Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 1<br />

NUCLEAR FUEL COMPLEX<br />

3TPA NIOBIUM THERMIT PRODUCTION FACILITY<br />

SPECIFICATION<br />

FOR<br />

DESIGN, MANUFACTURE, TESTING, SUPPLY OF<br />

AGITATED AND NON-AGITATED PLASTIC (PP-FRP)<br />

TANKS WITH NECESSARY SUPPORTS<br />

SPECIFICATION NO. <strong>NFC</strong>/PRO-02<br />

JULY 2012<br />

M.N.DASTUR & COMPANY (P) LIMITED<br />

Consulting Engineers<br />

Kolkata-Mumbai-New Delhi-Chennai-Bangalore-Bhubaneswar


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 2<br />

PART A<br />

TECHNICAL SPECIFICATIONS FOR PP-FRP TANKS<br />

1. Item: Polypropylene (PP) Tanks reinforced with FRP – agitated and nonagitated<br />

with necessary supports.<br />

2. Description: Preparation of fabrication drawings, mechanical design of<br />

tanks and supports, design of agitator, material procurement,<br />

fabrication, inspection & testing and supply of agitated and non-agitated<br />

PP-FRP tanks with necessary supports.<br />

3. Desired Features:<br />

The list of the tanks and their details are as indicated in Table 1 and<br />

Table 2. (Typical sketches enclosed.)<br />

A) Design and Construction Features of Tanks :<br />

a) Code for design: BS 4994<br />

b) Description: Vertical, cylindrical, flat top and conical/flat bottom<br />

tanks with supported agitator for some tanks and without agitators<br />

for balance tanks.<br />

c) Material of Construction:<br />

i) Vessel body, top cover, bottom, nozzles & flanges: PP reinforced<br />

with FRP<br />

ii) Agitator shaft : MS lined with PP<br />

iii) Impeller: PP<br />

iv) Gaskets: 3mm thick PTFE.<br />

v) Counter Flanges: HDPE<br />

vi) Bolts and nuts: SA 193 Gr. B8 & SA 194 Gr. 8<br />

vii) Supports: MS lined with FRP.


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 3<br />

d) Mechanical Design of the tanks shall be carried out and submitted<br />

by the vendor. The thickness of the tanks shall be calculated by the<br />

vendor. In any case, the thickness of the tanks shall not be less than<br />

the values specified below :<br />

• PP lining: 3 mm<br />

• Laminate thickness: 5 mm<br />

e) Top cover shall be bolted to the vessel as shown in the drawings.<br />

Gasket and fasteners for top cover shall be supplied by vendor.<br />

f) Flanges: Flanges shall be class 150 as per ANSI B16.5<br />

g) Nozzles:<br />

• Number and size of nozzles shall be as indicated in the<br />

drawings of the tanks. Nozzles shall be designed as per BS<br />

4994.<br />

• Nozzles for instrumentation shown in the drawings are only<br />

indicative and the exact size and location shall be finalized<br />

prior to approval of fabrication drawings.<br />

• Reinforcement calculations for the nozzles shall be submitted<br />

by the vendor. Stiffeners shall be provided as per requirement.<br />

• Matching blind flanges, gaskets and fasteners for all nozzles<br />

shall be supplied by vendor.<br />

h) Necessary baffles for agitator vessels shall be provided suitably by<br />

the vendor.<br />

i) Supports: Lug supports shall be used for tanks with capacity upto<br />

1kl. For 2, 3 and 5 kl tanks, ring type supports shall be used. Design<br />

details to be submitted by the vendor.<br />

j) Lifting lugs: Lifting lugs shall be provided suitably on top cover and<br />

cylindrical shells for all the tanks.<br />

k) Fabrication: Hand layup or open contact molding may be adopted.<br />

Vendor to specify the details of fabrication procedure followed.<br />

l) FRP Material: FRP material used shall be the following (or any other<br />

superior material which shall be quoted separately) unless other wise<br />

mentioned specifically as different.<br />

• Resin - Bisphenol A


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 4<br />

• Chopped Strand Mat - Glass E Type, >= 450 g/m2<br />

• Woven roving - Glass E Type, 610 g/m2<br />

• Surface Veil – C Veil<br />

• Resin to Glass Ratio : Resin shall be minimum 65%<br />

No fillers shall be used in FRP.<br />

B) Agitator Details:<br />

a) Agitator of reputed make (Remi/Standard Engineer/Fibre & Fibre<br />

Products/ Thermotech Engineering) complete with drive motor ,<br />

reduction unit and other accessories.<br />

b) Design of agitator including strength calculations and critical speed<br />

calculations shall be submitted by the vendor. Tenderer, if required, may<br />

collect test samples of process fluids from <strong>NFC</strong> Hyderabad to generate<br />

necessary data for design of the agitator and its motor rating.<br />

Performance guarantee for the agitator under actual conditions has to be<br />

demonstrated by the vendor.<br />

c) Type of impeller: Pitched Blade Turbine<br />

d) Impeller Diameter: ~ 25% of tank diameter. Details to be confirmed by<br />

the vendor<br />

e) Speed of agitator: 150 rpm for clear liquids and 200 rpm for slurries.<br />

Details to be confirmed by the vendor.<br />

f) Type of mounting: Horizontal as shown in sketch<br />

g) Type of seal: Mechanical seal of reputed make (Burgman/ Flowserve/<br />

John Crane/ Eagle Poonawal)<br />

h) Type of installation: Agitator shall be installed at the centre of the top<br />

cover.<br />

i) Supports: The agitator assembly along with drive unit shall be<br />

supported on the tank supports for ring type supports as indiacted in<br />

the drawing (Drg No. 26616-39-00-PRJ-0060). Separate support for<br />

agitator assembly shall be provided as indicated in the drawing (Drg No.<br />

26616-39-00-PRJ-0011) for other tanks. Design calculations and details<br />

of the agitator support to be submitted by the vendor.


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 5<br />

j) Drive unit: Reputed make (NGEF/KIRLOSKAR/SIMENS) spark proof, 3<br />

phases, motor of suitable KW and speed. KW, speed, frame size, voltage<br />

shall be stated in the offer. Flame proof motors with IP 65 protection<br />

shall be provided where necessary as shown in the data sheets.<br />

k) Drive connection: Gear driven<br />

l) Speed Reduction Unit: Gear Assembly<br />

m) Speed Reduction Ratio: To be worked out by the vendor<br />

n) Drive motor and gear box shall be mounted on common base plate.<br />

o) Coupling:<br />

i) Agitator shaft and gear box output shaft shall be coupled through<br />

a rigid coupling with split ring locking arrangement in order to<br />

ensure that the agitator shaft doesn’t fall into the vessel during<br />

the operation.<br />

ii)<br />

p) Accessories:<br />

Gear box and drive motor shall be coupled through flexible<br />

coupling.<br />

i) Agitator shaft with impellers<br />

ii)<br />

iii)<br />

iv)<br />

Mechanical seal with seal housing<br />

Bearings<br />

Gear box<br />

v) Foot step bearing with support<br />

vi)<br />

vii)<br />

Coupling<br />

Fasteners.<br />

q) Other details: Details regarding mechanical seal etc. to be specified by<br />

vendor.<br />

r) Agitator assembly shall be designed to minimize vibrations.<br />

C) Spares: Recommended spares for two years of trouble-free normal operation<br />

shall be listed and quoted separately item-wise.


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 6<br />

4. Scope of Supply:<br />

i) Preparation of fabrication drawings, mechanical design of tanks and<br />

supports, design of agitator, material procurement, fabrication,<br />

inspection & testing, and supply of agitated and non-agitated PP-FRP<br />

tanks with necessary supports.<br />

ii) Agitator assembly as mentioned under item (B) above complete with<br />

drive motor, reduction unit, mechanical sealing arrangement and<br />

complete mounting arrangement, foundation bolts and nuts.<br />

iii) Spares as indicated in 3 (C) of Part-A.<br />

iv) Consumable materials required for initial filling, start-up and<br />

commissioning of agitators.<br />

5. Inspection and testing<br />

All the equipment shall be inspected and tested at the supplier’s works<br />

before delivery. All the tests shall be arranged by the supplier free of cost at<br />

his works.<br />

Testing shall be carried out as per BS: 4994 standard.<br />

• Dimensional check. All dimensions shall be as per approved drawing.<br />

• For the testing of the laminate the following testing methods shall be<br />

adopted:<br />

a) Surface hardness test (barcol test). The laminate should have a<br />

surface hardness of 90% of resin manufacturer’s specified minimum<br />

value. The testing to be done in a government recognized laboratory<br />

and the test report to be submitted at the time of inspection.<br />

b) Manufacturers test certificates shall be produced for the quality<br />

assurance of the resins and glass. The testing shall be done in a<br />

recognized laboratory and the test report to be submitted at the time<br />

of inspection.<br />

• Hydrostatic test shall be conducted.<br />

• Agitator performance shall be demonstrated by the supplier at site for<br />

speed, power consumption and efficiency.


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET 7<br />

6. Documents to be Furnished:<br />

With the Technical offer (Part-1)<br />

After Placement of Order<br />

Preliminary design calculations of<br />

the tanks and agitators.<br />

Detailed Technical specifications<br />

indicating all the required<br />

parameters like thickness, resin<br />

details, fabrication procedure,<br />

support details, agitator details etc.<br />

Technical brochures, catalogues of<br />

the bought out items.<br />

Filled in data sheets in the format<br />

as indicated in Part-C to be<br />

furnished for all the agitators<br />

List of spares with part nos.<br />

description and specification.<br />

Detailed Design calculations (for approval) :<br />

• Mechanical design<br />

• Agitator Design<br />

• Nozzle Reinforcement calculations<br />

• Support design calculations<br />

Detailed shop drawings showing weights<br />

and dimensions of equipment, all nozzles,<br />

wall thickness, laminate makeup,<br />

fabrication techniques, and construction<br />

materials – for approval<br />

Detailed dimensional drawings, schematic<br />

and line diagram for agitator assembly and<br />

the accessories<br />

Written instructions and recommended<br />

methods for unloading, storing and<br />

installing the tanks and recommended<br />

lifting and handling procedures, including<br />

all bolt torques.<br />

Installation and maintenance instruction<br />

manual for agitator and its accessories.<br />

Quality Assurance Plan Material test certificates showing its<br />

chemical composition and mechanical<br />

properties and other test certificates for all<br />

important parts of the equipment<br />

Loading data for each of the equipments<br />

Foundation detail drawings for the process<br />

tank and agitator supports.


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND SUPPLY OF AGITATED & NON-<br />

AGITATED PLASTIC(PP-FRP) TANKS WITH NECESSARY SUPPORTS<br />

SHEET 8<br />

Sl.<br />

No.<br />

I.<br />

Tag No.<br />

Conical<br />

Bottom<br />

1. T.ODR-<br />

01,02, N-<br />

ODR 01,02<br />

2. T-PPT-01,02,<br />

N-PPT-01,02<br />

II. Flat Bottom<br />

TABLE 1: LIST OF VERTICAL, CYLINDRICAL WITH FLAT BOLTED HEAD, PP TANKS<br />

WITH FRP REINFORCEMENT – WITH AGITATOR<br />

Capacity<br />

(kl)<br />

Fluid Handled<br />

0.75 40% HF acid with<br />

37% solids& steam<br />

1 NH 4F, NH 4OH<br />

solution with 10%<br />

solids<br />

1. T.FPT-01,02 1 Fluoro niobic acid,<br />

Fluoro tantalic acid,<br />

HF acid, H 2SO 4<br />

2. N.FPT-01,02 1 Fluoro niobic acid,<br />

Fluoro tantalic acid,<br />

HF acid, H 2SO 4<br />

3. N.SRU-01 1 TBP, kerosene,<br />

Na 2CO 3 soln.<br />

Viscosity<br />

@ 20 o C, 1<br />

atm<br />

(cP)<br />

Specific<br />

gravity<br />

@ 20 o C, 1<br />

atm<br />

Operating<br />

Conditions<br />

Temp.<br />

( o C) Pressure Qty<br />

Sketch Ref.<br />

1.5 1.6 80 1 atm 4 26616-39-00-<br />

PRJ-0025<br />

1.5 1.3 70 1 atm 4 26616-39-00-<br />

PRJ-0026<br />

1.5 1.34 40 1 atm 2 26616-39-00-<br />

PRJ-0029<br />

1.5 1.34 40 1 atm 2 26616-39-00-<br />

PRJ-0056<br />

2 0.9 40 1 atm 1 26616-39-00-<br />

PRJ-0030<br />

4. T.HSDT- 1 HF acid, H 2SO 4 2.2 1.4 40 1 atm 2 26616-39-00-


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING, PACKING, SUPPLY AND<br />

SUPERVISION OF ERECTION & COMMISSIONING OF PLASTIC TANKS<br />

AND AGITATORS<br />

SHEET 9<br />

Sl.<br />

No.<br />

Tag No.<br />

Capacity<br />

(kl)<br />

Fluid Handled<br />

Viscosity<br />

@ 20 o C, 1<br />

atm<br />

(cP)<br />

Specific<br />

gravity<br />

@ 20 o C, 1<br />

atm<br />

Operating<br />

Conditions<br />

Temp.<br />

( o C) Pressure Qty<br />

Sketch Ref.<br />

01, 02 PRJ-0031<br />

5. N-AT-01,02 1 Sodium Niobate<br />

solution with 43 %<br />

solids<br />

1.2 40 1 atm 2 26616-39-00-<br />

PRJ-0027<br />

6. N.HFDT-01 0.5 HF solution 1.15 40 1 atm 1 26616-39-00-<br />

PRJ-0028<br />

7. E –HT-<br />

1A/B/C,<br />

2A/B/C<br />

8. E-IT-<br />

1A/B,2A/B<br />

9. E-R-1A/B,<br />

2A/B<br />

5 HF,H 2SO 4 solution ~1 1.1 40 1 atm 6 26616-39-00-<br />

PRJ-0032<br />

5 CaF, CaSO 4<br />

solution with solids<br />

3 HF,H 2SO 4 solution<br />

with lime<br />

1.2 40 1 atm 3 26616-39-00-<br />

PRJ-0034<br />

1.2 40 1 atm 4 26616-39-00-<br />

PRJ-0033<br />

10. SLDT-01 3 12% H 2SO 4 solution 1.08 40 1 atm 1 26616-39-00-<br />

PRJ-0046


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING, PACKING, SUPPLY AND<br />

SUPERVISION OF ERECTION & COMMISSIONING OF PLASTIC TANKS<br />

AND AGITATORS<br />

SHEET 10<br />

TABLE 2: LIST OF VERTICAL, CYLINDRICAL WITH FLAT BOLTED HEAD AND FLAT BOTTOM PP TANKS<br />

WITH FRP REINFORCEMENT – WITHOUT AGITATOR<br />

Sl.<br />

No. Tag No.<br />

1. T-FRS-<br />

01,02, T-<br />

SRT<br />

2.<br />

Capacity<br />

(kl)<br />

1<br />

T-IMST-01 1<br />

3. T-SDT-01,<br />

N-SDT-01<br />

4.<br />

5.<br />

6.<br />

7.<br />

T-FDT-01 1<br />

T-ECT-01 1<br />

N-FDT-01 1<br />

N-ECT-01 1<br />

Fluid Handled<br />

Acidic solution<br />

containing HF<br />

Acidic solution<br />

containing HF<br />

Specific<br />

gravity @<br />

20 o C, 1<br />

atm<br />

Operating conditions<br />

Temp.<br />

Pressure<br />

Qty<br />

1.6 40 o C 1 atm 3<br />

1.6 40 o C 1 atm 1<br />

1 TBP + Kerosene 0.9 40 o C 1 atm 2<br />

Acidic solution<br />

containing HF<br />

Acidic solution<br />

containing HF<br />

Acidic solution<br />

containing HF<br />

Acidic solution<br />

containing HF<br />

1.6 40 o C 1 atm 1<br />

1.6 40 o C 1 atm 1<br />

1.6 40 o C 1 atm 1<br />

1.6 40 o C 1 atm 1<br />

Drg Ref.<br />

26616-39-00-<br />

PRJ-0042<br />

26616-39-00-<br />

PRJ-0058<br />

26616-39-00-<br />

PRJ-0043<br />

26616-39-00-<br />

PRJ-0044<br />

26616-39-00-<br />

PRJ-0057<br />

26616-39-00-<br />

PRJ-0059<br />

26616-39-00-<br />

PRJ-0045


Spec. No.<strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING, PACKING, SUPPLY AND<br />

SUPERVISION OF ERECTION & COMMISSIONING OF PLASTIC TANKS<br />

AND AGITATORS<br />

SHEET 11<br />

Sl.<br />

No.<br />

8.<br />

9.<br />

10.<br />

11.<br />

12.<br />

13.<br />

14.<br />

Tag No.<br />

Capacity<br />

(kl)<br />

T.SET-01,02 1<br />

N.SET-01,02 0.5<br />

T.DMWST-<br />

01,BDT<br />

01,02<br />

3<br />

Fluid Handled<br />

Acidic solution<br />

containing HF<br />

Acidic solution<br />

containing HF<br />

DM water /<br />

Ammo-nium<br />

Sulfate /<br />

hydroxide soln.<br />

Specific<br />

gravity @<br />

20 o C, 1<br />

atm<br />

Operating conditions<br />

Temp.<br />

Pressure<br />

Qty<br />

1.3 40 o C 1 atm 2<br />

1.3 40 o C 1 atm 2<br />

1 40 o C 1 atm 3<br />

T-SMT-01 1 TBP + Kerosene 0.9 40 o C 1 atm 1<br />

N.SMT-01 1 TBP + Kerosene 0.9 40 o C 1 atm 1<br />

HFST-01,02 2 40% HF 40 o C<br />

E.FT-1A-<br />

01/2A-01<br />

5<br />

Calcium fluoride<br />

& calcium<br />

sulphate<br />

solution<br />

1 atm &<br />

650mm Hg<br />

vacuum<br />

1.0 40 o C 1 atm 2<br />

2<br />

Drg Ref.<br />

26616-39-00-<br />

PRJ-0035<br />

26616-39-00-<br />

PRJ-0036<br />

26616-39-00-<br />

PRJ-0039<br />

26616-39-00-<br />

PRJ-0037<br />

26616-39-00-<br />

PRJ-0038<br />

26616-39-00-<br />

PRJ-0041<br />

26616-39-00-<br />

PRJ-0040


Spec. No. <strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET I<br />

PART-B<br />

GENERAL TERMS AND CONDITIONS<br />

1. Unit Price: The vendor shall quote the unit price for the equipment<br />

including accessories as indicated in Part-A (Clause 3.0) for delivery<br />

to <strong>NFC</strong> stores. Packing & Forwarding, Delivery charges, Taxes and<br />

duties, if any shall be clearly mentioned.<br />

2. Evaluation: This is a two part tender, so technical and financial offer<br />

shall be submitted separately. Financial bid of the technically<br />

qualified parties will be opened after evaluation of the technical bid.<br />

Comparative statement shall be prepared combining all the items/<br />

equipments included in the scope of work. Total cost including all<br />

the items/ equipment as indicated in the scope of work shall be<br />

calculated and the technically qualified collective lowest offer will be<br />

considered for placing the order.<br />

3. Design and Fabrication drawings: The successful vendor shall<br />

submit all the detailed design calculations and the fabrication<br />

drawings for the equipment and accessories within 15 days from the<br />

date of receipt of the firm order. The actual fabrication shall be<br />

started only after the receipt of approved fabrication drawings from<br />

the users.<br />

4. GA Drawings: The vendor shall submit GA drawing of agitators<br />

showing the dimensions of various parts and material of<br />

construction along with their quotation.<br />

5. Marking: The tanks shall be marked with year of manufacture,<br />

capacity and tag number. All the other major parts shall be marked<br />

with make and model.<br />

6. Material test certificates: The vendor shall provide material test<br />

certificates for all materials from approved laboratory only, for all the<br />

materials used in fabrication of the equipment and accessories.<br />

7. Vendor Information: Vendors are requested to give details of the<br />

similar types of jobs executed by them with Purchase order copies.<br />

Vendors shall submit other details viz, fabrication procedures, lining<br />

facilities, sub-contractors if any, facilities available for inspection &<br />

testing etc. The vendor may suggest for any alternative materials and<br />

also quote for the alternating materials. The vendor shall mention the<br />

facilities available at their works for inspection and testing of the<br />

items.<br />

8. Validity: The offer shall be valid for a minimum period of 120 days.


Spec. No. <strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET I<br />

9. Guarantee: The vendor shall give Performance guarantee for<br />

capacity, power consumption and efficiency and guarantee that the<br />

pumps are free from defects of design, materials and<br />

workmanship/manufacturing, for at least 12 months from the date<br />

of commissioning or 24 months from the date of supply, which ever<br />

is earlier.<br />

10. Delivery Period: Delivery period is maximum 12 weeks from the<br />

date of receipt of purchase order.<br />

11. Delivery: The items shall be delivered to <strong>NFC</strong> stores. The items shall<br />

be suitably packed so as to avoid any damage during transportation.<br />

It shall be delivered at site in good condition<br />

12. Final Drawings and Documents: 3 Nos. of final<br />

drawings/documents along with a soft copy of such approved<br />

drawings/documents shall be submitted by the successful vendor.<br />

13. Painting: All the external parts of the equipment including<br />

structural parts and accessories shall be painted with two coats of<br />

epoxy paint after one coat of epoxy primer and proper surface<br />

preparation and finish. No painting scheme is applicable for FRP<br />

laminated parts.<br />

14. Inspection & Testing: The equipment and accessories shall be<br />

inspected and tested at the supplier’s works before delivery as<br />

mentioned in Part-A. Inspection & Testing involves visual inspection,<br />

dimension checking, hydrostatic test for leak proofness and spark<br />

test for continuity. The equipment will be accepted only after passing<br />

all above tests satisfactorily.<br />

Note to the Vendor:<br />

a) Only offers of Fabricators with proven technology for design and<br />

fabrication of such items will be considered for evaluation.<br />

b) The quotation should be complete in all respects ( with motors,<br />

agitators, accessories and spares). Incomplete quotations are likely<br />

to be rejected.


Spec. No. <strong>NFC</strong>/PRO-02<br />

DESIGN, MANUFACTURE, TESTING AND<br />

SUPPLY OF AGITATED & NON-AGITATED<br />

PLASTIC(PP-FRP) TANKS WITH<br />

NECESSARY SUPPORTS<br />

SHEET I<br />

PART-C<br />

SAMPLE DATA SHEET FOR AGITATOR<br />

M.N. DASTUR & COMPANY (P) LTD,<br />

CONSULTING ENGINEERS, CHENNAI<br />

DATA SHEET FOR<br />

AGITATOR<br />

Spec. No.<br />

<strong>NFC</strong>/PRO-07<br />

CLIENT : Qty. Tag Nos. Unit Revision : 00<br />

PROJECT : NTPF 1 T-AG-01 Ore Dissolution reactor (T.ODR)<br />

Design Standard *<br />

Fluid Properties/Performance Data<br />

Tank Details<br />

Components to be As per Table-1 Type Vertical<br />

mixed<br />

Phase –<br />

Solid-liquid<br />

Diameter (DT) As per sketch<br />

Solid/liquid/gas<br />

Height<br />

% solids 20% Operating Temp. As per Table-1<br />

Solids – particle size - 200 mesh Operating Pressure As per Table-1<br />

Nature of solids Soluble / Insoluble<br />

Abrasive/ Sticky<br />

Crystalline/Fluffy<br />

Design<br />

Temperature<br />

*<br />

Sp. Gravity of mixture As per Table-1 Design Pressure *<br />

Viscosity of mixture As per Table-1 Baffles: Required<br />

Number<br />

Length<br />

*<br />

*<br />

*<br />

Purpose of mixing<br />

Dissolving/Mixing/<br />

Suspension<br />

Liquid level<br />

Minimum<br />

Maximum<br />

20% of height<br />

70% of height<br />

Type of mixing desired Mild/ Medium/ violent Construction Data<br />

Tendency to foam Slight/Average/High/NA Impeller<br />

Mixing time 30 min Type Pitched blade<br />

turbine<br />

Batch size: Maximum 70% of tank capacity Diameter *<br />

Mixing operation<br />

during filling/<br />

emptying of tank<br />

Yes/No No. of Blades *<br />

Fixed/Removable Fixed<br />

Accessories by Vendor Speed *<br />

Driver<br />

Electric Shaft Diameter *<br />

Motor<br />

Mechanical Seal Yes Shaft Length *<br />

Coupling on drive assembly Yes Critical speed *<br />

Speed Reducer Gear box Shaft coupling Flexible<br />

Accessories for seal : Flushing/<br />

cooling plan inclusive of seal pot &<br />

associated piping<br />

Yes Shaft Seal Mechanical Seal<br />

Driver Details<br />

Material of Construction<br />

Type Electric Motor Shaft MS lined with PP<br />

HP * Impeller PP<br />

RPM *<br />

Efficiency *<br />

Flame proof protection Yes/No *<br />

* - VENDOR TO SPECIFY