A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals
A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals
A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A <strong>NEW</strong> <strong>GOLD</strong> <strong>PROJECT</strong> <strong>IN</strong> <strong>THE</strong><br />
<strong>ASHANTI</strong> <strong>GOLD</strong> BELT OF GHANA<br />
DIGGERS AND DEALERS<br />
August 2009
COMPANY PROFILE<br />
• African focussed company developing a new gold project<br />
in the world class Ashanti Gold Belt of Ghana<br />
• Focussed on moving the Konongo Gold ldProject tto a<br />
+100,000 ounce per annum gold producer.<br />
• Experienced management team with track record of<br />
Experienced management team with track record of<br />
success and adding value to projects.
MANAGEMENT TEAM<br />
Matthew Wood (Chairman) – Expertise in project identification, negotiation,<br />
acquisition and corporate development.<br />
Bill Oliver (Managing Director) ‐ Wide‐ranging exploration experience including leading<br />
large‐scale resource definition projects for Rio Tinto Iron Ore and grassroots<br />
exploration teams in Europe.<br />
Tim Flavel (Director) –Chartered Accountant and Company Secretary with more than<br />
20 years experience in the mining industry and accounting profession in Australia<br />
and overseas.<br />
Stuart Murray (Director) ‐ Chief Executive Officer of Aquarius Platinum Limited.<br />
Provides a wealth of African project tdevelopment and operating experience.
COMPANY STRUCTURE<br />
No. Shares<br />
(million)<br />
% Shares<br />
Top 20 153.0 36.7<br />
Total 417.0 100<br />
Shares<br />
• 52 week trading range: A$0.006 to A$0.04<br />
• Current cash reserves: A$785,000<br />
• Market capitalisation at A$0.02: 02: A$8.3 million
LOCATION<br />
The Konongo Gold Project<br />
is situated in the world class<br />
Ashanti Gold Belt of Ghana.<br />
Along strike from some of the<br />
worlds largest gold mines.<br />
Located 200km NNW of the<br />
capital Accra.<br />
Ghana has an established,<br />
successful gold mining<br />
industry (9 th largest gold<br />
producer globally).<br />
ll
HISTORICAL <strong>GOLD</strong> PRODUCTION<br />
Recorded dhistorical i gold production of<br />
16million 1.6 ounces of gold at a<br />
head grade of 11.8 g/t gold.<br />
Current JORC resources are<br />
15 million tonnes at 2.0g/t Au,<br />
over 975,000 ounces of contained gold.<br />
(Indicated and Inferred category)
RESOURCE TABLE<br />
Deposit Measured Indicated Inferred Total<br />
Tonnes<br />
Grade<br />
Ounces<br />
Tonnes<br />
Grade (/ (g/t<br />
Ounces<br />
Tonnes<br />
Grade (/ (g/t<br />
Ounces<br />
Tonnes<br />
Grade<br />
Ounces<br />
(t) (g/t Au) Au (t) Au) Au (t) Au) Au (t) (g/t Au) Au<br />
Obenemase 1,297,000 3.43 143,000 1,081,000 2.88 100,000 2,378,000 3.18 243,000<br />
Asieye 1,500,000 0.80 38,581 1,500,000 0.80 38,581<br />
Kwakawkaw 344,000 4.31 47,673 344,000 4.31 47,673<br />
Nyabo East 540,000 1.03 17,939 540,000 1.03 17,939<br />
Patuo 43,000 1.60 2,212 122,000 1.42 5,565 165,000 1.47 7,777<br />
Kyereben West 124,000 3.10 12,359 124,000 3.10 12,359<br />
Atunsu North 164,000 4.49 26,165 164,000 4.49 26,165<br />
Aserewa 20,000 1.90 1,222 423,000 3.27 44,423 443,000 3.20 45,645<br />
Atunsu 14,000 3.10 1,395 146,000 4.32 20,275 160,000 4.21 21,670<br />
Apan 24,000 2.50 1,929 530,000 5.46 93,121 554,000 5.34 95,050<br />
Leopard Shaft 95,000 7.55 23071 95,000 7.55 23,071<br />
Boabedroo 30,000 2.82 2,720 2985972 1.59 152506 3,015,972 1.60 155,226<br />
Akyenase Central 58,000 4.00 7,459 96,000 8.80 27,161 154,000 6.99 34,620<br />
Santreso West 3,520,000 1.20 135,807 810,000 1.25 32,553 4,330,000 1.21 168,360<br />
Santreso South 340,000 1.16 12,682 340,000 1.16 12,682<br />
Santreso East 700,000 1.27 28,612 700,000 1.27 28,612<br />
Total 5,006,000 1.84 295,744 10,000,972 2.12 682,686 15,006,972 2.02 978,430<br />
The Mineral Resource presented in this table has been compiled and reviewed by Mr Bill Oliver from publically stated JORC-compliant information originally prepared in 2005 by RSG Global for Mwana Africa’s<br />
AIM-listing document with a 2006 resource update for the Obenemase Deposit and a 2008 resource update for the Boabedroo deposit. This information, in the opinion of Mr Oliver, complies with the reporting<br />
standards of the 2004 JORC Code. Mr Oliver is a Member of the Australian Institute of Mining and Metallurgy and the Australlian Institue of Geoscientists and has sufficient experience which is relevant to the<br />
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australian Code for Reporting<br />
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oliver is the Exploration Director of <strong>Signature</strong> <strong>Metals</strong> and consents to the inclusion of this table in the form and context in which it appears<br />
based on the information presented to him.
• 192km 2 of granted tenure<br />
(1 mining license,<br />
1 prospecting license).<br />
• Over 12 kilometres of<br />
mineralised strike along the<br />
world class Ashanti Gold<br />
Belt.<br />
• 16 known gold deposits<br />
within the project area.<br />
• Existing resources being<br />
updated and re‐evaluated<br />
evaluated
<strong>IN</strong>ITIAL DEVELOPMENT AREA<br />
• 5 deposits mined by open cut<br />
methods during a period where spot<br />
gold price was less than US$300/oz.<br />
• Eiti Existing haul road to plant.<br />
ASEWERA SOUTH PIT<br />
• Remanant resources below pits and<br />
along strike<br />
• Strike extensions not fully tested.<br />
• Open at depth
350KTPA CIL PLANT<br />
REMA<strong>IN</strong>S ON SITE
<strong>IN</strong>FRASTRUCTURE<br />
350ktpa CIL plant on site<br />
Lead time 6‐12 months if<br />
fast‐trackedtracked<br />
• Plant can be refurbished at a fraction of the cost of<br />
purchasing a new/2 nd hand plant<br />
• Significant ifi infrastructure t – access via sealed ldroads,<br />
project on national power grid, 50kms from Kumasi<br />
(regional centre with airport, support businesses)<br />
• Skilled workforce and mining contractors available<br />
g<br />
locally ‐ will reduce implementation times/costs.
CONSIDERABLE EXPLORATION UPSIDE<br />
• Potential for new<br />
discoveries i<br />
• Significant soil<br />
anomalies not drill<br />
tested<br />
OBENEMASE AREA<br />
KONONGO AREA<br />
• Numerous drill<br />
ready targets<br />
• Most exploration<br />
focussed on one<br />
mineralised trend
KONONGO AREA<br />
• Potential for further<br />
reefs and high‐grade<br />
shoots to be<br />
discovered.<br />
• Resources outside main<br />
development areas not<br />
tested deeper than 50<br />
metres.
OBENEMASE LONG SECTION<br />
Potential for further high grade mineralisation
WORK PROGRAMME<br />
• Resource review and re‐estimation estimation has<br />
commenced.<br />
• Resource updates to be released through 2009.<br />
• Exploration review has commenced.<br />
• Mining study to be completed by end 2009.<br />
• Exploration and resource drilling late 2009.<br />
• Review of plant refurbishment, infrastructure and<br />
stockpiles underway.
TARGETS FOR<br />
KONONGO <strong>PROJECT</strong><br />
• Assess potential for early cash flow from<br />
stockpiles and open pit mining<br />
• Early move to full feasibility study.<br />
• Move to first production in 2010/2011.<br />
• New high‐grade (+10g/t Au)<br />
g g ( g )<br />
Obenemase‐style discovery.
SUMMARY<br />
• Proven management team.<br />
• 1 Million ounce JORC Resource in the<br />
world‐class Ashanti Gold Belt of Ghana.<br />
• Market cap of $8.3M = $7.50 EV/resource oz<br />
• Considerable potential for resource growth.<br />
• Past production of 1.6 Million ounces at 11.8g/t<br />
gold.<br />
• 350ktpa CIL gold treatment plant on‐site<br />
site.