GOVERNMENT OF ANDHRA PRADESH<br />

ABSTRACT<br />

M.A. & U.D. (M1) <strong>Department</strong> - <strong>The</strong> <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> <strong>Penalization</strong> <strong>of</strong><br />

Unauthorizedly constructed buildings <strong>and</strong> buildings constructed in deviation <strong>of</strong> the<br />

Sanctioned Plan Rules 2007- Notification - orders – Issued.<br />

MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT (M1) DEPARTMENT<br />

G.O.Ms.No.901<br />

Dated:31.12.2007<br />

Read the following:<br />

Ordinance No. 15 <strong>of</strong> 2007<br />

ORDER:<br />

* * *<br />

In the Ordinance read above, the Government have amended the H.M.C. Act 1955, A.P.<br />

Municipalities Act, 1965, A.P. Municipal Corporation Act, <strong>and</strong> A.P. Urban areas (Development)<br />

Act 1975, duly authorizing the Municipal Commissioners / Vice chairmen <strong>of</strong> all Urban<br />

Development Authority areas (in case <strong>of</strong> gram panchayats falling under Urban Development<br />

Authorities) to penalize the unauthorized constructions/deviations as a one time measure.<br />

Consequently Government hereby issue the <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> <strong>Penalization</strong> <strong>of</strong><br />

Unauthorizedly constructed buildings <strong>and</strong> buildings constructed in deviation <strong>of</strong> the Sanctioned<br />

Plan Rules 2007.<br />

2. Accordingly the following Notification shall be published in the Extraordinary Gazette <strong>of</strong><br />

<strong>Andhra</strong> <strong>Pradesh</strong> Dated: 31.12.2007<br />

NOTIFICATION<br />

In exercise <strong>of</strong> the powers conferred by Section 455AA <strong>of</strong> the Hyderabad Municipal<br />

Corporations Act, 1955, Section 218(A) <strong>of</strong> the AP Municipalities Act, 1965, Section 46 (A) <strong>of</strong> the AP<br />

Urban Areas (Development) Act, 1975, the Government hereby makes the following Rules, viz.,<br />

1. Short Title, Application <strong>and</strong> Commencement:<br />

(1) <strong>The</strong>se Rules may be called “<strong>The</strong> <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> <strong>Penalization</strong> <strong>of</strong><br />

Unauthorizedly constructed buildings <strong>and</strong> building constructed in deviation <strong>of</strong> the<br />

Sanctioned Plan Rules, 2007”<br />

(2) <strong>The</strong>y shall be applicable to existing buildings in the jurisdiction <strong>of</strong> all Municipal<br />

Corporations, Urban development Authorities <strong>and</strong> Municipalities in the State <strong>of</strong><br />

<strong>Andhra</strong> <strong>Pradesh</strong> constructed after 1-1-1985 <strong>and</strong> before<br />

15-12-2007.


2<br />

(3) <strong>The</strong>y shall come into force from the date <strong>of</strong> publication <strong>of</strong> the Notification in the<br />

<strong>Andhra</strong> <strong>Pradesh</strong> Gazette.<br />

2. Definitions:<br />

(1) “Authorized technical personnel” means pr<strong>of</strong>essionals authorized by the Competent<br />

Authority to take up scrutiny <strong>of</strong> the Application made for regulation <strong>and</strong><br />

<strong>Penalization</strong> under these Rules.<br />

(2) “Competent Authority” means the Municipal Commissioner in case <strong>of</strong> areas falling in<br />

the Municipal Corporation <strong>and</strong> Municipal limits; the Vice Chairman <strong>of</strong> the Urban<br />

Development Authority in case <strong>of</strong> area falling outside Municipal Corporation or<br />

Municipality in the Urban Development Authority area.<br />

(3) “Total Built up area” means the entire built up area covered in the building including<br />

common areas <strong>and</strong> balconies on all floors.<br />

(4) “Unauthorized construction” means any building that has been constructed in violation<br />

<strong>of</strong> the sanctioned building plan or without obtaining a building permission from the<br />

sanctioning authority.<br />

3. Compulsory Application for <strong>Penalization</strong>:<br />

An Application for regulation <strong>and</strong> penalization <strong>of</strong> existing unauthorizedly constructed<br />

buildings shall be compulsorily made by the owner/GPA/Registered Association to the<br />

Competent Authority or <strong>of</strong>ficer authorized by him in the prescribed Pr<strong>of</strong>orma along with<br />

Declaration, Self Assessment, copy <strong>of</strong> sanctioned building plan, if any, a clear latest photograph <strong>of</strong><br />

the building, copy <strong>of</strong> document <strong>of</strong> ownership title, Indemnity Bond <strong>and</strong> two sets <strong>of</strong> drawings<br />

showing the sanctioned area <strong>and</strong> violated area <strong>of</strong> the building/Complex <strong>and</strong> in case <strong>of</strong> totally<br />

unauthorized constructions the total built up area along with the site plan. It shall be filed within<br />

sixty days from the date <strong>of</strong> Notification <strong>of</strong> these Rules along with full penal amount as given in<br />

Rule 5. If any owner/individual does not apply within the stipulated time, he shall be liable for<br />

enforcement action under the law <strong>and</strong> his building shall not be taken up for regulation <strong>and</strong><br />

penalization under these Rules.<br />

4. Prior clearance from other Authorities/<strong>Department</strong>s in certain cases:<br />

(1) In the following cases, prior clearance shall be ensured by the Competent Authority before<br />

considering the application under these Rules:<br />

(a) In respect <strong>of</strong> cases <strong>of</strong> residential buildings 18 m <strong>and</strong> above in height, Commercial<br />

buildings 15mts. <strong>and</strong> above in height, <strong>and</strong> buildings <strong>of</strong> public congregation like schools,<br />

Cinema theatres, function halls <strong>and</strong> other assembly buildings on plot area <strong>of</strong> 500 sq. mts.<br />

<strong>and</strong> above or <strong>of</strong> height above 6mts as stipulated in Section 13 <strong>of</strong> the <strong>Andhra</strong> <strong>Pradesh</strong> Fire<br />

Service Act, 1999 from Fire Service <strong>Department</strong>.<br />

(b) From Airport Authority <strong>of</strong> India wherever applicable.<br />

(c) In case <strong>of</strong> buildings <strong>of</strong> height above 15 mt, necessary certificate from licensed structural<br />

engineer with regard to structural safety compliance <strong>of</strong> such buildings needs to be<br />

submitted.


3<br />

(2) Applicants shall submit such application along with the above details within the stipulated<br />

time. However, an additional time period <strong>of</strong> three months will be allowed for filing the<br />

Clearances as required under Rule 4 (1) (a) <strong>and</strong> Rule 4(1) (b).<br />

5. Payment <strong>of</strong> Penal Charges:<br />

(1) <strong>The</strong> owner/applicant shall pay the Penal Charge as given in Annexure-I <strong>and</strong> II along with the<br />

Application for <strong>Penalization</strong> <strong>and</strong> other details. <strong>The</strong> Penal Charges are levied for the total<br />

violated built up area on all floors. <strong>The</strong> Penal Charges include Building permit fee,<br />

Development Charges, Betterment charges, Impact Fees, etc. No other fees <strong>and</strong> charges shall<br />

be levied <strong>and</strong> collected.<br />

(2) <strong>The</strong> above fees <strong>and</strong> charges shall be remitted by way <strong>of</strong> Dem<strong>and</strong> Draft drawn in favour <strong>of</strong> the<br />

Competent Authority.<br />

(3) <strong>The</strong> Penal amount paid are not refundable. However, in cases <strong>of</strong> rejection, the Competent<br />

Authority may refund the amount after retaining 10% <strong>of</strong> the Penal amount towards scrutiny<br />

<strong>and</strong> processing charges. In case <strong>of</strong> bonafide error in calculation, the excess amount paid may<br />

be refunded.<br />

6. Scrutiny, Rejection <strong>and</strong> Approval by the Competent Authority:<br />

After receipt <strong>of</strong> the Application for <strong>Penalization</strong> in the prescribed Format along with<br />

required documents <strong>and</strong> plans, the Competent Authority shall scrutinize the applications <strong>and</strong><br />

after carrying out necessary site inspections, communicate it’s approval or rejection to the<br />

applicant as early as possible but not beyond six months from the last date <strong>of</strong> receipt <strong>of</strong><br />

Applications. <strong>The</strong> Competent Authority may engage the services <strong>of</strong> licensed technical personnel<br />

for scrutiny <strong>of</strong> the applications <strong>and</strong> for field inspections. Mere receipt <strong>of</strong> application or any delay<br />

in communication <strong>of</strong> final orders in the matter will not imply the approval <strong>of</strong> the application.<br />

7. Violation after submission <strong>of</strong> Application:<br />

During verification, if it is found that the applicant has undertaken further additions or<br />

extensions to the existing building, then such application shall be summarily rejected duly<br />

forfeiting the entire penal amount <strong>and</strong> necessary action shall be taken against the unauthorized<br />

building including demolition as per the law.<br />

8. Exemption:<br />

Huts, semi-permanent houses (other than RCC structure) <strong>of</strong> single storey in sites up to 100<br />

sq yards are not covered under these Rules.<br />

9. <strong>Penalization</strong> not to apply to certain sites:<br />

<strong>Penalization</strong> <strong>of</strong> unauthorized constructions shall not be considered in the following cases <strong>and</strong><br />

in cases where public interest <strong>and</strong> public safety are likely to be adversely affected, viz.<br />

(a) Encroachment on Government l<strong>and</strong> or property belonging to Public undertakings, <strong>Andhra</strong><br />

<strong>Pradesh</strong> Housing Board, <strong>Andhra</strong> <strong>Pradesh</strong> Industrial Infrastructure Corporation, Urban<br />

Development Authority, Local body, Endowments, Wakf Board, etc.;<br />

(b) L<strong>and</strong> for which the applicant has no title;


4<br />

(c) Surplus l<strong>and</strong> declared under Urban l<strong>and</strong> Ceiling /Agriculture L<strong>and</strong> Ceiling/ l<strong>and</strong>s<br />

resumed under <strong>Andhra</strong> <strong>Pradesh</strong> assigned L<strong>and</strong>s ( PO T) Act;<br />

(d) Buildings affected under alignment <strong>of</strong> any road or proposed road under Master<br />

Plan/Zonal Development Plan/Road Development Plan or any other public<br />

roads/MRTS/BRTS;<br />

(e) Tank bed <strong>and</strong> Sikham l<strong>and</strong>s;<br />

(f) Areas prohibited for construction under GOMs No. 111 MA&U.D.Dept., dated 8-3-1996<br />

(protection <strong>of</strong> Catchment area <strong>of</strong> Osmansagar <strong>and</strong> Himayatsagar lakes);<br />

(g) Prohibited areas under the Coastal <strong>Regulation</strong> Zone <strong>and</strong> such other environmentally<br />

restricted zones as may be prescribed;<br />

(h) Layout/Master Plan open spaces/Areas earmarked for Recreation Use in Master<br />

Plan/Zonal development Plan;<br />

(i) Buildings that are not in conformity with l<strong>and</strong> use approved in Master Plan/Zonal<br />

development Plan;<br />

(j) Sites under legal litigation/ disputes regarding ownership <strong>of</strong> the site / building;<br />

(k) Area earmarked for parking as per sanctioned plan;<br />

(l) Unauthorized constructions without any building sanction in unapproved /unauthorized<br />

layouts, for which prior approval <strong>of</strong> site/plot under regulation <strong>of</strong><br />

unapproved/unauthorized layouts rules shall be obtained;<br />

However in case <strong>of</strong> Rule 9 (l), applications for penalization will be accepted if the applicant<br />

encloses the Acknowledgment <strong>of</strong> the Application made for regulation <strong>of</strong> the unauthorized<br />

site/plot under the relevant rules to the competent authority.<br />

(m) <strong>Regulation</strong> <strong>and</strong> penalization shall not be done for the constructions made within the<br />

building line <strong>of</strong> major roads <strong>of</strong> width 80 feet <strong>and</strong> above within the limits <strong>of</strong> Greater<br />

Hyderabad Municipal Corporation, Greater Visakhapatnam Municipal Corporation,<br />

Vijayawada Municipal Corporation <strong>and</strong> roads <strong>of</strong> width 60 feet <strong>and</strong> above in rest <strong>of</strong> the<br />

urban areas as per Master Plan / Zonal Development Plan.<br />

10. Issue <strong>of</strong> Occupancy certificate:<br />

In case <strong>of</strong> approval, the local authority shall issue a Proceeding to the effect that all<br />

proceedings <strong>and</strong> action <strong>of</strong> enforcement initiated or contemplated against the said construction are<br />

withdrawn <strong>and</strong> then issue Occupancy Certificate to the applicant.<br />

11. Appeal:<br />

(1) Any applicant aggrieved by an order passed by the Competent Authority under Rule 6, may<br />

prefer an appeal to the Committee constituted by the Government within thirty days from the<br />

date <strong>of</strong> receipt <strong>of</strong> the order provided the applicant has paid the necessary charges <strong>and</strong> submitted<br />

documents as specified in Rule 3 <strong>of</strong> these rules.<br />

(2) All the appeals shall be disposed <strong>of</strong>f within 3 months.


5<br />

12. Failure to come forward for penalization <strong>of</strong> unauthorized constructions:<br />

Where an application for regulating <strong>and</strong> penalizing the unauthorizedly constructed<br />

building has not been made as per rule 3:<br />

(1) Such unauthorized constructions would be treated as continuing <strong>of</strong>fence <strong>and</strong><br />

Penalty as per law would be levied.<br />

(2) Other enforcement action including demolition shall be initiated by the local authority<br />

as per law.<br />

(3) No further building approvals shall be considered by the building sanctioning<br />

authority in the said site.<br />

13. Amount levied kept in separate account:<br />

(1) <strong>The</strong> amount collected by the Competent Authority under these rules shall be kept <strong>and</strong><br />

maintained under the control <strong>of</strong> the Competent authority in a separate escrow account<br />

<strong>and</strong> utilized only for improvement <strong>of</strong> amenities in the area.<br />

(2) In respect <strong>of</strong> Gram Panchayat areas falling in the Urban Development Authority areas,<br />

the penal amount so collected will be shared in equal proportion between Urban<br />

Development Authority <strong>and</strong> Gram Panchayat concerned. In respect <strong>of</strong> Corporation <strong>and</strong><br />

Municipalities falling in Urban Development Authority areas, the penal amount will be<br />

shared between the concerned Corporation/Municipality <strong>and</strong> Urban Development<br />

Authority in the ratio <strong>of</strong> 70 : 30.<br />

14. Constitution <strong>of</strong> Committee:<br />

Government will issue separate orders constituting appellate<br />

Committees for examining appeals under rule 11.<br />

15. Government may issue guidelines to operationalize these rules.<br />

16. All existing rules, regulations, bye-laws <strong>and</strong> orders that are in<br />

conflict or inconsistent with these rules shall st<strong>and</strong> modified to the extent <strong>of</strong> the provisions <strong>of</strong> these<br />

rules.<br />

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)<br />

S.P. SINGH<br />

PRINCIPAL SECRETARY TO GOVERNMENT


6<br />

To<br />

<strong>The</strong> Commissioner <strong>and</strong> Director, Printing , Stationery <strong>and</strong> Stores Purchase A.P. Hyderabad ( in<br />

duplicate, with a request to publish the Notification in the Extraordinary Gazette <strong>of</strong> A.P. Dt.<br />

31.12.2007, <strong>and</strong> furnish 1000 copies to Government)<br />

<strong>The</strong> Director <strong>of</strong> Town <strong>and</strong> Country, Planning, A.P. Hyderabad.<br />

<strong>The</strong> Commissioner <strong>and</strong> Director <strong>of</strong> Municipal Administration, A.P. Hyderabd.<br />

<strong>The</strong> Commissioners <strong>of</strong> all Municipal Corporations/ Municipalities in the State, through CDMA.<br />

<strong>The</strong> Vice chairman <strong>of</strong> all Urban Development Authorities in the State<br />

All <strong>Department</strong>s <strong>of</strong> Secretariat<br />

All Heads <strong>of</strong> <strong>Department</strong>.<br />

<strong>The</strong> Director General Fire Services.<br />

<strong>The</strong> Chairperson, AP Transco.<br />

<strong>The</strong> Managing Director, H.M.W.S&S.B, Hyderabad.<br />

<strong>The</strong> Engineer in Chief (Public Health) Hyderabad.<br />

<strong>The</strong> Commissioner & Inspector General <strong>of</strong> Registration & Stamps.<br />

<strong>The</strong> Managing Director, AP Housing Board.<br />

<strong>The</strong> District Collectors <strong>of</strong> all Districts.<br />

Copy to :<br />

<strong>The</strong> Special Secretary to Chief Minister.<br />

<strong>The</strong> P.S. to Minister (M.A).<br />

<strong>The</strong> P.S. to Principal Secretary to Government (MA&UD Dept)<br />

<strong>The</strong> P.S.to Secretary to Government (M.A&U.D.Dept)<br />

S.F/S.C.<br />

// FORWARDED :: BY ORDER//<br />

SECTION OFFICER


7<br />

A N N E X U R E - I<br />

RATES OF PENALISATION (See Rule 9)


8<br />

Sl<br />

No<br />

Category/<br />

Sub-category<br />

Rate in Rupees per sq feet <strong>of</strong> violated built up area<br />

Cases where building permission was<br />

obtained but deviated from the<br />

sanctioned plan, <strong>and</strong> where violation<br />

<strong>of</strong> permitted built up area including<br />

setbacks, Balcony projections <strong>and</strong><br />

balcony areas converted into other<br />

built up area /uses is up to 30%<br />

1. Cases where building permission<br />

was obtained but where violation<br />

<strong>of</strong> permitted built up area<br />

including setbacks, Balcony<br />

projections, balcony areas<br />

converted into other built up area<br />

/uses is more than 30%<br />

2. Cases where no permission was<br />

obtained (in this category entire<br />

built up area will be treated as<br />

violated area)<br />

(1)<br />

(2)<br />

GHMC/<br />

GVMC &<br />

VMC<br />

3(i)<br />

Other<br />

Municipa<br />

l<br />

Corporati<br />

ons<br />

Municipalitie<br />

s & rest <strong>of</strong><br />

UDA area<br />

GHMC/<br />

GVMC &<br />

VMC<br />

3 (ii)<br />

Other<br />

Municipal<br />

Corporation<br />

s<br />

Municipalities<br />

& rest <strong>of</strong> UDA<br />

area<br />

3(i) (a) 3(i)(b) 3(i)(c)<br />

3<br />

3 (ii)(a) (ii)(b) (ii)(c)<br />

1 Commercial buildings/Usage<br />

a Upto G+1 200 150 100 300 200 150<br />

Floor height<br />

b Above G+1 & 400 300 200 500 400 300<br />

below 15 m<br />

height<br />

c 15 m <strong>and</strong> 500 400 300 600 500 400<br />

above in<br />

height<br />

2A Individual Residential buildings<br />

a up to G+2 60 40 30 100 60 50<br />

floors or 10 m<br />

height<br />

b Above G+2<br />

floors or 10 m<br />

height<br />

100 60 50 200 150 100<br />

2 B Multiple dwellings/Flats/Apartment Complexes (See Annexure II Below)<br />

3 Other Non-Residential Buildings (Institutional/Educational/Industrial, etc.)<br />

3<br />

i) Height up<br />

to 15 m height<br />

ii) Height<br />

above 15 m<br />

height<br />

60 40 30 100 60 50<br />

100 60 50 200 150 100


9<br />

ANNEXURE II<br />

RATES OF PENALISATION FOR MULTIPLE DWELLING UNITS/ FLATS/ APARTMENT<br />

COMPLEXES WHICH ARE IN VIOLATION/ INDIVIDUAL BUILDINGS CONVERTED<br />

INTO APARTMENTS<br />

SlNo<br />

Multiple<br />

dwelling<br />

units/Flats/<br />

Apartment<br />

Complexes<br />

Cases where building permission<br />

was obtained but deviated from<br />

sanctioned plan including Balcony<br />

projections/areas converted into other<br />

built up area/Individual buildings<br />

converted into Apartments<br />

(3)<br />

Penalisation Charge in Rupees<br />

GHMC/<br />

GVMC<br />

& VMC<br />

Other<br />

Municipal<br />

Corporatio<br />

ns<br />

Municipaliti<br />

es & rest <strong>of</strong><br />

UDA area<br />

Cases where no building permission was<br />

obtained from the sanctioning Authority/<br />

Additional floors constructed over the<br />

permitted floors<br />

(4)<br />

Rate in Rupees per sq feet <strong>of</strong> violated built up<br />

area on each floor<br />

GHMC/ Other Municipalities<br />

GVMC & Municipal & rest <strong>of</strong> UDA<br />

VMC Corporations area<br />

(1) (2) 3(a) 3(b) 3(c) 4(a) 4(b) 4(c)<br />

(i)<br />

Height<br />

below 18<br />

mtr.<br />

Plinth area<br />

upto 1000<br />

sft<br />

20,000<br />

per flat<br />

/dwellin<br />

g unit<br />

15,000 per<br />

flat<br />

/dwelling<br />

unit<br />

10,000 per<br />

flat<br />

/dwelling<br />

unit<br />

Rs 100 per sq<br />

ft <strong>of</strong> plinth<br />

area<br />

Rs 75 per sq ft<br />

<strong>of</strong> plinth area<br />

Rs 50 per sq ft<br />

<strong>of</strong> plinth area<br />

Plinth area<br />

<strong>of</strong> more<br />

than 1000<br />

sft<br />

(ii)<br />

Height 18 meters <strong>and</strong><br />

above<br />

30,000<br />

per flat<br />

/dwellin<br />

g unit<br />

80,000<br />

per flat<br />

/dwellin<br />

g unit<br />

20,000 per<br />

flat<br />

/dwelling<br />

unit<br />

50,000 per<br />

flat<br />

/dwelling<br />

unit<br />

15,000 per<br />

flat<br />

/dwelling<br />

unit<br />

30,000 per<br />

flat<br />

/dwelling<br />

unit<br />

Rs 200 per sq<br />

ft <strong>of</strong> plinth<br />

area<br />

Rs 150 per sq ft<br />

<strong>of</strong> plinth area<br />

Rs 100 per sq ft<br />

<strong>of</strong> plinth area<br />

S.P. SINGH<br />

PRINCIPAL SECRETARY TO GOVERNMENT<br />

SECTION OFFICER


10<br />

GUIDELINES FOR COMPULSORY DISCLOSURE SCHEME RELATING TO PENALISATION<br />

AND REGULATION OF UNAUTHORISEDLY CONSTRUCTED BUILDINGS AND BUILDINGS<br />

CONSTRUCTED IN DEVIATION TO THE SANCTIONED PLAN IN MUNICIPAL AND URBAN<br />

DEVELOPMENT AUTHORITY AREAS<br />

1. Introduction:<br />

<strong>Andhra</strong> <strong>Pradesh</strong> has experienced rapid growth <strong>of</strong> urbanization during the last four decades.<br />

<strong>The</strong> urban population has increased from 62 lakhs in 1961 to 205 lakhs in 2001 registering a<br />

growth close to 230 percent. As per 2001 census the percentage <strong>of</strong> population living in urban<br />

areas in the state stood at 27.08 compared to 27.78 for the country. <strong>Andhra</strong> <strong>Pradesh</strong> is the<br />

sixth most major urbanized state in the country. <strong>Andhra</strong> <strong>Pradesh</strong> has been making rapid<br />

strides in economic development in the recent past. Consequently the migration to urban<br />

areas from villages has increased manifold. <strong>The</strong>re is a great spurt in construction activity to<br />

meet the increased dem<strong>and</strong> for buildings due to general economic development <strong>and</strong><br />

migration from rural areas. In this process <strong>of</strong> development, it is noticed that large number <strong>of</strong><br />

unauthorized layouts <strong>and</strong> unauthorized buildings are cropping up in all urban areas.<br />

2. Background:<br />

In order to regulate such type <strong>of</strong> constructions <strong>and</strong> to bring them into the main stream <strong>of</strong><br />

planned development, the Government have already taken measures <strong>and</strong> brought out<br />

Revised Building Rules in the year 2006-2007 wherein effective enforcement systems <strong>and</strong><br />

mechanisms have been created such as mortgaging 10% <strong>of</strong> built up area as surety, making<br />

Occupancy Certificate m<strong>and</strong>atory for obtaining electricity <strong>and</strong> water & sewerage connections,<br />

severe penalties for building violations, registration <strong>of</strong> buildings to be done only as per<br />

sanctioned plans etc. While the Revised Building Rules take care <strong>of</strong> regulating the present<br />

<strong>and</strong> future developments, there is a felt need for finding a pragmatic solution for certain types<br />

<strong>of</strong> constructions in deviation <strong>of</strong> sanctioned plan or unauthorised constructions that have come<br />

up in large numbers over a period <strong>of</strong> time.<br />

3. Amendments to Municipal Laws:<br />

Government with a view to regulate the unauthorized constructions has come up with a<br />

pragmatic solution namely Penalisation <strong>of</strong> unauthorized constructions <strong>and</strong> constructions in<br />

deviations <strong>of</strong> the sanctioned plan in order to help the people to bring unauthorized<br />

constructions into planning fold <strong>and</strong> also to remove the threat or fear <strong>of</strong> demolition.<br />

It is a one-time opportunity for the public for their benefit to get their unauthorized<br />

constructions regulated, To give effect to the above policy relevant Municipal Laws have been<br />

amended for this purpose <strong>and</strong> Statutory Rules have been issued for implementation <strong>of</strong>


11<br />

Compulsory Disclosure Scheme for Penalisation <strong>and</strong> <strong>Regulation</strong> <strong>of</strong> Unauthorizedly<br />

Constructed Buildings <strong>and</strong> Buildings constructed in deviation to the sanctioned plan.<br />

4. Objectives <strong>of</strong> Compulsory Disclosure Scheme:<br />

I. To penalize each <strong>and</strong> every building constructed<br />

unauthorizedly or in deviation <strong>of</strong> the sanctioned plan so as to create<br />

deterrence against any such practice.<br />

II. To bring all the unauthorized constructions into planning fold <strong>and</strong> to regulate the<br />

development in urban areas.<br />

III. To provide an opportunity to the owners <strong>of</strong> the buildings to regulate their unauthorized<br />

constructions <strong>and</strong> deviations made to the sanctioned plan.<br />

IV. To provide relief to several persons who have purchased buildings without any<br />

knowledge about the building regulations.<br />

5. Applicability:<br />

Building Penalisation Scheme (herein after called BPS) envisages the penalization <strong>and</strong><br />

regulation <strong>of</strong> certain categories <strong>of</strong> buildings. <strong>The</strong> scheme is applicable to the following<br />

cases in the jurisdiction <strong>of</strong> all Municipal Corporations, Municipalities <strong>and</strong> Urban Development<br />

Authorities in A.P<br />

a) Existing Buildings constructed in violation <strong>of</strong> the sanctioned plan approved by the<br />

competent authority from 1-1-85 till the date <strong>of</strong> publication <strong>of</strong> A.P Municipal Laws <strong>and</strong><br />

Urban areas(Development) (Amendment) Ordinance, 2007in A.P Gazette i.e 15-12-2007<br />

b) Existing Buildings constructed without obtaining sanction from the competent authority<br />

from 1-1-85 till the date <strong>of</strong> publication <strong>of</strong> A.P Municipal Laws <strong>and</strong> Urban<br />

areas(Development) (Amendment) Ordinance, 2007in A.P Gazette i.e 15-12-2007<br />

Explanation: Existing Building means a building with a Property Tax Assessment or a<br />

Building which has been purchased prior to the date <strong>of</strong> notification <strong>of</strong> the Rules by way <strong>of</strong> a<br />

Registered Deed or a Building with ro<strong>of</strong> slab as on date <strong>of</strong> notification <strong>of</strong> the rules.<br />

6. BPS is not applicable in the following cases:<br />

i) Encroachment on Government l<strong>and</strong>s or property belonging to public undertakings.<br />

ii) L<strong>and</strong> for which the applicant has no title.<br />

iii) Surplus l<strong>and</strong> declared under Urban L<strong>and</strong> Ceiling / Agricultural L<strong>and</strong> Ceiling / L<strong>and</strong>s<br />

resumed under <strong>Andhra</strong> <strong>Pradesh</strong> assigned l<strong>and</strong>s (POT) Act<br />

iv) Buildings affected under alignment <strong>of</strong> any road or proposed road under Master Plan /<br />

Zonal Development Plan / Road Development Plan or any other public roads / MRTS /<br />

BRTS.


12<br />

v) Tank bed <strong>and</strong> Sikham l<strong>and</strong>s.<br />

vi) Areas covered under G.O. Ms No. 111 MA dated 8-3-1996 (protection <strong>of</strong> Catchment<br />

area <strong>of</strong> Osmansagar <strong>and</strong> Himayatsagar lakes).<br />

vii) Prohibited areas under the Coastal <strong>Regulation</strong> Zone <strong>and</strong> such other environmentally<br />

restricted zones as may be prescribed.<br />

viii) Layout open spaces / Master Plan open spaces / Areas earmarked for Recreation Use<br />

in Master Plan / Zonal Development Plan;<br />

ix) Buildings that are not in conformity with l<strong>and</strong> use approved in Master Plan / Zonal<br />

Development Plan<br />

x) Sites under litigation / legal disputes regarding ownership.<br />

xi) Area reserved for parking in the sanctioned plan / area meant for parking purposes in<br />

the building.<br />

xii) Unauthorized constructions without any building sanction in unapproved/unauthorized<br />

layouts, for which prior approval <strong>of</strong> site/plot under regulation <strong>of</strong> unapproved /<br />

unauthorized layouts rules is required to be obtained. However applications for building<br />

penalisation would be accepted if the applicant applies for regulation <strong>of</strong> the<br />

unauthorized site / plot <strong>and</strong> encloses the acknowledgement to that effect.<br />

xiii) Penalisation shall not be done for the constructions made within the building line <strong>of</strong><br />

major roadwidths <strong>of</strong> 80 feet <strong>and</strong> above within the limits <strong>of</strong> Greater Hyderabad Municipal<br />

Corporation, Greater Visakhapatnam Municipal Corporation, Vijayawada Municipal<br />

Corporation <strong>and</strong> roads <strong>of</strong> 60 feet width <strong>and</strong> above in rest <strong>of</strong> the urban areas as per<br />

Master Plan / Zonal Development Plan.<br />

7. Exemptions from BPS:<br />

Huts, Semi-permanent houses (other than RCC structure) <strong>of</strong> single storey in sites up to 100<br />

sq. yards are exempted from the operation <strong>of</strong> the scheme.<br />

8. Compulsory Submission <strong>of</strong> applications:<br />

Applications under BPS shall be filed compulsorily in the prescribed form with all enclosures<br />

by the owners <strong>of</strong> the buildings mentioned in Para 5 in the <strong>of</strong>fice <strong>of</strong> the Municipal Corporation /<br />

Municipality / Urban Development Authority as the case may be within 60 days from the date<br />

<strong>of</strong> publication <strong>of</strong> the Rules in question in A.P. Gazette.<br />

9. Who can apply under BPS:<br />

<strong>The</strong> following persons can apply under BPS:


13<br />

1. Owner <strong>of</strong> the building<br />

2. Registered G.P.A. Holder<br />

3. Developer / Builder/ Association who has developmental rights<br />

10. Services <strong>of</strong> Technical Personnel:<br />

In every Municipality, Municipal Corporation, Urban Development Authority licensed technical<br />

personnel will be authorized by the Municipal Commissioner /Vice Chairman as the case may<br />

be to assist citizens in filling up the application form <strong>and</strong> preparation <strong>of</strong> building <strong>and</strong> site plan.<br />

In addition, the citizens can utilise the services <strong>of</strong> Registered Architects for filling up the<br />

application form <strong>and</strong> preparation <strong>of</strong> plans.<br />

11. Prior clearances in certain cases:<br />

Prior clearances are required in the following cases:<br />

1. NOC from Fire Services <strong>Department</strong> is required in the following cases:<br />

a) Residential Buildings with height <strong>of</strong> 18m <strong>and</strong> above<br />

b) Commercial Buildings with height <strong>of</strong> above15m<br />

c) Buildings <strong>of</strong> Public congregation like schools, cinema theatres, function halls <strong>and</strong><br />

other assembly buildings on plot area <strong>of</strong> 500 sq.mts <strong>and</strong> above or <strong>of</strong> height above<br />

6mts.<br />

2. NOC from Airport Authority <strong>of</strong> India for all multi-storied buildings <strong>and</strong> also sites falling in<br />

Air funnel zone.<br />

3. Certificate from Licensed Structural Engineer in case <strong>of</strong> building with height above 15m.<br />

Note: <strong>The</strong> application in such cases shall be submitted along with the penal amount & other<br />

documents with in the prescribed time. However an additional time period <strong>of</strong> 3 months will be<br />

allowed for submitting the NOCs from Fire Services <strong>Department</strong> <strong>and</strong> Airport Authority <strong>of</strong> India.<br />

12. Payment <strong>of</strong> Penalisation charges:<br />

<strong>The</strong> owner / applicant shall pay the penalization charges as given in Annexure-I <strong>and</strong> II <strong>of</strong> the<br />

Rules. <strong>The</strong> penalization charges are levied for the total violated built up area <strong>of</strong> all floors. <strong>The</strong><br />

penalization charges include the following:<br />

1. Building permit fee<br />

2. Development charges<br />

3. Betterment charges<br />

4. Other charges<br />

<strong>The</strong> penalization charges shall be remitted by way <strong>of</strong> dem<strong>and</strong> draft or bank pay order in<br />

favour <strong>of</strong> the competent authority. After the payment <strong>of</strong> penalization charges, no other<br />

charges will be levied <strong>and</strong> collected by the Competent Authorities. <strong>The</strong> penal charges paid


14<br />

are not refundable. However in cases <strong>of</strong> rejection, penal amount will be refunded after<br />

retaining 10% <strong>of</strong> the penal amount towards scrutiny <strong>and</strong> processing charges. In case <strong>of</strong><br />

bonafide error in calculation, the excess amount may be refunded after issue <strong>of</strong> proceedings.<br />

13. Categories <strong>of</strong> Penalisation Charges:<br />

Penalisation charges shall be levied under BPS as per the following categories:<br />

1) Building permission obtained but deviated from the sanctioned plan wherein the<br />

violated built up area is up to 30%.<br />

2) Building permission obtained but deviated from the sanctioned plan wherein the<br />

violated built up area is more than 30%.<br />

3) Buildings constructed without obtaining sanction for the building plan.<br />

4) Apartments / Flats constructed in deviation from the sanctioned plan<br />

5) Apartments / Flats constructed without sanctioned plan.<br />

<strong>The</strong> details <strong>of</strong> the penalisation charges are given in Annexure-I <strong>and</strong> II <strong>of</strong> the Rules in<br />

question.<br />

Note: Deviation means deviated from the sanctioned plan within the<br />

permissible floors. An additional floor constructed would construe<br />

violation <strong>of</strong> the sanctioned plan , i.e., additional construction over <strong>and</strong><br />

above the sanctioned plan will be treated as unauthorisd construction<br />

<strong>and</strong> penalty for this additional floor will be levied as per the relevant<br />

category rates.<br />

14. Scrutiny <strong>and</strong> timeline for disposal <strong>of</strong> applications:<br />

All the applications received under BPS would be disposed <strong>of</strong>f within 6 months from the last<br />

date for receipt <strong>of</strong> applications.<br />

15. Competent Authorities:<br />

<strong>The</strong> following are the Competent Authorities for disposal <strong>of</strong> applications.<br />

1. Municipal Commissioner in the respective areas falling in the Municipal Corporations<br />

<strong>and</strong> Municipalities.<br />

2. Vice-Chairman <strong>of</strong> Urban Development Authority in case <strong>of</strong> areas falling outside the<br />

Urban Local Bodies in the respective UDA area.<br />

16. Violation after submission <strong>of</strong> application:<br />

During verification, if it is found that the applicant has constructed further additions or<br />

extensions to the existing building, then such application shall be summarily rejected duly


15<br />

forfeiting the entire penal amount <strong>and</strong> necessary enforcement action shall be taken against<br />

the said owner including demolition <strong>of</strong> the building.<br />

17. Issue <strong>of</strong> Orders <strong>and</strong> Occupancy Certificate:<br />

After receipt <strong>of</strong> the application along with the necessary documents <strong>and</strong> plans, the Competent<br />

Authority shall scrutinize the applications <strong>and</strong> after carrying out necessary site inspections<br />

shall communicate Proceedings regulating the building constructed in violation <strong>of</strong> sanctioned<br />

plan or regulating the building constructed without obtaining sanction from the competent<br />

authority or rejecting the application with in six months from the last date for receipt <strong>of</strong> the<br />

applications under this scheme. Further the proceedings issued will also mention that all<br />

earlier proceedings <strong>and</strong> action <strong>of</strong> enforcement initiated or contemplated against the said<br />

construction are withdrawn.<br />

Occupancy Certificate shall be issued by the Competent Authority in case <strong>of</strong> approval <strong>of</strong> the<br />

application.<br />

Mere receipt <strong>of</strong> application or any delay in communication <strong>of</strong> final orders will not be<br />

construed as automatic regulation <strong>of</strong> unauthorizedly constructed building.<br />

18. Disposal instructions:<br />

Each Application for Building Peanalisation shall be maintained as a separate File Year-wise,<br />

area-wise <strong>and</strong> category –wise with distinct number for a period <strong>of</strong> 10 years (D.Dis disposal).<br />

<strong>The</strong> Competent Authority shall update their records relating to all buildings <strong>and</strong> layouts<br />

approvals <strong>and</strong> maintain these Year-wise, area-wise <strong>and</strong> category –wise, so as to facilitate<br />

people to apply for true copy <strong>of</strong> sanctioned plan under the RTI Act.<br />

19. Appeal:<br />

Any applicant aggrieved by an order passed by the Competent Authority may prefer an appeal<br />

to the Appellate Committee constituted by the Government within thirty days from the date<br />

<strong>of</strong> receipt <strong>of</strong> the order if he has paid the necessary charges <strong>and</strong> submitted documents as<br />

specified in Rule 3 <strong>of</strong> the Rules in question.<br />

20. Consequences in case <strong>of</strong> failure to apply:<br />

Where an application for regulating <strong>and</strong> penalizing the unauthorisedly constructed building<br />

has not been made, the following consequences have to be faced :<br />

a) <strong>The</strong> unauthorized construction would be treated as continuing <strong>of</strong>fence <strong>and</strong> exemplary<br />

penalty would be levied as per Municipal Laws amended recently.<br />

b) A penalty <strong>of</strong> 25% on Property Tax shall be levied till the unauthorized construction is<br />

demolished or regulated.<br />

c) Other enforcement action including demolition <strong>of</strong> the building will be initiated.


16<br />

INSTRUCTIONS TO THE APPLICANTS UNDER BPS<br />

1. Read the Guidelines, FAQs <strong>and</strong> other details provided in the H<strong>and</strong> Book carefully.<br />

2. Ensure that your building falls in the applicable categories for penalization <strong>and</strong><br />

regulation <strong>of</strong> unauthorized constructions.<br />

3. Read the Application Form carefully <strong>and</strong> fill up all the columns correctly.<br />

4. Read the <strong>Penalization</strong> Charges payable as provided in the Rules <strong>and</strong> correctly fill up<br />

the concerned Self-Computation Table for payment <strong>of</strong> penalization charges.<br />

5. <strong>The</strong> Application requires a list <strong>of</strong> documents to be enclosed. Ensure that all the<br />

documents required are enclosed to the Application.<br />

6. If you need any assistance, you may take the help <strong>of</strong> the Licensed Technical<br />

Personnel authorized by the Competent Authority or Registered Architects to guide<br />

you in filling up the Application Form, calculation <strong>of</strong> the penalization charges payable<br />

<strong>and</strong> preparation <strong>of</strong> the required plans.<br />

7. In respect <strong>of</strong> buildings with a height <strong>of</strong> above 15m, a certificate from Licensed<br />

Structural Engineer shall be submitted.<br />

8. Prior clearance is required from Fire Services <strong>Department</strong> <strong>and</strong> Airport Authority <strong>of</strong><br />

India as per para 10 <strong>of</strong> the Guidelines. Ensure that these NOCs are submitted<br />

within the stipulated time.<br />

9. Enclose the Dem<strong>and</strong> Draft/Bank Pay Order obtained from any one <strong>of</strong> the schedule<br />

Banks in favour <strong>of</strong> the Competent Authority to the Application.<br />

10. Fill up the Acknowledgement & Check List in duplicate by ticking the list <strong>of</strong><br />

documents enclosed.<br />

11. Ensure that the Application is submitted before the last date fixed for receipt <strong>of</strong><br />

Applications.<br />

12. Before submitting the Application at the places designated by the Competent<br />

Authority make sure that you have made a photostat copy <strong>of</strong> filled in Application<br />

Form for your record.<br />

13. Submit the filled in Application in the Counters set up in the Circle /Zone /Head Office<br />

<strong>of</strong> the concerned Municipal Corporation /Municipality /UDA <strong>and</strong> obtain <strong>and</strong> retain the<br />

Acknowledgement.<br />

14. For future Correspondence with the Competent Authority the File Number on the<br />

Acknowledgement may be quoted.


17<br />

EXTRACT OF ORDINANCE OF 2007<br />

Regularisation <strong>of</strong><br />

Buildings<br />

constructed<br />

without<br />

sanctioned plan.<br />

455-A. <strong>The</strong> Commissioner may regularize constructions<br />

made without obtaining sanctioned plan, subject to<br />

fulfilling the following conditions:-<br />

(a) submission <strong>of</strong> building plans to the competent authority duly paying all<br />

categories <strong>of</strong> fee <strong>and</strong> charges;<br />

(b) the construction shall be subject to the condition that all<br />

parameters laid down in relevant statutes, Master Plan, Zonal<br />

Development Plan, Building Bye-Laws, Building Rules <strong>and</strong> other relevant<br />

Government Orders including <strong>Andhra</strong> <strong>Pradesh</strong> Fire Service Act, 1999 <strong>and</strong><br />

National Building Code are satisfied;<br />

Act No 15<br />

<strong>of</strong> 1999<br />

(c) payment <strong>of</strong> penalty equivalent to 33% <strong>of</strong> the various categories <strong>of</strong> fees<br />

<strong>and</strong> charges payable by the applicant for obtaining building permission in<br />

addition to the regular fee <strong>and</strong> other charges payable.<br />

455-AA. Notwithst<strong>and</strong>ing anything in the Act, the Municipal Commissioner<br />

"<strong>Regulation</strong> <strong>and</strong><br />

penalization <strong>of</strong><br />

construction <strong>of</strong><br />

buildings in<br />

deviation <strong>of</strong><br />

sanctioned plan.<br />

may regulate <strong>and</strong> penalise the constructions <strong>of</strong> buildings,<br />

made by the owner, or as the case may be, by an individual<br />

unauthorisedly or in deviation <strong>of</strong> the sanctioned plan as on<br />

the date <strong>of</strong> commencement <strong>of</strong> the <strong>Andhra</strong> <strong>Pradesh</strong><br />

Municipal Laws <strong>and</strong> Urban Areas (Development)<br />

(Amendment) Ordinance, 2007 as a one time measure, as<br />

per the procedure <strong>and</strong> by levying such penal amount as may be prescribed


18<br />

<strong>and</strong> upon payment <strong>of</strong> such amount all pending or contemplated proceedings<br />

<strong>and</strong> action <strong>of</strong> enforcement shall be deemed to have been withdrawn <strong>and</strong> the<br />

competent authority shall issue necessary Occupancy Certificate to the<br />

owner or the individual as the case may be."<br />

3. In the <strong>Andhra</strong> <strong>Pradesh</strong> Municipalities Act, 1965, after section<br />

218, the following new section shall be inserted, namely, -<br />

Amendme<br />

nt <strong>of</strong> Act<br />

No.6 <strong>of</strong><br />

"<strong>Regulation</strong> <strong>and</strong><br />

penalisation <strong>of</strong><br />

construction <strong>of</strong><br />

buildings in<br />

deviation <strong>of</strong><br />

sanctioned plan.<br />

218-A. Notwithst<strong>and</strong>ing anything in the Act, the Municipal<br />

Commissioner may regulate <strong>and</strong> penalise the constructions<br />

<strong>of</strong> buildings, made by the owner, or as the case may be, by<br />

an individual unauthorisedly or in deviation <strong>of</strong> the<br />

sanctioned plan as on the date <strong>of</strong> commencement <strong>of</strong> the<br />

<strong>Andhra</strong> <strong>Pradesh</strong> Municipal Laws <strong>and</strong> Urban Areas (Development)<br />

(Amendment) Ordinance, 2007 as a one time measure, as per the procedure<br />

<strong>and</strong> by levying such penal amount as may be prescribed <strong>and</strong> upon payment<br />

<strong>of</strong> such amount all pending or contemplated proceedings <strong>and</strong> action <strong>of</strong><br />

enforcement shall be deemed to have been withdrawn <strong>and</strong> the competent<br />

authority shall issue necessary Occupancy Certificate to the owner or the<br />

individual as the case may be. ".<br />

"<strong>Regulation</strong> <strong>and</strong><br />

penalisation <strong>of</strong><br />

construction <strong>of</strong><br />

buildings in deviation<br />

<strong>of</strong> sanctioned plan<br />

46-A. Notwithst<strong>and</strong>ing anything contained in the Act, in<br />

the case <strong>of</strong> Gram Panchayats falling in Urban<br />

Development Authority areas the Vice-Chairman may<br />

regulate <strong>and</strong> penalise the construction <strong>of</strong> buildings, made<br />

by the owner, or as the case may be, by an individual unauthorisedly or in<br />

deviation <strong>of</strong> the sanctioned plan as on the date <strong>of</strong> commencement <strong>of</strong> the<br />

<strong>Andhra</strong> <strong>Pradesh</strong> Municipal Laws <strong>and</strong> Urban Areas (Development)<br />

(Amendment) Ordinance, 2007 as a one time measure, as per the procedure


19<br />

<strong>and</strong> by levying such penal amount as may be prescribed <strong>and</strong> upon payment<br />

<strong>of</strong> such amount, all pending or contemplated proceedings <strong>and</strong> action <strong>of</strong><br />

enforcement shall be deemed to have been withdrawn <strong>and</strong> the competent<br />

autority shall issue necessary Occupancy Certificate to the owner or the<br />

individual as the case may be. ".


20<br />

INSTRUCTIONS TO THE COMPETENT AUTHORITIES FOR<br />

IMPLEMENTATION OF COMPULSORY DISCLOSURE<br />

SCHEMES RELATING TO:<br />

1. <strong>Penalization</strong> <strong>and</strong> <strong>Regulation</strong> <strong>of</strong> Unauthorizedly constructed buildings <strong>and</strong> buildings<br />

constructed in deviation to the sanctioned plan.<br />

2. <strong>Regulation</strong> <strong>of</strong> Unapproved <strong>and</strong> illegal Layouts.<br />

Municipal Administration <strong>and</strong> Urban Development <strong>Department</strong><br />

Government <strong>of</strong> <strong>Andhra</strong> <strong>Pradesh</strong><br />

January 2008


21<br />

INSTRUCTIONS TO COMPETENT AUTHORITIES<br />

Municipal Administration & Urban Development <strong>Department</strong>, Government <strong>of</strong> A.P has formulated<br />

two schemes namely:-<br />

(1) Compulsory disclosure scheme for <strong>Regulation</strong> <strong>and</strong> <strong>Penalization</strong> <strong>of</strong> Unauthorizedly<br />

constructed buildings <strong>and</strong> buildings constructed in deviation <strong>of</strong> the sanctioned plan in the<br />

areas <strong>of</strong> Municipalities, Municipal Corporations <strong>and</strong> Urban Development Authorities.<br />

(2) Compulsory disclosure scheme for <strong>Regulation</strong> <strong>of</strong> unapproved <strong>and</strong> illegal layouts falling in the<br />

areas <strong>of</strong> Municipalities, Municipal Corporations <strong>and</strong> Urban Development Authorities.<br />

1. To implement the above schemes, Government have initiated the following actions:-<br />

i. Promulgation <strong>of</strong> A.P Municipal Laws <strong>and</strong> Urban areas (Development) (Amendment)<br />

Ordinance 2007 on 15-12-2007.<br />

ii. Issue <strong>of</strong> the <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong> Unauthorizedly<br />

constructed Buildings <strong>and</strong> Buildings Constructed in deviation <strong>of</strong> the Sanctioned<br />

Plan Rules, 2007.<br />

iii. Issue <strong>of</strong> the <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>of</strong> Unapproved <strong>and</strong> Illegal Layout<br />

Rules, 2007.<br />

iv. Issue <strong>of</strong> a H<strong>and</strong> Book containing guidelines for implementation <strong>of</strong> the schemes.<br />

2. Competent Authorities<br />

2.1 <strong>The</strong> following are the Competent Authorities for disposal <strong>of</strong>f applications under Compulsory<br />

disclosure scheme for <strong>Regulation</strong> <strong>and</strong> <strong>Penalization</strong> <strong>of</strong> Unauthorizedly constructed buildings<br />

<strong>and</strong> buildings constructed in deviation <strong>of</strong> the sanctioned plan (herein after called Building<br />

Penalisation Scheme (BPS))<br />

i. Municipal Commissioner in case <strong>of</strong> areas falling in the Municipal Corporations <strong>and</strong><br />

Municipalities.<br />

ii. Vice-Chairman <strong>of</strong> Urban Development Authority in case <strong>of</strong> areas falling outside the<br />

Urban Local Bodies <strong>and</strong> within UDA Limits.<br />

2.2 <strong>The</strong> following are the Competent Authorities under Compulsory disclosure scheme for<br />

<strong>Regulation</strong> <strong>of</strong> unapproved <strong>and</strong> illegal layouts (herein after called Layout <strong>Regulation</strong><br />

Scheme (LRS))<br />

i. <strong>The</strong> Vice - Chairman <strong>of</strong> the Urban Development Authority in case <strong>of</strong> areas falling in<br />

UDA area.<br />

ii.<br />

iii.<br />

<strong>The</strong> Commissioner <strong>of</strong> Municipal Corporation in case <strong>of</strong> areas falling in Municipal<br />

Corporations <strong>and</strong> not covered by Urban Development Authorities.<br />

Municipal Council in case <strong>of</strong> Municipalities <strong>and</strong> Nagar Panchayats.


22<br />

iv.<br />

Gram Panchayat in case <strong>of</strong> areas falling in Master Plan limits <strong>of</strong> respective Urban Local<br />

Bodies.<br />

3. Familiarization with amended Municipal Laws <strong>and</strong> Statutory Rules<br />

<strong>The</strong> Competent Authorities i.e Commissioner <strong>of</strong> Municipalities <strong>and</strong> Municipal<br />

Corporations <strong>and</strong> Vice Chairmen <strong>of</strong> Urban Development Authorities have to play a<br />

well defined <strong>and</strong> vital role in the effective implementation <strong>of</strong> the above two schemes.<br />

Hence it is necessary for the Competent Authorities to acquaint themselves with<br />

amended Municipal Laws, relevant Statutory Rules, H<strong>and</strong> Book for implementation <strong>of</strong><br />

two schemes <strong>and</strong> existing up-to-date Building Rules <strong>and</strong> procedures connected with<br />

the implementation <strong>of</strong> the two schemes.<br />

4. Training <strong>of</strong> Officers <strong>and</strong> Staff<br />

Competent Authorities shall utilize the services <strong>of</strong> <strong>of</strong>ficers <strong>and</strong> staff working in<br />

Engineering <strong>and</strong> Revenue Sections in addition to <strong>of</strong>ficers <strong>and</strong> staff <strong>of</strong> Town Planning<br />

section for implementation <strong>of</strong> the schemes. All the <strong>of</strong>ficers <strong>and</strong> staff drafted for the<br />

implementation <strong>of</strong> the schemes shall be provided with H<strong>and</strong> Book on the schemes.<br />

<strong>The</strong> Competent Authority shall conduct orientation training for <strong>of</strong>ficers <strong>and</strong> staff<br />

drafted for implementation <strong>of</strong> the above schemes.<br />

5. Awareness Campaign<br />

<strong>The</strong> Competent Authority shall hold awareness campaign on the schemes with the<br />

following groups to make them pro-active in the successful implementation <strong>of</strong> the<br />

schemes<br />

i. Municipal Councilors / Corporators<br />

ii. Resident’s Welfare Associations, Organizations, NGOs, Builders Associations,<br />

Plot Owners Associations <strong>and</strong> other stakeholders.<br />

6. Publicity<br />

<strong>The</strong> Competent Authority shall give wide publicity about the guidelines <strong>of</strong> the<br />

schemes in the following manner<br />

i. Distribution <strong>of</strong> Leaflets detailing salient features <strong>of</strong> the schemes<br />

ii. Brief advertisement in local newspapers<br />

iii. Hoardings, Cinema slides


23<br />

Advertisements in T.V in respect <strong>of</strong> major Municipal Corporations<br />

<strong>The</strong> Competent Authority should make the H<strong>and</strong> Book available at a price <strong>of</strong> Rs.25/-<br />

at convenient places namely Circle Offices, Municipal Office, E-seva centers. <strong>The</strong><br />

h<strong>and</strong> book may be made available in Website <strong>of</strong> the respective Urban Local Body /<br />

Urban Development Authority. In addition, the H<strong>and</strong> Book may be made available at<br />

Post Offices, Nationalized Banks <strong>and</strong> other places as determined by the Competent<br />

Authority.<br />

7. Licensed Technical Personnel<br />

<strong>The</strong> Competent Authority shall publish the list <strong>of</strong> Licensed Technical Personnel <strong>and</strong><br />

inform the public about utilization <strong>of</strong> their services for filling up <strong>of</strong> the application form,<br />

preparation <strong>of</strong> plans etc. <strong>The</strong> Competent Authority shall enclose list <strong>of</strong> Licensed<br />

Technical Personnel to the application for the convenience <strong>of</strong> the public. In addition,<br />

the public may be informed that they can utilize the services <strong>of</strong> Registered Architects<br />

for filling up the application form <strong>and</strong> preparation <strong>of</strong> plans.<br />

8. Constitution <strong>of</strong> Teams<br />

<strong>The</strong> Competent Authority shall constitute required number <strong>of</strong> teams for attending to<br />

the following activities:<br />

i. Issue <strong>and</strong> Receipt <strong>of</strong> applications.<br />

ii. Maintenance <strong>of</strong> Registers.<br />

iii. Scrutiny <strong>and</strong> site Inspection <strong>of</strong> Unauthorized Buildings <strong>and</strong> Layouts.<br />

iv. Issue <strong>of</strong> proceedings <strong>and</strong> Occupancy certificates<br />

9. Reception centers<br />

<strong>The</strong> Competent Authority shall set up adequate number <strong>of</strong> receiving centers at<br />

convenient locations for issue <strong>and</strong> receipt <strong>of</strong> applications <strong>and</strong> ensure that adequate<br />

number <strong>of</strong> application forms <strong>and</strong> h<strong>and</strong> books are available at the receiving centers.<br />

<strong>The</strong> applications downloaded from the Website or the photostat copies <strong>of</strong> the<br />

applications shall also be accepted.


24<br />

Building <strong>Penalization</strong> Scheme (BPS)<br />

10. Maintenance <strong>of</strong> Registers<br />

<strong>The</strong> Competent Authority shall ensure maintenance <strong>of</strong> the following registers for<br />

receipt <strong>and</strong> disposal <strong>of</strong> applications under BPS.<br />

10.1 Register showing receipt <strong>of</strong> the application at the receiving center under BPS<br />

(Annexure-I)<br />

10.2 Register showing disposal <strong>of</strong> applications under BPS (Annexure-II).<br />

11. Scrutiny <strong>and</strong> Inspection <strong>of</strong> the applications under BPS.<br />

<strong>The</strong> Competent Authority shall undertake the scrutiny <strong>of</strong> the applications on day-today<br />

basis without waiting for the last date. Depending on the necessity <strong>and</strong> workload,<br />

the Competent Authority may engage Technical Personnel namely architects /<br />

graduate engineers to take up Scrutiny <strong>and</strong> Inspection <strong>of</strong> the applications received<br />

under the two schemes in addition to <strong>Department</strong>al <strong>of</strong>ficers.<br />

<strong>The</strong> following framework is suggested for the Scrutiny <strong>and</strong> inspection <strong>of</strong> the<br />

applications under Building <strong>Penalization</strong> Scheme (BPS)<br />

Residential Buildings:<br />

11.1 In respect <strong>of</strong> G+2 residential buildings, scrutiny <strong>and</strong> inspection may be taken up at<br />

least to the extent <strong>of</strong> the 10% <strong>of</strong> the applications as selected by the competent<br />

authority by <strong>Department</strong>al Officials /Technical Personnel<br />

11.2 In respect <strong>of</strong> residential buildings <strong>of</strong> more than G+2 floors <strong>and</strong> G+4 floors excluding<br />

cellar <strong>and</strong> stilt, at least 50% <strong>of</strong> the applications shall be scrutinized by <strong>Department</strong>al<br />

Officials /Technical Personnel<br />

11.3 In respect <strong>of</strong> multi-storied buildings, all applications shall be scrutinized by<br />

<strong>Department</strong>al <strong>of</strong>ficials only.<br />

Non-Residential Buildings:<br />

11.4 In respect <strong>of</strong> non-residential buildings, scrutiny <strong>and</strong> inspection may be taken at least<br />

to the extent mentioned below as selected by the competent authority:<br />

Type <strong>of</strong> the<br />

Building<br />

Percentage<br />

Scrutiny<br />

r<strong>and</strong>om)<br />

<strong>of</strong><br />

(at<br />

Inspection at the<br />

level <strong>of</strong>


25<br />

G+1floors 10% <strong>of</strong> the<br />

applications<br />

G+2 <strong>and</strong> G+3 25% <strong>of</strong> the<br />

floors<br />

applications<br />

G+4 floors 50% <strong>of</strong> the<br />

applications<br />

Multi-Storied<br />

buildings<br />

100% <strong>of</strong> the<br />

applications<br />

Lower level<br />

UDA/Municipal staff<br />

HOD<br />

<strong>of</strong><br />

UDA/Municipal staff<br />

Dy.Commissioner/<br />

Addl.Commssioner/<br />

Commissioner/V.C<br />

Committee<br />

constituted by<br />

Commissioner/V.C<br />

Commissioner/VC<br />

Ensure whether the site is getting affected in road widening or is in<br />

conformity with Master Plan <strong>and</strong> zoning regulations.<br />

12. Penalisation <strong>and</strong> <strong>Regulation</strong> <strong>of</strong> Unauthorizedly Constructed Buildings <strong>and</strong><br />

buildings constructed in deviation <strong>of</strong> the sanctioned plan<br />

<strong>The</strong> Competent Authority is required to dispose <strong>of</strong>f the applications with in six<br />

months from the last date <strong>of</strong> receipt <strong>of</strong> applications under this scheme. In case <strong>of</strong><br />

applications found to be in order, the Competent Authority shall communicate<br />

proceedings penalizing <strong>and</strong> regulating the unauthorized construction enclosing<br />

occupancy certificate. <strong>The</strong> proceedings shall also contain that all earlier proceedings<br />

<strong>and</strong> action <strong>of</strong> enforcement initiated or contemplated against the said construction are<br />

withdrawn. Format <strong>of</strong> the proceedings is given as annexure – III. Further the plans<br />

shall be enfaced as shown below<br />

13. Disposal instructions:<br />

Each Application for Building <strong>Penalization</strong> shall be maintained as a separate File Year-wise,<br />

area-wise <strong>and</strong> category –wise with distinct number for a period <strong>of</strong> 10 years (D.Dis disposal).<br />

<strong>The</strong> Competent Authority shall update their records relating to all buildings <strong>and</strong> layouts<br />

approvals <strong>and</strong> maintain these Year-wise, area-wise <strong>and</strong> category –wise, so as to facilitate<br />

people to apply for true copy <strong>of</strong> sanctioned plan under the RTI Act.<br />

14. Approval proceedings:<br />

“<strong>The</strong> Building as shown in the plans is Penalised <strong>and</strong> Regulated<br />

under <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong><br />

Unauthorizedly constructed Buildings <strong>and</strong> Buildings Constructed in


26<br />

deviation <strong>of</strong> the Sanctioned Plan Rules,2007 vide Proceedings No.-----<br />

--------------------- Dated ------------. This does not regulate the<br />

use/activity/trade in the said Premises for which the relevant rules<br />

/stipulations shall be applicable regulating such activity.<br />

Commissioner<br />

…………Municipal Corporation / Municipality<br />

Or<br />

Vice Chairman<br />

…….…….Urban Development Authority<br />

13. Rejection <strong>of</strong> applications<br />

In case <strong>of</strong> applications which are found to be not in accordance with the Rules, the<br />

competent authority shall issue proceedings rejecting the application for penalization<br />

<strong>and</strong> regulation <strong>of</strong> authorizedly constructed building in the format given in the<br />

Annexure - IV<br />

14. Submission <strong>of</strong> Progress Reports<br />

<strong>The</strong> Competent Authority shall send weekly progress report to the Commissioner <strong>and</strong><br />

Director <strong>of</strong> Municipal Administration <strong>and</strong> the Director <strong>of</strong> Town <strong>and</strong> Country Planning<br />

for the week ending every Sunday. Format <strong>of</strong> the progress report is given as<br />

Annexure – V.<br />

Layout <strong>Regulation</strong> Scheme (LRS)<br />

15. <strong>The</strong> Competent Authority shall ensure maintenance <strong>of</strong> the following registers for<br />

receipt <strong>and</strong> disposal <strong>of</strong> applications under LRS.<br />

15.1. Register showing receipt <strong>of</strong> the application at the receiving center under LRS<br />

(Annexure-VI)<br />

15.2. Register showing disposal <strong>of</strong> applications under LRS (Annexure-VII).<br />

16. Scrutiny <strong>and</strong> Inspection <strong>of</strong> the applications under LRS<br />

16.1 After receipt <strong>of</strong> an application for regulation <strong>of</strong> layout in the limits <strong>of</strong> Urban Development<br />

Authority, the competent authority shall scrutinize application as per the Rules, carry out


27<br />

necessary inspections <strong>and</strong> if the application is found in accordance with Rules, shall intimate<br />

the applicant to pay the short fall <strong>of</strong> penalization charges if any as prescribed in these Rules<br />

within 30 days. Format for the intimation is given in Annexure – VIII.<br />

16.2 In case <strong>of</strong> Municipalities/Municipal Corporations falling outside UDA area, the Competent<br />

Authority after scrutiny with respect to Master Plan <strong>and</strong> as per the Rules <strong>and</strong> after carrying<br />

out necessary site inspection shall submit remarks to the Director <strong>of</strong> Town <strong>and</strong> Country<br />

Planning or his delegatee for technical approval. After receipt <strong>of</strong> technical approval, the<br />

competent authority shall intimate the applicant to pay the short fall <strong>of</strong> penalization charges if<br />

any as prescribed in theses Rules within 30 days.<br />

In case <strong>of</strong> application for individual plot which is not affected by any Change <strong>of</strong> L<strong>and</strong> Use or<br />

Master Plan roads, such cases may be processed <strong>and</strong> disposed at level <strong>of</strong> Competent<br />

Authority only.<br />

Format for intimation is as given in Annexure - VIII.<br />

17.1 <strong>Regulation</strong> <strong>of</strong> unapproved layouts.<br />

<strong>The</strong> Competent Authority is required to dispose <strong>of</strong> the applications with in six<br />

months from the last date <strong>of</strong> receipt <strong>of</strong> applications under this scheme. After payment<br />

<strong>of</strong> necessary fees, charges <strong>and</strong> penalization charges as specified in the Rules <strong>and</strong><br />

after h<strong>and</strong>ing over the open space if any, by the applicant as per Layout Rules,<br />

competent authority shall issue proceedings regulating the layout. <strong>The</strong> proceedings<br />

shall also contain that all earlier proceedings <strong>and</strong> action <strong>of</strong> enforcement initiated or<br />

contemplated against the said layout are withdrawn. Format <strong>of</strong> the proceedings is<br />

given as Annexure – IX. Further, the plans shall be enfaced as shown below<br />

“<strong>The</strong> layout / plot as shown in the plan is Regulated under <strong>Andhra</strong><br />

<strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong> unapproved <strong>and</strong> illegal<br />

layouts Rules,2007 vide Proceedings No.-------------------------- Dated -----<br />

-------“<br />

Commissioner<br />

…………Municipal Corporation/ Municipality/<br />

or<br />

Vice Chairman<br />

…………….. Urban Development Authority


28<br />

17.2 In case <strong>of</strong> applications which are found to be not in accordance with the Rules, the<br />

competent authority shall issue proceedings rejecting the application for regulation <strong>of</strong><br />

unapproved layout in the format given in the Annexure - X.<br />

18. Submission <strong>of</strong> Progress Reports<br />

<strong>The</strong> Competent Authority shall send weekly progress report to the Commissioner <strong>and</strong><br />

Director <strong>of</strong> Municipal Administration <strong>and</strong> Director <strong>of</strong> Town <strong>and</strong> Country Planning for<br />

the week ending with Sunday. Format <strong>of</strong> the progress report is given as Annexure –<br />

XI.<br />

Annexure – I<br />

Annexure – II<br />

Annexure – III<br />

Annexure – IV<br />

Annexure – V<br />

Annexure – VI<br />

Annexure – VII<br />

Annexure – VIII<br />

Annexure – IX<br />

Annexure – X<br />

Annexure – XI<br />

Register showing receipt <strong>of</strong> the application at the receiving<br />

centre under BPS.<br />

Register showing disposal <strong>of</strong> applications under BPS.<br />

Format <strong>of</strong> the proceedings to be given for <strong>Penalization</strong> <strong>and</strong><br />

<strong>Regulation</strong> <strong>of</strong> Unauthorizedly Constructed Building.<br />

Format <strong>of</strong> the Proceedings rejecting an application for<br />

<strong>Penalization</strong> <strong>and</strong> <strong>Regulation</strong> <strong>of</strong> Unauthorizedly constructed<br />

building.<br />

Format <strong>of</strong> the progress report under BPS.<br />

Register showing receipt <strong>of</strong> the application at the receiving<br />

centre under LRS.<br />

Register showing disposal <strong>of</strong> applications under LRS<br />

Format for intimation to be given to the applicant to pay<br />

shortfall <strong>of</strong> charges if any under LRS.<br />

Format <strong>of</strong> the proceedings to be given for <strong>Regulation</strong> <strong>of</strong><br />

Unapproved Layout.<br />

Format <strong>of</strong> the Proceedings rejecting an application for<br />

<strong>Regulation</strong> <strong>of</strong> unapproved layout.<br />

Format <strong>of</strong> the progress report under LRS.


29<br />

Sl.<br />

No<br />

Sl.<br />

No<br />

Annexure – I<br />

Register showing receipt <strong>of</strong> the applications at the receiving centre under BPS.<br />

………………………………Municipality/Municipal Corporation<br />

………………………………Urban Development Authority.<br />

Annexure – II<br />

Register showing disposal <strong>of</strong> applications under BPS.<br />

………………………………Municipality/Municipal Corporation<br />

………………………………Urban Development Authority.<br />

Applicatio<br />

n No<br />

Name &<br />

Address<br />

<strong>of</strong> the<br />

Applicant<br />

Locatio<br />

n <strong>of</strong> the<br />

Buildin<br />

g with<br />

Door<br />

No.<br />

Application Name & Address <strong>of</strong> the Location <strong>of</strong> Type <strong>of</strong> Building<br />

No<br />

Applicant<br />

the Building as per Tablewith<br />

Door No. I,II,III <strong>of</strong><br />

application form<br />

1 2 3 4 5 6<br />

Type <strong>of</strong><br />

Building as<br />

per Table-<br />

I,II,III <strong>of</strong><br />

application<br />

form<br />

Penal<br />

Amount<br />

paid,<br />

D.D.No.<br />

Dt: with<br />

name<br />

<strong>of</strong> the<br />

Bank<br />

Action taken<br />

Penalisatio<br />

n Proc. No.<br />

& DT.<br />

Returned<br />

Proc. No.<br />

DT.<br />

Penal<br />

Amount<br />

paid<br />

Remarks<br />

1 2 3 4 5 6 7(a) 7(b) 8<br />

Annexure – III<br />

Format <strong>of</strong> the proceedings for <strong>Penalization</strong> <strong>and</strong> <strong>Regulation</strong> <strong>of</strong> Unauthorizedly<br />

Constructed Building / Building Constructed in deviation <strong>of</strong> the sanctioned plan.<br />

Proceedings <strong>of</strong> the Vice Chairman ………………..UDA<br />

Proceedings <strong>of</strong> the Commissioner …………….Municipality / Municipal Corporation<br />

Present:…………………………………………………………………………<br />

Proceedings No: ………………….dt.…………………<br />

Sir/Madam<br />

Sub: <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong> Unauthorizedly Constructed Buildings - Building<br />

bearing H.No……………<strong>of</strong>………………Municipality / Municipal Corporation / Gram<br />

Panchayat - Penalisation Orders issued.<br />

Ref: ApplicationNo…………….. dt:………….<strong>of</strong> Sri/Smt…………..……..…………<br />

An application has been filed in the reference cited, for penalization <strong>and</strong> regulation <strong>of</strong><br />

Unauthorizedly constructed building / building constructed in deviation <strong>of</strong> the sanctioned plan as<br />

per the details shown hereunder:<br />

1 Location <strong>of</strong> the Building :<br />

T.S.No /Door No./ Plot No.<br />

Layout/Sub Division No.<br />

Street <strong>and</strong> Locality


30<br />

City/Town/Village & m<strong>and</strong>al<br />

2 Status <strong>of</strong> the Building : Unauthorizedly constructed building /<br />

Building constructed in deviation <strong>of</strong><br />

the sanctioned plan.<br />

3 Type <strong>of</strong> Building as per table 1,2,3 <strong>of</strong> the :<br />

application.<br />

Tick the applicable column from<br />

column No.4 to 9<br />

4 Total built up area as per sanctioned plan :<br />

in Sft.<br />

5 Total built up area as on site in Sft :<br />

6 Extent <strong>of</strong> built up area in deviation to :<br />

sanctioned plan in Sft<br />

7 Total built up area with out obtaining :<br />

building permission.<br />

8 Apartment complex with sanction / :<br />

individual building converted in to<br />

apartments.<br />

1). Height less than 18 Mts<br />

:<br />

a. Apartment area upto 1000 Sft.,<br />

b. Apartment area more than 1000 Sft.,<br />

2). Height 18 Mts <strong>and</strong> above<br />

:<br />

a. Flat<br />

9 Apartment complex with out permission. :<br />

1). Height less than 18 Mts<br />

:<br />

Total built up area<br />

2). Height 18 Mts <strong>and</strong> above<br />

Total built up area<br />

:<br />

<strong>The</strong> above said application has been examined with reference to the A.P. <strong>Regulation</strong> <strong>and</strong><br />

<strong>Penalization</strong> <strong>of</strong> Unauthorizedly constructed buildings <strong>and</strong> Buildings constructed in deviation <strong>of</strong> the<br />

sanctioned plan Rules, 2007 <strong>and</strong> found to be in order. Hence the said building is penalized <strong>and</strong><br />

regulated under the said Rules as shown here under:<br />

1 Total built up area penalized <strong>and</strong> regulated<br />

2 Penal Amount Paid : Rs……….<br />

3 D.D.No. with date <strong>and</strong> name <strong>of</strong> the Bank<br />

Further, all proceedings <strong>and</strong> action <strong>of</strong> enforcement initiated or contemplated against the<br />

said building are withdrawn. <strong>The</strong> Plans showing the Building Penalized <strong>and</strong> Regulated is herewith<br />

enclosed along with the Occupancy Certificate..<br />

Enclosures: As above..<br />

Vice Chairman<br />

………………….Urban Development Authority.<br />

Commissioner<br />

………………… Municipality/Municipal Corporation.


31<br />

To<br />

Sri/Smt………………………...<br />

………………………………….<br />

…………………………………<br />

Copy to Assistant City Planner, Circle No……………………………Municipal Corporation<br />

Copy to Deputy Commissioner, Circle No………………………….. Municipal Corporation<br />

Copy to Town Planning <strong>of</strong>ficer, …………………………………………<br />

Municipality<br />

Copy to TPS / TPBO …………………………………………………. Municipality<br />

Copy to Revenue <strong>of</strong>ficer/Revenue Inspector, ……………………….<br />

Municipality<br />

Annexure – IV<br />

Format <strong>of</strong> the proceedings showing the rejection <strong>of</strong> an application for penalization<br />

<strong>and</strong> regulation <strong>of</strong> unauthorizedly constructed building / building constructed in<br />

deviation <strong>of</strong> the sanctioned plan.<br />

Proceedings <strong>of</strong> the Vice Chairman ………………..UDA<br />

Proceedings <strong>of</strong> the Commissioner …………………Municipality / Municipal Corporation<br />

Present:…………………………………………………………………………<br />

Proceedings No: ………………….dt.…………………<br />

Sir/Madam<br />

Sub: <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong> Unauthorizedly Constructed Buildings - Building<br />

bearing H.No……………<strong>of</strong>………………Municipality / Municipal Corporation / Gram<br />

Panchayat - Penalisation refused - Orders issued.<br />

Ref: Application No…………dt:………….<strong>of</strong> Sri/Smt……………..…..……………..<br />

An application has been filed in the reference cited, for penalization <strong>and</strong> regulation <strong>of</strong><br />

unauthorisedly constructed building / building constructed in deviation <strong>of</strong> the sanctioned plan as<br />

per the details shown here under:<br />

1 Location <strong>of</strong> the Building :<br />

T.S.No /Door No./ Plot No.<br />

Layout/Sub Division No.<br />

Street <strong>and</strong> Locality<br />

City/Town/Village & m<strong>and</strong>al<br />

2 Status <strong>of</strong> the Building : Unauthorizedly constructed building /<br />

Building constructed in deviation <strong>of</strong><br />

the sanctioned plan.<br />

3 Type <strong>of</strong> Building as per table 1,2,3 <strong>of</strong> the :<br />

application.<br />

Tick the applicable column from<br />

column No.4 to 9<br />

4 Total built up area as per sanctioned plan :<br />

in Sft.<br />

5 Total built up area as on site in Sft :<br />

6 Extent <strong>of</strong> built up area in deviation to :<br />

sanctioned plan in Sft<br />

7 Total built up area with out obtaining :<br />

building permission.<br />

8 Apartment complex with sanction / :<br />

individual building converted in to


32<br />

apartments.<br />

1). Height less than 18 Mts<br />

:<br />

c. Apartment area upto 1000 Sft.,<br />

d. Apartment area more than 1000 Sft.,<br />

2). Height 18 Mts <strong>and</strong> above<br />

:<br />

a. Flat<br />

9 Apartment complex with out permission. :<br />

1). Height less than 18 Mts<br />

:<br />

Total built up area<br />

2). Height 18 Mts <strong>and</strong> above<br />

Total built up area<br />

:<br />

<strong>The</strong> above said application has been examined with reference to the A.P. <strong>Regulation</strong> <strong>and</strong><br />

<strong>Penalization</strong> <strong>of</strong> Unauthorizedly constructed buildings <strong>and</strong> Buildings constructed in deviation <strong>of</strong> the<br />

sanctioned plan Rules, 2007 <strong>and</strong> found to be not in accordance with the Rules. Hence the<br />

application is rejected for penalization <strong>and</strong> regulation for the reasons mentioned below (Tick the<br />

appropriate item):<br />

i. Encroachment on Government l<strong>and</strong>s or property belonging to public under takings.<br />

ii. <strong>The</strong> applicant has no title over the l<strong>and</strong><br />

iii. Surplus l<strong>and</strong> declared under Urban L<strong>and</strong> Ceiling / Agricultural L<strong>and</strong> Ceiling / L<strong>and</strong>s<br />

resumed under <strong>Andhra</strong> <strong>Pradesh</strong> assigned l<strong>and</strong>s (POT) Act<br />

iv. Building affected under alignment <strong>of</strong> proposed road under Master Plan / Zonal<br />

Development Plan / Road Development Plan or public roads / MRTS / BRTS.<br />

v. Tank bed <strong>and</strong> Sikham l<strong>and</strong>s.<br />

vi. Areas covered under G.O. Ms No. 111 MA dated 8-3-1996 (protection <strong>of</strong> Catchment<br />

area <strong>of</strong> Osmansagar <strong>and</strong> Himayatsagar lakes).<br />

vii. Prohibited areas under the Coastal <strong>Regulation</strong> Zone<br />

viii. Layout open spaces / Master Plan open spaces / Areas earmarked for Recreation Use<br />

in Master Plan / Zonal Development Plan;<br />

ix. Building is not in conformity with l<strong>and</strong> use approved in Master Plan / Zonal<br />

Development Plan<br />

x. Sites under litigation / legal disputes regarding ownership.<br />

xi. Area reserved for parking in the sanctioned plan / area meant for parking purposes in<br />

the building.<br />

xii. Unauthorized construction is in unapproved layout.<br />

<strong>The</strong> applicant is informed that the unauthorized construction would be treated as continuing<br />

<strong>of</strong>fence <strong>and</strong> action will be taken to levy exemplary penalty including demolition <strong>of</strong> the building.<br />

Vice Chairman<br />

………………………….Urban Development Authority./<br />

Commissioner<br />

…………………Municipality /Municipal Corporation.


33<br />

To<br />

Sri/Smt………………………...<br />

………………………………….<br />

Copy to Assistant City Planner, Circle No………………………… Municipal Corporation<br />

Copy to Deputy Commissioner, Circle No……………………….. Municipal Corporation<br />

Copy to Town Planning <strong>of</strong>ficer, …………………………………………<br />

Municipality<br />

Copy to TPS/TPBO . …………………………………………………. Municipality<br />

Copy to Revenue <strong>of</strong>ficer/Revenue Inspector, ………………………. Municipality<br />

Total<br />

No. <strong>of</strong><br />

applicati<br />

ons<br />

received<br />

upto the<br />

beginnin<br />

g <strong>of</strong> the<br />

week<br />

Annexure – V<br />

(Format <strong>of</strong> the progress report under BPS for the week ending. ……………………)<br />

Total<br />

No. <strong>of</strong><br />

applicati<br />

ons<br />

receive<br />

during<br />

the<br />

week<br />

Cumul<br />

ative<br />

No. <strong>of</strong><br />

applic<br />

ations<br />

receiv<br />

ed<br />

……………………………Municipality/Municipal Corporation<br />

…………………………………Urban Development Authority.<br />

Type <strong>of</strong> Building (Nos) out<br />

<strong>of</strong> column No.3<br />

Individ<br />

ual<br />

reside<br />

ntial<br />

buildin<br />

g<br />

Comm<br />

ercial<br />

buildin<br />

g<br />

Other<br />

non<br />

reside<br />

ntial<br />

buildin<br />

g<br />

Apar<br />

tme<br />

nt<br />

com<br />

plex<br />

es<br />

No. <strong>of</strong> cases<br />

disposed<br />

during the<br />

week<br />

Penali<br />

sed<br />

Retur<br />

ned<br />

Total<br />

No. <strong>of</strong><br />

cases<br />

dispose<br />

d during<br />

the<br />

week<br />

Total<br />

No. <strong>of</strong><br />

cases<br />

dispos<br />

ed<br />

upto<br />

the<br />

end <strong>of</strong><br />

the<br />

week<br />

Balan<br />

ce No.<br />

<strong>of</strong><br />

applic<br />

ations<br />

pendi<br />

ng.<br />

Penal<br />

amou<br />

nt<br />

collect<br />

ed<br />

during<br />

the<br />

week<br />

Tota<br />

l<br />

pen<br />

al<br />

amo<br />

unt<br />

colle<br />

cted<br />

1 2 3 4(a) 4(b) 4(c) 4(d) 5(a) 5(b) 6 7 8 9 10 11<br />

Sl.<br />

No.<br />

Annexure – VI<br />

Register showing the receipt <strong>of</strong> applications at Receiving Center under LRS<br />

Application<br />

No<br />

……………………………Municipality/Municipal Corporation<br />

…………………………………Urban Development Authority.<br />

Name & address <strong>of</strong><br />

the applicant<br />

Location Details i.e<br />

Revenue Village,<br />

Sy.No, Locality etc.,<br />

Total Plot<br />

area /<br />

layout<br />

area<br />

Area <strong>of</strong><br />

open space<br />

available<br />

Re<br />

mar<br />

ks<br />

Remarks<br />

1 2 3 4 5 6 7<br />

Annexure – VII<br />

(Register showing the disposal <strong>of</strong> applications under LRS)<br />

……………………………Municipality/Municipal Corporation<br />

…………………………………Urban Development Authority.<br />

Action taken


34<br />

Sl.<br />

No.<br />

Applica<br />

tion No.<br />

Name &<br />

address <strong>of</strong><br />

the<br />

applicant<br />

Locatio<br />

n <strong>of</strong><br />

Plot /<br />

Layout<br />

Sy.No.<br />

Locality<br />

,<br />

Village<br />

Total Plot<br />

area /<br />

layout<br />

area<br />

Area<br />

<strong>of</strong><br />

open<br />

space<br />

availa<br />

ble<br />

Penal<br />

Amount<br />

paid,<br />

D.D.No<br />

. Dt:<br />

with<br />

name<br />

<strong>of</strong> the<br />

Bank.<br />

Action taken<br />

1 2 3 4 5 6 7 Area 8(a) No. 8(b) <strong>of</strong> Regul 8(c) Return 8(d) 9<br />

<strong>of</strong><br />

open<br />

Plots<br />

regulat<br />

ation<br />

Proce<br />

ed<br />

Proce<br />

Annexure – VIII<br />

space ed edings edings<br />

provid<br />

No./Dt No.<br />

(Intimation to the applicant to pay shortfall <strong>of</strong> charges<br />

ed if<br />

if any under LRS)<br />

any<br />

From<br />

Commissioner, ………………………Municipality/Municipal Corporation<br />

Vice Chairman, ………………………Urban Development Authority,<br />

Rem<br />

arks<br />

Endorsement No. ……………………dated:……………..<br />

Sub: UDA / Municipal Corporation / Municipality - <strong>Regulation</strong> <strong>of</strong> unapproved<br />

layout/plots in Sy.No…………..<strong>of</strong>………………………………….Village,<br />

………………………….. Municipality/Municipal Corporation - Regarding.<br />

Ref: Your Application No………………dated:…………………<br />

1. In response to the application cited, the applicant is informed that the competent<br />

authority has scrutinized your application <strong>and</strong> it is proposed to regulate the<br />

unapproved layout/plot in the site mentioned above.<br />

2. It is noticed that the applicant has paid the fees <strong>and</strong> charges which is less than the<br />

required levy. Accordingly, the applicant is required to remit the following shortfall <strong>of</strong><br />

fees <strong>and</strong> charges so as to enable the competent authority to take further action in<br />

the matter:<br />

(i) Shortfall <strong>of</strong> pro-rata charges Rs……………..<br />

(ii) Shortfall <strong>of</strong> pro-rata open space charges: Rs……………..<br />

(v) Shortfall <strong>of</strong> conversion charges Rs……………..<br />

Total<br />

Rs……………..


35<br />

(Rupees in words …………………………………………………….)<br />

<strong>The</strong> applicant is required to remit the said amount through a D.D. or Pay order from<br />

a scheduled bank in favour <strong>of</strong> the competent authority within 30 days from the date <strong>of</strong><br />

receipt <strong>of</strong> this intimation. In case the above amount is not remitted with in the stipulated<br />

time, the matter will be closed at this end <strong>and</strong> necessary action will be taken as per Rules.<br />

To<br />

Sri/Smt………………………...<br />

Vice Chairman<br />

………………………. Urban Development Authority.<br />

Commissioner<br />

…..………Municipality/Municipal Corporation<br />

Annexure – IX<br />

(Format <strong>of</strong> the proceedings to be given for regulation <strong>of</strong> unapproved layout/plot)<br />

Proceedings <strong>of</strong> the Vice Chairman ………………..UDA<br />

Proceedings <strong>of</strong> the Commissioner …………….Municipality / Municipal Corporation<br />

Present:…………………………………………………………………………<br />

Proceedings No: …………………….dt.…………………<br />

Sir/Madam<br />

Sub: <strong>Regulation</strong> <strong>of</strong> unapproved layout/plot in Sy.No………….. <strong>of</strong>……………… village,<br />

………………locality …………………<strong>of</strong> Municipality / Municipal Corporation / Gram<br />

Panchayat - <strong>Regulation</strong> Orders issued.<br />

Ref: 1. Application No…………dt:…………..<strong>of</strong> Sri/Smt……………..……..………<br />

2. Letter No…………..dt:…………from Director <strong>of</strong> Town <strong>and</strong> Country Planning,<br />

according technical approval for the layout.<br />

An application has been filed in the reference cited, for regulation <strong>of</strong> unapproved layout/plot<br />

as per the details shown here under:<br />

1 Location <strong>of</strong> the layout/plot :<br />

T.S.No /Door No./ Plot No./Sy No.<br />

Layout/Sub Division No.<br />

Street <strong>and</strong> Locality<br />

City/Town/Village & M<strong>and</strong>al<br />

2 Total extent <strong>of</strong> the Layout/Plot :<br />

3 No. <strong>of</strong> plots :<br />

4 Extent <strong>of</strong> open space already available in<br />

the layout if any<br />

:<br />

In the reference second cited, the Director <strong>of</strong> Town <strong>and</strong> Country Planning, has accorded<br />

technical approval (wherever applicable) for the layout subject to compliance <strong>of</strong> the certain


36<br />

conditions. <strong>The</strong> applicant has paid the following charges in<br />

D.D.No…………………..dt:……………..<strong>of</strong> ……………….Bank:<br />

1. Pro - rata charges (towards betterment/scrutiny /layout/development charges) :<br />

(towards betterment/scrutiny /layout/development charges/penalty)<br />

2. Pro - rata open space charges<br />

3. Conversion charges<br />

Total Amount : Rupees …………………………………………………<br />

<strong>The</strong> above said application has been examined with reference to the A.P. <strong>Regulation</strong> <strong>of</strong><br />

unapproved <strong>and</strong> illegal layout Rules 2007 <strong>and</strong> found to be in order. Hence the said layout/plot is<br />

regulated under the said Rules as shown here under subject to following conditions:<br />

1. <strong>The</strong> above regulation orders are subject to the conditions that may be applicable under<br />

the Urban L<strong>and</strong> Ceiling <strong>and</strong> <strong>Regulation</strong> Act, 1976 <strong>and</strong> A.P Agriculture L<strong>and</strong> Ceiling Act.<br />

2. <strong>The</strong> owners /applicants are solely responsible for any misrepresentation with regard to<br />

ownership/ title, Urban L<strong>and</strong> Ceiling Clearance etc. <strong>The</strong> owners /applicants are<br />

responsible for any damage claimed by any one on account <strong>of</strong> regulation <strong>of</strong> the above<br />

layout / plot.<br />

3. <strong>The</strong> regulation orders shall not be used as the sole reason for obtaining exemption from<br />

the provisions <strong>of</strong> Urban L<strong>and</strong> Ceiling <strong>and</strong> <strong>Regulation</strong> Act, 1976 <strong>and</strong> A.P Agriculture<br />

L<strong>and</strong> Ceiling Act.<br />

4. <strong>The</strong> regulation <strong>of</strong> layout /plot does not confer ownership on the applicant or alter the<br />

ownership <strong>of</strong> the l<strong>and</strong>.<br />

5. <strong>The</strong> regulation orders shall not be used as pro<strong>of</strong> <strong>of</strong> any title <strong>of</strong> the l<strong>and</strong>.<br />

6. <strong>The</strong> regulation <strong>of</strong> layout /plot does not bar the Government or any public agency from<br />

acquisition <strong>of</strong> the above l<strong>and</strong> for any public purpose.<br />

7. All developments/construction activity shall be taken up as per the layout pattern<br />

regulated by these orders.<br />

8. <strong>The</strong> roads <strong>and</strong> open spaces as per the layout pattern regulated by these orders are<br />

deemed to be h<strong>and</strong>ed over to the ------------------- Municipal Corporation /Municipality<br />

/Gram Panchayat <strong>and</strong> no claims / counter claims on the said roads <strong>and</strong> open places<br />

will be entertained in future.<br />

9. <strong>The</strong> boundaries, dimensions <strong>and</strong> layout pattern <strong>of</strong> the regulated layout /plot shall not be<br />

altered except with the previous approval <strong>of</strong> the Competent Authority.<br />

1 Total extent <strong>of</strong> the layout / plot area :<br />

regulated<br />

2 No. <strong>of</strong> plots in the layout. :<br />

3 Extent <strong>of</strong> area occupied by the roads :<br />

4 Percentage <strong>of</strong> the area occupied by the :<br />

roads


37<br />

5 Extent <strong>of</strong> open space provided if any in the :<br />

layout<br />

6 Percentage <strong>of</strong> the open space provided if :<br />

any in the layout<br />

5 Penal Amount Paid : Rs……….<br />

6 D.D.No. with date <strong>and</strong> name <strong>of</strong> the Bank :<br />

Further, all proceedings <strong>and</strong> action <strong>of</strong> enforcement initiated or contemplated against the<br />

said layout/plot are withdrawn. <strong>The</strong> plan showing Layout/Plot regulated is herewith enclosed.<br />

Enclosures: 1.<br />

Vice Chairman<br />

………………………….Urban Development Authority.<br />

Commissioner<br />

…………………Municipality/Municipal Corporation.<br />

To<br />

Sri/Smt………………………...<br />

………………………………….<br />

…………………………………<br />

Copy to Assistant City Planner, Circle No………………………… Municipal Corporation<br />

Copy to Deputy Commissioner, Circle No……………………….. Municipal Corporation<br />

Copy to Town Planning <strong>of</strong>ficer, …………………………………………<br />

Municipality<br />

Copy to TPS/TPBO . …………………………………………………. Municipality<br />

Copy to Revenue <strong>of</strong>ficer/Revenue Inspector, ……………………….<br />

Municipality<br />

Annexure – X<br />

(Format <strong>of</strong> the proceedings for rejection <strong>of</strong> regulation <strong>of</strong> unapproved layout/plot)<br />

Proceedings <strong>of</strong> the Vice Chairman ………………..UDA<br />

Proceedings <strong>of</strong> the Commissioner …………….Municipality / Municipal Corporation<br />

Present:…………………………………………………………………………<br />

Proceedings No: ………………….dt.…………………<br />

Sir/Madam<br />

Sub: <strong>Regulation</strong> <strong>of</strong> unapproved layout/plot in Sy.No………….. <strong>of</strong>……………… village,<br />

………………locality …………………<strong>of</strong> Municipality / Municipal Corporation / Gram<br />

Panchayat - <strong>Regulation</strong> Refused -Orders issued.<br />

Ref: 1. Application No…………dt:…………..<strong>of</strong> Sri/Smt……………..……..………<br />

2. Letter No……………..dt:…………from Director <strong>of</strong> Town <strong>and</strong> Country Planning,<br />

according technical approval for the layout.<br />

An application has been filed in the reference cited, for regulation <strong>of</strong> unapproved layout<br />

/plot as per the details shown here under:<br />

1 Location <strong>of</strong> the layout/plot :<br />

T.S.No /Door No./ Plot No./Sy No.<br />

Layout/Sub Division No.<br />

Street <strong>and</strong> Locality<br />

City/Town/Village & m<strong>and</strong>al<br />

2 Total extent <strong>of</strong> the Layout/Plot :


38<br />

3 No. <strong>of</strong> plots :<br />

4 Extent <strong>of</strong> open space already available in :<br />

the layout if any<br />

<strong>The</strong> above said application has been examined with reference to the A.P. <strong>Regulation</strong> <strong>of</strong><br />

unapproved <strong>and</strong> illegal layout Rules 2007 <strong>and</strong> found to be not in accordance with the said Rules.<br />

Hence the application is rejected for regulation for the reasons mentioned below (Tick the<br />

appropriate item/items).<br />

i. Encroachment on Government L<strong>and</strong>.<br />

ii. Property belongs to public under takings.<br />

iii. Surplus l<strong>and</strong> declared under Urban L<strong>and</strong> Ceiling / Agricultural L<strong>and</strong> Ceiling / L<strong>and</strong>s<br />

resumed under A.P. assigned l<strong>and</strong>s (POT).<br />

iv. Tank beds <strong>and</strong> Sikham l<strong>and</strong>s.<br />

v. Areas covered under GO. MS. No. 111 MA dt. 8.3.1996.<br />

vi. Prohibited area under the Costal <strong>Regulation</strong> Zone <strong>and</strong> such other environmentally<br />

restricted zones as may be prescribed.<br />

vii. Earmarked for Industrial use in the sanctioned Master Plans.<br />

viii. Site is under legal litigations/disputes.<br />

ix. Layout /plot is in the bed <strong>of</strong> water bodies viz., river, nala, pond, cheruvu, kunta /<br />

shikam l<strong>and</strong>s <strong>and</strong> in Full Tank Level(FTL) <strong>of</strong> a lake<br />

x. Within 30 Mts. from the boundary <strong>of</strong> river course/Lakes <strong>of</strong> area 10 Ha <strong>and</strong> above<br />

xi. Within 9 Mts. from the boundary <strong>of</strong> Lakes/ Kuntas / Shikam l<strong>and</strong>s <strong>of</strong> area less than<br />

10 Ha<br />

xii. Within 9 Mts. from the boundary <strong>of</strong> Canal, Vagu etc.<br />

xiii. Within 2 Mts. from the defined boundary <strong>of</strong> nala<br />

<strong>The</strong> applicant is informed that the unauthorized layout / plot would be treated as continuing<br />

<strong>of</strong>fence <strong>and</strong> action will be taken to levy exemplary penalty.<br />

Vice Chairman<br />

………………………….Urban Development Authority.<br />

Commissioner<br />

………………… Municipality/Municipal Corporation.<br />

To<br />

Sri/Smt………………………...<br />

………………………………….<br />

…………………………………<br />

Copy to Assistant City Planner, Circle No………………………… Municipal Corporation<br />

Copy to Deputy Commissioner, Circle No……………………….. Municipal Corporation<br />

Copy to Town Planning <strong>of</strong>ficer, …………………………………………<br />

Municipality<br />

Copy to TPS/TPBO . …………………………………………………. Municipality<br />

Copy to Revenue <strong>of</strong>ficer/Revenue Inspector, ……………………….<br />

Municipality


39<br />

Annexure –XI<br />

(Format <strong>of</strong> the progress report under LRS for the week ending. ……………………)<br />

Total No.<br />

<strong>of</strong><br />

application<br />

s received<br />

upto the<br />

beginning<br />

<strong>of</strong> the<br />

week<br />

Total<br />

No. <strong>of</strong><br />

applicati<br />

ons<br />

receive<br />

during<br />

the<br />

week<br />

Cumulat<br />

ive No.<br />

<strong>of</strong><br />

applicati<br />

ons<br />

received<br />

……………………………Municipality/Municipal Corporation<br />

…………………………………Urban Development Authority.<br />

No. <strong>of</strong> cases<br />

disposed during<br />

the week<br />

Regulated Returne<br />

d<br />

Total<br />

No. <strong>of</strong><br />

cases<br />

dispose<br />

d during<br />

the<br />

week<br />

Total No.<br />

<strong>of</strong> cases<br />

disposed<br />

upto the<br />

end <strong>of</strong> the<br />

week<br />

Balance<br />

No. <strong>of</strong><br />

applicati<br />

ons<br />

pending<br />

.<br />

Penal<br />

amount<br />

collected<br />

during<br />

the week<br />

Total<br />

penal<br />

amount<br />

collecte<br />

d<br />

Remarks<br />

1 2 3 4(a) 4(b) 5 6 7 8 9 10<br />

FREQUENTLY ASKED QUESTIONS UNDER BPS<br />

Q1. What are the advantages <strong>of</strong> Penalisation <strong>of</strong> Unauthorised Constructions?<br />

A: <strong>The</strong> constructed building will get formal orders <strong>of</strong> regulation which will remove the<br />

uncertainty <strong>and</strong> threat <strong>of</strong> demolition <strong>and</strong> will get the occupancy certificate which is<br />

m<strong>and</strong>atory as per Municipal Laws.<br />

Q2. Is it compulsory to apply for penalisation <strong>of</strong> Unauthorised Constructions?<br />

A: Yes.<br />

Q3. What are the consequences if I do not apply?<br />

A: Action will be taken against such unauthorised construction as per the provisions<br />

<strong>of</strong> the Municipal Laws for levy <strong>of</strong> exemplary fines including demolition <strong>of</strong> the<br />

unauthorised constructions.<br />

Q4. Unauthorised construction made before 1.1.1985 can be penalised if applied?<br />

A: Persons who have made unauthorised constructions before 1.1.1985 need not<br />

apply. However, if persons apply under this scheme, it will be considered subject to<br />

verification <strong>of</strong> structural stability <strong>and</strong> heritage angle.<br />

Q5. Whether the time prescribed for filing the applications for penalisation <strong>of</strong><br />

unauthorised constructions Scheme will be extended?<br />

A: No


40<br />

Q6. My neighbour has complained against me on building setbacks violation <strong>and</strong><br />

a case is pending in the court. Can I apply for building regularisation?<br />

A: Yes, provided there are no specific court orders/directions in this matter.<br />

Q7. Whether unauthorised construction made in a parking area which was in<br />

excess <strong>of</strong> the required parking area, can be penalised under these rules?<br />

A: No. <strong>The</strong> said area has to be utilised for parking only.<br />

Q8. Permission has been obtained for one use (e.g. residential use) <strong>and</strong><br />

constructed as per plan but the use <strong>of</strong> the building is changed (e.g. for<br />

commercial use), can it be penalised?<br />

A: If the present usage <strong>of</strong> the building is in accordance with Zoning <strong>Regulation</strong>s such<br />

cases are eligible for penalisation.<br />

Q9. Sanction for construction <strong>of</strong> the building is obtained but the sanctioned copy is<br />

not available. How the penalisation charges will be levied?<br />

A: <strong>The</strong> concerned Municipality shall assist the applicant to trace out the copy <strong>of</strong><br />

sanctioned plan from the Municipal records. If it is found that there is no sanction<br />

for the said construction, the entire building will be treated as unauthorized <strong>and</strong><br />

penalisation charges will be levied accordingly.<br />

Q10. Permission is obtained for 3 floors but constructed 4 floors. What penalisation<br />

charges will be levied?<br />

A: If the permitted 3 floors are constructed as per plan no penalisation charges will be<br />

collected for the 3 floors. If there are deviations in the permitted floors, the<br />

penalisation charges will be collected as per that rate. But the entire 4th floor will<br />

be treated as unauthorized construction <strong>and</strong> penalisation charges will be collected<br />

as per that category.<br />

Q11. Permission was obtained for individual residential building but converted in<br />

to Apartment Complex. Whether such apartments are eligible for<br />

penalisation?<br />

A: Yes, Penalisation charges will be levied as applicable in the case <strong>of</strong> apartment<br />

complexes.


41<br />

Q12. Whether Constructions made in parks, green areas <strong>and</strong> layout open spaces<br />

are eligible for Penalisation?<br />

A: No.<br />

Q13. Permission was obtained for stilt for parking + 5 floors for apartments but<br />

converted the stilt floor for other purposes (flats/shops/<strong>of</strong>fice etc). Whether<br />

the apartments in the upper 5 floors are eligible for penalisation?<br />

A: Constructions made in the stilt floor are not eligible for penalisation. However<br />

apartments in upper floors are eligible for penalisation. Prompt action will be taken<br />

for removal <strong>of</strong> structures in the parking area.<br />

Q14. Whether the pent houses constructed over Stilt + 5 floors Apartment<br />

Complex can be penalised?<br />

OR<br />

I have a flat on the 3rd floor <strong>of</strong> an Apartment Complex with sanctioned plan <strong>of</strong><br />

5 floors which has balcony violations. In addition to these violations, the<br />

owner/builder constructed a pent house on the 6th floor <strong>and</strong> sold <strong>of</strong>f the pent<br />

house. What penalties do I need to pay under these Rules?<br />

A: Pent houses in buildings <strong>of</strong> height less than 18 meters are eligible for penalisation,<br />

In cases where penthouse construction is making the building height more than 18<br />

meters then the penthouses can penalised provided the these are below 25% <strong>of</strong><br />

the covered area <strong>of</strong> the floor <strong>and</strong> height is average floor height <strong>and</strong> would be<br />

considered subject to production <strong>of</strong> No Objection Certificate (NOC) from Fire<br />

Services <strong>Department</strong> <strong>and</strong> Airport Authority <strong>of</strong> India. In respect <strong>of</strong> flats on other<br />

floors, the pro-rata charges as applicable for an Apartment Complex would be<br />

levied with out insisting on such NOCs.<br />

Pent Houses exceeding the above stated limits would be treated as High Rise<br />

Buildings <strong>and</strong> all provisions <strong>of</strong> High Rise Buildings for the entire building shall be<br />

applicable in such cases.<br />

Q15. Whether the constructions affected in road widening are eligible for<br />

penalisation?


42<br />

A: Constructions/buildings falling in the road widening portion are not eligible for<br />

penalisation. However the remaining portion is eligible for penalisation after<br />

h<strong>and</strong>ing over the affected portion to the Urban Local Body.<br />

Q16. Whether the constructions made in the area earmarked for Tot-lot are eligible<br />

for penalisation?<br />

A: Yes.<br />

Q17. Whether the constructions made in deviation to the Special <strong>Regulation</strong>s<br />

applicable to the Banjara Hills / Jubilee Hills are eligible for Penalisation?<br />

A: Yes<br />

Q18. <strong>The</strong>re are cases where certain builders are constructing additional floors<br />

during the interregnum period. Will these be covered under these<br />

Penalisation Rules?<br />

A: No. Such additional constructions are liable to be demolished besides taking penal<br />

action against the builders including black-listing.<br />

Q19. A Builder has taken approval under the new Revised Building Rules, 2006<br />

mortgaging the area as required under the said rules. He is constructing in<br />

violation <strong>of</strong> the sanctioned plan. Whether he is eligible for penalisation under<br />

these Rules?<br />

A: No, since he has already mortgaged certain area which would be forfeited in case<br />

<strong>of</strong> violations.<br />

Q20. My builder has unauthorisedly constructed an additional cellar for parking.<br />

Will the parking floor be considered for penalisation?<br />

A: Yes.<br />

Q21. Whether the penalisation charges can be paid in installments?<br />

A: No, All penalisation charges have to be paid along with the application.<br />

Q22. Whether Penalisation charges paid in excess will be refunded?<br />

A: Yes, refunded after issue <strong>of</strong> the proceedings.


43<br />

Q23. If the application is rejected, whether the penalisation charges paid are<br />

returned?<br />

A: Yes, 10% <strong>of</strong> penalisation charges will be deducted towards processing fee.<br />

In case <strong>of</strong> false declaration/misrepresentation <strong>of</strong> facts penalisation charges will not<br />

be refunded.<br />

Q24. Permission is taken in two plots by amalgamating them but constructed in<br />

one plot only, what would be the penalisation charges?<br />

A: <strong>The</strong> penalisation charges will be levied on excess built up area i.e, differencebetween<br />

the proportionate permitted area on the extent <strong>of</strong> plot applied for regularisation <strong>and</strong><br />

the total area constructed.<br />

Q25. A person has constructed 3 floors with extra balconies <strong>and</strong> a 4 th floor which is<br />

not permitted as per the sanctioned plan. What penalties would be levied?<br />

A.: He has to apply for penalisation for both deviations in the permitted floor (extra<br />

balconies) <strong>and</strong> unauthorized 4 th floor, as given in the Application Form,viz., the penal<br />

charges for the extra balconies which are deviation to the sanctioned plan; <strong>and</strong><br />

separate penal charges for the additional floor which is totally unauthorized shall have<br />

to be paid as per relevant category.<br />

Q 26. My builder has taken sanctioned plan from the Gram Panchayat with stilt+ 5<br />

upper floors <strong>and</strong> constructed according to the sanctioned plan only. I have<br />

purchased a flat in the said building. Am I liable for any penalisation?<br />

A.:<br />

Yes, <strong>and</strong> all the flat owners are required to pay penalisation since the sanctioned<br />

plan <strong>of</strong> the Gram Panchayat is not valid as they are not empowered to approve<br />

such type <strong>of</strong> constructions as per delegation <strong>of</strong> powers without prior technical<br />

approval from UDA/ DTCP as per the Gram Panchayat Building Rules, 2002. This<br />

is clearly indicated on the plans.


44<br />

APPLICATION<br />

NUMBER<br />

BPS/…………………….<br />

APPLICATION FOR PENALISATION OF UNAUTHORISEDLY CONSTRUCTED BUILDING /<br />

BUILDING CONSTRUCTED IN DEVIATION OF THE SANCTIONED PLAN<br />

----------------------------------------------------------MUNICIPAL CORPORATION / MUNICIPALITY<br />

----------------------------------------------------------URBAN DEVELOPMENT AUTHORITY<br />

1 Name <strong>of</strong> the Applicant<br />

2 Postal Address<br />

3 Building Location<br />

i T.S. No.<br />

ii Door No.<br />

iii Plot No.<br />

iv Layout / Sub Divn. No.<br />

v Street<br />

vi Locality<br />

vii City/Town/ Village<br />

4 Furnish the following<br />

i Copy <strong>of</strong> latest Property Tax receipt YES NO<br />

ii Copy <strong>of</strong> Registered document duly attested by Gazetted Officer YES NO


45<br />

iii One Photograph showing the Elevation <strong>and</strong> ro<strong>of</strong> slab YES NO<br />

5 Details <strong>of</strong> Site & Building<br />

i<br />

ii<br />

iii<br />

iv<br />

iv<br />

Plot Area (in Sq.m)<br />

Building Permit No. & Date if<br />

any<br />

Sanctioned Plan copy enclosed<br />

No. <strong>of</strong> Floors Sanctioned <strong>and</strong><br />

height <strong>of</strong> building<br />

No. <strong>of</strong> Floors <strong>and</strong> height <strong>of</strong><br />

building from the road level as<br />

on site<br />

v Total Built Up Area Sanctioned<br />

(in Sq m)<br />

vi Total Built Up Area as on site<br />

(in Sq m)<br />

vii Additional built up area built<br />

a. Area in deviation to<br />

sanctioned plan within<br />

permitted floors<br />

b. Area constructed<br />

without any permission<br />

or over <strong>and</strong> above the<br />

permitted floors<br />

6 Road Access Details<br />

i Existing Road Width <strong>of</strong> abutting<br />

road<br />

7 Usage <strong>of</strong> the building as per<br />

approved plan<br />

(if any)<br />

a. Individual Residential Building<br />

b. Commercial Building<br />

c. Non-Residential Building<br />

d. Apartment complex<br />

8 Total Penalisation charges<br />

payable (as per Self<br />

Computation Table duly filled in)<br />

9 Dem<strong>and</strong> Draft / Pay Order<br />

As per Sanctioned Plan<br />

As on ground<br />

i<br />

Amount:


46<br />

ii<br />

iii<br />

D.D.No.<br />

Date<br />

iv<br />

Name <strong>of</strong> the Bank & Branch<br />

10 Any court case is pending<br />

regarding ownership <strong>of</strong> the site<br />

11 If yes details may be enclosed<br />

separately<br />

YES / NO<br />

12 Certificate to be submitted by the Applicant:<br />

Date<br />

! I hereby certify that the Building Plans, Site Plan <strong>and</strong> the particulars furnished above are<br />

true <strong>and</strong> correct.<br />

! I declare that the property for which I am applying for penalisation is not a public property<br />

<strong>and</strong> I further declare that there are no disputes/ legal cases pending in court <strong>of</strong> law<br />

regarding ownership <strong>of</strong> the site/ building.<br />

! I also declare that my application is not in contravention <strong>of</strong> l<strong>and</strong> use as per the Master<br />

Plan.<br />

! In the event <strong>of</strong> the particulars furnished in the application are found to be not true , my<br />

application may summarily be rejected duly forfeiting the entire penal charges paid <strong>and</strong> I<br />

am liable for enforcement action by the Competent Authority as per the law.<br />

Name<br />

Place<br />

Signature<br />

14 Certificate to be signed by the Licensed Technical Personnel:<br />

! I hereby certify that the Building Plans <strong>and</strong> Site Plan are prepared by me duly taking the<br />

measurements on ground. <strong>The</strong> technical data with regard to the permitted built up area, as<br />

per sanctioned plan <strong>and</strong> actual built up area existing at site, extent <strong>of</strong> built up area in<br />

deviation to sanctioned plan <strong>and</strong> total built up area without any building permission is true <strong>and</strong><br />

correct.<br />

! .<br />

Signature<br />

Name<br />

License No. <strong>and</strong><br />

Stamp<br />

Category Architect Surveyor Engineer Others (specify)<br />

Address<br />

Contact<br />

Numbers<br />

15<br />

with<br />

Certificate to be signed by the Structural Engineer:<br />

(Certificate to be submitted in case <strong>of</strong> the buildings <strong>of</strong> height above 15 m or above )<br />

! I hereby certify that the building is structurally safe <strong>and</strong> the construction is in accordance


47<br />

with the specified designs <strong>and</strong> that I will be held responsible if the same are not in order at<br />

a later stage.<br />

Signature<br />

Name<br />

Licence No.<br />

Address with<br />

Contact Numbers<br />

16.1. Fill up the table applicable<br />

TABLE-1<br />

Sl.<br />

No<br />

Self Computation Table showing Penalisation Charges for Individual Residential<br />

Buildings / Commercial Buildings / other Non-Residential Buildings for the cases<br />

where Building Permission was obtained but deviated from the sanctioned plan<br />

Category /<br />

Sub-category<br />

Built Up<br />

Area as per<br />

sanctioned<br />

plan (in sft)<br />

Built Up<br />

Area as on<br />

site<br />

(in sft)<br />

Difference<br />

<strong>of</strong> area in<br />

(in sft)<br />

% <strong>of</strong><br />

violation<br />

Rate per sft<br />

as per<br />

Annexure-I<br />

<strong>of</strong> the Rules<br />

Total<br />

penal<br />

amount to<br />

be paid<br />

(1) (2) (3) (4) (5) = (4)-(3) (6) =<br />

(5) /<br />

(3)x100<br />

A. INDIVIDUAL RESIDENTIAL BUILDINGS:<br />

1 Upto G+2 floors<br />

or 10m height<br />

2 Above G+2 floors<br />

<strong>and</strong> upto G+4<br />

floors or above<br />

10m <strong>and</strong> upto<br />

15m height<br />

B. COMMERCIAL BUILDINGS:<br />

1 Up to G+1 floor<br />

(7) (8) =<br />

(5)x(7)<br />

2 Above G+1 floor<br />

<strong>and</strong> up to G+4<br />

floors <strong>and</strong> upto<br />

15m Height<br />

3 Above 15 m in<br />

height<br />

C. Other Non-Residential Buildings (Institutional / Educational / Industrial, etc.):<br />

1 upto 15m height<br />

2 above 15 m in<br />

height


48<br />

Signature:<br />

Name :


49<br />

16.2. Fill up the table applicable<br />

TABLE-2<br />

Sl.<br />

No.<br />

Self-Computation Table showing Penalisation Charges for Individual Residential<br />

Buildings / Commercial Buildings /Other Non- Residential Buildings for the cases<br />

where No Building Permission was obtained<br />

Category /<br />

Sub-category<br />

Built Up Area<br />

as on ground<br />

(in sft)<br />

Rate per S. ft<br />

as per<br />

Annexure-I<br />

<strong>of</strong> the Rules<br />

(in Rs.)<br />

Total Penal Amount<br />

to be paid (in Rs.)<br />

1 2 3 4 5 = 3x4<br />

A INDIVIDUAL RESIDENTIAL BUILDINGS:<br />

1 Up to G+2 floors or 10m<br />

height<br />

2<br />

Above G+2 floors <strong>and</strong><br />

up to G+4 floors <strong>and</strong><br />

above 10m <strong>and</strong> up to 15m<br />

COMMERCIAL BUILDINGS<br />

1 Up to G+1 floor<br />

2<br />

Above G+1 floor <strong>and</strong> up to<br />

G+ 4 floors <strong>and</strong><br />

up to 15m Height<br />

3 Above 15 m in height<br />

1<br />

2<br />

OTHER NON-RESIDENTIAL BUILDINGS (Institutional / Educational / Industrial, etc.)<br />

Up to 15m height<br />

Above 15 m in height<br />

Name<br />

Signature


50<br />

16.3 Fill up the table applicable<br />

TABLE-3<br />

Self computing Table showing Penal Charges for Multiple Dwelling Units / Flats /<br />

Apartment Complexes<br />

Sl.N<br />

o.<br />

Categor<br />

y<br />

Permitted by Sanctioning<br />

Authority but deviated<br />

Penalisati<br />

on<br />

Sub-category<br />

Charges<br />

to be paid<br />

Building Constructed Without<br />

permission /Unauthorised Floor<br />

Built Up<br />

Area <strong>of</strong><br />

Apartment<br />

(in Sq. ft.)<br />

Penalisatio<br />

n Charges<br />

per sft<br />

1 2 3(a) 3(b) 4(a) 4(b)<br />

Penalisation<br />

Charges<br />

to be paid<br />

4(c) =<br />

4(a)x4(b)<br />

1<br />

Height<br />

less<br />

than 18<br />

mtrs<br />

Apartment area up<br />

to 1000 sft<br />

Apartment area<br />

more than 1000 sft<br />

2 Height<br />

18 mtrs<br />

&<br />

above<br />

Signature:<br />

Name:


51<br />

17. INDEMNITY BOND & UNDERTAKING<br />

(On Non-Judicial Stamp paper <strong>of</strong> Rs. 100 & Notarised)<br />

(To be submitted along with Application Form)<br />

This Indemnity Bond <strong>and</strong> Undertaking executed on this __________ day <strong>of</strong> ____200- by Smt./Sri<br />

_______________________________________________________________<br />

S/o/W/o____________________________________________________Age________<br />

Occupation____________________________________ R/o_____________________<br />

Herein after called the FIRST PARTY which term shall include their legal heirs, successors,<br />

assignees, agents, representatives <strong>and</strong> tenants.<br />

IN FAVOUR OF<br />

<strong>The</strong> Commissioner <strong>of</strong> ------------------------------------------------------------------------------/ Vice-<br />

Chairman ______________________________Urban Development Authority herein after called<br />

the SECOND PARTY, which term shall include all <strong>of</strong>ficials <strong>and</strong> staff <strong>of</strong><br />

the___________________________Municipal Corporation/Municipality/Urban Development<br />

Authority.<br />

Whereas the FIRST PARTY has applied for the penalisation <strong>of</strong> the unauthorized construction in<br />

Premises No.--------------------------- <strong>of</strong> ---------------------, --------------/Sy. No.------------------- <strong>of</strong><br />

___________, _____________ M<strong>and</strong>al, ____________ District in the site / plot covering an extent<br />

<strong>of</strong> __________________________ sq m.<br />

Whereas the SECOND PARTY has agreed to consider penalisation <strong>of</strong> the unauthorized<br />

construction in the said site/ plot in terms <strong>of</strong> ‘the <strong>Andhra</strong> <strong>Pradesh</strong> <strong>Regulation</strong> <strong>and</strong> Penalisation <strong>of</strong><br />

Unauthorisedly Constructed Buildings <strong>and</strong> Buildings constructed in deviation <strong>of</strong> the Sanctioned<br />

Plan Rules, 2007’ <strong>and</strong> made it a condition that there shall not be any defect/litigations/L<strong>and</strong><br />

Acquisition over the said site/l<strong>and</strong> <strong>and</strong> the same shall be free from all claims <strong>of</strong> Govt./Banks/<strong>and</strong><br />

attachments <strong>of</strong> Courts, <strong>and</strong> the FIRST PARTY has to indemnify the SECOND PARTY to this<br />

effect.<br />

Whereas the FIRST PARTY having agreed to the aforesaid condition hereby indemnifies the<br />

SECOND PARTY with the above assurance <strong>and</strong> hereby solemnly declare that the above said<br />

site/l<strong>and</strong> is the property <strong>of</strong> the FIRST PARTY which is possessed by him/her since the date <strong>of</strong><br />

purchase <strong>and</strong> the same is free from all defects, litigations, claims <strong>and</strong> attachments from any<br />

courts, etc. <strong>and</strong> in case <strong>of</strong> any disputes/litigations arises at any time in future the FIRST PARTY<br />

will be responsible for the settlement <strong>of</strong> the same <strong>and</strong> the SECOND PARTY will not be a party to<br />

nay such disputes/litigations.


52<br />

Hence this Indemnity Bond.<br />

FIRST PARTY ____________________________________<br />

WITNESSES:<br />

1. ______________________ Name <strong>and</strong> address_____________________________<br />

1. ______________________ Name <strong>and</strong> address____________________________<br />

Sworn <strong>and</strong> signed before me on this ------------ day <strong>of</strong> ---------- 200 in presence <strong>of</strong> above witnesses.<br />

PUBLIC NOTARY<br />

18. List <strong>of</strong> documents to be enclosed along with the application: Submitted<br />

1 Sanctioned Plan copy YES NO<br />

2 Copy <strong>of</strong> Ownership document / Title Deed attested by Gazetted Officer YES NO<br />

3 3 sets <strong>of</strong> Plans (one original on Tracing Paper / Cloth + 2 ammonia prints) as<br />

stated below drawn by Licensed Technical Person <strong>and</strong> signed by applicant<br />

YES NO


53<br />

<strong>and</strong> LTP<br />

a. Site Plan YES NO<br />

b. Location Plan YES NO<br />

c.Detailed Plan YES NO<br />

d. Section YES NO<br />

e. Elevation YES NO<br />

4 Self computation table for the penalization charges YES NO<br />

5<br />

Dem<strong>and</strong> Draft / Pay Order drawn in favour <strong>of</strong> the Competent Authority towards<br />

the penalization charges<br />

YES NO<br />

6 Copy <strong>of</strong> latest Property Tax Receipt YES NO<br />

7 One Photograph showing the Elevation YES NO<br />

8 One Photograph showing the Ro<strong>of</strong> Slab YES NO<br />

9 Indemnity Bond YES NO<br />

10<br />

Affidavit as required under Urban L<strong>and</strong> Ceiling Act in case the total extent <strong>of</strong> the<br />

l<strong>and</strong> held by the applicant does not exceed ceiling limit.<br />

YES NO<br />

11<br />

Urban L<strong>and</strong> Ceiling Clearance Certificate in case the extent <strong>of</strong> plot / site<br />

exceeds the ceiling limit<br />

YES NO<br />

12 NOC from Fire Services <strong>Department</strong> (where ever applicable) YES NO<br />

13 NOC from Airport Authority <strong>of</strong> India (where ever applicable) YES NO<br />

14<br />

15<br />

Total No. <strong>of</strong> Documents<br />

19. CHECK LIST & ACKNOWLEDGEMENT<br />

(To be submitted in duplicate - one to be retained in file <strong>and</strong> another to be given to applicant as<br />

acknowledgement)<br />

APPLICATION<br />

NUMBER BPS/…………………………<br />

APPLICATION FOR PENALISATION OF UNAUTHORISEDLY CONSTRUCTED BUILDING<br />

/BUILDING CONSTRUCTED IN DEVIATION OF THE SANCTIONED PLAN<br />

-------------------------------------------------------------MUNICIPAL CORPORATION / MUNICIPALITY


54<br />

----------------------------------------------------------------------URBAN DEVELOPMENT AUTHORITY<br />

1 Name <strong>of</strong> the Applicant<br />

2 Building Location<br />

i T.S. No.<br />

ii Door No.<br />

iii Plot No.<br />

iv Layout / Sub Divn.<br />

No.<br />

v Street<br />

vi Locality<br />

vii City/Town/Village<br />

List <strong>of</strong> documents to be enclosed along with the application:<br />

Submitted<br />

1 Copy <strong>of</strong> Sanctioned Plan YES NO<br />

2 Copy <strong>of</strong> Ownership document / Title Deed attested by Gazetted Officer YES NO<br />

3<br />

3 sets <strong>of</strong> Plans (one original on Tracing Paper / Cloth + 2 ammonia prints) as stated<br />

below drawn by Licensed Technical Person <strong>and</strong> signed by applicant <strong>and</strong> LTP<br />

YES NO<br />

a Site Plan YES NO<br />

b Location Plan YES NO<br />

c Detailed Plan YES NO<br />

d Section YES NO<br />

e Elevation YES NO<br />

4 Self computation table for the penalization charges YES NO<br />

5<br />

Dem<strong>and</strong> Draft / Pay Order drawn in favour <strong>of</strong> the Competent Authority towards the<br />

penalization charges<br />

YES NO<br />

6 Copy <strong>of</strong> latest Property Tax Receipt attested by Gazetted Officer YES NO<br />

7 One Photograph showing the Elevation YES NO<br />

8 One Photograph showing the Ro<strong>of</strong> Slab YES NO<br />

9 Indemnity Bond YES NO<br />

10<br />

Affidavit as required under Urban L<strong>and</strong> Ceiling Act in case the total extent <strong>of</strong> the<br />

l<strong>and</strong> held by the applicant does not exceed ceiling limit.<br />

YES NO<br />

11<br />

Urban L<strong>and</strong> Ceiling Clearance Certificate in case the extent <strong>of</strong> plot / site exceeds<br />

YES NO<br />

the ceiling limit<br />

12 NOC from Fire Services <strong>Department</strong> (where ever applicable) YES NO<br />

13 NOC from Airport Authority <strong>of</strong> India (where ever applicable) YES NO<br />

Total No. <strong>of</strong> Documents<br />

20. ACKNOWLEDGEMENT<br />

Received the application <strong>and</strong> documents as stated above.<br />

OFFICE SEAL<br />

Application Number for<br />

BPS/………………………..<br />

future reference<br />

SIGNATURE OF THE RECEIVER<br />

DESIGNATION