EU <strong>Project</strong> <strong>CAST</strong><br />

www.castproject.eu<br />

_________________________________________________________________________________________________________________________<br />

cast_draft Minutes_2 nd PC <strong>Meeting</strong> & ExecCommMeet_V1.0_16 Dec 2009.doc<br />

EU FP 7 Grant Agreement No. 218070<br />

<strong>Project</strong><br />

COMPARATIVE ASSESSMENT OF SECURITY-CENTERED<br />

TRAINING CURRICULA FOR FIRST RESPONDERS ON DISASTER<br />

MANAGEMENT IN THE EU<br />

Acronym: <strong>CAST</strong><br />

Official project starting date: 1 July 2009<br />

<strong>Project</strong> duration: 24 months<br />

2 nd <strong>Project</strong> <strong>Coordination</strong> <strong>Meeting</strong><br />

1 st <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong><br />

MINUTES<br />

V 1.0<br />

Prof. Friedrich STEINHÄUSLER (Editor)<br />

<strong>CAST</strong> is co‐funded by the European Commission, DG Energy & Industry and<br />

The Austrian Federal Ministry for Science and Research (BMWF)<br />

University of Salzburg, Hellbrunnerstr. 34, A 5020 Salzburg (Austria)<br />

<strong>Project</strong> Coordinator: Prof. Friedrich Steinhäusler<br />

(Friedrich.Steinhaeusler@sbg.ac.at; Tel.: +43‐680‐123 7158 or +43‐662‐8044‐5701)<br />

<strong>Project</strong> Administrator: Ms. Claudia Heissl<br />

(Claudia.Heissl@sbg.ac.at, Tel.: +43‐662‐8044‐5700, Fax: +43‐662‐8044‐150)<br />

1


DOCUMENT CODE:<br />

cast_draft Minutes_2 nd PC <strong>Meeting</strong> & ExecCommMeet_V1.0_16 Dec 2009.doc<br />

DOCUMENT INFORMATION:<br />

Editor<br />

Contributors<br />

Name Affiliation E-mail address<br />

Prof. Friedrich Steinhäusler<br />

PLUS friedrich.steinhaeusler@sbg.ac.at<br />

<strong>Project</strong> Coordinator<br />

Claudia Heissl<br />

Lyudmila Zaitseva<br />

PLUS<br />

PLUS<br />

Claudia.heissl@sbg.ac.at<br />

Lyudmila.zaitseva@sbg.ac.at<br />

Version V 1.0<br />

Date of Issue 16 Dec. 2009<br />

DOCUMENT HISTORY:<br />

Date Version Editor Status<br />

16 Dec. 2009 V 1.0 Steinhäusler Draft<br />

DOCUMENT KEY DATA:<br />

Keywords: PC <strong>Coordination</strong> <strong>Meeting</strong>, <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong>, Minutes V1.0<br />

Editor address data:<br />

Prof. Friedrich Steinhäusler<br />

Div. of Physics and Biophysics, Hellbrunnerstr. 34<br />

A 5020 Salzburg, Austria<br />

Phone: +43-662-8044-5701<br />

Fax: +43-662-8044-150<br />

E-mail:<br />

Friedrich.Steinhaeusler@sbg.ac.at<br />

Delivery Date: 16 Dec. 2009<br />

DOCUMENT DISTRIBUTION LIST:<br />

Date: 16 Dec. 2009<br />

Issue:<br />

E-mailer:<br />

To all <strong>CAST</strong> consortium members<br />

niklas.andersson@saabgroup.com; johan.olander@sts.saab.se; guenther.boegl@gmx.at; rcaro@tecnatom.es;<br />

fgarrote@tecnatom.es; cmbenito@tecnatom.es; efrutos@tecnatom.es; jlserrano@tecnatom.es;<br />

cast@feuerwehr.hamburg.de; Norbert.eisenreich@ict.fraunhofer.de; polisgurra@hotmail.com; e.gustenau@diamondair.at;<br />

m.paar@diamond-sensing.com; marcus.paar@gmail.com; Wilhelm.Heidegger@sbg.ac.at;<br />

Claudia.Heissl@sbg.ac.at; gesa.langer@ict.fraunhofer.de; gyorgy.nogradi@uni-corvinus.hu;<br />

Karin.rainer@w.roteskreuz.at; wolfgang.reitschmied@aon.at; office.pirolt@gmail.com; bernhard.schneider2@utanet.at;<br />

Alexander.schwille@w,roteskreuz.at; nigiac@gmx.at; roland.pachler@hotmail.de; office@schopf.co.at;<br />

eva.schrank@aon.at; gabriele.sprengseis@w.roteskreuz.at; Friedrich.steinhaeusler@sbg.ac.at; rstix@gmx.at;<br />

Nadine.sturm@w.roteskreuz.at; jiri.urbanek@unob.cz; urjf@yahoo.com; ingo.wieser@aon.at;<br />

Lyudmila.zaitseva@sbg.ac.at;<br />

© <strong>CAST</strong> <strong>Project</strong> Office<br />

This document is for exclusive use within the <strong>CAST</strong> Consortium and Commission only<br />

2


2nd <strong>Project</strong> <strong>Coordination</strong> <strong>Meeting</strong> and<br />

1 st <strong>Executive</strong> <strong>Committee</strong> <strong>Meeting</strong><br />

MINUTES<br />

(Draft)<br />

Date/Time:<br />

Venue:<br />

3 December 2009 / 09h00, to 4 December 2009, 11h00<br />

Ausbildungszentrum des Wiener Roten Kreuzes<br />

Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />

Participants:<br />

• Andersson, Bruimann (DSTS Proxy), Eisenreich, Heissl, Krempin, Mieling, Pirolt,<br />

Rainer, Schneider, Schrank, Schwille, Sprengseis, Steinhäusler, Stix, Sturm, Wieser,<br />

Zaitseva,<br />

• Urbanek (3 December 2009, from 9:30 hr onwards)<br />

• Schrank: (3 December 2009; 09h00 to 12h00)<br />

• US subject matter experts:<br />

Francis Edwards (San Jose State University, CA, USA)<br />

Dan Goodrich<br />

Results:<br />

1. Welcome by the <strong>Project</strong> Coordinator and the local host (FRK) and introduction of the<br />

new WP5 Leader Alexander Schwille<br />

2. Adoption of the Draft Agenda<br />

3. Discussion by the PC of:<br />

3.1. Amendment to the Grant Agreement procedure<br />

Application for amendment has been submitted to Bruxelles. Partners<br />

will be notified upon receipt of notification by Ms. Engdahl and are<br />

requested to act swiftly to potential requests by the EU project officer.<br />

3.2. 1 st Quarterly Progress Report<br />

Report submitted to Bruxelles.<br />

3.3. 1 st Risk Analysis Report<br />

Report submitted to Bruxelles. Second Risk Analysis Report will no<br />

longer provide tolerance for non-performers.<br />

4. Progress report by WP Leaders:<br />

4.1 WP1 / B. Schneider<br />

• Disaster Management issues have been integrated into the FRK<br />

questionnaire by using EvaSys Software.<br />

• Design of Database DTIC progressing in accordance with Work<br />

Plan<br />

3


4.2 WP2 / J. Urbanek<br />

• Field tests of personal protective equipment (PPE) have<br />

neither been started, nor planned yet; UDB can test only Czech<br />

PPE, which is easily available to them.<br />

• PC expressed serious concerns regarding the deadline for the<br />

Deliverable 2.1 (31 December 2009), since it is very unlikely that it<br />

can be met given the current work progress.<br />

• HFSC contacted Urbanek, but received no reply.<br />

• HFSC offered Urbanek help and advice regarding the aspects of<br />

PPE testing they, as first responders, are interested in.<br />

• Urbanek submitted 3 <strong>CAST</strong>-releated presentations for security<br />

meeting in Israel in early January 2010 (abstracts acccepted); coauthors<br />

from consortium identified. Urbanek will provide first draft<br />

to co-authors.<br />

4.3 WP3 / F. Steinhäusler<br />

• Work by WP members focused on drafting the different reports<br />

representing the WP Deliverables<br />

• Deliverable 3.1 Comprehensive overview of weapons used and<br />

explosives suitable for WMDi terror attacks: first draft provided by<br />

Steinhäusler to WP members for internal review<br />

• Deliverable 3.2 Critical review of available software for analysis<br />

of effects of WMK on structures: no results provided by<br />

Urbanek<br />

• Deliverable 3.4 Overview on weapons and explosives suitable for<br />

WMK: first draft provided by Pirolt to WP members for internal<br />

review<br />

• Deliverable 3.6 Overview on threats to first responders and<br />

countermeasures in case of WMD: first draft provided by Mieling to<br />

WP members for internal review<br />

4.4 WP4 / N. Eisenreich<br />

• For details see Appendix 1<br />

4.5 WP5 / A. Schwille<br />

• Report on the progress concerning the Questionnaire, which has<br />

been sent out on 17 Nov 2009 to about 120 members of fire fighters<br />

and paramedics in EU Member States. Only 10 addresses were<br />

available for police, therefore the questionnaire has not yet been<br />

sent out to law enforcement agencies. So far, only 3 completed<br />

questionnaires have been returned to the FRK. FRK has set three<br />

deadlines for completing the questionnaire (all in December 2009).<br />

• At this low rate of return this issue may become a high risk for the<br />

project and FRK conducted an emergency meeting regarding the<br />

issue. It was decided to approach military FR (staff officers) in<br />

Austria and Hungary with the request of questionnaire completion.<br />

4


• Ms. Sturm emphazised the need for an incentive to encourage FR<br />

to fill in 24 pages of the questionnaire. FRK will compile a list of<br />

possible incentives to offer to potential providers of information to<br />

serve as incentives.<br />

• For details see Appendix 2<br />

4.6 WP 6/ I. Mieling<br />

• For details see Appendix 3<br />

4.7 WP 7/ E. Schrank<br />

• Preliminary Report on biofeedback tests and training. Altogether 90<br />

persons from the Austrian first responder community have undergone<br />

the tests so far. They assessed the tests as being very useful<br />

and important for their work. Most frightning, dramatic experience<br />

was associated with viewing beheading of persons, self-mutilation,<br />

and corpses of babies and children. Additional training will be<br />

offered in April 2010. 870 hours were used up in this WP, another<br />

290 hours are left. The large pool of accumulated data will be<br />

analyzed (cost: 4600 EUR till 19 Dec. 2009 for personnel for<br />

statistics).<br />

• Additional input from Tecnatom has been received by DSTS.<br />

Cooperation with Tecnatom is planned regarding test persons in<br />

Spain.<br />

• A coordination meeting between SAAB and DSTS took place in<br />

Baden on 2 nd December 2009. Biofeedback system supplied by<br />

SAAB did not work as well as that of DSTS. It could not be used in<br />

its current form for the biofeedback tests conducted by the DSTS.<br />

• DSTS suggests that SAAB shifts some person-months to WP7 to<br />

compensate for the work and expenses incurred by DSTS as a<br />

result of lack of participation by SAAB. SAAB representative<br />

apologized for SAAB’s failure. DSTS will prepare a list of manmonths<br />

and equipment expenditures for compensation by SAAB.<br />

• Virtual Reality is still a high risk, because neither SAAB, nor<br />

Diamond can provide such a tool. SAAB does not have a<br />

solution yet and sees a need to work out a common approach<br />

to solving it.<br />

• SAAB proposes a virtual vehicle (2 to 4 chairs) with commands,<br />

sounds. HFSC and DSTS caution that car driving simulation and<br />

control room simulators are nothing new. They exist already. One<br />

needs complete immersion (see the accident, smell the burning<br />

material and bodies, hear sirens and cries for help, etc.). HFSC will<br />

provide SAAB with the description of what first responders need.<br />

DSTS will provide threat scenarios to the SAAB to help in<br />

developing the simulator in accordance with the legal specifications.<br />

• Steinhäusler stresses the contractual requirements that it has to be<br />

a driving simulator with visual and motion simulation.<br />

4.8 WP 8/ N. Andersson<br />

5


• Andersson sent out a report on the work implementation on<br />

1 st of December and expects to receive comments from the WP<br />

partners by 14 December 2009.<br />

4.9 WP9 / I. Wieser<br />

• Collection of information on international training curricula for first<br />

responders has been initiated. Mr. Kopatschek (ISCC),<br />

responsible for this task, contacted Urbanek on this issue, but<br />

received no reply.<br />

4.10 WP 10/F. Steinhäusler<br />

• Communication of classified data: in view of significant EUrequired<br />

regulations it is advisible to keep the exchange of this<br />

kind of data to the absolute necessary minimum.<br />

4. Preparation of 2 nd Quarterly Progress Report<br />

• PC reminded the consortium members about the approaching deadline:<br />

31 December 2009.<br />

• In addition to the scientific progress, the contributions should also include<br />

all the relevant meetings, publications and outreach activities.<br />

5. Communication between <strong>Project</strong> Office and consortium members. No suggestions to<br />

change the current mode have been made.<br />

6. Report on current status of project finances.<br />

• Auditing is to be conducted only for those consortium members with funds over<br />

€ 375 000. (For details see:<br />

(ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf).<br />

• Financial expenditures overview of funds spent until now and time sheets<br />

need to be provided to the <strong>Project</strong> Office.<br />

7. Report by consortium members on preparation of publications.<br />

• PC requested that all <strong>CAST</strong>-relevant publications and PowerPoint presentations<br />

be sent to PO for the subsequent production of a special folder and<br />

shared with other project partners.<br />

8. Report by consortium members on participation at conferences.<br />

• WP4 Leader (Eisenreich) reported that a conference will be conducted in<br />

Germany in September 2010, which could be used as a venue for <strong>CAST</strong><br />

publications and presentations.<br />

• Red Cross offered to mention <strong>CAST</strong> in its current publications.<br />

9. Report by consortium members on public outreach activities.<br />

• Stix suggested that the PO should provide an official presentation about<br />

<strong>CAST</strong> to all members, which could then be used by all <strong>CAST</strong> partners. Stix<br />

volunteered to create some 10 slides, which will be approved for<br />

correctness and distributed to all <strong>CAST</strong> partners for future use by the PO.<br />

• DSTS will deliver a summary overview of all outreach activities and<br />

meetings with regard to this WP.<br />

6


10. Other business<br />

No other business.<br />

Appendix 1: PP presentation Fraunhofer ICT<br />

Appendix 2: PP presentation FRK<br />

Appendix 3: PP presentation HFSC<br />

7


ACTIONS<br />

1. WP 2 / Urbanek<br />

• Accelerate planning and conduct of field tests of personal protective<br />

equipment for FR<br />

• Coordinate with other WP-members about Deliverables<br />

• Improve communication with WP-members about Work Plan and<br />

implementation<br />

• Provide draft on D 3.2<br />

2. WP 5 / Schwille<br />

• Acquire contact addresses through personal networks<br />

• Send out questionnaire together with list of incentives<br />

3. WP 7 / Schrank<br />

• Clarify future contribution by SAAB for biofeedback test system and Virtual<br />

Reality simulation<br />

• Settle compensation with SAAB on financial losses due to non-performance of<br />

SAAB<br />

• Clarify future contribution by DIAMOND about Virtual Reality simulation<br />

4. WP 8 / Andersson<br />

• Accelerate implemention of Work Plan<br />

8


5. 2 nd <strong>Project</strong> <strong>CAST</strong> <strong>Coordination</strong> <strong>Meeting</strong><br />

AGENDA<br />

Date/Time: 3 December 2009 / 09h00 to 12h00<br />

Venue:<br />

Objective:<br />

Ausbildungszentrum des Wiener Roten Kreuzes<br />

Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />

Tel.: Tel.: +43 (1) 79 580-6116; Fax: +43 (1) 79 580-59-6116<br />

Review of logistical and administrative issues in implementing the project<br />

1. Welcome by the <strong>Project</strong> Coordinator and the local host (FRK)<br />

2. Adoption of the Draft Agenda<br />

3. Implementation of actions agreed upon during the 1 st FIRST COORDINATION<br />

MEETING, 24 September 2009 (document ID cast_pc_first comet minutes_v1.0_30<br />

sept09_fjs.doc)<br />

4. Discussion of the 1 st <strong>CAST</strong> Risk Analysis Report<br />

5. Preparation of the 2 nd <strong>CAST</strong> Progress Report<br />

6. Communication between <strong>Project</strong> Office and consortium members<br />

7. <strong>Coordination</strong> between consortium members<br />

8. Report by consortium members on current status of project finances<br />

9. Report by consortium members on preparation of publications<br />

10. Report by consortium members on participation at conferences<br />

11. Report by consortium members on public outreach activities<br />

12. Other business<br />

13. Next meeting<br />

18:30 hr: Dinner at Restaurant 12 Apostel-Keller (Sonnenfelsg. 3, 1010 Vienna)<br />

9


<strong>CAST</strong><br />

1 st EXECUTIVE COMMITTEE MEETING<br />

AGENDA<br />

Date:<br />

Venue:<br />

3 December 2009 / 14h30 to 17h00<br />

4 December 2009 / 09h00 to 12h00<br />

Ausbildungszentrum des Wiener Roten Kreuzes<br />

Room no. 211, Safargasse 4 (Franzosengraben 6), A 1030 Wien<br />

Tel.: Tel.: +43 (1) 79 580-6116; Fax: +43 (1) 79 580-59-6116<br />

Objective: Discussion of general organisational and technical issues, and coordination of<br />

inter-work package related issues<br />

1. Welcome by the <strong>Project</strong> Coordinator<br />

2. Adoption of the Draft Agenda<br />

3. Progress Report by Leader of WP 1<br />

4. Progress Report by Leader of WP 2<br />

5. Progress Report by Leader of WP 3<br />

6. Progress Report by Leader of WP 4<br />

7. Progress Report by Leader of WP 5<br />

8. Progress Report by Leader of WP 6<br />

9. Progress Report by Leader of WP 7<br />

10. Progress Report by Leader of WP 8<br />

11. Progress Report by Leader of WP 9<br />

12. Inter-work package related issues<br />

13. Proposals to the <strong>CAST</strong> Advisory Board<br />

(General management- and technical issues and choices)<br />

14. Other business<br />

15. Next meeting<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!