Bidder's Quote/ Proposal for Fixed Price Contract with Cost ... - ATST
Bidder's Quote/ Proposal for Fixed Price Contract with Cost ... - ATST
Bidder's Quote/ Proposal for Fixed Price Contract with Cost ... - ATST
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Bidder’s <strong>Quote</strong>/ <strong>Proposal</strong><br />
<strong>for</strong> <strong>Fixed</strong> <strong>Price</strong> <strong>Contract</strong><br />
<strong>with</strong> <strong>Cost</strong> Breakdown and Schedule<br />
(Appendix 6)<br />
DATE:_______________________<br />
TO: Harvey S. Bass, Esq.<br />
<strong>Contract</strong>s Officer, <strong>ATST</strong>/NSO<br />
950 N. Cherry Avenue<br />
P. O. Box 26732<br />
Tucson, AZ 85726-6732<br />
1. By submitting this <strong>Proposal</strong> the Undersigned accepts all of the terms and conditions of the RFP Documents as<br />
defined in 1.2 of the Instructions to Bidders.<br />
2. In compliance <strong>with</strong> AURA's Request <strong>for</strong> <strong>Quote</strong> <strong>for</strong> Polarization Optics, the Undersigned hereby proposes to<br />
furnish all labor, materials, equipment and supplies to per<strong>for</strong>m the Work <strong>for</strong> AURA’s Polarization Optics in<br />
accordance <strong>with</strong> the Specifications, pertinent <strong>Contract</strong> Documents and Statement of Work.<br />
3. The Undersigned hereby specifies, in accordance <strong>with</strong> Article 7, Completion Time, of Instructions to Bidders,<br />
that work shall be completed <strong>with</strong>in ______ working days after receipt of the <strong>Contract</strong>. The scheduled duration of<br />
the Specific Task of Work phases defined in the Statement of Work (SOW) shall be as follows (in working days):<br />
Earliest Estimated Start Date ___________________.<br />
Estimated Duration of work tasks, as per the SOW, Sections 1.3 and 1.4, Project Deliverables.<br />
SOW Task:<br />
1.3.1 Risk Mitigation Plan Development _________________________ working days<br />
1.3.2 RMU Manufacture _________________________ working days<br />
1.3.3 Development of Manufacturing Plan _________________________ working days<br />
1.3.4 Development of Final Instrument <strong>Quote</strong> _________________________ working days<br />
1.4 Final Instrument Component Manufacture _________________________ working days<br />
4. In accordance <strong>with</strong> the above completion schedule (Paragraph 3) and enclosed specifications, the<br />
Undersigned hereby proposes to accomplish the work described above <strong>for</strong> the total of:<br />
_______________________________________________________________________ DOLLARS($).<br />
This amount includes all applicable federal, state and city taxes.<br />
____________________________________________________<br />
(Legal Name of individual, firm or Corporation Bidding)<br />
____________________________________________________<br />
Authorized Individual (Signature)<br />
____________________________________________________<br />
Authorized Individual (Printed)<br />
____________________________________________________<br />
Title<br />
1
Bidder’s <strong>Quote</strong>/ <strong>Proposal</strong><br />
<strong>for</strong> <strong>Fixed</strong> <strong>Price</strong> <strong>Contract</strong><br />
<strong>with</strong> <strong>Cost</strong> Breakdown and Schedule<br />
(Appendix 6)<br />
Polarization Optics Pricing Chart shall describe the prices <strong>for</strong> the Specific Tasks.<br />
Polarization Optics Pricing Chart.<br />
* Use Additional sheet(s) to describe Skills/Trades used and associated rates.<br />
Example Only: Equip. Operator - 10 hr @ $50 $/hr = $500; General Laborer - 20 hr @ $20 $/hr = $400; Labor Total = $900<br />
** Use additional sheet(s) <strong>for</strong> Materials/Equipment/Transportation/Misc descriptions and pricing.<br />
SOW Task Labor Total($)* Materials($)** Total Equipment($)** Total<br />
Transportation($)**<br />
Total<br />
Misc($)**<br />
Total<br />
Total Task<br />
<strong>Price</strong>($)<br />
1.3.1 Risk Mitigation Plan<br />
Development<br />
1.3.2 RMU Manufacture<br />
1.3.3 Development of<br />
Manufacturing Plan<br />
1.3.4 Development of Final<br />
Instrument <strong>Quote</strong><br />
1.4 Final Instrument<br />
Component Manufacture<br />
TOTALS<br />
2