Wind Energy Scheme Information Sheet - Wind Direct
Wind Energy Scheme Information Sheet - Wind Direct
Wind Energy Scheme Information Sheet - Wind Direct
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Airfield Industrial Estate<br />
<strong>Wind</strong> <strong>Energy</strong> <strong>Scheme</strong><br />
W I N D<br />
DIRECT<br />
The concept<br />
<strong>Wind</strong> <strong>Direct</strong> specialises in <strong>Wind</strong> <strong>Energy</strong><br />
<strong>Scheme</strong>s for supply to intensive energy<br />
users, and is founded on the expertise<br />
of pioneering companies that began<br />
working in renewable energy in the<br />
early 1990s. <strong>Wind</strong> <strong>Direct</strong> is part of the<br />
<strong>Wind</strong> Prospect Group, one of the most<br />
successful independent renewable<br />
energy developers in the world. The<br />
group has secured planning approval<br />
for over 1,100MW of wind energy<br />
projects; directly attributable to careful<br />
site selection, optimised site layouts and<br />
in-depth consultation.<br />
On behalf of the Roy Humphrey<br />
Group, <strong>Wind</strong> <strong>Direct</strong> is proposing to<br />
install two wind turbines at their site at<br />
the Airfield Industrial Estate, Eye. The<br />
turbines will have a generation capacity<br />
of 2.5MW each and would provide<br />
the site with a direct supply of clean,<br />
renewable electricity with any surplus<br />
electricity being transferred directly<br />
to the grid. The total energy produced<br />
each year would be the equivalent to<br />
that consumed by 2,796 houses.<br />
In order to ensure that the site is<br />
suitable for wind energy, <strong>Wind</strong> <strong>Direct</strong> is<br />
undertaking a full Environmental Impact<br />
Assessment and has commissioned a<br />
range of independent consultants to<br />
assess the scheme’s potential impact on<br />
ecology, landscape and archaeology. In<br />
addition the assessment will consider in<br />
detail the amenity of local residents and<br />
will include a full noise survey.<br />
Benefits of the proposed development<br />
➜ Clean renewable energy for the good of the environment.<br />
➜ Reduction in energy costs and price stability which will benefit<br />
the recipient.<br />
➜ Contribution to national renewable targets.<br />
➜ Demonstrates a strong sense of corporate responsibility.<br />
Project Facts<br />
➜ The proposed turbine type<br />
is a Nordex N100 which has<br />
been identified to suit the site<br />
conditions.<br />
➜ The turbines would have a<br />
rotor diameter of 100m and<br />
a hub height of 80m.<br />
At maximum extent they<br />
would reach approximately<br />
130m high.<br />
➜ Any planning application<br />
would be for an operational<br />
period of 25 years.<br />
➜ Following a successful planning<br />
application, it would take 12–<br />
18 months from commencing<br />
the project to operation.<br />
➜ Construction would take<br />
place over approximately<br />
25 weeks.<br />
➜ Erecting a wind turbine only<br />
takes two days.<br />
VIEW NORTH FROM A140 THORNHAM PARVA JUNCTION
Roy Humphrey Group<br />
The Humphrey Group was started in the early 70s when<br />
Roy Humphrey purchased a village garage in Yaxley near<br />
Eye. Roy extended the range of services he offered with<br />
a vision to build a complex catering for all transport needs<br />
and the company now occupies a 70 acre site at the<br />
Airfield Industrial Estate.<br />
SITE LOCATION<br />
With a high cumulative energy usage across the estate<br />
and over 150 people employed at the site, the Humphrey<br />
Group is ideally placed to benefit from on-site generation.<br />
The initiative will bring the company vital price stability and<br />
security of supply, with the added benefit of enabling a large<br />
scale consumer of energy to reduce its carbon footprint.<br />
The proposed wind<br />
energy scheme is a<br />
demonstration of the<br />
Humphrey Group’s desire<br />
to minimise its impact<br />
on the environment by<br />
reducing its reliance on<br />
brown electricity and<br />
replacing it with a cleaner<br />
more efficient renewable<br />
energy source of power.<br />
VIEW SOUTH FROM A140 SITE ENTRANCE<br />
Printed on recycled paper containing 80% post-consumer waste. 08/09<br />
W I N D<br />
DIRECT<br />
<strong>Wind</strong> <strong>Direct</strong> Ltd, The Gatehouse, White Cross, Lancaster LA1 4XQ<br />
Tel: 01524 230 857<br />
Em a i l: eye@wind-direct.co.uk<br />
Web: www.wind-direct.co.uk<br />
<strong>Wind</strong> <strong>Direct</strong> is a registered trade mark of <strong>Wind</strong> <strong>Direct</strong> Limited (registration number 2507239 and 2376951)