Comminution - Ausenco
Comminution - Ausenco
Comminution - Ausenco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Our experience<br />
Project<br />
Sepon Copper Project<br />
Location<br />
Laos, South East Asia<br />
Client<br />
Oxiana Resources Limited<br />
Year<br />
2008<br />
Description<br />
The Sepon Copper Project uses<br />
a patented copper leaching<br />
process comprising crushing,<br />
grinding in acid, acidic<br />
flotation, pressure oxidation<br />
and a solvent extraction<br />
electrowinning circuit.<br />
<strong>Ausenco</strong>’s scope was for<br />
the full EPCM for the project.<br />
The grinding circuit comprises<br />
a 2 MW variable speed<br />
single-stage grate discharge<br />
ball mill operating in closed<br />
circuit with hydrocyclones,<br />
with a capacity of 1.34 Mt/y.<br />
The circuit is designed to scrub<br />
and grind the copper-rich clay<br />
ore to a P80 of 106 μm. Milling<br />
is conducted in a warm acid<br />
recycle solution to avoid<br />
excessive dilution of the<br />
copper tenor in subsequent<br />
leaching. The mill internals are<br />
clad with SAF 2205 and rubber<br />
lined to protect the carbon<br />
steel shell and end plates.<br />
Project<br />
Cadia East Project<br />
Location<br />
New South Wales, Australia<br />
Client<br />
Newcrest Mining Ltd<br />
Year<br />
2010–2011<br />
Description<br />
<strong>Ausenco</strong> designed a new<br />
comminution circuit for the<br />
existing concentrator to allow<br />
for the treatment of much<br />
harder ore. We created an<br />
innovative circuit incorporating<br />
High Pressure Grinding Rolls<br />
(HPGR) technology prior to the<br />
Semi-Autogenous Grinding<br />
(SAG) mill to improve efficiency<br />
and increase throughput of<br />
the concentrator.<br />
For this upgrade, <strong>Ausenco</strong><br />
was awarded Contractor of<br />
the Year from the 2012<br />
Annual Australian Mining<br />
Prospect Awards.<br />
Project<br />
Lumwana Copper Project<br />
Location<br />
North Western Province,<br />
Zambia<br />
Client<br />
Equinox Minerals<br />
Year<br />
2006–2008<br />
Description<br />
Located in the North Western<br />
Province of Zambia, Lumwana<br />
is the largest copper project of<br />
its kind in Africa.<br />
<strong>Ausenco</strong>’s scope included the<br />
design, supply, construction<br />
and commissioning of the<br />
20 Mt/y copper concentrator<br />
including associated on-site<br />
and off-site infrastructure,<br />
water and waste-management<br />
systems, dams, diversion<br />
channels, and associated<br />
facilities. This project uses<br />
a SAB circuit with pebble<br />
recycle, using a gearless drive<br />
18 MW SAG mill and a gearless<br />
drive 16 MW ball mill.<br />
To learn more about our comminution experience, contact us via<br />
email business.development@ausenco.com or visit our website www.ausenco.com<br />
AUS0717_11_C_V1_26.03.13