Architectural Review Request - Ideal Community Management
Architectural Review Request - Ideal Community Management
Architectural Review Request - Ideal Community Management
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ECHO MESA<br />
HOMEOWNERS ASSOCIATION<br />
<strong>Architectural</strong> Submittal Checklist<br />
EXHIBIT A<br />
PLEASE NOTE: INCOMPLETE SUBMITTALS WILL CAUSE DELAY IN APPROVAL<br />
PROCESS. PLEASE READ CHECKLIST CAREFULLY.<br />
Below is a listing of items that are required to accompany the application prior to review by the <strong>Architectural</strong><br />
<strong>Review</strong> Committee.<br />
AN ORIGINAL AND ONE (1) COPY OF ITEMS 1-5 BELOW ARE REQUIRED.<br />
1. Application (Exhibit B)<br />
a. Complete Homeowner Information (name, address, telephone).<br />
b. Homeowner’s signature(s)<br />
c. Approximate start and completion dates<br />
d. Project(s) being submitted<br />
2. Signed Neighbor Impact Statement (Exhibit C) - The Impacted Neighbor Statement is intended to<br />
make neighbors aware of any improvement that may impact their property or their enjoyment<br />
thereof. It is intended for advisory use only and is mainly to inform the neighbor that there may be<br />
visual or physical impact upon, or there may be construction equipment and/or workers in or near<br />
the area of their property. “Impacted” refers to immediate surrounding areas affected by the<br />
construction. “Facing” refers to most directly across the street. “Adjacent” refers to adjoining<br />
properties. “Rear” refers to neighbor(s) directly behind property.<br />
3. Plans Showing the Work to Be Done – Detailed drawings showing the height, length, width, color<br />
and what the improvement will look like when it’s completed.<br />
4. Landscape Plans – These plans show a diagram of your house and where the landscaping<br />
improvements will be. Indication of plant and tree types and location are required.<br />
5. Material Samples – Example: type of rock to be used, color chip of paint, pictures of gazebo, pool,<br />
patio cover and spa should accompany the plans for the same. A detailed drawing or picture<br />
must be submitted.<br />
Notice of Completion Form (or request for an extension to submit such a notice) Must be returned within<br />
ninety (90) days of receiving ARC approval for any work performed.<br />
Send original application and plans, with a copy to:<br />
ECHO MESA HOA<br />
<strong>Architectural</strong> <strong>Review</strong> Committee<br />
C/O <strong>Ideal</strong> <strong>Community</strong> <strong>Management</strong>, Inc.<br />
6767 W. Tropicana Ave Ste 200<br />
Las Vegas, NV 89103<br />
Phone: (702) 247-1115 Fax: (702) 247-1118<br />
www.ideal-mgmt.com<br />
*Failure to fallow these requirements and procedures may cause your request to be delayed, pending submission of<br />
additional information and documentation to the <strong>Architectural</strong> <strong>Review</strong> Committee. An incomplete application may affect<br />
the time limits for approval.<br />
1
ECHO MESA<br />
HOMEOWNERS ASSOCIATION<br />
ARCHITECTURAL REVIEW SUBMITTAL FORM<br />
Exhibit B<br />
Name:<br />
Address:<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
Home Phone: _________________________ Work Phone: ____________________________<br />
Start Date: _________________________ Finish Date: ____________________________<br />
PROJECTS BEING SUBMITTED: (Please check all appropriate spaces)<br />
____ Pool & Equipment<br />
____ Patio<br />
____ Spa & Equipment<br />
____ Patio Cover<br />
____ Satellite Dish/TV Antenna<br />
____ Sports Apparatus & Play Equipment<br />
____ Fence(s)<br />
____ Gazebo<br />
____ Awnings<br />
____ Painting<br />
____ Gutters<br />
____ Drains (if altering existing grade)<br />
____ Lawn Only<br />
____ Other<br />
____ Landscaping: ___ Front ___ Back ___ Side ___ (Check appropriate space(s))<br />
PLEASE FILL IN DETAILS IF NOT SHOWN ON PLANS:<br />
1. Are all existing improvements shown on plans? Yes No<br />
2. Landscape additions require:<br />
Names of plants<br />
Locations of plant material<br />
Color and sample of rock material (if appropriate)<br />
3. Types of building materials used: ________________________________________________________<br />
______________________________________________________________________________________<br />
4. Color Scheme of improvement: __________________________________________________________<br />
CHECKLIST:<br />
A. County and/or City of Las Vegas building permits attached? Yes No<br />
B. Impacted Neighbor Statement signed by all affected neighbors attached? Yes No<br />
C. Original submittal and plans with 2 copies included? Yes No<br />
Please Initial each paragraph below<br />
____ NOTE: Owners remain permanently responsible for the maintenance and upkeep of additions<br />
and modifications to their property and must be recorded with their deed.<br />
____ NOTE: Plans that are approved are not to be considered authorization to change the drainage plan as<br />
installed by the developer. The review is intended to consider aesthetic applicable aspects of drainage. Owner<br />
may also need to acquire approval from the County/City of Las Vegas for permission to encroach within<br />
County/City easement.<br />
2
ECHO MESA<br />
HOMEOWNERS ASSOCIATION<br />
NEIGHBOR IMPACT STATEMENT<br />
Exhibit C<br />
On _________________, ______________________________________ submitted the attached plans<br />
(DATE)<br />
(NAME)<br />
For installation of _______________________________________________________________________<br />
(IMPROVEMENT)<br />
These plans were made available to neighbors as required and noted below for their review. They have been<br />
notified that I am submitting these plans to the <strong>Architectural</strong> <strong>Review</strong> Committee for approval.<br />
Facing neighbor: ______________________ ______________________________<br />
(PRINT NAME)<br />
(SIGNATURE)<br />
Address: _________________________________________________ Date: _______________________<br />
I HAVE REVIEWED AND UNDERSTAND THE PLANS MENTIONED ABOVE<br />
Right side neighbor: ____________________ ______________________________<br />
(PRINT NAME)<br />
(SIGNATURE)<br />
Address: _________________________________________________ Date: _______________________<br />
I HAVE REVIEWED AND UNDERSTAND THE PLANS MENTIONED ABOVE<br />
Left side neighbor: ______________________<br />
(PRINT NAME)<br />
______________________________<br />
(SIGNATURE)<br />
Address: _________________________________________________ Date: _______________________<br />
I HAVE REVIEWED AND UNDERSTAND THE PLANS MENTIONED ABOVE<br />
Rear neighbor: _________________________<br />
(PRINT NAME)<br />
______________________________<br />
(SIGNATURE)<br />
Address: _________________________________________________ Date: _______________________<br />
I HAVE REVIEWED AND UNDERSTAND THE PLANS MENTIONED ABOVE<br />
________________________________________________<br />
(HOMEOWNERS SIGNATURE)<br />
NOTE: The “Facing neighbor” is the one most directly across the street in the front of your property; the “Rear neighbor” is<br />
the one most directly behind your property. Where multiple neighbors may be impacted, each neighbor must have the<br />
opportunity to review the plans; use the back of this form for additional signatures. Please include all information.<br />
NOTE: ALL signatures must be obtained prior to submitting plans for approval. Failure to obtain ALL signatures may result in<br />
delays in the approval process.<br />
NOTE TO NEIGHBORS: Signing this statement does not constitute approval nor may it be considered a veto. It indicates<br />
solely that you have been notified that your neighbor is going to begin a project. Approval or disapproval rests exclusively<br />
with the Board of Directors. Any neighbor with a concern regarding this improvement should put their concerns in writing<br />
and forward it to the <strong>Architectural</strong> <strong>Review</strong> Committee at 10191 Park Run Dr., Ste 110, Las Vegas, NV 89145.<br />
3
ECHO MESA<br />
HOMEOWNERS ASSOCIATION<br />
PATIO COVER CHECKLIST<br />
EXHIBIT D<br />
The following information is needed for all patio cover submittals. This information must be accompanied by<br />
plans which show all the listed details, dimensions and what the completed cover will look like.<br />
NOTE: Restrictions and requirements for patio covers are clearly defined in <strong>Architectural</strong><br />
Guidelines. Failure to comply with the building standards as set forth in the Guidelines will be<br />
sufficient reason for the <strong>Architectural</strong> <strong>Review</strong> Committee to DENY the request for the project.<br />
Projects found to be in non-compliance with established may be required to be removed or replaced<br />
at the homeowner’s expense.<br />
1. Height _________________ Slope ________________<br />
Width __________________<br />
Overhang _____________<br />
2. Setbacks must be clearly indicated on the site plan, meet all code requirements and be<br />
approved by the <strong>Architectural</strong> <strong>Review</strong> Committee.<br />
3. Roof Type: _____________________ (A or B)<br />
A. Flat with spaced slats? Yes or No<br />
What is the spacing of the slats? ____________________<br />
B. Must match existing roof type.<br />
5. Post Size: __________________________________<br />
6. Color:<br />
A. Structure must be painted to match the color of the residence. Yes or No<br />
7. Stucco – Will patio cover be stuccoed? Yes or No<br />
If yes, stucco must match the stucco type and color that is on the residence.<br />
NOTE: Owners remain permanently responsible for the maintenance and upkeep of additions<br />
and modifications to their property and any modifications must be recorded with their deed.<br />
4
ECHO MESA<br />
HOMEOWNERS ASSOCIATION<br />
NOTICE OF COMPLETION FOR HOME IMPROVEMENT(S)<br />
This form must be submitted upon completion of home improvements. If<br />
improvements are not completed within ninety (90) days of receiving ARC<br />
approval for such improvement, a request for an extension to submit this<br />
notice must be submitted within those ninety days.<br />
EXHIBIT E<br />
(Complete and return form AFTER installation of improvement has been COMPLETED)<br />
Fill out and return to:<br />
The Falls @ Hidden Canyon HOA<br />
<strong>Architectural</strong> <strong>Review</strong> Committee<br />
C/O <strong>Ideal</strong> <strong>Community</strong> <strong>Management</strong>, Inc.<br />
6767 W. Tropicana Ave. Ste 200 Las Vegas, NV 89103<br />
_____________________________________________<br />
HOMEOWNER NAME (PRINT)<br />
____________________________<br />
DAY PHONE NUMBER<br />
______________________________________________________________________________________<br />
ADDRESS<br />
_______________________________________________________<br />
IMPROVEMENT(S)<br />
_________________________<br />
DATE OF COMPLETION<br />
Signature of Owner<br />
________________________________________________________________<br />
Note: Owners remain permanently responsible for the maintenance and upkeep of additions<br />
and modifications to their property and must be recorded with their deed.<br />
DO NOT WRITE BELOW THIS LINE – FOR STAFF USE ONLY<br />
C NC C NC<br />
Pool ____ ____ Spa ____ ____<br />
Patio ____ ____ Patio Cover ____ ____<br />
Fencing ____ ____ Wall Extension ____ ____<br />
Basketball Hoop ____ ____ Play/Swing Set ____ ____<br />
Painting ____ ____ Gazebo ____ ____<br />
Gate/Screening ____ ____ Lighting ____ ____<br />
Stucco ____ ____ Landscaping (F, S, R) ____ ____<br />
5