Our experience<br />

Project<br />

Sepon Copper Project<br />

Location<br />

Laos, South East Asia<br />

Client<br />

Oxiana Resources Limited<br />

Year<br />

2008<br />

Description<br />

The Sepon Copper Project uses<br />

a patented copper leaching<br />

process comprising crushing,<br />

grinding in acid, acidic<br />

flotation, pressure oxidation<br />

and a solvent extraction<br />

electrowinning circuit.<br />

<strong>Ausenco</strong>’s scope was for<br />

the full EPCM for the project.<br />

The grinding circuit comprises<br />

a 2 MW variable speed<br />

single-stage grate discharge<br />

ball mill operating in closed<br />

circuit with hydrocyclones,<br />

with a capacity of 1.34 Mt/y.<br />

The circuit is designed to scrub<br />

and grind the copper-rich clay<br />

ore to a P80 of 106 μm. Milling<br />

is conducted in a warm acid<br />

recycle solution to avoid<br />

excessive dilution of the<br />

copper tenor in subsequent<br />

leaching. The mill internals are<br />

clad with SAF 2205 and rubber<br />

lined to protect the carbon<br />

steel shell and end plates.<br />

Project<br />

Cadia East Project<br />

Location<br />

New South Wales, Australia<br />

Client<br />

Newcrest Mining Ltd<br />

Year<br />

2010–2011<br />

Description<br />

<strong>Ausenco</strong> designed a new<br />

comminution circuit for the<br />

existing concentrator to allow<br />

for the treatment of much<br />

harder ore. We created an<br />

innovative circuit incorporating<br />

High Pressure Grinding Rolls<br />

(HPGR) technology prior to the<br />

Semi-Autogenous Grinding<br />

(SAG) mill to improve efficiency<br />

and increase throughput of<br />

the concentrator.<br />

For this upgrade, <strong>Ausenco</strong><br />

was awarded Contractor of<br />

the Year from the 2012<br />

Annual Australian Mining<br />

Prospect Awards.<br />

Project<br />

Lumwana Copper Project<br />

Location<br />

North Western Province,<br />

Zambia<br />

Client<br />

Equinox Minerals<br />

Year<br />

2006–2008<br />

Description<br />

Located in the North Western<br />

Province of Zambia, Lumwana<br />

is the largest copper project of<br />

its kind in Africa.<br />

<strong>Ausenco</strong>’s scope included the<br />

design, supply, construction<br />

and commissioning of the<br />

20 Mt/y copper concentrator<br />

including associated on-site<br />

and off-site infrastructure,<br />

water and waste-management<br />

systems, dams, diversion<br />

channels, and associated<br />

facilities. This project uses<br />

a SAB circuit with pebble<br />

recycle, using a gearless drive<br />

18 MW SAG mill and a gearless<br />

drive 16 MW ball mill.<br />

To learn more about our comminution experience, contact us via<br />

email business.development@ausenco.com or visit our website www.ausenco.com<br />

AUS0717_11_C_V1_26.03.13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!