28.04.2015 Views

University of North Carolina at Charlotte - International Hydrail ...

University of North Carolina at Charlotte - International Hydrail ...

University of North Carolina at Charlotte - International Hydrail ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Project<br />

<strong>North</strong> Corridor Commuter Rail<br />

Project Snapshot<br />

– Upgrade <strong>of</strong> existing tracks on existing right-<strong>of</strong>-way<br />

– Connects: <strong>Charlotte</strong>, Huntersville, Cornelius,<br />

Davidson & Mooresville<br />

– 10 st<strong>at</strong>ions, 25 miles<br />

– Shared Right-<strong>of</strong>-Way<br />

One (1) freight train to oper<strong>at</strong>e, <strong>at</strong> night<br />

– Trip Time - Mooresville to <strong>Charlotte</strong>: 50 minutes<br />

• Service<br />

– Train Equipment - 5 trainsets<br />

• consisting <strong>of</strong> a locomotive and 2-3 coaches<br />

300-500 passengers per train<br />

– 30-minute headway during rush<br />

– Hourly service <strong>of</strong>f-peak<br />

– Top Speed: 60 mph<br />

– Daily Ridership: 4,500 – 6,000<br />

– Project Cost $358 Million (2009 Dollars)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!