Bidder’s <strong>Quote</strong>/ <strong>Proposal</strong><br />

<strong>for</strong> <strong>Fixed</strong> <strong>Price</strong> <strong>Contract</strong><br />

<strong>with</strong> <strong>Cost</strong> Breakdown and Schedule<br />

(Appendix 6)<br />

Polarization Optics Pricing Chart shall describe the prices <strong>for</strong> the Specific Tasks.<br />

Polarization Optics Pricing Chart.<br />

* Use Additional sheet(s) to describe Skills/Trades used and associated rates.<br />

Example Only: Equip. Operator - 10 hr @ $50 $/hr = $500; General Laborer - 20 hr @ $20 $/hr = $400; Labor Total = $900<br />

** Use additional sheet(s) <strong>for</strong> Materials/Equipment/Transportation/Misc descriptions and pricing.<br />

SOW Task Labor Total($)* Materials($)** Total Equipment($)** Total<br />

Transportation($)**<br />

Total<br />

Misc($)**<br />

Total<br />

Total Task<br />

<strong>Price</strong>($)<br />

1.3.1 Risk Mitigation Plan<br />

Development<br />

1.3.2 RMU Manufacture<br />

1.3.3 Development of<br />

Manufacturing Plan<br />

1.3.4 Development of Final<br />

Instrument <strong>Quote</strong><br />

1.4 Final Instrument<br />

Component Manufacture<br />

TOTALS<br />