location. This<br />
schedule is to relocate Airport Rd. in 2009/2010. FAA will fund the Airport<br />
Road relocation in an amount equal to the cost to extend Airport Road as<br />
originally planned, which is estimated at $1,000,000.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
P re lim in a ry E n gine er ing $ 0<br />
Fina l E n ginee r ing $ 0<br />
R / W C on sult a nt $ 0<br />
R / W P ur cha s e $ 0<br />
Ad m inst ra t ive $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
C o nst ru ct io n $ 9 9 0 ,0 0 0 $ 9 9 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 0<br />
C o nst ru ct io n En ginee ring $ 0<br />
In s p ec t ion $ 0<br />
T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
O th e r C ity Fu nd s $ 0<br />
M un icip a l B on d s $ 0<br />
P riva t e F un d in g $ 0<br />
FA A Fed e ra l D is ret ion a ry $ 9 5 0 ,0 0 0 $ 9 5 0 ,0 0 0<br />
$ 0<br />
T ot a ls $ 1 ,0 0 0 , 0 0 0 $ 0 $ 0 $ 0 $ 0 $ 1 ,0 0 0 , 0 0 0<br />
31
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Terminal Building <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Expansion <strong>of</strong> existing pilot lounge and install <strong>of</strong> sleep room for pilots, re-side<br />
and re-ro<strong>of</strong> existing building.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Airport <strong>Improvement</strong> Fund<br />
Justification:<br />
N/A<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Fina l E n gineer ing $ 0<br />
R / W P ur cha se $ 0<br />
Ad m inst ra t ive $ 0<br />
C o nst ru ct io n $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />
In sp ection $ 0<br />
T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $ 0<br />
FA A Fed era l D iscre tio na ry $ 3 0 0 , 0 0 0 $ 3 0 0 ,0 0 0<br />
M un icip a l B on d s $ 0<br />
P riva t e F un d in g $ 0<br />
Sta te /F ed era l $ 0 $ 0<br />
$ 0<br />
T ot a ls $ 0 $ 0 $ 3 0 0 , 0 0 0 $ 0 $ 0 $ 3 0 0 ,0 0 0<br />
32
CAPITAL IMPROVEMENT PLAN<br />
STREET MAINTENANCE IMPROVEMENTS<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
REVENUES:<br />
PERMISSIVE TAX (License Fee Fund) 360,000 370,000 380,000 390,000 390,000<br />
STATE LICENSE FEES 17,755 17,755 0 20,000 20,000<br />
STATE GASOLINE TAXES 79,500 79,500 80,000 85,000 85,000<br />
NEW GAS TAXES 340,000 380,000 400,000 410,000 410,000<br />
CDBG BLOCK GRANT (FORMULA FUNDS) 85,000 85,000 85,000 85,000 85,000<br />
SIDEWALK PROGRAM ASSESSMENTS 150,000 150,000 150,000 150,000 150,000<br />
ISSUE II POINT PHASE 1 370,656 0 0 0 0<br />
COUNTY ISSUE II POINT 50,000 0 0 0 0<br />
<strong>CIP</strong> Allocation 136,768 176,906 189,090 170,561 168,761<br />
TOTAL REVENUE 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Bonds - S. Houk Road ($600,000, 10yrs) 75,561 75,561 75,561 75,561 73,761<br />
TOTAL DEBT SERVICE 75,561 75,561 75,561 75,561 73,761<br />
STREET RESURFACING PROGRAM<br />
CDBG Rehabilitation 85,000 85,000 85,000 85,000 85,000<br />
<strong>City</strong> Street Resurfacintg/Maintenance 226,718 798,600 823,529 850,000 850,000<br />
TOTAL STREET RESURFACING PROGRAM 311,718 883,600 908,529 935,000 935,000<br />
STREET IMPROVEMENTS<br />
Point Phase 1 927,400 0 0 0 0<br />
TOTAL STREET IMPROVEMENTS 927,400 0 0 0 0<br />
OTHER IMPROVEMENTS<br />
CSX <strong>Improvement</strong> (Crossing Pavement)<br />
Traffic Signalization 50,000 50,000 50,000 50,000 50,000<br />
Sidewalk and ADA access 25,000 50,000 50,000 50,000 50,000<br />
Sidewalk Program <strong>City</strong> Repairs 50,000 50,000 50,000 50,000 50,000<br />
Sidewalk Program Property Owner Repairs 150,000 150,000 150,000 150,000 150,000<br />
TOTAL OTHER IMPROVEMENTS 275,000 300,000 300,000 300,000 300,000<br />
TOTAL EXPENDITURES 1,589,679 1,259,161 1,284,090 1,310,561 1,308,761<br />
33
THIS PAGE INTENTIONALLY LEFT BLANK<br />
34
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Sidewalk Program<br />
Description and Purpose:<br />
Repair & replacement <strong>of</strong> existing sidewalks in various sections <strong>of</strong> the<br />
community through an annual sidewalk capital program initiative.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
Repairs are required, per city code section 909, by property owners; however<br />
the city can completed the repairs at the election <strong>of</strong> the property owner, and<br />
invoice the property owner for the cost <strong>of</strong> the work.<br />
Pictures and Drawings:<br />
35
Recommended Funding:<br />
Reimbursement to the city is either by direct payment, an agreed upon<br />
payment plan, or by tax assessment if required for uncooperative property<br />
owners.<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
Sid ew a lk & A DA A ccess $ 2 5 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 2 5 ,0 0 0<br />
Sid ew a lk P rg m C it y R ep a irs $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
Sid ew a lk P rg m P r op O w ner $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />
T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d<br />
Sid ew a lk P ro gr am As sm nt s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 7 5 0 ,0 0 0<br />
O th er C ity Fu nd s $ 7 5 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 4 7 5 ,0 0 0<br />
P riv at e F un d ing<br />
St a t e/ Fed era l<br />
T ot a ls $ 2 2 5 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,2 2 5 ,0 0 0<br />
36
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Annual Street Resurfacing<br />
Description and Purpose:<br />
Annual program to maintain the surface course <strong>of</strong> pavement through mill & fill,<br />
overlay, slurry seal, and asphalt rejuvenator applications to select city streets.<br />
Without adequate funding, the focus <strong>of</strong> the program continues to be on<br />
preventative maintenance processes on local streets, deferring necessary<br />
surface course replacement until future years.<br />
Department:<br />
Engineering Services & Public Works<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
License Fee (Fund 202)<br />
Inflow/Infiltration (Fund 541)<br />
Justification:<br />
To improve the integrity <strong>of</strong> city streets for the safety <strong>of</strong> the traveling public, and<br />
to protect the city from unaffordable projects that involve total replacement <strong>of</strong><br />
roadways that results from the lack <strong>of</strong> adequate preventative maintenance<br />
operations.<br />
Pictures/Images<br />
37
Recommended Funding:<br />
It is recommended that the funding for this program be gradually increased to<br />
a level that coincides with the calculated amount necessary to properly<br />
maintain the city street network as a whole (according to the city’s pavement<br />
maintenance s<strong>of</strong>tware and recommendations from experts). Small percentage<br />
<strong>of</strong> funding is recommended to come from Fund 541 for manhole casting<br />
improvements that are traditionally made part <strong>of</strong> this project.<br />
R EC OM M EN D ED F UN D IN G<br />
Es tim a te d Expe nditure s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />
Res urfacing P ro gram $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />
To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />
S o urc e o f F unds 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 To ta ls<br />
General Fund<br />
CDBG Rehabilitatio n $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 425,000<br />
Other <strong>City</strong> Funds /Gas Tax $ 226,718 $ 798,600 $ 823,529 $ 850,000 $ 850,000 $ 3,548,847<br />
P rivate Funding<br />
State/Federal<br />
To tals $ 311,718 $ 883,600 $ 908,529 $ 935,000 $ 935,000 $ 3,973,847<br />
38
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Annual Traffic Signalization <strong>Improvement</strong>s<br />
Description and Purpose:<br />
The traffic signalization program provides annual funding for major signal<br />
equipment upgrades and installations for the over 58 existing and proposed<br />
signalized intersection locations in the city.<br />
Department:<br />
Public Works & Department <strong>of</strong> Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
Advances upgrades to signal system equipment including L.E.D. bulb<br />
changeover, battery back-up installation, and closed loop interconnect<br />
improvements.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E s tim a te d E x p e n d itu r e s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />
T r a ffic S ig n a liz a tio n $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
S o u r c e o f F u n d s 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 T o ta ls<br />
C a p ita l Im p r o v e m e n ts $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
T o ta ls $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
39
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
The Point Intersection - Phase I <strong>Improvement</strong>s<br />
Description and Purpose:<br />
This project is Phase I <strong>of</strong> a two phase project. It consists <strong>of</strong> the realignment <strong>of</strong><br />
SR 37 in the eastbound direction to a proposed intersection on US 36<br />
approximately 300 feet west <strong>of</strong> the existing US 36/SR 37 “The Point”<br />
intersection. As part <strong>of</strong> the realignment, an eastbound left turn lane will be<br />
included for EBLT to Moore Street. The newly configured intersection on US 36<br />
will include the installation <strong>of</strong> a mast arm traffic signal, which will replace the<br />
existing traffic signal located at the existing intersection. The intersection will<br />
also include the alignment <strong>of</strong> a future public road (south leg <strong>of</strong> the intersection)<br />
along with the necessary widening on US 36 to install a westbound left turn<br />
lane.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant for 44%<br />
$50,000 County Engineer Funds<br />
Pictures/Images:<br />
40
Justification:<br />
The existing intersection operates at a LOS <strong>of</strong> E and has an intersection delay<br />
<strong>of</strong> 69.2 seconds during the peak hours. With these improvements, the LOS will<br />
improve to a C and the intersection delay will be reduced to 29.1 seconds<br />
during the peak hours. The 95 th % Queue Length for westbound US 36/SR 37<br />
will be reduced from 1175’ to 400’ and for eastbound SR 37 it will be reduced<br />
from 720’ to 500’. The installation <strong>of</strong> the traffic signal at the newly configured<br />
intersection to the west and the removal <strong>of</strong> the existing traffic signal at the<br />
existing intersection will provide additional westbound US 36 stacking allowing<br />
for the free flow <strong>of</strong> the westbound SR 37 traffic during most hours <strong>of</strong><br />
operation. The improvements will also provide a signalized access point along<br />
with a left turn lane for ODOT, the <strong>City</strong> Public Works Facility, future business<br />
property, and a future public street connection.<br />
Recommended Funding:<br />
Project was submitted for OPWC Round 23/24 S<strong>CIP</strong>/LTIP grant funding<br />
assistance. Requested OPWC amount funding is 44% <strong>of</strong> project cost.<br />
<strong>Delaware</strong> County has verbally committed $50,000 towards the project.<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
T ra ff ic<br />
E nv ir on m ent a l<br />
P relim in a ry E n gine ering<br />
Fina l E n gineer ing $ 8 5 ,0 0 0 $ 8 5 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha se $ 5 ,0 0 0 $ 5 ,0 0 0<br />
Ad m instra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />
C o nst ru ction $ 6 9 7 ,0 0 0 $ 6 9 7 ,0 0 0<br />
C h an ge O r d er/ C o nt ing enc y $ 6 9 ,7 0 0 $ 6 9 ,7 0 0<br />
C o nst ru ction E ngin eering $ 1 7 ,4 2 5 $ 1 7 ,4 2 5<br />
In sp ect ion $ 5 2 ,2 7 5 $ 5 2 ,2 7 5<br />
T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d<br />
O th er C ity Fu nd s $ 5 0 6 ,7 4 4 $ 5 0 6 ,7 4 4<br />
M un icip a l B on d s<br />
P riv at e F un d ing<br />
St a t e/ Fed era l $ 3 7 0 ,6 5 6 $ 3 7 0 ,6 5 6<br />
In H ou se (E ng ineer in g) $ 0<br />
C o un ty Fu nd s $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
T ot a ls $ 9 2 7 ,4 0 0 $ 9 2 7 ,4 0 0<br />
42
CAPITAL IMPROVEMENT PLAN<br />
TRANSPORTATION IMPROVEMENTS<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
REVENUES:<br />
<strong>CIP</strong> ALLOCATION 181,489 175,784 0 0 0<br />
COUNTY CONTRIBUTION - ISSUE II 50,000 50,000 0 0 0<br />
STATE ISSUE II<br />
Belle Avenue Intersection<br />
US36/Houk Rd. Turn Lane <strong>Improvement</strong>s 160,151<br />
William/Cheshire/Channing Intersection 27,060 221,216<br />
US23/SR315 INTERSECTION<br />
ODOT 25,000 125,000 100,000 250,000 1,611,000<br />
MORPC ALLOCATION<br />
US 23/Pennsylvania Interchange 200,000 150,000 0 0 0<br />
VETERAN'S PARKWAY<br />
Federal Funds 400,000 3,000,000 6,000,000 42,950,000<br />
TOTAL REVENUE 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />
EXPENDITURES:<br />
MORPC TRANSPORTATION PLANNING<br />
Veteran's Parkway - Alt. 16 400,000 3,000,000 6,000,000 42,950,000<br />
US23/Pennsylvania Intersection 200,000 150,000 0 0 0<br />
DEVELOPMENT IMPROVEMENT PROJECTS<br />
GRADY BLVD. IMPROVEMENTS 0<br />
Intersection <strong>Improvement</strong>s 0<br />
ISSUE II IMPROVEMENTS<br />
BELLE AVENUE INTERSECTION<br />
US36/HOUK RD. TURN LANE IMPROVEMENTS 357,200<br />
WILLIAM & CHESHIRE/CHANNING INTERSECT. 61,500 447,000<br />
CHANNING ST. INTERSECTION 0 0 0<br />
OLENTANGY ST. INTERSECTION/BIKE PATH 0 0 0<br />
US 36 CURTIS ST. TURN LANE INTERSECTION 0 0<br />
US 23/SR 315 INTERSECTION 25,000 125,000 100,000 250,000 1,611,000<br />
TOTAL EXPENDITURES 1,043,700 3,722,000 100,000 6,250,000 44,561,000<br />
PURPOSE: The Transportation <strong>Improvement</strong> <strong>CIP</strong> identifies future improvements/expansion <strong>of</strong> the<br />
<strong>City</strong>'s public works infrastructure.<br />
FUNDING SOURCE: Funding for these projects comes primarily from the Federal and State<br />
governments in the form <strong>of</strong> grants and allocated federal and state revenues. The <strong>City</strong>'s matching<br />
contributions and funding for projects not receiving grant funding comes from the same sources<br />
used for street maintenance projects.<br />
43
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
US 36 & Houk Road Turn Lane <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Construction <strong>of</strong> dedicated southbound right turn lane and lengthening <strong>of</strong> the<br />
existing southbound left turn lane on Houk Road at US-36. Project involves<br />
widening <strong>of</strong> an existing culvert and signal modifications to accommodate the<br />
new lane configuration.<br />
Department:<br />
Engineering Services<br />
Fund and Account:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
OPWC LTIP Grant ($160,151)<br />
<strong>Delaware</strong> County Engineer ($50,000)<br />
Justification:<br />
Project was prioritized based on previous <strong>City</strong> Council concerns over this<br />
intersection. The project has been awarded OPWC LTIP Grant funds for design<br />
and construction.<br />
Recommended Funding:<br />
Funding was awarded by OPWC LTIP grant for this project in Round 22 (2008),<br />
in addition to a contribution from the County. Final engineering for the project<br />
commenced in 2008. Recommended funding slightly higher than OPWC<br />
estimates in an attempt to cover anticipated rise in material prices.<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />
R / W P ur cha s e $ 3 ,7 0 0 $ 3 ,7 0 0<br />
Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />
C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 3 0 ,0 0 0 $ 3 0 ,0 0 0<br />
C o nst ru ct io n En ginee ring $ 2 ,5 0 0 $ 2 ,5 0 0<br />
In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />
T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
O th e r C ity Fu nd s $ 1 4 7 ,0 4 9 $ 1 4 7 ,0 4 9<br />
Sta te /F ed e ra l $ 1 6 0 ,1 5 1 $ 1 6 0 ,1 5 1<br />
D e law a re C ou nt y $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
T ot a ls $ 3 5 7 ,2 0 0 $ 3 5 7 ,2 0 0<br />
45
Pictures and Drawings:<br />
46
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
US 36 & Cheshire-Channing Intersection <strong>Improvement</strong>s<br />
Description and Purpose:<br />
The project involves widening US 36 to provide left turn lanes for traffic from<br />
US 36 westbound to Ann Street and Cheshire Street and US 36 eastbound to<br />
Channing Street. Also included is the conversion <strong>of</strong> Channing Street to “oneway”<br />
to the north and the establishment <strong>of</strong> a dedicated bus loading zone on the<br />
east side <strong>of</strong> Channing Street for the adjacent school. The traffic signal at Ann<br />
Street will be removed and a new mast arm signal will be installed at Cheshire<br />
Street and coordinated with an updated mast arm signal at Channing Street.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
OPWC S<strong>CIP</strong>/LTIP Grant Funding (44% <strong>of</strong> construction)<br />
$50,000 County Engineer Funds<br />
Justification:<br />
Recent traffic analysis indicates that a signal is warranted at US 36 and<br />
Cheshire Street and a signal is no longer warranted at US 36 and Ann Street.<br />
Left turn movements from US 36 to both Cheshire Street and Channing Street<br />
obstruct through traffic movements, especially during the peak traffic hours.<br />
Travel direction and access changes along Channing Street, between US 36<br />
and Winter Street, are included to improve the safety <strong>of</strong> the school bus loading<br />
zone and the signal operation at US 36. Most importantly, with the<br />
consideration <strong>of</strong> other roadway improvements to The Point, the traffic demand<br />
on this intersection will be greater.<br />
Pictures and Drawings: See drawing on next page<br />
47
Recommended Funding:<br />
The project was submitted for OPWC S<strong>CIP</strong>/LTIP Round 23/24 grant funding<br />
assistance. Requested amount <strong>of</strong> funding is $221,216. <strong>Delaware</strong> County has<br />
verbally committed $50,000 towards the project.<br />
R E C O MM E N D E D F U N D IN G<br />
E st im a t e d E x p e nd it ur e s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />
T ra f f ic<br />
E n vi r on m ent al<br />
P re li m ina r y E n gi nee r ing<br />
F in a l E ng in eer in g $ 6 0 ,0 0 0 $ 6 0 , 0 0 0<br />
R / W C on su lta n t<br />
R / W P ur ch a se $ 1 , 5 0 0 $ 1 , 5 0 0<br />
A d m i nst ra ti ve $ 1 , 0 0 0 $ 1 , 0 0 0<br />
C on str u cti on $ 3 8 5 , 0 0 0 $ 3 8 5 , 0 0 0<br />
C ha n ge O rd er / C o nti ng enc y $ 3 8 ,5 0 0 $ 3 8 , 5 0 0<br />
C on str u cti on E n gi ne er in g $ 2 , 5 0 0 $ 2 , 5 0 0<br />
In sp e cti on $ 2 0 ,0 0 0 $ 2 0 , 0 0 0<br />
T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />
S o u rc e o f F un d s 2 00 9 20 10 20 11 201 2 2 01 3 To t als<br />
G en er a l F u nd<br />
O th er C ity F u nd s $ 3 4 ,4 4 0 $ 1 7 5 , 7 8 4 $ 2 1 0 , 2 2 4<br />
M u ni cip a l B o nd s<br />
P ri va te F un d i ng<br />
S ta te / F ed e ra l $ 2 7 ,0 6 0 $ 2 2 1 , 2 1 6 $ 2 4 8 , 2 7 6<br />
D el a w a r e C o un ty $ 5 0 ,0 0 0 $ 5 0 , 0 0 0<br />
T ota l s $ 6 1 ,5 0 0 $ 4 4 7 , 0 0 0 $ 5 0 8 , 5 0 0<br />
49
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
US 23 – SR 315 Intersection <strong>Improvement</strong>s<br />
Description and Purpose:<br />
The project will begin with the preparation <strong>of</strong> a safety study that will include<br />
the U. S. Route 23/State Route 315/Stratford Road Intersection and the U. S.<br />
Route 23/Pollock Road. The realignment <strong>of</strong> State Route315 and Stratford Road<br />
intersection will be evaluated along with signal retiming for the existing<br />
intersections. If the safety study results in a conclusion that requires<br />
additional preliminary engineering and planning, the consultant will then be<br />
scoped to complete the Steps <strong>of</strong> the Minor Project Development Process as<br />
directed by the <strong>City</strong> and ODOT.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
HSP (Highway Safety Program Funds) – $1,156,003<br />
Federal Earmark for US 23 – $850,850<br />
TRC (ODOT Toll Revenue Credits) - $128,445<br />
Justification:<br />
The safety and efficiency <strong>of</strong> this intersection is critical to the entire US 23<br />
corridor through the city. The project was initially identified by ODOT’s US 23<br />
Access Management <strong>Plan</strong> as an intersection requiring improvement.<br />
Recommended Funding:<br />
Funding is from a combination <strong>of</strong> state Highway Safety Project (HSP) Funds,<br />
ODOT earmark funds and Toll Revenue Credits (TRC’s) which are to be applied<br />
to <strong>of</strong>fset the city’s required 20% cost <strong>of</strong> the R/W and construction costs, and<br />
100% <strong>of</strong> the design. Project start has been delayed due to ODOT’s requirement<br />
to repeat the consultant selection process. All design expenses are<br />
reimbursable on an as-invoiced basis through ODOT. <strong>City</strong> will have to fund PE<br />
portion directly, though reimbursement is 100%. R/W, utility relocation and<br />
construction is 100% city funded. Documented TRC, earmark, and HSP funds<br />
allocated to the project total $2,135,298.<br />
50
Recommended Funding Cont’d.:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
E nvir on m ent a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />
P re lim in a ry E n gine er ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
Fina l E n ginee r ing $ 1 0 0 , 0 0 0 $ 1 0 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
Ad m inst ra t ive $ 1 ,0 0 0 $ 1 ,0 0 0<br />
C o nst ru ct io n $ 1 ,4 0 0 ,0 0 0 $ 1 ,4 0 0 , 0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
C o nst ru ct io n En ginee ring $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
In s p ec t ion $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />
T ot a ls $ 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 0 0 , 0 0 0 $ 2 5 0 ,0 0 0 $ 1 ,6 1 1 ,0 0 0 $ 2 ,1 1 1 , 0 0 0<br />
51
Pictures and Drawings:<br />
52
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
US 23-Pennsylvania Avenue Interchange <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Project includes the study, design, and construction <strong>of</strong> a modified interchange<br />
to provide full movement access between Pennsylvania Avenue and US-23.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
MORPC STP Sub-allocation Funds<br />
Pictures and Drawings:<br />
Justification:<br />
Ongoing study <strong>of</strong> interchange modifications which commenced in 2005 and<br />
administered through the ODOT 10-Step Minor PDP process. Initial project<br />
study costs are being funded utilizing State STP-M funding through the annual<br />
MORPC allocation toward <strong>Delaware</strong>.<br />
53
Recommended Funding:<br />
Project continues under preliminary development in the ODOT PDP process for<br />
minor projects. All design expenses are 100% reimbursable through ODOT.<br />
Construction could begin in 2012 and is a candidate for funding split <strong>of</strong> 80%<br />
MORPC funds (STP) and 20% <strong>City</strong> funds (as is right-<strong>of</strong>-way purchase). Based<br />
on the projected 2012 STP available funds to cover remaining environmental<br />
and engineering costs (this project only), approximately $2,600,000 should be<br />
available for right-<strong>of</strong>-way and construction cost reimbursement. Our current<br />
estimate for right-<strong>of</strong>-way and construction is $2,875,000 (80% <strong>of</strong> this amount<br />
is $2,300,000).<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
T ra ff ic<br />
E nv ir on m ent a l $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
P relim in a ry E n gine ering $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
Fina l E n gineer ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha se<br />
Ad m instra t ive<br />
C o nst ru ction<br />
C h an ge O r d er/ C o nt ing ency<br />
C o nst ru ction E ngin eering<br />
In sp ect ion<br />
T ot a ls $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
P riv at e F un d ing<br />
St a t e/ Fed era l $ 2 0 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 5 0 ,0 0 0<br />
T ot a ls $ 3 5 0 ,0 0 0<br />
54
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Veterans Parkway<br />
Description and Purpose:<br />
<strong>Plan</strong>ning, design, and construction <strong>of</strong> a limited access highway from the US 23<br />
to the intersection <strong>of</strong> Glenn Road and Mill Run Crossing (as recently defined in<br />
determining the study area with ODOT). Identified as a Tier II project on<br />
ODOT’s TRAC list (PID 80824) – called the <strong>Delaware</strong> Southeast By-Pass. Project<br />
AKA Alternate #16 from the 2001 Thoroughfare <strong>Plan</strong>.<br />
Department:<br />
Engineering Services<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
Project is identified as a high priority project on the <strong>City</strong>’s thoroughfare plan by<br />
both the <strong>City</strong> and County. $4.48 million in federal earmark funds were<br />
authorized in the current SAFETEA-LU Transportation bill supported by U.S.<br />
House <strong>of</strong> Representative Patrick Tiberi’s <strong>of</strong>fice, with up to $4,082,813 Million<br />
available for the project study and design. The <strong>City</strong>’s 20% matching obligation<br />
for the federal earmark funds is to be <strong>of</strong>fset by ODOT assigned TRC’s (Toll<br />
Revenue Credits).<br />
Recommended Funding:<br />
Project must follow the ODOT 14-Step Project Development Process (PDP).<br />
Project negotiations were completed with pr<strong>of</strong>essional service contract approved<br />
in June 6, 2008 for $356,491 which has been encumbered through ODOT.<br />
<strong>City</strong> to front cost <strong>of</strong> all design work with reimbursement on an as-invoiced<br />
basis. Also, Senator Voinovich, Congressman Tiberi, and Senator Brown all<br />
submitted an appropriation questionnaire for FY 2009 for $38 million in<br />
additional federal earmark request for construction funding, though approval is<br />
unlikely.<br />
Recommended funding for construction is based on assumptions made during<br />
pre-planning process, absent <strong>of</strong> a preferred alignment. Estimates are provided<br />
only to illustrate the magnitude <strong>of</strong> the construction costs. Estimates based on<br />
2.6 miles <strong>of</strong> two-lane “super-two” highway and four (4) bridges.<br />
2013+ costs are shown to capture the magnitude <strong>of</strong> future additional funds<br />
required for the project construction and it is anticipated that the actual<br />
schedule for construction will be revised to subsequent years.<br />
55
Recommended Funding Cont’d:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing $ 4 0 0 ,0 0 0 $ 4 0 0 ,0 0 0<br />
Fina l E n ginee r ing $ 3 ,0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e $ 6 , 0 0 0 ,0 0 0 $ 6 ,0 0 0 , 0 0 0<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 3 7 ,0 0 0 ,0 0 0 $ 3 7 ,0 0 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 3 ,7 0 0 ,0 0 0 $ 3 ,7 0 0 , 0 0 0<br />
C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
In s p ec t ion $ 2 ,0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />
T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d $ 0<br />
O th e r C ity Fu nd s<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 3 ,4 0 0 , 0 0 0<br />
Fu tu re Fed er era l Fu nd in g $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 4 8 ,9 5 0 ,0 0 0<br />
T ot a ls $ 4 0 0 ,0 0 0 $ 3 ,0 0 0 ,0 0 0 $ 6 , 0 0 0 ,0 0 0 $ 4 2 ,9 5 0 ,0 0 0 $ 5 2 ,3 5 0 ,0 0 0<br />
56
Pictures and Drawings:<br />
This pictures shows the study area for Veteran’s Parkway.<br />
57
REVENUES:<br />
CAPITAL IMPROVEMENT PLAN<br />
PARKS IMPROVEMENT FUND<br />
2009 - 2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
Neighborhood Park Exaction Fees 315,000 15,000 15,000 15,000 15,000<br />
ODNR Grant<br />
<strong>CIP</strong> Allocation 0 37,200 14,000 17,500 10,000<br />
TOTAL REVENUES 315,000 52,200 29,000 32,500 25,000<br />
EXPENDITURES:<br />
COMMUNITY PARKS<br />
MINGO PARK<br />
- Gym Floor Replacement 36,000<br />
GLEN ROSS PARK<br />
- Park Construction 240,000<br />
SMITH PARK<br />
- Field <strong>Improvement</strong>s 0 10,000<br />
NEIGHBORHOOD PARK IMPROVEMENTS 75,000 15,000 15,000 15,000 15,000<br />
PARKING LOT RESURFACING/SEAL COATING<br />
- Eastside Park 1,200<br />
- Smith Park 14,000<br />
- Mingo and Blue Limestone 17,500<br />
TOTAL EXPENDITURES 315,000 52,200 29,000 32,500 25,000<br />
PURPOSE: The Parks <strong>Improvement</strong> Fund/ Non-Impact Fee <strong>Plan</strong> identifies future improvements<br />
to the <strong>City</strong>'s parks and recreation system that cannot be funded from parks impact fees.<br />
FUNDING SOURCES: The projects in this plan are funded by an allocation <strong>of</strong> the general fund<br />
income tax proceeds. Grant funds are also leveraged when possible to <strong>of</strong>fset the cost to the<br />
general fund. The <strong>City</strong> also has a parks exaction policy that requires new developers to dedicate<br />
parkland for public recreational purposes <strong>of</strong> approximately 10% <strong>of</strong> the acreage developed. In<br />
lieu <strong>of</strong> the required land dedication, Council may accept cash equivalent to the value <strong>of</strong> the land<br />
otherwise required to be dedicated. These funds are allocated in this plan.<br />
59
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Parking Lot/Pavement Resurfacing<br />
Description and Purpose:<br />
Seal coating parking lots/pavement in parks to extend the life <strong>of</strong> the existing<br />
pavement.<br />
Department:<br />
Parks and Recreation<br />
Fund:<br />
Park <strong>Improvement</strong> Fund<br />
Justification:<br />
Seal coating extends the life <strong>of</strong> the pavement, improves aesthetics <strong>of</strong> the parks,<br />
and eliminates safety hazards from holes or cracks.<br />
Recommended Funding:<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
M ingo a nd B lue L im est on e<br />
E a st Sid e P a r k / R heem St . $ 1 ,2 0 0 $ 1 ,2 0 0<br />
Sm ith P a rk $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />
M ingo a nd B lue L im est on e $ 1 7 ,5 0 0 $ 1 7 ,5 0 0<br />
T ot a ls $ 3 2 ,7 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
P riv at e F un d ing<br />
St a t e/ Fed era l<br />
T ot a ls $ 0 $ 1 ,2 0 0 $ 1 4 ,0 0 0 $ 1 7 ,5 0 0 $ 3 2 ,7 0 0<br />
61
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Gym Floor Replacement<br />
Description and Purpose:<br />
Replace existing gym floor with new tiles, underlayment and molding.<br />
Department:<br />
Parks and Recreation<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
The flooring tiles currently in the gym are original to the facility. They are<br />
worn, coming loose in places, and are beginning to pose safety concerns. The<br />
gym has received a large increase in usage with the upgrades at Mingo Park<br />
and the gym floor won’t hold up as is much longer. In order to upgrade<br />
programming, increase the number <strong>of</strong> activities in the gym, and to maintain<br />
safety the floor needs to be addressed within the next 2 years.<br />
Recommended Funding:<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ym F loor $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />
T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
P riv at e F un d ing<br />
St a t e/ Fed era l<br />
T ot a ls $ 3 6 ,0 0 0 $ 3 6 ,0 0 0<br />
62
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Smith Park Field <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Improve the fields at Smith Park to improve field conditions and drainage on<br />
each <strong>of</strong> the four fields. Field improvements needed include bringing in soil and<br />
regarding the infields on each <strong>of</strong> the four fields. Install dugouts at each <strong>of</strong> the<br />
four fields (8 dugouts). The dugouts would be built in-house and would be<br />
built using a concrete pad and concrete blocks, with posts going up to a ro<strong>of</strong>.<br />
Currently we only have benches with no dugout fencing or separation. Build<br />
SST Waterless restrooms on the site to provide improved restroom facilities and<br />
to alleviate the on-going rentals <strong>of</strong> the port-a-johns currently in use. The<br />
waterless restrooms could then be converted once city water reaches Smith<br />
Park.<br />
Department:<br />
Parks and Recreation<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong>s Fund (Fund 410)<br />
Justification:<br />
Smith Park is one <strong>of</strong> our three community parks in <strong>Delaware</strong>. As a community<br />
park, the appearance and functionality <strong>of</strong> the park reflects on our entire park<br />
system and image <strong>of</strong> the city as a whole. It is the home <strong>of</strong> our adult s<strong>of</strong>tball<br />
fields and has the potential to become more <strong>of</strong> a destination for teams and<br />
tournaments. The field conditions are below average due to drainage issues<br />
and the site as a whole is in need <strong>of</strong> improvements (dugouts, restrooms) to<br />
provide an environment competitive with those found at other similar facilities<br />
that our players and potential players can access.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
V ar iou s im p r ovem ent s $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
O th er C ity Fu nd s<br />
T ot a ls $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
63
CAPITAL IMPROVEMENT PLAN<br />
EQUIPMENT REPLACEMENT FUND<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCES FORWARD 303,598 372,398 56,898 18,398 132,398<br />
REVENUES:<br />
<strong>CIP</strong> Allocation 275,000 500,000 775,000 700,000 765,000<br />
TOTAL REVENUE 275,000 500,000 775,000 700,000 765,000<br />
EXPENDITURES:<br />
PUBLIC WORKS<br />
Pickup Trucks 0 115,000 20,000 15,000<br />
2 Ton Dump Truck 0 95,000 97,000 0 104,000<br />
1 Ton Dump Truck 99,000<br />
1 Ton Sign Truck 46,000<br />
Street Sweeper (3yr. Lease) 55,000 55,000 55,000<br />
Tandem Axle Dump Truck 116,000<br />
Backhoe 91,500<br />
Loader 110,000<br />
Skid Steer 33,000<br />
Crack Seal Machine 55,000<br />
Asphalt Roller 38,000<br />
Asphalt Saw 32,000<br />
Asphalt <strong>Plan</strong>ner 10,500<br />
Utility Van 21,500<br />
TOTAL PUBLIC WORKS 55,000 330,500 419,500 168,500 290,000<br />
PARKS AND RECREATION<br />
3/4 Ton Pickup Truck 0 24,000 25,000<br />
72" Outfront Mower 9,200 13,000 14,000 15,000 15,000<br />
45 HP 4WD Tractor 24,000<br />
55 HP Tractor 28,000<br />
1 Ton Dump Truck 55,000<br />
TOTAL PARKS AND RECREATION 9,200 61,000 67,000 70,000 15,000<br />
AIRPORT<br />
Rebuilt Tug 5,500<br />
Ground Power Unit 12,000<br />
Utility Vehicle 14,000<br />
Jet A Truck 56,500<br />
TOTAL AIRPORT 14,000 0 12,000 56,500 5,500<br />
POLICE DEPARTMENT<br />
Police Cruiser Replacements 128,000 134,000 140,000 146,000 146,000<br />
Detective Vehicle 25,000<br />
Chief Car 25,000<br />
Weight Enforcement Truck 25,000<br />
Parking Control Vehicle 20,000<br />
TOTAL POLICE 128,000 159,000 190,000 166,000 146,000<br />
FIRE DEPARTMENT<br />
EMS Medic Vehicle Replacement 240,000 250,000<br />
Vehicle Replacement 25,000<br />
Engine Truck Replacement (Lease Payment) 65,000<br />
Fire Ladder Replacement (Lease Payment) 125,000 125,000 125,000<br />
TOTAL FIRE 0 265,000 125,000 125,000 440,000<br />
TOTAL EXPENDITURES 206,200 815,500 813,500 586,000 896,500<br />
CARRY OVER BALANCE 372,398 56,898 18,398 132,398 898<br />
PURPOSE: The Equipment Replacement Fund schedules replacement <strong>of</strong> existing equipment<br />
utilized in the Public Works, Parks and Recreation, and Airport. The fund also schedules<br />
replacement <strong>of</strong> Police and Fire vehicles not covered by impact fees.<br />
FUNDING SOURCE: Funding for these equipment purchases comes from the general income<br />
tax allocation.<br />
65
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Equipment: Public Works Equipment Replacement<br />
Description and Purpose:<br />
The Public Works Department vehicles are used for variety <strong>of</strong> roadway and<br />
public works projects. Vehicles and equipment is replaced based on a vehicle<br />
replacement schedule based on the number <strong>of</strong> hours <strong>of</strong> operations and mileage<br />
and service needs.<br />
Department:<br />
Public Works Department<br />
Fund:<br />
Equipment Replacement Fund (Fund 440)<br />
Justification:<br />
The Public Works Department uses a replacement schedule to minimize the<br />
overall maintenance costs and depreciation loss to the <strong>City</strong> for equipment<br />
expenditures. The proposed purchases will replace items that range from 8 to<br />
12 years old.<br />
Recommended Funding:<br />
RE CO M M E ND ED F UND ING<br />
E st im a t ed Expe n dit ur e s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />
U tility V a n $21 ,500 $21,5 00<br />
Picku p tru cks $115,00 0 $ 20,000 $15 ,000 $150,0 00<br />
2 To n D u m p $95,000 $ 97,000 $104, 000 $296,0 00<br />
1 To n D u m p $99 ,000 $99,0 00<br />
1 To n S ign Tru ck $ 46,000 $46,0 00<br />
Stre et Sw eeper (3 yr. Leas e $55 ,000 $55,000 $ 55,000 $165,0 00<br />
Ta ndem A xle D u m p $116, 000 $116,0 00<br />
Ba ckh oe $ 91,500 $91,5 00<br />
Loa der $ 110,000 $110,0 00<br />
Skid Steer $33 ,000 $33,0 00<br />
Cr ack Sea l M a chin e $55,000 $55,0 00<br />
As pha lt Ho t Bo x $0<br />
As pha lt <strong>Plan</strong> ner $10,500 $10,5 00<br />
As pha lt Roller $38,0 00 $38,0 00<br />
As pha lt Sa w $32,0 00 $32,0 00<br />
Tota ls $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />
So ur ce <strong>of</strong> Fu nd s 2 00 9 20 10 201 1 2 012 20 13 + T ota l s<br />
Tra n sfer fro m CI P $55 ,000 $330,50 0 $ 419,500 $168 ,500 $290, 000 $1, 263,500<br />
67
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Equipment: Police Equipment Replacement<br />
Description and Purpose:<br />
The Police Department’s vehicles are typically replaced before the vehicle<br />
mileage exceeds 90,000 miles and an estimated use <strong>of</strong> approximately 27,000<br />
miles per year. The Department usually replaces one or two vehicles a year to<br />
avoid large capital expenditures. This incremental approach minimizes down<br />
time for cruiser transition, excessive maintenance expenses and a more<br />
systematic approach to fleet replacement. Also, the addition <strong>of</strong> new cruisers is<br />
consistent with anticipated increases in the work load and work force. In<br />
addition to standard cruiser replacement, the Department plans to replace the<br />
Chief’s vehicle and CSO Vehicle in 2009, and one <strong>of</strong> the current detective<br />
vehicles in 2010.<br />
Department:<br />
Police Department<br />
Fund:<br />
Equipment Replacement Fund (Fund 440)<br />
Justification:<br />
Replacement <strong>of</strong> police vehicles based on estimated useful life, service needs,<br />
and mileage limits.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E st im a t ed<br />
E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />
P olice C ru is ers $ 1 2 8 ,0 0 0 $ 1 3 4 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 6 9 4 ,0 0 0<br />
D e te ctiv e V e hic le $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
C h ie f C a r $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
C S O V ehicle $ 0<br />
T ru ck W e igh t E n f. $ 2 5 , 0 0 0 $ 2 5 ,0 0 0<br />
P a rk in g C o nt ro l $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />
T ot a ls $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />
So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o ta ls<br />
T ra n sfe r fro m C I P $ 1 2 8 ,0 0 0 $ 1 5 9 ,0 0 0 $ 1 9 0 ,0 0 0 $ 1 6 6 ,0 0 0 $ 1 4 6 , 0 0 0 $ 7 8 9 ,0 0 0<br />
68
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Fire Fleet Vehicle Replacement<br />
Description and Purpose:<br />
- Replacement <strong>of</strong> Existing Fleet Vehicles<br />
o Vehicle Replacement Schedule<br />
o Insurance Services Report – October 22, 1998<br />
o T.G. Fire/EMS Services Inc., 2001 Study<br />
o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />
Goal #2 - Improve Facilities to Match Resource to Risk<br />
Reduce Response Times<br />
o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />
Meet international benchmarks and standard <strong>of</strong> care<br />
Upgrade and modernize existing facilities<br />
Deployment analysis to identify appropriate location <strong>of</strong><br />
facilities to meet the standards <strong>of</strong> coverage.<br />
Department:<br />
Fire Department<br />
Fund and Account:<br />
General Fund (Fund 101)<br />
Fire Impact Fee Fund (Fund 493)<br />
Justification:<br />
The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />
a staff vehicle due to mechanical problems, and it has not been replaced. The<br />
purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />
a command vehicle and a training vehicle through Impact Fees. The<br />
Department has proposed a plan to develop a rotation based on the<br />
Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />
Department to be prepared for Fire Department operations.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />
E M S M e d ic V eh R eplcm t $ 2 4 0 ,0 0 0 $ 2 5 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />
V ehicle R ep lac em ent $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
E ng in e R ep lcm t (Le ase) $ 6 5 ,0 0 0 $ 6 5 ,0 0 0<br />
L a d d er R ep lcm t (L ea se) $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 3 7 5 ,0 0 0<br />
T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />
T ra n sfer fro m C I P $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />
T ot a ls $ 0 $ 2 6 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0 $ 4 4 0 ,0 0 0 $ 9 5 5 ,0 0 0<br />
69
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Equipment: Airport Equipment Replacement<br />
Description and Purpose:<br />
Similar to other departments, the Airport uses a vehicle replacement schedule<br />
to replace its vehicles and or airport equipment based on estimated useful life,<br />
service needs, and mileage limits.<br />
Department:<br />
Public Works – Airport<br />
Fund:<br />
Equipment Replacement Fund (Fund 440)<br />
Justification:<br />
In 2009 the Department plans to add an all terrain vehicle to service airfield<br />
perimeter maintenance areas and drainage areas. The remaining equipment<br />
will be utilized to address increased demand for service.<br />
Recommended Funding:<br />
R E C O M M E N DE D F U N D IN G<br />
E st im a t ed<br />
E x pe n di tu re s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />
R eb u ilt T ug $ 5 ,5 0 0 $ 5 ,5 0 0<br />
G rou n d P ow e r Un it $ 1 2 ,0 0 0 $ 1 2 ,0 0 0<br />
U tilit y V eh icle $ 1 4 ,0 0 0 $ 1 4 ,0 0 0<br />
3 / 4 T o n P ick up $ 0<br />
J e t A T ru ck $ 5 6 ,5 0 0 $ 5 6 ,5 0 0<br />
T ot a ls $ 1 4 ,0 0 0 $ 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 8 8 ,0 0 0<br />
So ur ce o f Fu nd s 20 09 2 01 0 20 11 201 2 20 13 T o t a ls<br />
T ra n s fe r fro m C I P $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />
T ot a ls $ 1 4 ,0 0 0 $ 2 5 , 5 0 0 $ 1 2 ,0 0 0 $ 5 6 ,5 0 0 $ 5 ,5 0 0 $ 1 1 3 ,5 0 0<br />
70
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Parks and Recreation Equipment Replacement<br />
Description and Purpose:<br />
The Parks and Recreation Department uses various pieces <strong>of</strong> equipment for<br />
special park projects as well as park mowing. Prudent replacement <strong>of</strong><br />
equipment allows for optimum usage and minimizes lost time in repairs and<br />
service issues with damaged or inoperable equipment.<br />
Department:<br />
Parks and Recreation<br />
Fund:<br />
Equipment Replacement Fund (Fund 440)<br />
Justification:<br />
Replacement <strong>of</strong> parks and recreation department vehicles and equipment is<br />
based on estimated useful life, service needs, and mileage limits. Out-front<br />
mowers are highly maneuverable and designed to meet the varied and<br />
demanding conditions found in the <strong>City</strong>’s park system. Many <strong>of</strong> these models<br />
include hydraulic mower lifts, have shaft driven mowers and transmission and<br />
have power steering. In most conditions, they out-mow larger decked mowers<br />
due to their mowing speed tolerance, maneuverability (less trimming) and<br />
versatility. The purchase <strong>of</strong> a fourth mower is the result <strong>of</strong> increasing mowing<br />
acreage and the loss <strong>of</strong> productivity in loading and unloading mowers,<br />
transporting across town, etc. Having a fourth mower will allow for split<br />
mowing crews when efficiency would benefit. The 45 HP and 55 HP tractors<br />
have high powered engines with high torque and will be used for a variety <strong>of</strong><br />
projects such as excavation, hauling, leveling, plowing, etc. The ¾ Ton Pick-up<br />
and 1 Ton Dump Truck purchases are replacement for current inventory that<br />
will all be 10 years old or older at time <strong>of</strong> replacement.<br />
71
Recommended Funding:<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
3 / 4 To n P ick -u p $ 2 4 ,0 0 0 $ 2 5 ,0 0 0 $ 4 9 ,0 0 0<br />
7 2 " O ut fr on t M ow er $ 9 ,2 0 0 $ 1 3 ,0 0 0 $ 1 4 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 6 6 ,2 0 0<br />
4 5 H P 4 W D T r act or $ 2 4 ,0 0 0 $ 2 4 ,0 0 0<br />
5 5 H P T ra cto r $ 2 8 ,0 0 0 $ 2 8 ,0 0 0<br />
1 T o n D u m p T ru ck $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />
T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 1 5 ,0 0 0 $ 2 2 2 ,2 0 0<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
T ot a ls $ 9 ,2 0 0 $ 6 1 ,0 0 0 $ 6 7 ,0 0 0 $ 7 0 ,0 0 0 $ 2 0 7 ,2 0 0 $ 2 2 2 ,2 0 0<br />
72
REVENUES:<br />
CAPITAL IMPROVEMENT PLAN<br />
TECHNOLOGY IMPROVEMENTS<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
<strong>CIP</strong> Allocation 177,000 347,000 262,000 287,000 212,000<br />
TOTAL REVENUE 177,000 347,000 262,000 287,000 212,000<br />
EXPENDITURES:<br />
Telephone System Lease (5yrs. $250,000) 60,000 60,000 60,000 60,000 60,000<br />
<strong>Plan</strong>ning S<strong>of</strong>tware (5yrs. $200,000) 47,000 47,000 47,000 47,000 47,000<br />
Fiber/Infrastructure 0 35,000 35,000 35,000 35,000<br />
Servers/Server Hardware 15,000 15,000 15,000 15,000 15,000<br />
PC Replacement 35,000 35,000 35,000 35,000 35,000<br />
Copier Replacement 20,000 20,000 20,000 20,000 20,000<br />
S<strong>of</strong>tware Systems 50,000 75,000<br />
AS 400 PD 85,000<br />
PD Call Logger (see telephone sys. Sheet) 50,000<br />
TOTAL EXPENDITURES 177,000 347,000 262,000 287,000 212,000<br />
PURPOSE: The Technology <strong>Improvement</strong>s <strong>CIP</strong> identifies significant technology improvements<br />
necessary to address <strong>City</strong>wide technology systems.<br />
FUNDING SOURCES: General fund income tax allocation.<br />
73
34 74
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
Annual Server and Network Equipment Purchases and Replacements<br />
Description and Purpose:<br />
Annual Server and Network Equipment Purchases and Replacements. The IT Department maintains a<br />
scheduled replacement <strong>of</strong> all servers in the <strong>City</strong> <strong>of</strong> a maximum <strong>of</strong> 5 years <strong>of</strong> service to the <strong>City</strong> for front-line<br />
services. Once a server reaches this age, the machine may be utilized in a reserve role, or its service to the <strong>City</strong><br />
terminated, depending upon the condition <strong>of</strong> the hardware. A similar plan is in effect for Network equipment,<br />
although that equipment may be used effectively for up to 7 years, at present.<br />
Department:<br />
IT Department<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
In 2009, we have scheduled the removal from service <strong>of</strong> 6 servers. The functionality <strong>of</strong> each <strong>of</strong> these servers will<br />
require replacement. The <strong>City</strong>’s server capacity strategy is to purchase bigger servers, but to divide the use <strong>of</strong><br />
the servers into virtual servers, capable <strong>of</strong> providing more capacity in fewer machines. The servers targeted for<br />
retirement in 2008, 6 in all, were replaced by 2 physical servers. Those two physical servers still have capacity to<br />
provide more services, and are being utilized in the implementation <strong>of</strong> additional s<strong>of</strong>tware systems, such as that<br />
for the <strong>Plan</strong>ning/Development Department.<br />
In this category also comes additional disk capacity within the <strong>City</strong>. The <strong>City</strong> currently has 13 terabytes <strong>of</strong> data<br />
storage capacity. Of this, more than 50% is currently in use in some way. IT intends to extend the <strong>City</strong>’s data<br />
storage capacity, and evaluate disaster recovery systems, and <strong>of</strong>f-site storage in order to continue to provide<br />
adequate file storage to the <strong>City</strong>.<br />
With respect to Network Equipment, the <strong>City</strong> continues to build some network redundancy, particularly between<br />
<strong>City</strong> Hall and the Justice Center. This requires the purchase <strong>of</strong> an additional router, so that connectivity can be<br />
mirrored across the fiber. With 911 consolidation, it may become critical to have two different pathways to the<br />
Justice Center by fiber, so that remote operations are possible.<br />
Backup <strong>of</strong> <strong>City</strong> Data, including High Value Data. The <strong>City</strong> now has a strategic plan for the consolidated storage<br />
<strong>of</strong> general information, and for High Value Data—so that all data in the <strong>City</strong> can reside, in a backup form, in one<br />
location. There are two synergistic goals <strong>of</strong> this strategy: (1) the desire to keep High Value Data (SSNs, personal<br />
information, etc.) private, and (2) to have a reliable <strong>of</strong>f-site storage mechanism with an easy method to both<br />
recover deleted files, and to recover in the event <strong>of</strong> a disaster (DR). This strategy calls for the implementation <strong>of</strong><br />
a mirrored hard drive solution at the new Public Works facility, and/or a major robotic tape library installed at the<br />
new Public Works facility.<br />
Changes and Updates:<br />
Public Records laws will require greater availability <strong>of</strong> information to the public. Without some sort <strong>of</strong><br />
consolidation <strong>of</strong> information, the <strong>City</strong> may have difficulty in complying with these new laws.<br />
Recommended Funding<br />
E s tim a te d<br />
E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 + T o ta ls<br />
S e rv e r R e p la c e m e n t<br />
N e t w o rk E q u ip m e n t<br />
$ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />
$ 1 5 ,0 0 0 $ 7 5 ,0 0 0<br />
T o ta ls $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 1 5 ,0 0 0 $ 0 $ 7 5 ,0 0 0<br />
Source <strong>of</strong> Funds<br />
S o u r c e o f F u n d s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 To ta ls<br />
G e n e ra l F u nd $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />
O th e r C ity F un d s $0<br />
M u n ic ip al B on d s $0<br />
P riv a te Fu n d in g $0<br />
S tate /F ed e ral $0<br />
O th e r G ra n ts $0<br />
T o ta l $ 1 5 ,00 0 $ 1 5 ,00 0 $1 5 ,0 00 $1 5 ,0 00 $1 5 ,0 00 $ 7 5 ,0 0 0<br />
75
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
Police Department AS/400 Replacement<br />
Description and Purpose:<br />
Police Department AS/400 Replacement. The <strong>City</strong>’s Police Department currently utilizes the CHIEFS s<strong>of</strong>tware<br />
system, which can only successfully reside on IBM AS/400 mid-range computers. The current AS/400 is<br />
approximately 7 years old.<br />
Department:<br />
IT Department<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
In 2007, the <strong>City</strong> spent approximately $8,000 in order to extend the life <strong>of</strong> the <strong>City</strong>’s AS/400 computer system.<br />
The system, which is now beyond end-<strong>of</strong>-life from a manufacturer’s perspective (IBM no longer supports the<br />
machine), will eventually fail. While these machines are true workhorses among computers, if the Police<br />
Department intends to continue to use the CHIEFS s<strong>of</strong>tware system, will need to be replaced.<br />
Changes and Updates:<br />
Recommended Funding<br />
E s tim a ted<br />
E x p en d itu re s 2 0 09 2 0 10 2 0 11 2 0 1 2 2 0 1 3 2 0 1 4 + T o tals<br />
S erve r<br />
R ep la c e m e n t $ 7 0 ,00 0 $ 7 0,0 0 0<br />
E qu ip m e n t<br />
U pg ra de s $ 0<br />
D R /C o nso lid a tio n $ 1 5 ,00 0 $ 1 5,0 0 0<br />
T o ta ls $ 8 5 ,00 0 $ 0 $ 0 $ 0 $ 0 $ 8 5,0 0 0<br />
Source <strong>of</strong> Funds<br />
So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2013+ T o tals<br />
G e neral F und $ 85,000 $0 $0 $ 85,000<br />
O ther C ity F unds $0<br />
M u nicipal B onds $0<br />
P riva te Fu nding $0<br />
S tate/F edera l $0<br />
O ther G ra nts $0<br />
T otal $ 0 $ 85,000 $0 $0 $0 $0 $ 85,000<br />
76
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
PC Replacements<br />
Description and Purpose:<br />
PC Replacements<br />
Department:<br />
IT Department<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
Commonly, technology used by users in the <strong>City</strong> will last 3 to 5 years, with those using 5 years having<br />
significantly fewer abilities to get high productivity out <strong>of</strong> their pcs as those using 3 year or younger equipment.<br />
We attempt to replace all pcs within a 4 year cycle in order to keep productivity as high as possible from a<br />
technology point <strong>of</strong> view.<br />
Changes and Updates:<br />
Each year, the <strong>City</strong> typically identifies from 30 to 40 computers which are the highest need candidates for<br />
replacement.<br />
The <strong>City</strong> is currently investigating installation <strong>of</strong> “Thin Client” computers, rather than pcs for most departmental<br />
users. The primary advantages to this approach are: (1) lower cost <strong>of</strong> replacement (at a certain point), (2)<br />
lower cost <strong>of</strong> deployment, (3) standardized user experiences, (4) lower cost <strong>of</strong> antivirus and other<br />
management s<strong>of</strong>tware systems, (4) lower energy cost, (5) longer lifecycle, (6) lower maintenance cost <strong>of</strong><br />
machines (no moving parts). In order to achieve this, we have to acquire additional servers (about 1 for each<br />
25 users). In the long term, it should mean overall lower operating cost for all departments except<br />
Engineering, and possibly planning and GIS, where high-end graphics capabilities are required.<br />
For the next several years, the IT Department will be purchasing a combination <strong>of</strong> PCs and Servers/thin client<br />
computers within the PC Replacement line item. This will permit the <strong>City</strong> to take as large an advantage from<br />
the thin client implementation perspective, while still taking into consideration the trade-<strong>of</strong>fs associated with<br />
thin client computing.<br />
Also included in this Project are Laptops, Monitors, Peripherals, and Projectors.<br />
Not included in this Project, are replacements for printers, which are not contained in any <strong>CIP</strong> Project.<br />
Recommended Funding<br />
E stim ate d<br />
E xp e nd itur e s 2 0 09 2 0 10 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4+ T ota ls<br />
P C s/T hi n<br />
L a p top s<br />
P rin ters<br />
M o n itors<br />
$ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 17 5 ,0 00<br />
$ 0<br />
P e rip h e ra ls $ 0<br />
P ro je ctors $ 0<br />
T o ta ls $ 3 5 ,00 0 $ 3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $3 5 ,0 00 $ 0 $ 17 5 ,0 00<br />
Source <strong>of</strong> Funds<br />
So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />
G e nera l F u nd $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $175,000<br />
O th er C ity F unds $0<br />
M unicipal B on ds $0<br />
P rivate Fu nding $0<br />
S tate/F ederal $0<br />
O th er G rants $0<br />
T ota l $ 35,00 0 $35,000 $3 5,000 $35,0 00 $35,000 $ 0 $175,000<br />
77
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
Fiber Infrastructure<br />
Description and Purpose:<br />
Fiber Infrastructure; <strong>City</strong> and Consortium fiber infrastructure projects. This project is meant to develop fiber optic<br />
infrastructure in furtherance <strong>of</strong> the <strong>City</strong>’s IT needs, and economic development.<br />
Department:<br />
Information Technology<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
The <strong>City</strong> has committed to building a city-wide fiber infrastructure for use by the <strong>City</strong>, and as an economic<br />
development tool. <strong>City</strong> Council agreed that the fiber optic infrastructure should be considered on the same level as<br />
other infrastructure assets here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Cities which are currently experiencing growth, typically<br />
have made significant investment in fiber technology.<br />
Changes and Updates:<br />
To date, 2008 has seen little change in the fiber optic infrastructure itself, here in the <strong>City</strong> <strong>of</strong> <strong>Delaware</strong>. Legal<br />
documents for the formation <strong>of</strong> the Consortium entity, <strong>Delaware</strong> Area Super Highway (D.A.S.H.) have been drafted.<br />
However, absent external funding <strong>of</strong> some kind from DASH members, the infrastructure will not be able to be<br />
completed.<br />
In 2009 and beyond, we hope to work closely with the Public Works Department to develop in-house expertise at<br />
creating fiber-ready infrastructure. That is, we hope to be able to perform all aspects <strong>of</strong> building fiber infrastructure,<br />
from burying conduit, installing handholes, and pushing fiber, except for fiber terminations.<br />
Recommended Funding<br />
E stim ated<br />
Expenditures 2009 2010 2011 2012 2013 2014+ T otals<br />
N etwork<br />
R edundancy $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />
Total $0 $35,000 $35,000 $35,000 $35,000 $35,000 $175,000<br />
Source <strong>of</strong> Funds<br />
So urce o f Fu nd s 2009 2 010 2011 2012 2 013 2014+ To ta ls<br />
G e nera l F u nd $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />
O th er C ity F unds $0<br />
M unicipal B on ds $0<br />
P rivate Fu nding $0<br />
S tate/F ederal $0<br />
O th er G rants $ 0 $0<br />
T ota l $ 0 $35,000 $35,000 $35,000 $35,0 00 $3 5,000 $175,000<br />
78
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
Copier Replacement<br />
Description and Purpose:<br />
Copier Replacement<br />
Department:<br />
IT Department<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
With the implementation <strong>of</strong> the fiber optic network, the new telephone system, and unified messaging, it is paramount<br />
that we maintain current technology in our copier systems. We now utilize copiers as printers and scanners, as well as<br />
photocopy machines. IT’s plan for maintaining current technology was primarily implemented in 2007 with the purchase<br />
<strong>of</strong> 14 current technology copiers. These copiers permit the <strong>City</strong> to take advantage <strong>of</strong> the power <strong>of</strong> the unified<br />
messaging systems we have in place by permitting all users in the <strong>City</strong> to use copiers as scanners, saving files to the<br />
network, and faxing directly from their PCs.<br />
By implementing these changes, the <strong>City</strong> has begun to experience lower operational maintenance cost.<br />
The funding in this project is to pay the payments on a <strong>Capital</strong> Lease, which is the method used to make the purchase<br />
<strong>of</strong> the copiers in 2007.<br />
Changes and Updates:<br />
Recommended Funding<br />
E stim ate d<br />
E xp e nd itur e s 2 0 09 2 0 1 0 2 0 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />
P rin te r/C o pie r/S ca n n ers $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />
$ 0<br />
$ 0<br />
$ 0<br />
$ 0<br />
T o ta ls $ 2 0 ,00 0 $ 2 0 ,0 00 $2 0 ,0 00 $ 20 ,0 0 0 $ 20 ,0 0 0 $ 2 0,0 0 0 $1 2 0 ,0 00<br />
Source <strong>of</strong> Funds<br />
So u rce o f Fu n ds 2009 2010 2011 2012 201 3 2014+ T o tals<br />
G e neral F und $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />
O ther C ity F unds $ 0<br />
M unicip al B onds $ 0<br />
P rivate Fundin g $ 0<br />
S tate/F ed eral $ 0<br />
O ther G rants $ 0<br />
T otal $20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $20,000 $12 0,000<br />
79
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project Detail<br />
Telephone System <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Telephone System <strong>Improvement</strong>s<br />
Department:<br />
IT Department<br />
References, Appendices, Images:<br />
Justification: Please list any supporting goals, principles, objectives and strategies:<br />
This project represents the payment for the telephone system for which implementation began in 2006, and was<br />
completed in 2007.<br />
Changes and Updates:<br />
The <strong>City</strong> did make additional telephone system investment in 2007 to add additional capacity and redundancy for the<br />
Police Department. Additional capacity will be added when the telephone system is expanded to include service at the<br />
new Public Works facility on E. William Street. In conjunction with 911 consolidation, the <strong>City</strong> will need to invest in the<br />
replacement <strong>of</strong> the Police Department’s call logging system. This cost is expected to be about $50,000.<br />
Recommended Funding<br />
E s tim a te d<br />
E x p e nd itur es 2 0 09 20 1 0 20 1 1 2 0 1 2 20 1 3 20 1 4 + T ota ls<br />
T e le p ho n e S y stem $ 6 0 ,00 0 $ 6 0,0 0 0 $ 60 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 3 6 0,0 0 0<br />
P .D . C a ll Lo g g er $ 50 ,0 0 0 $ 5 0 ,0 0 0<br />
$ 0<br />
$ 0<br />
$ 0<br />
T o ta ls $ 6 0 ,00 0 $ 6 0,0 0 0 $ 1 10 ,0 0 0 $ 60 ,0 0 0 $ 6 0,0 0 0 $ 6 0,0 0 0 $ 4 1 0,0 0 0<br />
Source <strong>of</strong> Funds<br />
So u rc e o f Fu n ds 2009 2010 2011 2012 2013 2014+ T o tals<br />
G e neral F und $60,0 00 $60,0 00 $ 60,000 $ 60,000 $60,0 00 $60,00 0 $360 ,0 00<br />
O ther C ity F unds $ 50,000 $ 50,000<br />
M u nicipal B o nds $0<br />
P riva te Funding $0<br />
S tate/F edera l $0<br />
O ther G ra nts $0<br />
T otal $60,0 00 $60,0 00 $110 ,000 $ 60,000 $60,0 00 $60,00 0 $410 ,0 00<br />
80
CAPITAL IMPROVEMENT PLAN<br />
BUILDING MAINTENANCE<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
REVENUES:<br />
<strong>CIP</strong> Allocation 51,100 106,300 54,500 25,500 0<br />
TOTAL REVENUE 51,100 106,300 54,500 25,500 0<br />
EXPENDITURES:<br />
Carpet Replacement <strong>City</strong> Hall 10,000<br />
<strong>City</strong> Hall HVAC Replacement 0 60,000<br />
Justice Center Boiler Replacement 28,000 30,000<br />
Justice Center HVAC Overhaul 23,100 23,800 24,500 25,200 0<br />
HVAC Hilborn Room Mingo 12,500<br />
TOTAL EXPENDITURES 51,100 106,300 54,500 25,200 0<br />
PURPOSE: To plan for major building maintenance projects.<br />
FUNDING SOURCES: General fund income tax allocation.<br />
81
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: <strong>City</strong> Hall Carpet Replacement<br />
Description and Purpose:<br />
<strong>City</strong> Hall Carpet Replacement – 1 S. Sandusky Street<br />
Department:<br />
Public Works – Building Maintenance Division<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
<strong>City</strong> Hall renovation occurred 14 years ago and the carpeting is in need <strong>of</strong><br />
replacement. 2010 funding will replace flooring in Council Chambers<br />
Recommended Funding:<br />
R E C O M M E N DE D F U N D IN G<br />
E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
C a rp e t R e p la ce m ent $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />
So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
G e n e ra l F u n d $ 1 0 ,0 0 0 $ 1 0 ,0 0 0<br />
T o ta ls $ 0 $ 1 0 ,0 0 0 $ 0 $ 0 $ 0 $ 1 0 ,0 0 0<br />
83
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Justice Center HVAC Overhaul<br />
Description and Purpose:<br />
Aging heat pump replacement program for Justice Center – 70 N. Union Street<br />
Department:<br />
Public Works – Building Maintenance Division<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
The Justice Center currently has 43 heat pumps that are 15 years old. The<br />
average operation expectation for these units is 12-15 years. The proposed 5<br />
year plan would replace approximately 9 units per year.<br />
Recommended Funding:<br />
R E C O M M E N DE D F U N D IN G<br />
E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
H V A C R e p lac e m en t $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />
T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />
So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
G e n e ra l F u n d $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />
T o ta ls $ 2 3 ,1 0 0 $ 2 3 ,8 0 0 $ 2 4 ,5 0 0 $ 2 5 ,2 0 0 $ 9 6 ,6 0 0<br />
84
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Justice Center Boiler Replacement<br />
Description and Purpose:<br />
Aging heating system boilers replacement program for Justice Center – 70 N.<br />
Union Street<br />
Department:<br />
Public Works – Building Maintenance Division<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
The Justice Center currently has 3 boilers that are 16 years old. The average<br />
operation expectation for these units is 12-15 years. The proposed 5 year plan<br />
would replace approximately 2 units over the next three years. One boiler was<br />
replaced during the recent renovations however another unit is inoperable.<br />
Recommended Funding:<br />
R E C O M M E N DE D F U N D IN G<br />
E s t i m a t e d E x p e nd it ur e s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
H e a t Sy ste m B oiler $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />
T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />
So ur ce o f F un d s 20 09 20 10 2 01 1 2 01 2 20 13 T o ta ls<br />
G e n e ra l F u n d $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 0 $ 5 8 ,0 0 0<br />
T o ta ls $ 2 8 ,0 0 0 $ 0 $ 3 0 ,0 0 0 $ 0 $ 5 8 ,0 0 0<br />
85
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: <strong>City</strong> Hall HVAC Upgrade<br />
Description and Purpose:<br />
Replacement <strong>of</strong> Johnson Control HVAC Management System to reduce annual<br />
<strong>City</strong> Hall HVAC operating cost<br />
Department:<br />
Public Works – Building Maintenance Division<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
The HVAC system in <strong>City</strong> Hall HVAC system is 15 years old. The HVAC<br />
management system is a proprietary system and requires a non-competitive<br />
parts & pr<strong>of</strong>essional service arrangement with Johnson Controls to maintain. A<br />
replacement system will be chosen that is a LonMark certified system to insure<br />
the HVAC system control components will be open to allow competitive<br />
purchasing <strong>of</strong> parts and service.<br />
Recommended Funding:<br />
RE C OM M E N D E D FU N DIN G<br />
E s t im a te d E x p e nd it ur es 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
H V AC M an a ge m e n t Syst e m $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />
T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />
So ur c e o f F un d s 2 009 2 01 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G e ner al F un d $ 6 0 ,0 0 0 $ 6 0 ,0 0 0<br />
T ot a ls $ 6 0 ,0 0 0 $ 0 $ 0 $ 6 0 ,0 0 0<br />
86
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: AC/Furnace in Hilborn Room<br />
Description and Purpose:<br />
HVAC replacement in Hilborn Room at Recreation Center.<br />
Department:<br />
Parks and Recreation<br />
Fund:<br />
<strong>Capital</strong> <strong>Improvement</strong> Fund (Fund 410)<br />
Justification:<br />
HVAC replacement program schedule.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
H ilb o rn R m HV A C R e p lace $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />
T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />
O th er C ity Fu nd s<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed era l<br />
T ot a ls $ 1 2 ,5 0 0 $ 1 2 ,5 0 0<br />
87
22 88
CAPITAL IMPROVEMENT PLAN<br />
PARK IMPACT FEE IMPROVEMENT FUND<br />
2009-2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
BALANCE FORWARD 965,984 156,968 103,912 70,856 37,800<br />
REVENUES:<br />
Impact Fees 85,000 85,000 85,000 85,000 85,000<br />
TOTAL REVENUES 85,000 85,000 85,000 85,000 85,000<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Bonds<br />
Pool Imprvmnts ($450,000 10yrs., 2006 Issue) 55,927 55,927 55,927 55,927 55,322<br />
2006 Mingo Expansion ($500,000 10yrs.) 62,129 62,129 62,129 62,129 61,462<br />
Pool Imprvmts ($425,000 notes) 451,942 0 0 0 0<br />
Skate Park (Net) ($300,000 notes.) 319,018 0 0 0 0<br />
TOTAL DEBT SERVICE 889,016 118,056 118,056 118,056 116,784<br />
BIKEWAYS<br />
Henry St. Trail Enhancements 5,000 20,000<br />
TOTAL EXPENDITURES 894,016 138,056 118,056 118,056 116,784<br />
IMPACT FEE BALANCE 156,968 103,912 70,856 37,800 6,016<br />
PURPOSE: The Parks <strong>Improvement</strong> Fund/ Impact Fee <strong>Plan</strong> identifies future projects intended<br />
to increase the capacity <strong>of</strong> the <strong>City</strong>'s community parkland and recreation systems. In 2001 the<br />
<strong>City</strong> enacted a parks and recreation facilities development impact fee <strong>of</strong> $1,226 per new<br />
residential development unit. All revenue collected from this fee must be used for system<br />
improvements<br />
FUNDING SOURCES: Parks and Recreation Development Impact Fees<br />
89
THIS PAGE INTENTIONALLY LEFT BLANK<br />
90
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Henry Street Pedestrian Crossing Enhancements<br />
Description and Purpose:<br />
Safety improvements and enhancements to the existing Springfield Branch<br />
bike path crossing at Henry Street. <strong>Improvement</strong>s may include pedestrian<br />
crossing warning signage mounted on a mast-arm, lighting, brick pavers or<br />
stamped concrete crossing, directional signage (using remnant stone from the<br />
demolished tunnel), landscape beds, and possibly benches.<br />
Department:<br />
Engineering Services and Parks & Recreation<br />
Fund:<br />
Park Impact Fee <strong>Improvement</strong> Fund (Fund 491)<br />
Justification:<br />
<strong>Improvement</strong>s are necessary to make the crossing more noticeable and<br />
attractive. <strong>Improvement</strong>s should make the crossing utilized more <strong>of</strong>ten. This<br />
work was originally part <strong>of</strong> a final phase <strong>of</strong> the bike path project that was<br />
cancelled.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Fina l E n ginee r ing $ 5 ,0 0 0 $ 5 ,0 0 0<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy $ 0 $ 0<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d $ 0<br />
O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0<br />
Sta te /F ed e ra l<br />
In H ou se (E ng in ee rin g) $ 5 ,0 0 0<br />
T ot a ls $ 5 ,0 0 0 $ 2 0 ,0 0 0 $ 2 5 ,0 0 0<br />
91
THIS PAGE INTENTIONALLY LEFT BLANK<br />
92
CAPITAL IMPROVEMENT PLAN<br />
POLICE IMPACT FEE FUND<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCES FORWARD 290,000 387,000 359,000 371,000 383,000<br />
REVENUES<br />
Police Impact Fees 185,000 125,000 100,000 100,000 383,000<br />
Bond/Note Proceeds<br />
TOTAL REVENUE 185,000 125,000 100,000 100,000 383,000<br />
IMPACT FEE EXPENDITURES<br />
Police Cruiser ( 14th unit) 40,000<br />
Early Warning System Expansion 25,000<br />
DEBT SERVICE<br />
Justice Center ($1,100,000 20yrs.) 88,000 88,000 88,000 88,000 88,000<br />
TOTAL IMPACT FEE EXPENDITURES 88,000 153,000 88,000 88,000 88,000<br />
IMPACT FEE BALANCE 387,000 359,000 371,000 383,000 678,000<br />
PURPOSE: The Police <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />
necessary for operation <strong>of</strong> the <strong>City</strong>'s Police Department. In 2001 the <strong>City</strong> enacted a Police<br />
Facilities Development Impact Fee <strong>of</strong> $162 per single family residential unit and approximately<br />
$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Police<br />
equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />
spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />
impact fee resources. Replacement vehicles for the Police Department are included in the <strong>CIP</strong><br />
replacement fund.<br />
FUNDING SOURCES: Police Impact Fees<br />
93
THIS PAGE INTENTIONALLY LEFT BLANK<br />
94
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Equipment: Early Warning System<br />
Description and Purpose:<br />
Purchase <strong>of</strong> complete digital Early Warning Siren unit including pole to add to<br />
the current system.<br />
Department:<br />
Police Department<br />
Fund:<br />
Police Impact Fee Fund (Fund 492)<br />
Justification:<br />
Previously slated for 2009; pushed back to 2010 based on system capacity.<br />
Recommended Funding:<br />
R E C O M M E N DE D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />
Sir en $2 5 ,0 0 0 $2 5 ,0 0 0<br />
T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />
So u rc e o f F un ds 2 00 9 20 10 20 11 20 12 2 01 3 T o ta ls<br />
P olice Im pa ct Fee s $2 5 ,0 0 0 $2 5 ,0 0 0<br />
T ota ls $2 5 ,0 0 0 $2 5 ,0 0 0<br />
95
THIS PAGE INTENTIONALLY LEFT BLANK<br />
96
CAPITAL IMPROVEMENT PLAN<br />
FIRE IMPACT FEE FUND<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCES FORWARD 388,914 488,914 445,164 445,164 445,164<br />
REVENUES:<br />
Fire Impact Fees 200,000 165,000 140,000 140,000 0<br />
Bond Issue<br />
TOTAL REVENUE 200,000 165,000 140,000 140,000 0<br />
IMPACT FEE EXPENDITURES:<br />
Command Vehicle 25,000<br />
Training Vehicle 83,750<br />
Land Acquisition Area Substation 100,000 100,000<br />
Construction Station #3 $1,750,000<br />
Annual Debt Service 20yrs. 140,000 140,000 140,000<br />
Construction Station #4 $2,000,000<br />
Annual Debt Service 20yrs. 160,000<br />
TOTAL IMPACT FEE EXPENDITURES: 100,000 208,750 140,000 140,000 300,000<br />
IMPACT FEE BALANCE 488,914 445,164 445,164 445,164 145,164<br />
PURPOSE: The Fire <strong>Improvement</strong> Fund identifies future projects and equipment purchases<br />
necessary for operation <strong>of</strong> the <strong>City</strong>'s Fire/EMS Department. In 2001 the <strong>City</strong> enacted a Fire<br />
Facilities Development Impact Fee <strong>of</strong> $314 per single family residential unit and approximately<br />
$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Fire/EMS<br />
equipment and facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be<br />
spent on replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with<br />
impact fee resources.<br />
FUNDING SOURCES: Fire Impact Fees.<br />
97
THIS PAGE INTENTIONALLY LEFT BLANK<br />
98
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Fleet Vehicle Replacement<br />
Description and Purpose:<br />
- Replacement <strong>of</strong> Existing Fleet Vehicles<br />
o Vehicle Replacement Schedule<br />
o Insurance Services Report – October 22, 1998<br />
o T.G. Fire/EMS Services Inc., 2001 Study<br />
o Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />
Goal #2 - Improve Facilities to Match Resource to Risk<br />
Reduce Response Times<br />
o Fire Department Strategic <strong>Plan</strong> – Service Gap<br />
Meet international benchmarks and standard <strong>of</strong> care<br />
Upgrade and modernize existing facilities<br />
Deployment analysis to identify appropriate location <strong>of</strong><br />
facilities to meet the standards <strong>of</strong> coverage.<br />
Department:<br />
Fire Department<br />
Fund:<br />
General Fund (Fund 101)<br />
Fire Impact Fee Fund (Fund 493)<br />
Justification:<br />
The Fire Department fleet vehicles are aging. In 2007, the Fire Department lost<br />
a staff vehicle due to mechanical problems, and it has not been replaced. The<br />
purchase <strong>of</strong> new fleet vehicles in 2009 and 2010 would include the purchase <strong>of</strong><br />
a command vehicle and a training vehicle through Impact Fees. The<br />
Department has proposed a plan to develop a rotation based on the<br />
Department’s Vehicle Replacement <strong>Plan</strong>. These vehicles would allow the<br />
Department to be prepared for Fire Department operations.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a t ed E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />
C o m m a nd V ehicle $ 2 5 ,0 0 0 $ 0 $ 2 5 ,0 0 0<br />
T ra inin g V eh icle $ 8 3 ,7 5 0 $ 8 3 ,7 5 0<br />
T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t a ls<br />
Fire Im p act F ees $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />
T ot a ls $ 0 $ 1 0 8 ,7 5 0 $ 0 $ 0 $ 0 $ 1 0 8 ,7 5 0<br />
99
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: New Fire Stations<br />
Description and Purpose:<br />
-Fire Station #303 – new building in the <strong>City</strong>’s NW quadrant<br />
• Fire Station located on <strong>City</strong> owned property on Lexington Blvd<br />
between W. Central Ave. and W. William St.<br />
• Decrease response times in the <strong>City</strong>’s NW quadrant<br />
• Provide for current and projected growth<br />
• <strong>City</strong> currently owns the associated land for new fire station<br />
• Approximately 10,000 sq ft building<br />
-Fire Station #304 – new building in the <strong>City</strong>’s SE quadrant<br />
• Fire Station is proposed to be located at/in the <strong>City</strong> water tower<br />
located on Cheshire Rd.<br />
• Decrease response times in the <strong>City</strong>’s SE quadrant<br />
• Provide for current and projected growth<br />
• <strong>City</strong> currently owns the associated land for new fire station<br />
• Build out the interior finish <strong>of</strong> the water tower<br />
• Fire Apparatus Bay area attached to the building<br />
-Fire Station #301 – new building in the <strong>City</strong>’s East side<br />
• Fire Station 301 is proposed to be relocated near the<br />
intersection <strong>of</strong> E Winter St. and Lake St.<br />
• Decrease response times in the <strong>City</strong>’s East side<br />
• The Fire Station would serve as the main headquarters and<br />
administrative <strong>of</strong>fices for the Fire Department<br />
• Ohio Wesleyan University has expressed interest in purchasing<br />
the property that Fire Station 301 is located<br />
• Provide for current and projected growth<br />
• Fire Station could serve as the catalyst for redevelopment on the<br />
East side <strong>of</strong> the <strong>City</strong><br />
• <strong>City</strong> currently does not own the associated land for new fire<br />
station<br />
-Fire Station construction costs are currently running @ $200/ sq ft.<br />
-T.G. Fire/EMS Services Inc., 2001 Study<br />
-Fire Department Strategic <strong>Plan</strong> – Goals and Critical Service Gaps<br />
• Goal #2 – Improve Facilities to Match Resource to Risk Reduce<br />
Response Times<br />
-Fire Department Strategic <strong>Plan</strong> – Service Gap<br />
• Meet international benchmarks and standard <strong>of</strong> care<br />
• Upgrade and modernize existing facilities<br />
• Deployment analysis to identify appropriate location <strong>of</strong> facilities<br />
to meet the standards <strong>of</strong> coverage.<br />
100
Department:<br />
Fire Department<br />
Fund:<br />
Fire Impact Fee Fund (Fund 493)<br />
Justification:<br />
-Fire Department is currently responding to 57% <strong>of</strong> the calls within 4-<br />
minutes <strong>of</strong> drive time<br />
-<strong>City</strong> Comprehensive <strong>Plan</strong> states within 4-minutes 90% <strong>of</strong> the time<br />
-GIS Studies, indicate that this would increase our response times to<br />
77% within 4-minutes<br />
-2007-2012 Fire Department Strategic <strong>Plan</strong> identified internal and<br />
external stakeholders as one <strong>of</strong> the most important issues facing<br />
the Fire Department. This relates specifically to Goal # 2<br />
Recommended Funding:<br />
RE C O M M E N D E D F U N D IN G<br />
E st im a te d E x pe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
C o nst ru ction St a tio n 3 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 4 2 0 ,0 0 0<br />
C o nst ru ction St a tio n 4 $ 1 6 0 ,0 0 0 $ 1 6 0 ,0 0 0<br />
L a nd A cq . S ub sta t ions $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />
T ot a ls $ 0 $ 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />
So u rc e o f F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T o t a ls<br />
G ener al Fun d $ 0<br />
Im p ac t F ees/ B o nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />
M un icip a l B on d s $ 0<br />
P riv at e F un d ing (O W U) $ 0<br />
St a t e/ Fed era l $ 0<br />
T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 1 4 0 ,0 0 0 $ 3 0 0 ,0 0 0 $ 7 8 0 ,0 0 0<br />
101
THIS PAGE INTENTIONALLY LEFT BLANK<br />
102
CAPITAL IMPROVEMENT PLAN<br />
MUNI<strong>CIP</strong>AL SERVICES IMPACT FEE FUND<br />
2009-2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
BALANCE FORWARD 466,766 467,266 417,766 343,266 268,766<br />
REVENUES:<br />
Impact Fees 200,000 150,000 125,000 125,000 125,000<br />
Bond/Note Proceeds - Justice Center -<br />
Bond/Note Proceeds - Public Works Garage<br />
TOTAL REVENUES 200,000 150,000 125,000 125,000 125,000<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Public Works Facility ($1,404,000 20yrs.) 103,500 103,500 103,500 103,500 103,500<br />
Justice Center ($1,200,000 20yrs.) 96,000 96,000 96,000 96,000 96,000<br />
TOTAL EXPENDITURES 199,500 199,500 199,500 199,500 199,500<br />
IMPACT FEE BALANCE 467,266 417,766 343,266 268,766 194,266<br />
PURPOSE: The Municipal Services Fund identifies future projects and equipment purchases<br />
necessary for operation <strong>of</strong> the <strong>City</strong>'s Various Departments. In 2006 the <strong>City</strong> enacted a Municipal<br />
Services Development Impact Fee <strong>of</strong> $366 per single family residential unit and approximately<br />
$350 per 1000 s.f. <strong>of</strong> non-residential development. These funds must be spent on Municipal<br />
facilities made necessary by the growth <strong>of</strong> the <strong>City</strong>. The impact fees cannot be spent on<br />
replacement <strong>of</strong> existing equipment or on replacement <strong>of</strong> equipment purchased with impact fee<br />
resources.<br />
FUNDING SOURCES: Municipal Facilities Impact Fees.<br />
103
104
CAPITAL IMPROVEMENT PROGRAM<br />
WATER FUND CAPACITY PROJECTS<br />
2009-2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
BALANCES FORWARD 1,487,102 2,077,697 2,724,392 2,355,101 2,179,810<br />
REVENUES:<br />
Water Capacity Fees 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000<br />
Water Rate Increase 10% 2010 187,500 375,000 382,500 390,000<br />
Water Rate Increase 10% 2011 187,500 375,000 382,500<br />
Water Rate Increase 0% 2012 0 0<br />
JRS Grant 2,000,000<br />
Bond Proceeds 8,205,000 11,000,000 0<br />
TOTAL REVENUES 9,205,000 12,187,500 3,562,500 1,757,500 1,772,500<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Westside Trans. Line ($4,500,000 25 yrs.) 361,520 361,520 361,520<br />
Kingman Hill Tower ($3,545,000 25 yrs.) 239,405 240,805 242,005 243,005 243,005<br />
<strong>Plan</strong>t Expansion ($15,230,000 25yrs.) 1,128,266 1,128,266 1,128,266<br />
TOTAL DEBT SERVICE 239,405 240,805 1,731,791 1,732,791 1,732,791<br />
PLANT CAPACITY PROJECTS<br />
Treatment <strong>Plan</strong>t Expansion<br />
Design 850,000<br />
Construction 500,000 11,000,000<br />
WATER SUPPLY PROJETS<br />
Penry Rd. Wellfield 2,385,000<br />
DISTRIBUTION CAPACITY PROJECTS<br />
Westside Transmission Line 4,000,000<br />
Sawmill Parkway Waterline 100,000 100,000 2,000,000<br />
Panhandle Rd. Waterline (lowhead dam) 340,000<br />
New Line Oversizing 200,000 200,000 200,000 200,000 200,000<br />
TOTAL WATER CAPACITY PROJECTS 8,375,000 11,300,000 2,200,000 200,000 200,000<br />
ENDING FUND BALANCE 2,077,697 2,724,392 2,355,101 2,179,810 2,019,519<br />
105
106
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : Sawmill Parkway Waterline Extension<br />
Description and Purpose:<br />
Design and construction <strong>of</strong> a waterline with the Sawmill Parkway Extension.<br />
Department:<br />
Public Utilities & Engineering Departments<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536)<br />
Justification:<br />
Provide potable water service to the SW area <strong>of</strong> the <strong>City</strong> with a possible Jobs<br />
Ready Grant.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
Fina l E n ginee r ing $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 0 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
Job s Re a dy Gr a nt $ 2 , 0 0 0 ,0 0 0 $ 2 ,0 0 0 , 0 0 0<br />
T ot a ls $ 1 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 2 , 0 0 0 ,0 0 0 $ 2 ,2 0 0 , 0 0 0<br />
107
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Penry Road Raw Water Line<br />
Description and Purpose:<br />
Construction <strong>of</strong> the water transmission line from the Penry Wellfield to the<br />
Water Treatment <strong>Plan</strong>t. The transmission line will double the <strong>City</strong>’s well water<br />
supply from the current 2MGD to 4MGD. The additional well water will help in<br />
lowering nitrates, atrazine, and stage 2 disinfectant by-product levels because<br />
<strong>of</strong> the lower levels <strong>of</strong> organic material in the well water as opposed to the river<br />
water supply.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Fund Capacity Fee Fund (Fund 536)<br />
Justification:<br />
Necessary for additional water treatment capacity. Easements & design work<br />
are currently under way and construction is needed in order to supply water to<br />
the new proposed membrane plant pilot study scheduled as part <strong>of</strong> the Water<br />
Master <strong>Plan</strong>.<br />
Recommended Funding:<br />
E s t im a te d E x p e n d it u r es 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />
T ra ff ic<br />
E n v ir o n m e n t a l $ 7 5 ,0 0 0 $ 7 5 ,0 0 0<br />
R / W C on s u lt a n t $ 5 5 ,0 0 0 $ 5 5 ,0 0 0<br />
R / W P u r c h a s e $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
A d m in s t ra t iv e<br />
C o n s t ru c t io n $ 1 ,9 0 0 , 0 0 0 $ 1 ,9 0 0 , 0 0 0<br />
C h an g e O rd e r/ C o n t in g e n c y<br />
R E C O M M E N D E D F U N D I N G<br />
C o n s t ru c t io n En g in e e rin g $ 1 9 0 ,0 0 0 $ 1 9 0 ,0 0 0<br />
In s p e c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />
S o u r c e o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta ls<br />
G e n e r al F u n d<br />
O th e r C ity F u n d s $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />
M u n ic ip a l B o n d s<br />
T ot a ls $ 2 ,3 8 5 , 0 0 0 $ 2 ,3 8 5 , 0 0 0<br />
108
Pictures and Drawings:<br />
109
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Panhandle Road Waterline<br />
Description and Purpose:<br />
Project involves construction <strong>of</strong> a 12” water line crossing the river at the<br />
Panhandle Road low-head dam.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536) – Design in 2008 <strong>CIP</strong><br />
Justification:<br />
Larger water line needed to serve existing customers and additional capacity<br />
for future development in our service area. Water line construction is in<br />
conjunction with the removal <strong>of</strong> the low-head dam.<br />
Recommended Funding:<br />
Estim a te d Expe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Ad minstra tive<br />
Co nstru ctio n $3 00,000 $300,000<br />
Ch an ge O rd er/Co ntingen cy<br />
Co nstru ctio n En ginee ring $ 25,000 $25,000<br />
In spection $ 15,000 $15,000<br />
Tota ls $3 40,000 $340,000<br />
Sour c e <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d<br />
O th er C ity Fu nds $3 40,000 $340,000<br />
M un icipa l Bon ds<br />
Priva te F un din g<br />
Sta te /F edera l<br />
Tota ls $3 40,000 $340,000<br />
110
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Groundwater Membrane <strong>Plan</strong>t<br />
Description and Purpose:<br />
The construction <strong>of</strong> a rated 3MGD Groundwater Membrane <strong>Plan</strong>t which<br />
will treat the water coming from all the well fields and then blend it with<br />
the river water being treated by the existing plant. This will increase the<br />
total water treatment capacity by an additional 3 million gallons per day.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536)<br />
Justification:<br />
The membrane plant will increase water treatment capacity and help the water<br />
quality by reducing the Stage II Disinfectant by-products, nitrate and atrazine<br />
levels and helping to produce a s<strong>of</strong>ter and higher quality water able to meet the<br />
increasing EPA regulations<br />
Recommended Funding:<br />
Price estimated by engineering firm.<br />
R E C O M M E N DE D FU N D IN G<br />
E s t im a te d E x p e nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Stu d y $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />
E nvir on m ent a l $ 9 0 ,0 0 0 $ 9 0 ,0 0 0<br />
P re lim in a ry E n gine er ing $ 1 5 5 ,0 0 0 $ 1 5 5 ,0 0 0<br />
F ina l E n ginee r ing $ 6 0 5 ,0 0 0 $ 5 5 5 ,0 0 0<br />
C o nst ru ct io n $ 1 0 ,6 3 5 ,0 0 0 $ 1 0 ,6 3 5 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring $ 2 5 0 ,0 0 0 $ 2 5 0 ,0 0 0<br />
In s p ec t ion $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
T ot a ls $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 0 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
C a p a city F ee s/ B ond s $ 1 ,3 5 0 , 0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />
Sta te /F ed e ra l<br />
T ot a ls $ 8 0 0 ,0 0 0 $ 1 1 ,0 0 0 ,0 0 0 $ 1 2 ,3 5 0 ,0 0 0<br />
111
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Hills-Miller Road 24-inch Water Line Extension<br />
Description and Purpose:<br />
Construction <strong>of</strong> a 13,000 LF extension <strong>of</strong> the 24-inch distribution main along<br />
Hills-Miller Road, west <strong>of</strong> the CSX railway, east and then north along US23 to<br />
the Water <strong>Plan</strong>t.<br />
Department:<br />
Department <strong>of</strong> Engineering Services & Utility Department<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536)<br />
Justification:<br />
Project is the final phase <strong>of</strong> a necessary improvement to the distribution system<br />
and when complete, provides required redundancy in the system over the 100<br />
year old 16-inch line parallel to US23.<br />
Updates/Changes:<br />
A 400 ft portion <strong>of</strong> this project from Merrick Blvd. to Hills-Miller Rd was<br />
constructed in 2005 in conjunction with the TSC development project on the<br />
west side <strong>of</strong> US-23. Engineering will continue in early 2008 with R/W for<br />
approximately 30 properties. Construction <strong>of</strong> remaining portion <strong>of</strong> extension<br />
estimated to begin in 2009.<br />
Recommended Funding:<br />
RE C O M M E N D E D F U N DI N G<br />
E st im a te d E x pe n dit ur e s 2 009 20 10 20 11 20 12 2 01 3 T o t a ls<br />
C o nst ru ct io n $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 008 20 09 20 10 20 11 2 01 2 T o t a ls<br />
W a t er Fun d s $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
T ot a ls $ 4 ,0 0 0 ,0 0 0 $ 4 ,0 0 0 ,0 0 0<br />
112
Pictures and Drawings:<br />
113
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Waterline Oversizing<br />
Description and Purpose:<br />
Extensions and oversizing <strong>of</strong> water lines per development agreements<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Capacity Fee Fund (Fund 536)<br />
Justification:<br />
Proper over sizing <strong>of</strong> waterlines as needed per development agreements<br />
Recommended Funding:<br />
Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />
Adminstrative<br />
Construction $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />
Change Order/Contingency<br />
Construction Engineering<br />
Inspection<br />
RECOMMENDED FUNDING<br />
Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />
General Fund<br />
Other <strong>City</strong> Funds $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />
Municipal Bonds<br />
Private Funding<br />
State/Federal<br />
Totals $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000<br />
114
CAPITAL IMPROVEMENT PROGRAM<br />
WATER FUND MAINTENANCE PROJECTS<br />
2009 - 2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
BALANCES FORWARD 383,750 506,350 11,026,350 1,656,350 1,796,558<br />
REVENUES:<br />
Transfer from Water Fund 677,600 700,000 745,000 790,000 825,000<br />
Transfer from Water Fund Reserve 800,000<br />
Add'l Transfer 10% Rate Increase 2012 0 365,000 370,000<br />
Bond/Note Proceeds 800,000 10,500,000<br />
TOTAL REVENUES 1,477,600 11,200,000 1,545,000 1,155,000 1,195,000<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Treatment <strong>Plan</strong>t ($10,500,000 - 25 yrs) 0 839,792 839,792<br />
WATER TREATMENT PROJECTS<br />
Treatment <strong>Plan</strong>t Rehabilitation 800,000 10,500,000<br />
Lagoon Cleaning 450,000<br />
TREATMENT PLANT SUB-TOTAL 800,000 0 10,500,000 0 450,000<br />
WATER DISTRIBUTION PROJECTS<br />
Water Meter Replacement 25,000 25,000 25,000 25,000 25,000<br />
Water Meter New Installation 25,000 25,000 25,000 25,000 25,000<br />
Chlorine Booster Tank for SE Highland Tower<br />
Backhoe 90,000<br />
Dump Truck 105,000<br />
Water Line <strong>Improvement</strong>s<br />
Small Main/Service Replacement 50,000 50,000 50,000 50,000 50,000<br />
Fire Flow <strong>Improvement</strong> 75,000 75,000 75,000 75,000 75,000<br />
Hillside Dr. Orchard Lane Waterline 140,000<br />
Blymer St. Waterline 160,000<br />
Fair Ave. Waterline 115,000<br />
Eastwood Ave. Waterline Replacement 100,000<br />
US23 Waterline Replacement 400,000<br />
ODOT William St. Culvert Waterline Relocation 175,000<br />
WATER DISTRIBUTION SUB-TOTAL 555,000 680,000 415,000 175,000 335,000<br />
TOTAL WATER REPAIR AND MAINT. 1,355,000 680,000 10,915,000 1,014,792 1,624,792<br />
ENDING FUND BALANCE 506,350 11,026,350 1,656,350 1,796,558 1,366,766<br />
115
116
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Water Meter New Installation (New Residential)<br />
Description and Purpose:<br />
Purchase <strong>of</strong> water meters for new residential installs.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Water meters for new installations. These costs are reimbursed by the builder.<br />
Recommended Funding:<br />
Estimated Expenditures 2009 2010 2011 2012 2013 To tals<br />
R/W Purchase<br />
Ad minstrative<br />
Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Construction Enginee ring<br />
Inspection<br />
RECOMM ENDE D FUNDING<br />
Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />
General Fund<br />
Other <strong>City</strong> Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Municipal Bonds<br />
Totals $ 20,000 $20 ,000 $20,000 $20,0 00 $20,000 $125,000<br />
117
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: US 23 Waterline Replacement<br />
Description and Purpose:<br />
Construction <strong>of</strong> an 8” water line on Route US-23 North.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Water line to fill in gaps <strong>of</strong> water service along Rt. 23 N to allow taking the old<br />
16” water transmission main out <strong>of</strong> service. Existing 16” water main has been<br />
in continuous service since 1889 and its useful life has been surpassed.<br />
Repairs to this 16 inch main are costly, difficult, and temporarily impairs the<br />
Water <strong>Plan</strong>t capability to provide the necessary flow rates required.<br />
<strong>Improvement</strong>s for this project are defined in the 1986 Water System Master<br />
<strong>Plan</strong> study.<br />
Recommended Funding:<br />
R ECO MM ENDE D FUN DIN G<br />
Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />
Prelimin ary En gineer ing<br />
Final En gineer ing $45 ,000 $45,000<br />
R/W Pur chase<br />
Ad minstrative<br />
Co nstru ctio n $355 ,000 $355,000<br />
Co nstru ctio n En ginee ring<br />
In spection<br />
Totals $400 ,000 $400,000<br />
Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 T o tals<br />
Gener al F un d<br />
Oth er C ity Fu nds $400 ,000 $400,000<br />
Mun icipal Bon ds<br />
State /F ederal<br />
Totals $400 ,000 $400,000<br />
118
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Treatment <strong>Plan</strong>t Rehabilitation<br />
Description and Purpose:<br />
Rehabilitation <strong>of</strong> existing water treatment plant. This project is part <strong>of</strong> the new<br />
Water Master <strong>Plan</strong> to help extent the life <strong>of</strong> the existing water plant.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Program is needed to increase life <strong>of</strong> existing plant. The water plant was built<br />
in 1930’s and has been upgraded several times. A recent condition assessment<br />
showed that the current facilities are not suited for expansion or upgrade. The<br />
original concrete structures will require partial repair / reconstruction due to<br />
age, several unit processes do not meet current EPA design standards, building<br />
code violations have been identified, and the current plant is located within the<br />
Olentangy River flood plain.<br />
Recommended Funding:<br />
Est im a te d Expe nd it ur e s 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />
Tra ff ic<br />
E nv ir on m enta l $120,000 $12 0,000<br />
Prelim in a ry E n gine ering $210,000 $21 0,000<br />
Fina l E n gineer ing $470,000 $47 0,000<br />
Co nstru ction $10,160 ,000 $ 10,160, 000<br />
Ch an ge O r der/ Co nting ency<br />
RE CO M M E ND ED F UND ING<br />
Co nstru ction E ngin eering $ 225,000 $22 5,000<br />
In spection $ 115,000 $11 5,000<br />
Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />
Sou rc e <strong>of</strong> F un ds 200 9 201 0 2 01 1 2 01 2 2 01 3 T ot a ls<br />
G ener al Fun d<br />
O th er <strong>City</strong> Fu nds $800,000 $10,500 ,000 $ 11,300, 000<br />
M un icipa l Bon ds<br />
Tota ls $800,000 $10,500 ,000 $ 11,300, 000<br />
119
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Small Main Replacement<br />
Description and Purpose:<br />
Replacement <strong>of</strong> small (4 inch and less) water mains that have been prone to<br />
failures, represent water quality issues.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Will improve reliability <strong>of</strong> the water system, reduce water loss, and improve<br />
water quality issues in the water distribution system. This is a 1986 Water<br />
System Master <strong>Plan</strong> recommendation.<br />
Recommended Funding:<br />
Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />
Ad minstrative<br />
Construction $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />
Change Ord er/Contingency<br />
Construction Enginee ring<br />
Inspection<br />
RECOMM ENDE D FUN DIN G<br />
Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />
General F und<br />
Other C ity Funds $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />
Municipal Bonds<br />
Totals $ 50,000 $50 ,000 $50,000 $50,0 00 $50,000 $250,000<br />
120
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : ODOT Culvert Waterline Relocation Project<br />
Description and Purpose:<br />
Relocation <strong>of</strong> the water main at William St. & Liberty St. prior to the ODOT<br />
Culvert replacement.<br />
Department:<br />
Engineering & Public Utilities Departments<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Water main is in conflict with the ODOT culvert project and must be relocated.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 1 7 5 ,0 0 0 $ 1 7 5 ,0 0 0<br />
121
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Lime Lagoon Cleaning<br />
Description and Purpose:<br />
Removal <strong>of</strong> lime sludge from lagoons at the Water Treatment <strong>Plan</strong>t. The lagoons<br />
temporarily store the lime sludge, but when they reach its holding capacity<br />
they must be cleaned.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Sludge lagoons will have reached their holding capacity.<br />
Recommended Funding:<br />
Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />
Ad minstrative<br />
Construction $450,000 $450,000<br />
Change Ord er/Contingency<br />
Construction Enginee ring<br />
Inspection<br />
Totals $450,000 $450,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />
General F und<br />
Other C ity Funds $450,000 $450,000<br />
Municipal Bonds<br />
Private F unding<br />
State /F ederal<br />
Totals $450,000 $450,000<br />
122
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Hillside Dr / Orchard Lane Waterline<br />
Description and Purpose:<br />
Replacement <strong>of</strong> the existing 2” water line on a section <strong>of</strong> Hillside Drive with an<br />
8” water main. No water main exists on Orchard Lane.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Fire flow capacity improvement and water quality issue resolution. Refer to<br />
recommendations established by the 1986 Water System Master <strong>Plan</strong>.<br />
Recommended Funding:<br />
E s t im a t e d E xp e n d it u re s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />
A d m in s tra tiv e<br />
C o n s truc tio n $ 140 ,00 0 $ 140 ,00 0<br />
C h a ng e O rde r/C o n ting e nc y<br />
C o n s truc tio n E n gin e e ring<br />
Ins p e c tio n<br />
R E C O M M E N D E D F U N D IN G<br />
T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />
S o u rc e o f F u n d s 2 0 0 9 2 0 10 2 0 11 2 0 12 2 0 13 T o t a ls<br />
G e n e ra l F u n d<br />
O th e r C ity F u n ds $ 140 ,00 0 $ 140 ,00 0<br />
M u nic ip a l B o n d s<br />
S ta te /F e d e ra l<br />
T o ta ls $ 140 ,00 0 $ 140 ,00 0<br />
123
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Fire Flow <strong>Improvement</strong>s<br />
Description and Purpose:<br />
<strong>Improvement</strong> <strong>of</strong> fire flow capacity for existing water mains.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Funds to help increase size <strong>of</strong> water lines for fire flow capacity purposes. This<br />
is a 1986 Water System Master <strong>Plan</strong> recommendation.<br />
Recommended Funding:<br />
Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />
Adminstrative<br />
Construction $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />
Change Order/Contingency<br />
Construction Engineering<br />
Inspection<br />
RECOMMENDED FUNDING<br />
Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />
General Fund<br />
Other <strong>City</strong> Funds $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />
Municipal Bonds<br />
State/Federal<br />
Totals $75,000 $75,000 $75,000 $75,000 $75,000 $375,000<br />
124
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Fair Ave. & East St. Waterlines<br />
Description and Purpose:<br />
Replacement <strong>of</strong> existing water small main to improve fire flow capability. No<br />
water main exists on East Street.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Improves fire flow capabilities, and upgrades service line connections. Refer to<br />
recommendation established by the 1986 Water System Master <strong>Plan</strong> study.<br />
Recommended Funding:<br />
Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Prelimin ary En gineer ing<br />
Final En gineer ing<br />
Ad minstrative<br />
Co nstru ctio n $1 15,000 $115,000<br />
Ch an ge O rd er/Co ntingen cy<br />
In spection<br />
R ECO MM ENDE D FUN DIN G<br />
Totals $1 15,000 $115,000<br />
Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Gener al F un d<br />
Oth er C ity Fu nds $1 15,000 $115,000<br />
Mun icipal Bon ds<br />
State /F ederal<br />
Totals $1 15,000 $115,000<br />
125
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Eastwood Ave. Waterline<br />
Description and Purpose:<br />
Replacement <strong>of</strong> an existing aged 6” water main with a history <strong>of</strong> both main and<br />
service line failure, with a new 8” ductile iron main, new service lines and<br />
meter pit connections.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Eliminates frequent repairs to this water main that is prone to failure and<br />
improves fire flow capacity.<br />
Recommended Funding:<br />
Estim ated Expend it ur es 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Final En gineer ing<br />
Ad minstrative<br />
Co nstru ctio n $100, 000 $100,000<br />
Ch an ge O rd er/Co ntingen cy<br />
Co nstru ctio n En ginee ring<br />
In spection<br />
R ECO MM ENDE D FUN DIN G<br />
Totals $100, 000 $100,000<br />
Sour ce <strong>of</strong> F un ds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Gener al F un d<br />
Oth er C ity Fu nds $100, 000 $100,000<br />
Mun icipal Bon ds<br />
State /F ederal<br />
Totals $100, 000 $100,000<br />
126
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Dump Truck<br />
Description and Purpose:<br />
Purchase <strong>of</strong> a Water Distribution Tandem Axle Dump Truck<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Replacement <strong>of</strong> the existing 2 ton dump truck that has exceeded its useful life<br />
and is prone to repairs.<br />
Recommended Funding:<br />
Estimated Expenditures 2009 2010 2011 2012 2013 Totals<br />
Adminstrative<br />
Construction<br />
Change Order/Contingency<br />
Construction Engineering<br />
Inspection<br />
RECOMMENDED FUNDING<br />
Totals $105,000 $105,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 Totals<br />
General Fund<br />
Other <strong>City</strong> Funds $105,000 $105,000<br />
Municipal Bonds<br />
Private Funding<br />
State/Federal<br />
Totals $105,000 $105,000<br />
127
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Blymer St Water Main<br />
Description and Purpose:<br />
Construction <strong>of</strong> an 8” water main on Blymer St. from E. Lincoln Ave. to<br />
Fountain Ave. then west on Fountain to N. Union St.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
<strong>Improvement</strong> <strong>of</strong> fire flow capacity with the replacement <strong>of</strong> the existing 4”<br />
waterline. Project defined in the 1986 Water System Master <strong>Plan</strong>.<br />
Recommended Funding:<br />
RECOMM ENDE D FUN DIN G<br />
Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />
Final Engineering<br />
Ad minstrative<br />
Construction $160,000 $160,000<br />
Change Ord er/Contingency<br />
Construction Enginee ring<br />
Inspection<br />
Totals $160,000 $160,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />
General F und<br />
Other C ity Funds $160,000 $160,000<br />
Municipal Bonds<br />
State /F ederal<br />
Totals $160,000 $160,000<br />
128
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Backhoe<br />
Description and Purpose:<br />
Replacement <strong>of</strong> the Water Distribution existing “front line” backhoe that has<br />
reached the end <strong>of</strong> its current functional life cycle. A reliable properly<br />
configured backhoe is an indispensable piece <strong>of</strong> equipment for the water<br />
distribution daily system maintenance function.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
The existing “front line” back hoe will be retained to replace the existing<br />
“backup” backhoe. The “backup” unit serves to replace the “front line” unit as<br />
needed and as the aggregate loader at the stockpile location. The “backup” unit<br />
has long since been incapable <strong>of</strong> serving as a replacement for the “front line”<br />
unit, and has been prone to many failures.<br />
Recommended Funding:<br />
R ECOMM ENDE D FUN DIN G<br />
Estim ated Expend itures 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Ad minstrative<br />
Construction<br />
Ch an ge Ord er/Contingen cy<br />
Construction En ginee ring<br />
In spection<br />
Totals $ 90,000 $90,000<br />
Source <strong>of</strong> Funds 2 00 9 2 010 20 11 20 12 20 13 To tals<br />
Gener al F un d<br />
Oth er C ity Funds $ 90,000 $90,000<br />
Mun icipal Bon ds<br />
Totals $ 90,000 $90,000<br />
129
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Water Meter Replacement<br />
Description and Purpose:<br />
Replacement <strong>of</strong> aged inaccurate water meters. Some <strong>of</strong> these meter<br />
installations are also not remoted.<br />
Department:<br />
Public Utilities Department<br />
Fund:<br />
Water Construction Fund (Fund 531)<br />
Justification:<br />
Water fund and Waste Water fund share this cost. Inaccurate meters and nonremoted<br />
meters represent income stream and operational inefficiencies. These<br />
meter conditions are being improved on a continuous basis (there are 11,000+<br />
meters <strong>of</strong> various size in the system) for the benefit <strong>of</strong> both Utilities (Water &<br />
Sewer) hence the funding from both.<br />
Recommended Funding:<br />
RECOMM ENDE D FUN DIN G<br />
Estimated Expend itures 2009 2010 2011 2012 2013 To tals<br />
Construction $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Change Ord er/Contingency<br />
Construction Enginee ring<br />
Inspection<br />
Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Source <strong>of</strong> Funds 2009 2010 2011 2012 2013 To tals<br />
General F und<br />
Other C ity Funds $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
Municipal Bonds<br />
Private F unding<br />
State /F ederal<br />
Totals $ 25,000 $25 ,000 $25,000 $25,0 00 $25,000 $125,000<br />
130
CAPITAL IMPROVEMENT PROGRAM<br />
SEWER FUND CAPACITY PROJECTS<br />
2009 - 2013<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
BALANCES FORWARD 500,000 227,264 (70,007) (190,672) (272,854)<br />
REVENUES:<br />
Sewer Capacity Fees 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000<br />
SE Highland Sewer ERU Fees 68,250 71,663 75,246 78,000 78,000<br />
Sewer Fees Transfer - 15% 2007 619,000 631,380 644,000 656,890 670,025<br />
Sewer Fees Transfer - 15% 2008 619,000 631,380 644,000 656,890 670,025<br />
Sewer Fees Transfer - 15% 2009 389,600 631,380 644,000 656,890 670,025<br />
JRS Grant 3,000,000<br />
Bond Proceeds - SE Highland Sewer<br />
TOTAL REVENUES 2,795,850 3,065,803 6,107,246 3,148,670 3,188,075<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Land Armstrong Rd./23 N. Sewer $4,715,000 20yrs. 350,815 349,315 352,140 349,293 349,293<br />
230 North Sewer 67,132 66,132 70,132 68,932 68,932<br />
SE Highland Sewer $15,000,000, 5.5%, 25 yrs. 1,036,988 1,045,000 1,051,988 1,051,988<br />
SE Highland Sewer $2,800,000, 20 yrs. OWDA 204,879 204,879 204,879 204,879 204,879<br />
<strong>Plan</strong>t Expansion $21,262,000, 20 yrs. OWDA 1,555,760 1,555,760 1,555,760 1,555,760 1,555,760<br />
TOTAL DEBT SERVICE 2,178,586 3,213,074 3,227,911 3,230,852 3,230,852<br />
COLLECTION CAPACITY PROJECTS<br />
Pr<strong>of</strong>essional Services<br />
US23/US42 30" Sewer Belle Ave. to Cherry St. 490,000<br />
Sawmill Parkway Sewer Extension 150,000 150,000 3,000,000<br />
Columbus Pike Sanitary Sewer 100,000<br />
East St. Sewer 150,000<br />
TOTAL SEWER CAPACITY PROJECTS 890,000 150,000 3,000,000 0 0<br />
ENDING FUND BALANCE 227,264 (70,007) (190,672) (272,854) (315,631)<br />
131
132
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: Columbus Pike Sanitary Sewer<br />
Description and Purpose:<br />
The project extends a sanitary sewer along Columbus Pike just north <strong>of</strong><br />
Cheshire Road. Currently, the existing homes on septic systems and the<br />
residents have requested the <strong>City</strong> extend sanitary sewer service to the area.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Capacity Fee Fund (Fund 546)<br />
Justification:<br />
This project eliminates the septic systems and provides sanitary sewer service<br />
in the area. The residents would be required to pay a front footage fee and<br />
applicable capacity fees.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
C o n s tru ct io n $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />
T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
O t h e r C it y F u n d s $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />
T o ta ls $ 10 0 ,0 0 0 $ 1 0 0,0 0 0<br />
133
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : Sawmill Parkway Sanitary Sewer Extension<br />
Description and Purpose:<br />
Design and construction <strong>of</strong> a sanitary sewer main as a part <strong>of</strong> the Sawmill<br />
Parkway project.<br />
Department:<br />
Public Utilities & Engineering Departments<br />
Fund:<br />
Wastewater Capacity Fee Fund (Fund 546)<br />
Justification:<br />
Project will provide sanitary sewer services to the SW area <strong>of</strong> the <strong>City</strong> with the<br />
Sawmill Parkway extension. Part <strong>of</strong> the <strong>City</strong>’s Jobs Ready Grant application.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
Fina l E n ginee r ing $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
Job s Re a dy Gr a nt $ 3 , 0 0 0 ,0 0 0 $ 3 ,0 0 0 , 0 0 0<br />
T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0 $ 3 , 0 0 0 ,0 0 0 $ 3 ,3 0 0 , 0 0 0<br />
134
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: US23/RT 42 30-inch Belle Ave/Cherry St Sanitary Sewer<br />
Description and Purpose:<br />
Construction <strong>of</strong> the 30-inch sewer at Belle Ave under US23/RT42 to tie into the<br />
42-inch sewer on Stratford Rd to Cherry St. to provide additional sewer<br />
capacity to the SW area <strong>of</strong> the <strong>City</strong>.<br />
Department:<br />
Public Utilities & Engineering Department<br />
Fund:<br />
Wastewater Capacity fee fund (Fund 546)<br />
Justification:<br />
Project currently in the design phase, field investigations <strong>of</strong> the Stratford<br />
Rd/Cherry St sewer revealed the sewer is deteriorated due to H2S from the<br />
force main. This project is the first phase <strong>of</strong> improvements for the Industrial<br />
Park area as recommended in the 2007 report.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring $ 2 5 ,0 0 0 $ 2 5 ,0 0 0<br />
In s p ec t ion $ 1 5 ,0 0 0 $ 1 5 ,0 0 0<br />
T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 4 9 0 ,0 0 0 $ 4 9 0 ,0 0 0<br />
135
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: East Street Sewer<br />
Description and Purpose:<br />
The project extends a sanitary sewer along East Street. Currently, existing<br />
homes along East Street use long laterals that connect to existing sewer on<br />
adjacent streets. In addition, there are buildable lots along East Street that do<br />
not have access to sanitary sewer.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Capacity Fee Fund (Fund 546)<br />
Justification:<br />
This project eliminates the existing long laterals and provides sanitary sewer<br />
service to the area. In addition, long laterals are potentially a high infiltration<br />
source.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th er C ity Fu nd s $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
T ot a ls $ 1 5 0 ,0 0 0 $ 1 5 0 ,0 0 0<br />
136
CAPITAL IMPROVEMENT PROGRAM<br />
SEWER FUND MAINTENANCE PROJECTS<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCES FORWARD 1,000,000 1,496,008 1,732,016 2,497,017 1,853,458<br />
REVENUES:<br />
Transfer from Sewer Fund 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />
TOTAL REVENUES 1,349,837 1,349,837 1,403,830 1,425,000 1,425,000<br />
EXPENDITURES:<br />
DEBT SERVICE<br />
Current Debt Service 357,120 357,120 357,120 357,120 357,120<br />
<strong>Plan</strong>t Rehabilitation ($1,800,000 20 yrs. 3.52%) 131,709 131,709 131,709 131,709 131,709<br />
TOTAL DEBT SERVICE 488,829 488,829 488,829 488,829 488,829<br />
WASTEWATER TREATMENT PROJECTS<br />
Sludge Transport Truck 125,000<br />
Tertiary Filter Building Equipment 500,000<br />
Disinfection 50,000 55,000<br />
WASTEWATER COLLECTION PROJECTS<br />
Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />
Toledo Street Sewer Rehab 80,000<br />
Columbus Avenue Sewer Rehab 115,000<br />
Weselyan Woods 150,000<br />
William & Liberty Sewer Relocation 220,000<br />
Wastewater Service Area Facilities <strong>Plan</strong> 50,000<br />
Sewer Camera Truck Equipment 20,000<br />
Sewer Jet Truck 300,000<br />
Sewer Cleaning Unit 180,000<br />
Backhoe 90,000<br />
TOTAL SEWER REPAIR/MAINTENANCE 365,000 625,000 150,000 605,000 690,000<br />
ENDING FUND BALANCE 1,496,008 1,732,016 2,497,017 2,828,188 2,099,629<br />
137
138 34
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: Toledo Street Sewer Rehabilitation<br />
Description and Purpose:<br />
The sanitary sewer is broken down in several areas and is a significant source<br />
<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />
grouting and lining <strong>of</strong> the manholes.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
A CCTV inspection in February 2008 revealed numerous deficiencies allowing<br />
heavy infiltration to enter the sanitary sewer main. These flows decrease<br />
capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />
T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th er C ity Fu nd s $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />
T ot a ls $ 8 0 ,0 0 0 $ 8 0 , 0 0 0<br />
139
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Sewer Jet Truck<br />
Description and Purpose:<br />
These funds would be used to replace the existing 1999 combination sewer<br />
cleaning truck. This unit is used to perform preventive maintenance and<br />
remove blockages from the collection systems.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
The current primary unit (1999 unit) has past its effective life cycle and needs<br />
replaced.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
O th e r $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
140
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />
Project: Sewer Camera Truck Equipment<br />
Description and Purpose:<br />
These funds would be used to replace the existing computer, video capturing<br />
system, and s<strong>of</strong>tware in the collection systems CCTV sewer inspection unit.<br />
Department:<br />
Public Utilities – Sewer Fund - Maintenance<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
These updates would allow for easier access to the inspection video and would<br />
integrate with our CMMS.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
C o n s tru ct io n $2 0 ,0 0 0 $ 2 0, 00 0<br />
T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
O t h e r C it y F u n d s $2 0 ,0 0 0 $ 2 0, 00 0<br />
T o ta ls $2 0 ,0 0 0 $ 2 0, 00 0<br />
141
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: Inflow/Infiltration Remediation<br />
Description and Purpose:<br />
The project consists <strong>of</strong> securing pr<strong>of</strong>essional services to locate, identify, and<br />
repair various sources <strong>of</strong> infiltration and inflow found in the sanitary sewer<br />
system. Infiltration and inflow cause’s sanitary sewer backups into homes and<br />
increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />
cause OEPA permit violations. This program has been in effect for the past 4<br />
years and has made significant reductions in local infiltration and inflow<br />
problems. (grouting, sliplining)<br />
Department:<br />
Public Utilities – Sewer Fund – Maintenance<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
The <strong>City</strong>’s CCTV inspection program has identified numerous areas <strong>of</strong><br />
infiltration located within the <strong>City</strong>’s collection system. These areas include<br />
Sunbury Road (405’), William Street (245’), Central Avenue (769’), Smith Street<br />
(214’), Chamberlain Street (245’), Parson Avenue (184’), Winter Street (2521’),<br />
Milo Street (340’) any many others.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
I & I $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />
T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
O t h e r C it y F u n d s $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />
T o ta ls $ 10 0 ,0 0 0 $1 0 0 ,0 00 $ 10 0 ,0 0 0 $ 1 0 0,0 0 0 $ 1 0 0 ,00 0 $ 5 0 0,0 0 0<br />
142
Pictures and Drawings:<br />
The impact <strong>of</strong> inflow and infiltration on our network is represented in the following diagram.<br />
Dry weather flows - low inflow / infiltration<br />
Wet weather flows - high inflow / infiltration<br />
Off peak network load Peak network load Off peak network load Peak network load<br />
Wastewater pipes are underground and invisible. Most people do not consider that these pipes need maintenance<br />
like the rest <strong>of</strong> their property. Infiltration is an unseen problem and does not usually alert property owners that<br />
something may be wrong with their wastewater pipes.<br />
143
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Combination Sewer Cleaning Unit<br />
Description and Purpose:<br />
These funds would be used to replace the existing 1988 combination sewer<br />
cleaning truck with a combination sewer cleaning unit. This new smaller unit<br />
would service as the secondary unit to the existing 1999 combination sewer<br />
cleaning truck (replacement 2012). These units are used to perform preventive<br />
maintenance and remove blockages from the collection systems.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
The current secondary unit (1988 unit) has past its effective life cycle and is<br />
prone to failures and inefficiencies.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
O th e r $ 1 8 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 1 8 0 ,0 0 0 $ 1 8 0 ,0 0 0<br />
144
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Columbus Avenue Sewer Rehabilitation<br />
Description and Purpose:<br />
The sanitary sewer is broken down in several areas and is a significant source<br />
<strong>of</strong> infiltration/inflow. The repairs consist <strong>of</strong> spot repairs, sewer lining, sewer<br />
grouting and lining <strong>of</strong> the manholes.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
A CCTV inspection in March 2008 revealed numerous deficiencies allowing<br />
heavy infiltration to enter the sanitary sewer main. These flows decrease<br />
capacity <strong>of</strong> the WWTP and cause OEPA permit violations.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D I N G<br />
E s t im a t ed<br />
E x p e n d i tu re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />
C o n s t ru c t io n $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
S o u r ce o f F u n d s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o ta l s<br />
O th e r C ity F u n d s $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
T ot a ls $ 1 1 5 ,0 0 0 $ 1 1 5 ,0 0 0<br />
145
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />
Project: Backhoe<br />
Description and Purpose:<br />
These funds would be used to replace the 2004 Case 590 Backhoe.<br />
Department:<br />
Public Utilities – Sewer Fund - Maintenance<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
The existing unit has reached its functional life cycle and will need to be<br />
replaced.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
C o n s tru ct io n $ 9 0 ,0 00 $ 9 0, 00 0<br />
T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
O t h e r C it y F u n d s $ 9 0 ,0 00 $ 9 0, 00 0<br />
T o ta ls $ 9 0 ,0 00 $ 9 0, 00 0<br />
146
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : UV Disinfection Equipment<br />
Description and Purpose:<br />
Replacement <strong>of</strong> existing UV ballasts and lamps for the UV disinfection<br />
equipment.<br />
Department:<br />
Public Utilities<br />
Fund and Account:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
Replacement <strong>of</strong> the high intensity lamps that are at the end their recommended<br />
life cycle for meeting the <strong>City</strong>’s NPDES permit requirements.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n<br />
C h an ge O rd e r/ C o nt inge n cy<br />
O th e r $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 5 0 ,0 0 0 $ 5 5 ,0 0 0 $ 1 0 5 ,0 0 0<br />
147
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Tertiary Filter Building Equipment<br />
Description and Purpose: Replacement <strong>of</strong> existing filter media and pumps to<br />
continue to meet more stringent NPDES requirements.<br />
Department: Public Utilities<br />
Fund and Account: Wastewater Construction Fund (Fund 541)<br />
Justification: Existing filter media will be at the end <strong>of</strong> its recommended life<br />
cycle and will have to be replaced to ensure the <strong>City</strong> will be able to meet its<br />
NPDES requirements.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing $ 5 0 ,0 0 0 $ 5 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n $ 4 5 0 ,0 0 0 $ 4 5 0 ,0 0 0<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 5 0 0 ,0 0 0 $ 5 0 0 ,0 0 0<br />
148
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : Sludge Transport Truck<br />
Description and Purpose:<br />
Purchase <strong>of</strong> a new quad axle roll-<strong>of</strong>f hoist truck to transport WWTP sludge from<br />
plant to the landfill.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
Replace the existing 1995 sludge truck that currently has 515,000 miles.<br />
Existing truck has been prone to costly repairs and we have to use a private<br />
hauler when the truck is down for repairs.<br />
Recommended Funding:<br />
E st im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
Ad m inst ra t ive<br />
C o nst ru ct io n<br />
O th er $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />
C o nst ru ct io n En ginee ring<br />
In sp ection<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G ener al F un d<br />
O th er C ity Fu nd s $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed era l<br />
T ot a ls $ 1 2 5 ,0 0 0 $ 1 2 5 ,0 0 0<br />
149
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : Facilities <strong>Plan</strong>ning Report<br />
Description and Purpose:<br />
Facilities planning document for updating the wastewater service area <strong>of</strong> the<br />
<strong>City</strong>.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
Need to update the 2000 wastewater service area document.<br />
Recommended Funding:<br />
R E C O M M E N DE D FU N DIN G<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 5 0 , 0 0 0 $ 5 0 ,0 0 0<br />
150
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Fund<br />
Project: Wesleyan Woods Sanitary Sewer<br />
Description and Purpose:<br />
Several sources <strong>of</strong> infiltration/inflow and severe root intrusion into the sanitary<br />
sewer have been located in the Wesleyan Woods area. The project consists <strong>of</strong><br />
trenchless methods <strong>of</strong> infiltration/inflow removal and some limited spot<br />
repairs.<br />
Department:<br />
Public Utilities – Sewer Fund - Maintenance<br />
Fund:<br />
Wastewater Construction Fund (Fund 541)<br />
Justification:<br />
Infiltration and inflow cause’s sanitary sewer backups into homes and<br />
increases flow to the WWTP. These flows decrease capacity <strong>of</strong> the WWTP and<br />
cause OEPA permit violations.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />
T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th er C ity Fu nd s $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />
T ot a ls $ 1 5 0 , 0 0 0 $ 1 5 0 ,0 0 0<br />
151
152
CAPITAL IMPROVEMENT PLAN<br />
STORM SEWER FUND<br />
2009 - 2013<br />
2009 2010 2011 2012 2013<br />
BALANCES FORWARD 253,500 408,500 473,500 243,500 253,500<br />
REVENUES:<br />
Storm Sewer Fees 515,000 525,000 540,000 550,000 570,000<br />
TOTAL REVENUE 515,000 525,000 540,000 550,000 570,000<br />
EXPENDITURES:<br />
Catch Basin Replacement 10,000 10,000 10,000 10,000 10,000<br />
Miscellaneous Repair 30,000 30,000 30,000 30,000 30,000<br />
Inflow/Infiltration Remediation 100,000 100,000 100,000 100,000 100,000<br />
N. Sandusky St. to N. Liberty St. 380,000<br />
East Winter Street (Lake St. to Wade St.) 220,000<br />
Bernard Avenue (US 23 to Liberty St.) 75,000<br />
Cherry St. Stormwater Replacement 200,000<br />
Vernon Ave. 535,000<br />
W. William St/Liberty Culvert Replacement 300,000<br />
I & I Report 0 100,000<br />
NPDES Costs 20,000 20,000 20,000 20,000<br />
TOTAL EXPENDITURES 360,000 460,000 770,000 540,000 460,000<br />
UNRESERVED FUND BALANCE 408,500 473,500 243,500 253,500 363,500<br />
PURPOSE: The Storm Sewer <strong>CIP</strong> identifies future projects and studies necessary for<br />
improving and maintaining the <strong>City</strong>'s storm sewer system. The <strong>City</strong> will begin a master plan<br />
process in 2006 to identify issues related to compliance with recently adopted storm sewer<br />
regulations.<br />
FUNDING SOURCES: Storm sewer projects are funded primarily by the previously enacted<br />
storm sewer fees. These fees are assessed to all single and two family residential units<br />
at the rate <strong>of</strong> $2.50 per month. Non-residential and apartments are assesssed a fee based on<br />
an impervious surface calaculation performed on their property.<br />
153
154 12
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Public Works Storm Water Replacement<br />
Description and Purpose:<br />
This project replaces the existing storm water system that is currently located<br />
within the closed landfill located at 241 Cherry Street. The proposed storm<br />
water system would be located and the pipe joints would be water tight.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
The <strong>City</strong> received a Notice <strong>of</strong> Violation for the discharge <strong>of</strong> pollutants to “water<br />
<strong>of</strong> the state” without an NPDES permit. The pollutant is the leachate from the<br />
closed landfill that enters the storm water pipe through the pipe joints.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
C o n s tru ct io n $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />
T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o t a ls<br />
O t h e r C it y F u n d s $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />
T o ta ls $ 20 0 ,0 0 0 $ 2 0 0,0 0 0<br />
155
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: Storm Sewers from N. Sandusky to N. Liberty St.<br />
Description and Purpose:<br />
<strong>Improvement</strong>s <strong>of</strong> existing storm sewers and installations <strong>of</strong> new storm sewers<br />
and catch basins from N. Sandusky St. to N. Liberty St<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
The 1990 Storm Water Report update recommended this project (B-1) to<br />
improve the storm water drainage from N. Sandusky St. to N. Liberty St and<br />
reduction in known I&I.<br />
Recommended Funding:<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />
T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th e r C ity Fu nd s $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />
T ot a ls $ 3 8 0 , 0 0 0 $ 3 8 0 ,0 0 0<br />
156
<strong>City</strong> <strong>of</strong> <strong>Delaware</strong><br />
2009-2013 <strong>Capital</strong> <strong>Improvement</strong> Program<br />
Project: Storm Sewers Miscellaneous Repairs<br />
Description and Purpose:<br />
Fees for miscellaneous repairs to the <strong>City</strong>’s Storm sewer system.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Costs to provide repairs to the <strong>City</strong>’s storm sewer system as needed to maintain<br />
the system.<br />
Recommended Funding:<br />
R E C O M M EN D E D F U N D I N G<br />
E st im a te d<br />
E xp e n d it u re s 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />
M is c ell an e o u s Re p airs $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />
T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T o tal s<br />
O t h e r C it y F u n d s $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />
T o ta ls $ 3 0,0 0 0 $ 30 ,0 0 0 $ 3 0 ,00 0 $ 3 0 ,0 00 $3 0 ,0 0 0 $1 7 9 ,0 00<br />
157
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: East Winter Street Storm Sewer <strong>Improvement</strong>s<br />
Description and Purpose:<br />
Storm sewer improvements on East Winter St. from Lake St. to Wade St<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
The 1990 Storm Water Report update recommended this project (O-2) to<br />
improve the storm water drainage on East Winter St. from Lake St. to Wade St<br />
and reduction in known I&I.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />
T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th er C ity Fu nd s $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />
T ot a ls $ 2 2 0 ,0 0 0 $ 2 2 0 ,0 0 0<br />
158
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : I&I Report <strong>of</strong> the Storm Sewer System<br />
Description and Purpose:<br />
Comprehensive I&I report <strong>of</strong> the <strong>City</strong>’s storm sewer system. Includes flow<br />
monitoring, smoke & dye testing and modeling to locate sources <strong>of</strong> I&I within<br />
the <strong>City</strong>.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Need to locate sources <strong>of</strong> I&I in the <strong>City</strong> to help reduce amount <strong>of</strong> storm water<br />
at the UOWRC. This report is recommended in the 2000 wastewater report.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 2 0 0 ,0 0 0 $ 1 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
159
Description and Purpose:<br />
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Catch Basin Replacement<br />
Fees for replacement <strong>of</strong> catch basins within the <strong>City</strong>’s storm water system. A<br />
catch basin (a.k.a., storm drain inlet, curb inlet) is an inlet to the storm drain<br />
system that typically includes a grate or curb inlet where stormwater enters the<br />
catch basin and a sump to capture sediment, debris and associated pollutants.<br />
Catch basins act as pretreatment for other treatment practices by capturing<br />
large sediments. The performance <strong>of</strong> catch basins at removing sediment and<br />
other pollutants depends on the design <strong>of</strong> the catch basin (e.g., the size <strong>of</strong> the<br />
sump), and routine maintenance to retain the storage available in the sump to<br />
capture sediment.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Replacement <strong>of</strong> inoperable catch basins.<br />
Recommended Funding:<br />
R E C O M M EN D E D F U N D I N G<br />
E st im a te d E xp e n d it u res 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />
C at ch B as i n Re p la c e m e n t $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
S o u rc e o f F u n ds 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 T ot a ls<br />
O t h e r C it y F u n d s $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
T o ta ls $ 10 ,0 0 0 $ 10 ,0 0 0 $ 1 0,0 0 0 $ 1 0 ,0 00 $1 0 ,0 0 0 $ 5 0 ,0 00<br />
160
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Bernard Ave. Storm Sewer<br />
Description and Purpose:<br />
<strong>Improvement</strong>s to the storm sewer on Bernard Ave. from US 23 to Liberty Street<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
The 1990 Storm Water Report update recommended this project (F-3) to<br />
improve the storm water drainage along Bernard Ave. from US 23 to Liberty<br />
Street.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x p e n d it ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />
T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th e r C ity F u nd s $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />
T ot a ls $ 7 5 ,0 0 0 $ 7 5 , 0 0 0<br />
161
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project : Fees for MS4 Storm Water Management <strong>Plan</strong><br />
Description and Purpose:<br />
Fees for MS4 storm water management plan as required in the OEPA storm<br />
water NPDES permit.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Provide resources for storm water NPDES permit attainment.<br />
Recommended Funding:<br />
E s t im a te d E x pe nd it ur es 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
T ra ff ic<br />
E nvir on m ent a l<br />
P re lim in a ry E n gine er ing<br />
Fina l E n ginee r ing $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />
R / W C on sult a nt<br />
R / W P ur cha s e<br />
Ad m inst ra t ive<br />
C o nst ru ct io n<br />
C h an ge O rd e r/ C o nt inge n cy<br />
C o nst ru ct io n En ginee ring<br />
In s p ec t ion<br />
R E C O M M E N DE D FU N DIN G<br />
T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />
So ur c e o f F un ds 2 00 9 2 010 20 11 20 12 20 13 T o ta ls<br />
G e ner al F un d<br />
O th e r C ity Fu nd s $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />
M un icip a l B on d s<br />
P riva t e F un d in g<br />
Sta te /F ed e ra l<br />
T ot a ls $ 2 0 ,0 0 0 $ 2 0 ,0 0 0 $ 2 0 , 0 0 0 $ 2 0 ,0 0 0 $ 8 0 ,0 0 0<br />
162
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: West William Street/Liberty Street Culvert Replacement<br />
Description and Purpose:<br />
This project is initiated and administered by ODOT District 6 and involves the<br />
open cut replacement <strong>of</strong> the failing <strong>Delaware</strong> Run pipe arch culvert within the<br />
William Street & Liberty Street right <strong>of</strong> way.<br />
Department:<br />
Department <strong>of</strong> Engineering Services & Public Utilities Department<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
Per agreement with ODOT and includes the necessary storm sewer<br />
improvement in keeping with storm sewer master plan.<br />
Recommended Funding:<br />
The city is responsible for project construction costs within the Liberty Street<br />
R/W. The current cost estimate below is provided by ODOT.<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
Stor m S ewe r Fu nd $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
T ot a ls $ 3 0 0 ,0 0 0 $ 3 0 0 ,0 0 0<br />
163
CITY OF DELAWARE<br />
2009-2013 CAPITAL IMPROVEMENT PROGRAM<br />
Project: Vernon Avenue Storm Sewer<br />
Description and Purpose:<br />
Construction <strong>of</strong> a storm sewer from Vernon Ave. southwest along Conrail RR to<br />
Branch St. west under Conrail RR underneath Lake St. to the Olentangy River<br />
and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to Branch St.<br />
Department:<br />
Public Utilities<br />
Fund:<br />
Storm Sewer Fund (Fund 203)<br />
Justification:<br />
The 1990 Storm Water Report update recommended this project (L-1) to<br />
improve the storm water drainage from Vernon Ave. southwest along Conrail<br />
RR to Branch St. west under Conrail RR underneath Lake St. to the Olentangy<br />
River and the installation <strong>of</strong> a 36” storm sewer pipe from Vernon Ave. to<br />
Branch St.<br />
Recommended Funding:<br />
R E C O M M E N D E D F U N D IN G<br />
E st im a te d<br />
E x pe n dit ur e s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
C o nst ru ct io n $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />
T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />
So ur ce o f Fu nd s 2 00 9 20 10 201 1 2 012 201 3 T o t al s<br />
O th er C ity Fu nd s $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />
T ot a ls $ 5 3 5 ,0 0 0 $ 5 3 5 ,0 0 0<br />
164
CAPITAL IMPROVEMENT PLAN<br />
REFUSE FUND<br />
2009 - 2013<br />
REVENUES:<br />
2009 - 2013 2009 2010 2011 2012 2013<br />
Refuse Fees 457,476 428,876 470,276 466,276 466,276<br />
TOTAL REVENUE 457,476 428,876 470,276 466,276 0<br />
EXPENDITURES:<br />
Debt Service<br />
Curve Rd. Leachate Collection ($475,000 10rs.) 61,238 59,438 57,638 58,638 58,638<br />
Equipment<br />
Rear Load 20-Yard Packer - Commercial 140,000 150,000<br />
8 Yard Dump 113,000<br />
Side Load 20-Yard Packer - Residential 165,000 165,000 170,000<br />
Recycling Vehicle - Recycling 170,000 170,000 350,000<br />
Bulk Pickup Vehicle<br />
Pickup Truck 32,000<br />
Skid Steer 45,000<br />
Landfill<br />
Leachate Collection System-Curve Road 61,238 59,438 57,638 57,638 57,638<br />
TOTAL EXPENDITURES 457,476 428,876 470,276 466,276 436,276<br />
165