EU <strong>Project</strong> <strong>CAST</strong><br />
www.castproject.eu<br />
_________________________________________________________________________________________________________________________<br />
cast_draft Minutes_2 nd PC <strong>Meeting</strong> & ExecCommMeet_V1.0_16 Dec 2009.doc<br />
EU FP 7 Grant Agreement No. 218070<br />
<strong>Project</strong><br />
COMPARATIVE ASSESSMENT OF SECURITY-CENTERED<br />
TRAINING CURRICULA FOR FIRST RESPONDERS ON DISASTER<br />
MANAGEMENT IN THE EU<br />
Acronym: <strong>CAST</strong><br />
Official project starting date: 1 July 2009<br />
<strong>Project</strong> duration: 24 months<br />
2 nd <strong>Project</strong> <strong>Coordination</strong> <strong>Meeting</strong><br />
1 st <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong><br />
MINUTES<br />
V 1.0<br />
Prof. Friedrich STEINHÄUSLER (Editor)<br />
<strong>CAST</strong> is co‐funded by the European Commission, DG Energy & Industry and<br />
The Austrian Federal Ministry for Science and Research (BMWF)<br />
University of Salzburg, Hellbrunnerstr. 34, A 5020 Salzburg (Austria)<br />
<strong>Project</strong> Coordinator: Prof. Friedrich Steinhäusler<br />
(Friedrich.Steinhaeusler@sbg.ac.at; Tel.: +43‐680‐123 7158 or +43‐662‐8044‐5701)<br />
<strong>Project</strong> Administrator: Ms. Claudia Heissl<br />
(Claudia.Heissl@sbg.ac.at, Tel.: +43‐662‐8044‐5700, Fax: +43‐662‐8044‐150)<br />
1
DOCUMENT CODE:<br />
cast_draft Minutes_2 nd PC <strong>Meeting</strong> & ExecCommMeet_V1.0_16 Dec 2009.doc<br />
DOCUMENT INFORMATION:<br />
Editor<br />
Contributors<br />
Name Affiliation E-mail address<br />
Prof. Friedrich Steinhäusler<br />
PLUS friedrich.steinhaeusler@sbg.ac.at<br />
<strong>Project</strong> Coordinator<br />
Claudia Heissl<br />
Lyudmila Zaitseva<br />
PLUS<br />
PLUS<br />
Claudia.heissl@sbg.ac.at<br />
Lyudmila.zaitseva@sbg.ac.at<br />
Version V 1.0<br />
Date of Issue 16 Dec. 2009<br />
DOCUMENT HISTORY:<br />
Date Version Editor Status<br />
16 Dec. 2009 V 1.0 Steinhäusler Draft<br />
DOCUMENT KEY DATA:<br />
Keywords: PC <strong>Coordination</strong> <strong>Meeting</strong>, <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong>, Minutes V1.0<br />
Editor address data:<br />
Prof. Friedrich Steinhäusler<br />
Div. of Physics and Biophysics, Hellbrunnerstr. 34<br />
A 5020 Salzburg, Austria<br />
Phone: +43-662-8044-5701<br />
Fax: +43-662-8044-150<br />
E-mail:<br />
Friedrich.Steinhaeusler@sbg.ac.at<br />
Delivery Date: 16 Dec. 2009<br />
DOCUMENT DISTRIBUTION LIST:<br />
Date: 16 Dec. 2009<br />
Issue:<br />
E-mailer:<br />
To all <strong>CAST</strong> consortium members<br />
niklas.andersson@saabgroup.com; johan.olander@sts.saab.se; guenther.boegl@gmx.at; rcaro@tecnatom.es;<br />
fgarrote@tecnatom.es; cmbenito@tecnatom.es; efrutos@tecnatom.es; jlserrano@tecnatom.es;<br />
cast@feuerwehr.hamburg.de; Norbert.eisenreich@ict.fraunhofer.de; polisgurra@hotmail.com; e.gustenau@diamondair.at;<br />
m.paar@diamond-sensing.com; marcus.paar@gmail.com; Wilhelm.Heidegger@sbg.ac.at;<br />
Claudia.Heissl@sbg.ac.at; gesa.langer@ict.fraunhofer.de; gyorgy.nogradi@uni-corvinus.hu;<br />
Karin.rainer@w.roteskreuz.at; wolfgang.reitschmied@aon.at; office.pirolt@gmail.com; bernhard.schneider2@utanet.at;<br />
Alexander.schwille@w,roteskreuz.at; nigiac@gmx.at; roland.pachler@hotmail.de; office@schopf.co.at;<br />
eva.schrank@aon.at; gabriele.sprengseis@w.roteskreuz.at; Friedrich.steinhaeusler@sbg.ac.at; rstix@gmx.at;<br />
Nadine.sturm@w.roteskreuz.at; jiri.urbanek@unob.cz; urjf@yahoo.com; ingo.wieser@aon.at;<br />
Lyudmila.zaitseva@sbg.ac.at;<br />
© <strong>CAST</strong> <strong>Project</strong> Office<br />
This document is for exclusive use within the <strong>CAST</strong> Consortium and Commission only<br />
2
2nd <strong>Project</strong> <strong>Coordination</strong> <strong>Meeting</strong> and<br />
1 st <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong><br />
MINUTES<br />
(Draft)<br />
Date/Time:<br />
Venue:<br />
3 December 2009 / 09h00, to 4 December 2009, 11h00<br />
Ausbildungszentrum des Wiener Roten Kreuzes<br />
Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />
Participants:<br />
• Andersson, Bruimann (DSTS Proxy), Eisenreich, Heissl, Krempin, Mieling, Pirolt,<br />
Rainer, Schneider, Schrank, Schwille, Sprengseis, Steinhäusler, Stix, Sturm, Wieser,<br />
Zaitseva,<br />
• Urbanek (3 December 2009, from 9:30 hr onwards)<br />
• Schrank: (3 December 2009; 09h00 to 12h00)<br />
• US subject matter experts:<br />
Francis Edwards (San Jose State University, CA, USA)<br />
Dan Goodrich<br />
Results:<br />
1. Welcome by the <strong>Project</strong> Coordinator and the local host (FRK) and introduction of the<br />
new WP5 Leader Alexander Schwille<br />
2. Adoption of the Draft Agenda<br />
3. Discussion by the PC of:<br />
3.1. Amendment to the Grant Agreement procedure<br />
Application for amendment has been submitted to Bruxelles. Partners<br />
will be notified upon receipt of notification by Ms. Engdahl and are<br />
requested to act swiftly to potential requests by the EU project officer.<br />
3.2. 1 st Quarterly Progress Report<br />
Report submitted to Bruxelles.<br />
3.3. 1 st Risk Analysis Report<br />
Report submitted to Bruxelles. Second Risk Analysis Report will no<br />
longer provide tolerance for non-performers.<br />
4. Progress report by WP Leaders:<br />
4.1 WP1 / B. Schneider<br />
• Disaster Management issues have been integrated into the FRK<br />
questionnaire by using EvaSys Software.<br />
• Design of Database DTIC progressing in accordance with Work<br />
Plan<br />
3
4.2 WP2 / J. Urbanek<br />
• Field tests of personal protective equipment (PPE) have<br />
neither been started, nor planned yet; UDB can test only Czech<br />
PPE, which is easily available to them.<br />
• PC expressed serious concerns regarding the deadline for the<br />
Deliverable 2.1 (31 December 2009), since it is very unlikely that it<br />
can be met given the current work progress.<br />
• HFSC contacted Urbanek, but received no reply.<br />
• HFSC offered Urbanek help and advice regarding the aspects of<br />
PPE testing they, as first responders, are interested in.<br />
• Urbanek submitted 3 <strong>CAST</strong>-releated presentations for security<br />
meeting in Israel in early January 2010 (abstracts acccepted); coauthors<br />
from consortium identified. Urbanek will provide first draft<br />
to co-authors.<br />
4.3 WP3 / F. Steinhäusler<br />
• Work by WP members focused on drafting the different reports<br />
representing the WP Deliverables<br />
• Deliverable 3.1 Comprehensive overview of weapons used and<br />
explosives suitable for WMDi terror attacks: first draft provided by<br />
Steinhäusler to WP members for internal review<br />
• Deliverable 3.2 Critical review of available software for analysis<br />
of effects of WMK on structures: no results provided by<br />
Urbanek<br />
• Deliverable 3.4 Overview on weapons and explosives suitable for<br />
WMK: first draft provided by Pirolt to WP members for internal<br />
review<br />
• Deliverable 3.6 Overview on threats to first responders and<br />
countermeasures in case of WMD: first draft provided by Mieling to<br />
WP members for internal review<br />
4.4 WP4 / N. Eisenreich<br />
• For details see Appendix 1<br />
4.5 WP5 / A. Schwille<br />
• Report on the progress concerning the Questionnaire, which has<br />
been sent out on 17 Nov 2009 to about 120 members of fire fighters<br />
and paramedics in EU Member States. Only 10 addresses were<br />
available for police, therefore the questionnaire has not yet been<br />
sent out to law enforcement agencies. So far, only 3 completed<br />
questionnaires have been returned to the FRK. FRK has set three<br />
deadlines for completing the questionnaire (all in December 2009).<br />
• At this low rate of return this issue may become a high risk for the<br />
project and FRK conducted an emergency meeting regarding the<br />
issue. It was decided to approach military FR (staff officers) in<br />
Austria and Hungary with the request of questionnaire completion.<br />
4
• Ms. Sturm emphazised the need for an incentive to encourage FR<br />
to fill in 24 pages of the questionnaire. FRK will compile a list of<br />
possible incentives to offer to potential providers of information to<br />
serve as incentives.<br />
• For details see Appendix 2<br />
4.6 WP 6/ I. Mieling<br />
• For details see Appendix 3<br />
4.7 WP 7/ E. Schrank<br />
• Preliminary Report on biofeedback tests and training. Altogether 90<br />
persons from the Austrian first responder community have undergone<br />
the tests so far. They assessed the tests as being very useful<br />
and important for their work. Most frightning, dramatic experience<br />
was associated with viewing beheading of persons, self-mutilation,<br />
and corpses of babies and children. Additional training will be<br />
offered in April 2010. 870 hours were used up in this WP, another<br />
290 hours are left. The large pool of accumulated data will be<br />
analyzed (cost: 4600 EUR till 19 Dec. 2009 for personnel for<br />
statistics).<br />
• Additional input from Tecnatom has been received by DSTS.<br />
Cooperation with Tecnatom is planned regarding test persons in<br />
Spain.<br />
• A coordination meeting between SAAB and DSTS took place in<br />
Baden on 2 nd December 2009. Biofeedback system supplied by<br />
SAAB did not work as well as that of DSTS. It could not be used in<br />
its current form for the biofeedback tests conducted by the DSTS.<br />
• DSTS suggests that SAAB shifts some person-months to WP7 to<br />
compensate for the work and expenses incurred by DSTS as a<br />
result of lack of participation by SAAB. SAAB representative<br />
apologized for SAAB’s failure. DSTS will prepare a list of manmonths<br />
and equipment expenditures for compensation by SAAB.<br />
• Virtual Reality is still a high risk, because neither SAAB, nor<br />
Diamond can provide such a tool. SAAB does not have a<br />
solution yet and sees a need to work out a common approach<br />
to solving it.<br />
• SAAB proposes a virtual vehicle (2 to 4 chairs) with commands,<br />
sounds. HFSC and DSTS caution that car driving simulation and<br />
control room simulators are nothing new. They exist already. One<br />
needs complete immersion (see the accident, smell the burning<br />
material and bodies, hear sirens and cries for help, etc.). HFSC will<br />
provide SAAB with the description of what first responders need.<br />
DSTS will provide threat scenarios to the SAAB to help in<br />
developing the simulator in accordance with the legal specifications.<br />
• Steinhäusler stresses the contractual requirements that it has to be<br />
a driving simulator with visual and motion simulation.<br />
4.8 WP 8/ N. Andersson<br />
5
• Andersson sent out a report on the work implementation on<br />
1 st of December and expects to receive comments from the WP<br />
partners by 14 December 2009.<br />
4.9 WP9 / I. Wieser<br />
• Collection of information on international training curricula for first<br />
responders has been initiated. Mr. Kopatschek (ISCC),<br />
responsible for this task, contacted Urbanek on this issue, but<br />
received no reply.<br />
4.10 WP 10/F. Steinhäusler<br />
• Communication of classified data: in view of significant EUrequired<br />
regulations it is advisible to keep the exchange of this<br />
kind of data to the absolute necessary minimum.<br />
4. Preparation of 2 nd Quarterly Progress Report<br />
• PC reminded the consortium members about the approaching deadline:<br />
31 December 2009.<br />
• In addition to the scientific progress, the contributions should also include<br />
all the relevant meetings, publications and outreach activities.<br />
5. Communication between <strong>Project</strong> Office and consortium members. No suggestions to<br />
change the current mode have been made.<br />
6. Report on current status of project finances.<br />
• Auditing is to be conducted only for those consortium members with funds over<br />
€ 375 000. (For details see:<br />
(ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf).<br />
• Financial expenditures overview of funds spent until now and time sheets<br />
need to be provided to the <strong>Project</strong> Office.<br />
7. Report by consortium members on preparation of publications.<br />
• PC requested that all <strong>CAST</strong>-relevant publications and PowerPoint presentations<br />
be sent to PO for the subsequent production of a special folder and<br />
shared with other project partners.<br />
8. Report by consortium members on participation at conferences.<br />
• WP4 Leader (Eisenreich) reported that a conference will be conducted in<br />
Germany in September 2010, which could be used as a venue for <strong>CAST</strong><br />
publications and presentations.<br />
• Red Cross offered to mention <strong>CAST</strong> in its current publications.<br />
9. Report by consortium members on public outreach activities.<br />
• Stix suggested that the PO should provide an official presentation about<br />
<strong>CAST</strong> to all members, which could then be used by all <strong>CAST</strong> partners. Stix<br />
volunteered to create some 10 slides, which will be approved for<br />
correctness and distributed to all <strong>CAST</strong> partners for future use by the PO.<br />
• DSTS will deliver a summary overview of all outreach activities and<br />
meetings with regard to this WP.<br />
6
10. Other business<br />
No other business.<br />
Appendix 1: PP presentation Fraunhofer ICT<br />
Appendix 2: PP presentation FRK<br />
Appendix 3: PP presentation HFSC<br />
7
ACTIONS<br />
1. WP 2 / Urbanek<br />
• Accelerate planning and conduct of field tests of personal protective<br />
equipment for FR<br />
• Coordinate with other WP-members about Deliverables<br />
• Improve communication with WP-members about Work Plan and<br />
implementation<br />
• Provide draft on D 3.2<br />
2. WP 5 / Schwille<br />
• Acquire contact addresses through personal networks<br />
• Send out questionnaire together with list of incentives<br />
3. WP 7 / Schrank<br />
• Clarify future contribution by SAAB for biofeedback test system and Virtual<br />
Reality simulation<br />
• Settle compensation with SAAB on financial losses due to non-performance of<br />
SAAB<br />
• Clarify future contribution by DIAMOND about Virtual Reality simulation<br />
4. WP 8 / Andersson<br />
• Accelerate implemention of Work Plan<br />
8
5. 2 nd <strong>Project</strong> <strong>CAST</strong> <strong>Coordination</strong> <strong>Meeting</strong><br />
AGENDA<br />
Date/Time: 3 December 2009 / 09h00 to 12h00<br />
Venue:<br />
Objective:<br />
Ausbildungszentrum des Wiener Roten Kreuzes<br />
Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />
Tel.: Tel.: +43 (1) 79 580-6116; Fax: +43 (1) 79 580-59-6116<br />
Review of logistical and administrative issues in implementing the project<br />
1. Welcome by the <strong>Project</strong> Coordinator and the local host (FRK)<br />
2. Adoption of the Draft Agenda<br />
3. Implementation of actions agreed upon during the 1 st FIRST COORDINATION<br />
MEETING, 24 September 2009 (document ID cast_pc_first comet minutes_v1.0_30<br />
sept09_fjs.doc)<br />
4. Discussion of the 1 st <strong>CAST</strong> Risk Analysis Report<br />
5. Preparation of the 2 nd <strong>CAST</strong> Progress Report<br />
6. Communication between <strong>Project</strong> Office and consortium members<br />
7. <strong>Coordination</strong> between consortium members<br />
8. Report by consortium members on current status of project finances<br />
9. Report by consortium members on preparation of publications<br />
10. Report by consortium members on participation at conferences<br />
11. Report by consortium members on public outreach activities<br />
12. Other business<br />
13. Next meeting<br />
18:30 hr: Dinner at Restaurant 12 Apostel-Keller (Sonnenfelsg. 3, 1010 Vienna)<br />
9
<strong>CAST</strong><br />
1 st EXECUTIVE COMMITTEE MEETING<br />
AGENDA<br />
Date:<br />
Venue:<br />
3 December 2009 / 14h30 to 17h00<br />
4 December 2009 / 09h00 to 12h00<br />
Ausbildungszentrum des Wiener Roten Kreuzes<br />
Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />
Tel.: Tel.: +43 (1) 79 580-6116; Fax: +43 (1) 79 580-59-6116<br />
Objective: Discussion of general organisational and technical issues, and coordination of<br />
inter-work package related issues<br />
1. Welcome by the <strong>Project</strong> Coordinator<br />
2. Adoption of the Draft Agenda<br />
3. Progress Report by Leader of WP 1<br />
4. Progress Report by Leader of WP 2<br />
5. Progress Report by Leader of WP 3<br />
6. Progress Report by Leader of WP 4<br />
7. Progress Report by Leader of WP 5<br />
8. Progress Report by Leader of WP 6<br />
9. Progress Report by Leader of WP 7<br />
10. Progress Report by Leader of WP 8<br />
11. Progress Report by Leader of WP 9<br />
12. Inter-work package related issues<br />
13. Proposals to the <strong>CAST</strong> Advisory Board<br />
(General management- and technical issues and choices)<br />
14. Other business<br />
15. Next meeting<br />
10