100% - TodayIR.com
100% - TodayIR.com
100% - TodayIR.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
In Fukang, Xinjiang.<br />
Xiaohuangshan<br />
Mine<br />
(2.40 Mtpa)<br />
Pit Water<br />
Shizhuanggou<br />
Mine<br />
(1.05 Mtpa)<br />
Pit Water<br />
Quanshuigou<br />
Mine<br />
(1.05 Mtpa)<br />
Coal Washing<br />
Project<br />
(4.5 Mtpa)<br />
Clean Coal<br />
1.755 Mtpa<br />
Gangue,<br />
Middling Coal<br />
and Coal Slurry<br />
Coal Coking<br />
Project<br />
(1.3 Mtpa)<br />
Existing<br />
Mines<br />
Phase I<br />
Projects<br />
Clean Coal<br />
(1.98 Mtpa)<br />
Metallurgical Coke<br />
(Grade 2)<br />
(1.3 Mtpa)<br />
Coke Oven Gas<br />
(317 million m 3 /year)<br />
Coke Tar<br />
(63.57 tpa)<br />
End<br />
Products<br />
Pit Water<br />
Crude Benzene<br />
(18.59 tpa)<br />
Pit Water Recycling<br />
Project<br />
(~5.2 million m 3 /year)<br />
Irrigation Water<br />
Phase I Final Products: Clean Coal, Metallurgical Coke, Water for Industrial Use, By-products<br />
14<br />
© 2005-2013 Up Energy Development Group Limited.<br />
All rights reserved.