CONSTRUCTION PROGRESS<br />

PROJECTS COMPLETED:<br />

Burbank Drive Segment 1 Downtown Signalization Veterans Memorial Boulevard<br />

Burbank Drive Segment 2 Pecue Re-Alignment at Perkins Picardy Avenue Extension<br />

Coursey at Sherwood Intersection S. Choctaw at N. Flannery Brightside Lane<br />

North Harrell’s Ferry Road Perkins at Stanford/Acadian Lobdell Improvements<br />

Central Thruway 1 Elm Grove Garden Foster at Government<br />

- CT1 Comite & Beaver Bayou Bridges Staring Lane Extension Ford Street<br />

- CT1 Sullivan Drainage Lateral & ICCN RR Jones Creek Road Segment 3 Highland Road<br />

- Phase I Paving Siegen Lane Comite Drive<br />

- CT1 Paving - Florida / Sullivan Bridge<br />

- CT2 Earthwork: Beaver Bayou Bridges 2 & 3<br />

CONSTRUCTION UNDERWAY:<br />

South Harrell’s Ferry Seg. 1<br />

Staring Lane<br />

Stumberg Extension Phase 1<br />

Southeast Area Group Project:<br />

- South Harrell’s Ferry Seg. 2<br />

- O’Neal Lane Seg 1<br />

- O’Neal Lane Bridge Embankment:<br />

Knox Branch and Jones Creek<br />

CT2 Paving - Frenchtown Rd to <strong>Green</strong>well Springs<br />

<strong>The</strong> <strong>Green</strong> <strong>Light</strong> <strong>Plan</strong> has experienced a<br />

favorable bidding environment providing<br />

a cumulative savings on estimated<br />

construction costs of $40,266,374.<br />

STRETCHING THE TAX DOLLAR<br />

TOTAL COMMITTED FUNDS THRU<br />

END OF 4TH QTR 2011: $482.1M<br />

Construction - $331.1M<br />

Right of Way - $82.7M<br />

Engineering - $42.8M<br />

Utility Relocations - $25.5M<br />

CORRIDOR PRESERVATION Approximate Savings $15,000,000<br />

67 Permit Applications Reviewed<br />

31 Development Sign/Property Owners Contacted<br />

155 For Sale Properties Investigated<br />

TYPICAL SECTION MODIFICATIONS Approximate Savings $17,000,000<br />

Reduced Concrete or Asphalt Pavement<br />

Increased Traffic Capacity<br />

Enhanced Safety by Reduced Number of Conflict Points<br />

CONTRACTOR COMPETITION Approximate Savings $40,000,000<br />

Decline in Private Sector Work<br />

Volume and Size of Projects Supported by Local Companies<br />

Programming/Design during Katrina/Rita Construction Cost Spike<br />

RIGHT-OF-WAY DONATIONS Approximate Savings $6,200,000<br />

Consistent with Adjoining Private Development<br />

Expedited Project Segments<br />

Traffic Impact Credits<br />

STATE / FEDERAL FUNDING Approximate Savings $18,800,000<br />

Urban Systems<br />

Congestion Mitigation and Air Quality<br />

American Recovery and Reinvestment Act<br />

ESTIMATED GREEN LIGHT PLAN SAVINGS TO-DATE<br />

$97,000,000<br />

LOCAL INVOLVEMENT<br />

CONTINUED<br />

RIGHT OF WAY FIRMS<br />

Abstracts<br />

Lauck Land Co.<br />

Gulf South Land and Title<br />

Roberts Land Services<br />

Godail Abstracting Services<br />

James Gist<br />

Appraisals<br />

Valery Lowery<br />

George Platt, Inc<br />

Ross Shuffield<br />

<strong>The</strong> Lakvold Group LLC<br />

James Inc.<br />

James G. Lipscomb, ASA<br />

Custom Solutions Group<br />

Bill Kipf, SRA<br />

Gary P. Albarez<br />

Jack E. Evans, Jr.<br />

Roberto J. Aguilar<br />

Leonard Smith<br />

Thompson Wallace<br />

James Lieux<br />

Kermit Williams<br />

ROW Acquisitions<br />

Acquisition Services<br />

Rampart Resources<br />

Quest Acquisitions<br />

PEC Corporation<br />

Stone Property Services<br />

SJB Group<br />

ABMB Engineers<br />

Dan Collins & Associates<br />

LaPac<br />

Volkert & Associates<br />

Lauck Land Company<br />

Relocation Estimates<br />

America’s Best Sign<br />

Gulledge Fence Company<br />

SUPPORT SERVICES<br />

FIRMS<br />

Wetlands Determination<br />

Providence Engineering<br />

C-K Engineering<br />

Environmental Assessment<br />

CRA<br />

GSRC<br />

Geotechnical Investigations<br />

Louis Capozzoli & Assoc.<br />

Ardaman & Associates<br />

Noise Mitigation<br />

URS Corporation<br />

Survey Support<br />

Baton Rouge Land Surveying<br />

Traffic Engineering<br />

HNTB Corporation<br />

Urban Systems, Inc.<br />

Utility Relocation<br />

Pete’s Plumbing

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!