11.04.2015 Views

Wind Energy Scheme Information Sheet - Wind Direct

Wind Energy Scheme Information Sheet - Wind Direct

Wind Energy Scheme Information Sheet - Wind Direct

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Airfield Industrial Estate<br />

<strong>Wind</strong> <strong>Energy</strong> <strong>Scheme</strong><br />

W I N D<br />

DIRECT<br />

The concept<br />

<strong>Wind</strong> <strong>Direct</strong> specialises in <strong>Wind</strong> <strong>Energy</strong><br />

<strong>Scheme</strong>s for supply to intensive energy<br />

users, and is founded on the expertise<br />

of pioneering companies that began<br />

working in renewable energy in the<br />

early 1990s. <strong>Wind</strong> <strong>Direct</strong> is part of the<br />

<strong>Wind</strong> Prospect Group, one of the most<br />

successful independent renewable<br />

energy developers in the world. The<br />

group has secured planning approval<br />

for over 1,100MW of wind energy<br />

projects; directly attributable to careful<br />

site selection, optimised site layouts and<br />

in-depth consultation.<br />

On behalf of the Roy Humphrey<br />

Group, <strong>Wind</strong> <strong>Direct</strong> is proposing to<br />

install two wind turbines at their site at<br />

the Airfield Industrial Estate, Eye. The<br />

turbines will have a generation capacity<br />

of 2.5MW each and would provide<br />

the site with a direct supply of clean,<br />

renewable electricity with any surplus<br />

electricity being transferred directly<br />

to the grid. The total energy produced<br />

each year would be the equivalent to<br />

that consumed by 2,796 houses.<br />

In order to ensure that the site is<br />

suitable for wind energy, <strong>Wind</strong> <strong>Direct</strong> is<br />

undertaking a full Environmental Impact<br />

Assessment and has commissioned a<br />

range of independent consultants to<br />

assess the scheme’s potential impact on<br />

ecology, landscape and archaeology. In<br />

addition the assessment will consider in<br />

detail the amenity of local residents and<br />

will include a full noise survey.<br />

Benefits of the proposed development<br />

➜ Clean renewable energy for the good of the environment.<br />

➜ Reduction in energy costs and price stability which will benefit<br />

the recipient.<br />

➜ Contribution to national renewable targets.<br />

➜ Demonstrates a strong sense of corporate responsibility.<br />

Project Facts<br />

➜ The proposed turbine type<br />

is a Nordex N100 which has<br />

been identified to suit the site<br />

conditions.<br />

➜ The turbines would have a<br />

rotor diameter of 100m and<br />

a hub height of 80m.<br />

At maximum extent they<br />

would reach approximately<br />

130m high.<br />

➜ Any planning application<br />

would be for an operational<br />

period of 25 years.<br />

➜ Following a successful planning<br />

application, it would take 12–<br />

18 months from commencing<br />

the project to operation.<br />

➜ Construction would take<br />

place over approximately<br />

25 weeks.<br />

➜ Erecting a wind turbine only<br />

takes two days.<br />

VIEW NORTH FROM A140 THORNHAM PARVA JUNCTION


Roy Humphrey Group<br />

The Humphrey Group was started in the early 70s when<br />

Roy Humphrey purchased a village garage in Yaxley near<br />

Eye. Roy extended the range of services he offered with<br />

a vision to build a complex catering for all transport needs<br />

and the company now occupies a 70 acre site at the<br />

Airfield Industrial Estate.<br />

SITE LOCATION<br />

With a high cumulative energy usage across the estate<br />

and over 150 people employed at the site, the Humphrey<br />

Group is ideally placed to benefit from on-site generation.<br />

The initiative will bring the company vital price stability and<br />

security of supply, with the added benefit of enabling a large<br />

scale consumer of energy to reduce its carbon footprint.<br />

The proposed wind<br />

energy scheme is a<br />

demonstration of the<br />

Humphrey Group’s desire<br />

to minimise its impact<br />

on the environment by<br />

reducing its reliance on<br />

brown electricity and<br />

replacing it with a cleaner<br />

more efficient renewable<br />

energy source of power.<br />

VIEW SOUTH FROM A140 SITE ENTRANCE<br />

Printed on recycled paper containing 80% post-consumer waste. 08/09<br />

W I N D<br />

DIRECT<br />

<strong>Wind</strong> <strong>Direct</strong> Ltd, The Gatehouse, White Cross, Lancaster LA1 4XQ<br />

Tel: 01524 230 857<br />

Em a i l: eye@wind-direct.co.uk<br />

Web: www.wind-direct.co.uk<br />

<strong>Wind</strong> <strong>Direct</strong> is a registered trade mark of <strong>Wind</strong> <strong>Direct</strong> Limited (registration number 2507239 and 2376951)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!