<strong>Green</strong> <strong>Light</strong> <strong>Plan</strong><br />

Building Better Roads for East Baton Rouge Parish<br />

STUMBERG EXTENSION PHASE 1<br />

Design Engineer: HNTB Corporation<br />

Contractor: J. B. James Construction, LLC<br />

Construction Cost: $6.3M<br />

Project Length: 5,700 ft<br />

GROUNDBREAKING CEREMONY<br />

STUMBERG EXTENSION PHASE 1<br />

<strong>The</strong> project, divided id d into two phases, will provide a connection between Pecue Lane and Airline<br />

Highway and then to Jefferson Highway. <strong>The</strong> Stumberg Lane Extension Phase 1 project will stretch<br />

from the 90-degree turn on the existing Pecue Lane to a point approximately 1,300 feet north of<br />

Airline Highway. Improvements within the Phase 1 project include drainage improvements, a<br />

two-lane roundabout at the intersections of the new Stumberg Lane Extension and Woman’s<br />

Hospital access drive, new traffic signalization at the aligned intersection of Pecue Lane at Airline<br />

Highway, and sewer upgrades and installations.<br />

When complete, the project will provide significantly enhanced access to motorists along Airline<br />

Highway and Pecue Lane, two major areas of congestion. Six-foot sidewalks will be included on<br />

both sides of the four-lane roadway to allow for safe pedestrian access. Critical access points will be<br />

established to connect the new Woman’s Hospital with motorists and citizens requiring urgent care<br />

access. When combined with the Stumberg Lane Extension Phase 2 project, a new corridor will be<br />

established that links the existing Stumberg Lane from the Jefferson Highway intersection to Pecue<br />

Lane.<br />

QUARTER HIGHLIGHTS AND EXECUTIVE SUMMARY<br />

This Quarterly Report (4th Quarter 2011) covers the period from October 1, 2011 through December<br />

31, 2011, and provides an overview of the <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong>, a City of Baton Rouge, Parish of East<br />

Baton Rouge Road and Streets Improvements Program.<br />

PROJECT RENDERING<br />

DID YOU KNOW:<br />

<strong>The</strong> first documented roundabout was built in 1905 on the southwest corner of Central Park in<br />

New York City and named Columbus Circle (after Christopher Columbus).<br />

<strong>The</strong> “modern roundabout” is a circular intersection with specific design and traffic control<br />

features that distinguish it from other types of circular intersections.<br />

All vehicles circulate counterclockwise around a central island and circulating vehicles have<br />

the right-of-way.<br />

NEW WOMAN’S HOSPITAL<br />

WWW.BRGOV.COM/GREENLIGHT 4TH QUARTER REPORT - DECEMBER 2011


LOCAL INVOLVEMENT<br />

<strong>The</strong> engagement of the local<br />

business community with the<br />

<strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> was, and still<br />

is, an important goal of Mayor<br />

Kip Holden’s Administration.<br />

At the current time, ninetytwo<br />

(92) firms are providing<br />

services to the <strong>Green</strong> <strong>Light</strong><br />

<strong>Plan</strong>.<br />

PROGRAM<br />

MANAGEMENT<br />

CSRS, Inc.<br />

PBS&J<br />

GOTECH<br />

Neel-Schaffer<br />

Compliance Consultants<br />

Jones-Walker<br />

John C. Doiron, MAI<br />

Rampart Resources<br />

SSA Consultants<br />

DESIGN<br />

CONSULTANTS<br />

ABMB Engineers, Inc.<br />

AECOM<br />

AFJM<br />

Buchart Horn, Inc.<br />

Burk-Klienpeter, Inc.<br />

Civil Design & Construction<br />

Evans-Graves Engineers<br />

Ferris Engineering<br />

Forte & Tablada, Inc.<br />

GEC, Inc.<br />

HNTB Corporation<br />

Justice & Huang Engineers<br />

Marrero & Couvillon Assoc.<br />

PEC Corporation<br />

Providence Engineering<br />

Pyburn & Odom, Inc.<br />

Shaw Environmental<br />

Shread-Kuyrkendall<br />

SIGMA Consulting Group<br />

SJB Group, Inc.<br />

TRC Engineers, Inc.<br />

URS Corporation<br />

CONSTRUCTION<br />

FIRMS<br />

Ernest P. Breaux Electrical<br />

Industrial Enterprises, Inc.<br />

Barber Brothers Contracting<br />

J. B. James Construction<br />

Hardrock Construction, LLC<br />

L & A Contracting Company<br />

Stranco, Inc.<br />

James Construction Group<br />

Byron E. Talbot Contractor<br />

Boone Services, Inc.<br />

F.G. Sullivan, Jr. Contractor<br />

RCS Contractors, Inc.<br />

Gilchrist Construction Co.<br />

Richard Price Contracting<br />

GREEN LIGHT PLAN<br />

“As the year 2011 comes to a close, we are now able to look back at some of the<br />

extraordinary accomplishments of the <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> this past year. Twenty-two<br />

major road construction projects are now complete in just over four years since the first<br />

project broke ground, another five remain under construction across East Baton Rouge<br />

Parish, and we continue to make substantial progress towards a completed and<br />

drivable Central Thruway. While we don’t know all that lies ahead for us in 2012, one<br />

thing remains certain – the <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> will continue to move forward, and our<br />

team will remain hard at work as we open up roadways and bring new projects to<br />

construction”<br />

- Mayor-President Melvin “Kip” Holden<br />

A Look Back at 2011 and a Look Forward to 2012<br />

2011<br />

2012 *<br />

8 Projects Completed in 2011 5 Projects Currently Under Construction<br />

• Comite Drive<br />

• Staring Lane<br />

• Siegen Lane (Anticipated Completion December 2013)<br />

• Highland Road • South Harrell’s Ferry Segment 1<br />

• Central Thruway Phase l Paving (Anticipated Completion May 2012)<br />

(Florida – Sullivan Bridge)<br />

• Central Thruway - Phase 3 Paving<br />

• Staring Lane Extension<br />

(Frenchtown Road - <strong>Green</strong>well Springs)<br />

• Brightside Lane (Anticipated Completion March 2013)<br />

• Jones Creek Seg. 3<br />

• Southeast Area Group Project - Beginning<br />

• Ford Street<br />

work on O’Neal Lane<br />

• Stumberg Lane Phase l<br />

(Anticipated Completion July 2012)<br />

22 Projects Completed To-Date Right-of-Way Acquisition<br />

$482 million in committed <strong>Green</strong> Land acquisition completed on twenty-nine<br />

<strong>Light</strong> <strong>Plan</strong> funds through the end projects with over 730 parcels acquired<br />

of 2011 through the end of 2011<br />

Projects Anticipated to Reach...<br />

Construction<br />

Engineering<br />

Sullivan Road<br />

Stumberg Lane Phase II<br />

US 61 at LA Highway 64<br />

*Pecue @ I-10 Interchange<br />

O’Neal Lane<br />

Hooper Road (Joor – Sullivan)<br />

(George O’Neal – S. Harrell’s Ferry) Old Hammond Highway Segment 2<br />

Central Thruway *Old Hammond Highway Segment 1<br />

- Phase III Paving Glen Oaks Drive<br />

(Sullivan Bridge-Frenchtown Road) *Perkins Road Segment 1<br />

- <strong>Green</strong>well Springs Intersection Perkins-Picardy Connector<br />

Stumberg Lane Phase II Jones Creek Segment 1<br />

Fairchild-Badley Road<br />

Highland - Burbank Connector<br />

Nicholson Drive at Lee/Brightside Hooper Road (Blackwater - Joor)<br />

Nicholson Drive Segment 1<br />

Right of Way<br />

Nicholson Drive at Lee/Brightside<br />

*Old Hammond Highway - Segment 2<br />

* Federal/State Funding Candidates - “Shovel Ready” Focus<br />

* Assumes third bond sale of $38M in 1st quarter 2012<br />

Visit the <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> website for more detailed information about each project, www.brgov.com/greenlight.


CONSTRUCTION PROGRESS<br />

PROJECTS COMPLETED:<br />

Burbank Drive Segment 1 Downtown Signalization Veterans Memorial Boulevard<br />

Burbank Drive Segment 2 Pecue Re-Alignment at Perkins Picardy Avenue Extension<br />

Coursey at Sherwood Intersection S. Choctaw at N. Flannery Brightside Lane<br />

North Harrell’s Ferry Road Perkins at Stanford/Acadian Lobdell Improvements<br />

Central Thruway 1 Elm Grove Garden Foster at Government<br />

- CT1 Comite & Beaver Bayou Bridges Staring Lane Extension Ford Street<br />

- CT1 Sullivan Drainage Lateral & ICCN RR Jones Creek Road Segment 3 Highland Road<br />

- Phase I Paving Siegen Lane Comite Drive<br />

- CT1 Paving - Florida / Sullivan Bridge<br />

- CT2 Earthwork: Beaver Bayou Bridges 2 & 3<br />

CONSTRUCTION UNDERWAY:<br />

South Harrell’s Ferry Seg. 1<br />

Staring Lane<br />

Stumberg Extension Phase 1<br />

Southeast Area Group Project:<br />

- South Harrell’s Ferry Seg. 2<br />

- O’Neal Lane Seg 1<br />

- O’Neal Lane Bridge Embankment:<br />

Knox Branch and Jones Creek<br />

CT2 Paving - Frenchtown Rd to <strong>Green</strong>well Springs<br />

<strong>The</strong> <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> has experienced a<br />

favorable bidding environment providing<br />

a cumulative savings on estimated<br />

construction costs of $40,266,374.<br />

STRETCHING THE TAX DOLLAR<br />

TOTAL COMMITTED FUNDS THRU<br />

END OF 4TH QTR 2011: $482.1M<br />

Construction - $331.1M<br />

Right of Way - $82.7M<br />

Engineering - $42.8M<br />

Utility Relocations - $25.5M<br />

CORRIDOR PRESERVATION Approximate Savings $15,000,000<br />

67 Permit Applications Reviewed<br />

31 Development Sign/Property Owners Contacted<br />

155 For Sale Properties Investigated<br />

TYPICAL SECTION MODIFICATIONS Approximate Savings $17,000,000<br />

Reduced Concrete or Asphalt Pavement<br />

Increased Traffic Capacity<br />

Enhanced Safety by Reduced Number of Conflict Points<br />

CONTRACTOR COMPETITION Approximate Savings $40,000,000<br />

Decline in Private Sector Work<br />

Volume and Size of Projects Supported by Local Companies<br />

Programming/Design during Katrina/Rita Construction Cost Spike<br />

RIGHT-OF-WAY DONATIONS Approximate Savings $6,200,000<br />

Consistent with Adjoining Private Development<br />

Expedited Project Segments<br />

Traffic Impact Credits<br />

STATE / FEDERAL FUNDING Approximate Savings $18,800,000<br />

Urban Systems<br />

Congestion Mitigation and Air Quality<br />

American Recovery and Reinvestment Act<br />

ESTIMATED GREEN LIGHT PLAN SAVINGS TO-DATE<br />

$97,000,000<br />

LOCAL INVOLVEMENT<br />

CONTINUED<br />

RIGHT OF WAY FIRMS<br />

Abstracts<br />

Lauck Land Co.<br />

Gulf South Land and Title<br />

Roberts Land Services<br />

Godail Abstracting Services<br />

James Gist<br />

Appraisals<br />

Valery Lowery<br />

George Platt, Inc<br />

Ross Shuffield<br />

<strong>The</strong> Lakvold Group LLC<br />

James Inc.<br />

James G. Lipscomb, ASA<br />

Custom Solutions Group<br />

Bill Kipf, SRA<br />

Gary P. Albarez<br />

Jack E. Evans, Jr.<br />

Roberto J. Aguilar<br />

Leonard Smith<br />

Thompson Wallace<br />

James Lieux<br />

Kermit Williams<br />

ROW Acquisitions<br />

Acquisition Services<br />

Rampart Resources<br />

Quest Acquisitions<br />

PEC Corporation<br />

Stone Property Services<br />

SJB Group<br />

ABMB Engineers<br />

Dan Collins & Associates<br />

LaPac<br />

Volkert & Associates<br />

Lauck Land Company<br />

Relocation Estimates<br />

America’s Best Sign<br />

Gulledge Fence Company<br />

SUPPORT SERVICES<br />

FIRMS<br />

Wetlands Determination<br />

Providence Engineering<br />

C-K Engineering<br />

Environmental Assessment<br />

CRA<br />

GSRC<br />

Geotechnical Investigations<br />

Louis Capozzoli & Assoc.<br />

Ardaman & Associates<br />

Noise Mitigation<br />

URS Corporation<br />

Survey Support<br />

Baton Rouge Land Surveying<br />

Traffic Engineering<br />

HNTB Corporation<br />

Urban Systems, Inc.<br />

Utility Relocation<br />

Pete’s Plumbing


PROJECT STATUS<br />

<strong>The</strong> Program Management Team is responsible for thirty-six (36) <strong>Green</strong> <strong>Light</strong> Projects and six (6) 2002 1/2-Cent Sales Tax Projects. At the<br />

present time, twenty-four (24) projects are in “active” status ranging from corridor survey/design study through construction. <strong>The</strong> current project<br />

status is provided below in tabular form. Completed projects are considered “inactive” and projects with multiple phasing are counted only<br />

once.<br />

COMPLETED PROJECTS<br />

PROJECT DESIGN STUDY FINAL PLANS RIGHT-OF-WAY<br />

Veterans Memorial Boulevard<br />

Burbank Drive - Segment 1<br />

Burbank Drive - Segment 2<br />

North Harrell’s Ferry Road<br />

Coursey at Sherwood Intersection<br />

Foster at Government Intersection<br />

Picardy Avenue Extension<br />

Downtown Signalization<br />

Lobdell Improvements<br />

Pecue Re-Alignment at Perkins<br />

*CT1 Comite/Beaver Bayou Bridges<br />

Perkins at Stanford/Acadian<br />

S Choctaw at N Flannery Intersection<br />

Elm Grove Garden Drive<br />

*CT1 Sullivan & ICCN Railroad Bridges<br />

Brightside Lane<br />

Staring Lane Extension<br />

CT1 Paving - Florida / Sullivan Bridge<br />

Ford Street<br />

*CT2 Earthwork: Beaver Bayou Bridges 2 & 3<br />

Highland Road<br />

Jones Creek Segment 3<br />

Siegen Lane<br />

Comite Drive<br />

UTILITY<br />

RELOCATIONS<br />

CONSTRUCTION<br />

UNDER CONSTRUCTION<br />

PROJECT DESIGN STUDY FINAL PLANS RIGHT-OF-WAY UTILITY<br />

RELOCATIONS<br />

Southeast Area Group Project<br />

South Harrell’s Ferry - Seg. 1<br />

Staring Lane<br />

Stumberg Extension Phase 1<br />

*CT2 Paving - Frenchtown Rd to <strong>Green</strong>well Springs<br />

BID & CONTRACTING<br />

PROJECT DESIGN STUDY FINAL PLANS RIGHT-OF-WAY<br />

*CT1 Paving - Sullivan Bridge to Frenchtown Road<br />

*CT2 <strong>Green</strong>well Springs Intersection<br />

UTILITY<br />

RELOCATIONS<br />

CONSTRUCTION<br />

CONSTRUCTION<br />

BIDDING NEXT QUARTER<br />

PROJECT DESIGN STUDY FINAL PLANS RIGHT-OF-WAY<br />

US 61 - LA Hwy 64 Intersection<br />

PLANNING, DESIGN AND ROW ACQUISITION<br />

PROJECT DESIGN STUDY FINAL PLANS RIGHT-OF-WAY<br />

Stumberg Extension Phase 2<br />

O’Neal Lane<br />

Nicholson at Brightside/W Lee Intersection<br />

Essen Lane at I-10 Intersection<br />

Sullivan Road<br />

McHugh Road<br />

Old Hammond Hwy - Segment 2<br />

Old Hammond Hwy - Segment 1<br />

Fairchild-Badley Road<br />

Hooper Road - Blackwater to Joor<br />

Hooper Road - Joor to Sullivan<br />

Nicholson Drive - Segment 1<br />

Pecue Lane at I-10 Interchange<br />

*CT1 & CT2 refer to Central Thruway Phase 1 & Phase 2<br />

UTILITY<br />

RELOCATIONS<br />

UTILITY<br />

RELOCATIONS<br />

CONSTRUCTION<br />

CONSTRUCTION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!