11.04.2015 Views

reducing the environmental impacts of abandoned coal mines in china

reducing the environmental impacts of abandoned coal mines in china

reducing the environmental impacts of abandoned coal mines in china

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

accelerated to ensure gas emissions are reduced as soon as possible by<br />

ei<strong>the</strong>r <strong>in</strong>troduc<strong>in</strong>g AMM utilisation schemes where feasible, or allow<strong>in</strong>g<br />

flood<strong>in</strong>g, provided <strong>the</strong>re are no significant <strong>in</strong>rush hazards to neighbour<strong>in</strong>g<br />

<strong>m<strong>in</strong>es</strong> or major groundwater pollution risks.<br />

Any underground salvage operation which delays <strong>the</strong> <strong>in</strong>troduction <strong>of</strong> an AMM<br />

scheme or f<strong>in</strong>al closure should be f<strong>in</strong>ancially justifiable. An environment<br />

appraisal should be undertaken to assess surface stability, gas emission and<br />

m<strong>in</strong>e water recovery aspects <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> identification <strong>of</strong> any necessary<br />

control measures. The schedule should demonstrate that <strong>the</strong> closure and<br />

seal<strong>in</strong>g will be undertaken systematically and swiftly. Thus, f<strong>in</strong>ancial resources<br />

can be directed towards provid<strong>in</strong>g re-tra<strong>in</strong><strong>in</strong>g, and legitimate job creation<br />

schemes.<br />

Prior to closure <strong>of</strong> a gassy m<strong>in</strong>e, <strong>the</strong> feasibility <strong>of</strong> construct<strong>in</strong>g an AMM<br />

extraction and utilisation scheme should be undertaken. The guidance notes<br />

prepared by AMMPAC highlight <strong>the</strong> key factors to be considered and outl<strong>in</strong>e<br />

<strong>the</strong> necessary eng<strong>in</strong>eer<strong>in</strong>g works.<br />

6.0 ACKNOWLEDGEMENTS<br />

Thanks are due to <strong>the</strong> many organisations and <strong>in</strong>dividuals who have<br />

supported AMMPAC events and contributed to its work, and also to <strong>the</strong> staff<br />

<strong>of</strong> CCII without whom <strong>the</strong> project could not have succeeded. The views<br />

expressed are solely those <strong>of</strong> <strong>the</strong> authors.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!