University of North Carolina at Charlotte - International Hydrail ...
University of North Carolina at Charlotte - International Hydrail ...
University of North Carolina at Charlotte - International Hydrail ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• Project<br />
<strong>North</strong> Corridor Commuter Rail<br />
Project Snapshot<br />
– Upgrade <strong>of</strong> existing tracks on existing right-<strong>of</strong>-way<br />
– Connects: <strong>Charlotte</strong>, Huntersville, Cornelius,<br />
Davidson & Mooresville<br />
– 10 st<strong>at</strong>ions, 25 miles<br />
– Shared Right-<strong>of</strong>-Way<br />
One (1) freight train to oper<strong>at</strong>e, <strong>at</strong> night<br />
– Trip Time - Mooresville to <strong>Charlotte</strong>: 50 minutes<br />
• Service<br />
– Train Equipment - 5 trainsets<br />
• consisting <strong>of</strong> a locomotive and 2-3 coaches<br />
300-500 passengers per train<br />
– 30-minute headway during rush<br />
– Hourly service <strong>of</strong>f-peak<br />
– Top Speed: 60 mph<br />
– Daily Ridership: 4,500 – 6,000<br />
– Project Cost $358 Million (2009 Dollars)