30.05.2015 Views

A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals

A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals

A NEW GOLD PROJECT IN THE ASHANTI GOLD ... - Signature Metals

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A <strong>NEW</strong> <strong>GOLD</strong> <strong>PROJECT</strong> <strong>IN</strong> <strong>THE</strong><br />

<strong>ASHANTI</strong> <strong>GOLD</strong> BELT OF GHANA<br />

DIGGERS AND DEALERS<br />

August 2009


COMPANY PROFILE<br />

• African focussed company developing a new gold project<br />

in the world class Ashanti Gold Belt of Ghana<br />

• Focussed on moving the Konongo Gold ldProject tto a<br />

+100,000 ounce per annum gold producer.<br />

• Experienced management team with track record of<br />

Experienced management team with track record of<br />

success and adding value to projects.


MANAGEMENT TEAM<br />

Matthew Wood (Chairman) – Expertise in project identification, negotiation,<br />

acquisition and corporate development.<br />

Bill Oliver (Managing Director) ‐ Wide‐ranging exploration experience including leading<br />

large‐scale resource definition projects for Rio Tinto Iron Ore and grassroots<br />

exploration teams in Europe.<br />

Tim Flavel (Director) –Chartered Accountant and Company Secretary with more than<br />

20 years experience in the mining industry and accounting profession in Australia<br />

and overseas.<br />

Stuart Murray (Director) ‐ Chief Executive Officer of Aquarius Platinum Limited.<br />

Provides a wealth of African project tdevelopment and operating experience.


COMPANY STRUCTURE<br />

No. Shares<br />

(million)<br />

% Shares<br />

Top 20 153.0 36.7<br />

Total 417.0 100<br />

Shares<br />

• 52 week trading range: A$0.006 to A$0.04<br />

• Current cash reserves: A$785,000<br />

• Market capitalisation at A$0.02: 02: A$8.3 million


LOCATION<br />

The Konongo Gold Project<br />

is situated in the world class<br />

Ashanti Gold Belt of Ghana.<br />

Along strike from some of the<br />

worlds largest gold mines.<br />

Located 200km NNW of the<br />

capital Accra.<br />

Ghana has an established,<br />

successful gold mining<br />

industry (9 th largest gold<br />

producer globally).<br />

ll


HISTORICAL <strong>GOLD</strong> PRODUCTION<br />

Recorded dhistorical i gold production of<br />

16million 1.6 ounces of gold at a<br />

head grade of 11.8 g/t gold.<br />

Current JORC resources are<br />

15 million tonnes at 2.0g/t Au,<br />

over 975,000 ounces of contained gold.<br />

(Indicated and Inferred category)


RESOURCE TABLE<br />

Deposit Measured Indicated Inferred Total<br />

Tonnes<br />

Grade<br />

Ounces<br />

Tonnes<br />

Grade (/ (g/t<br />

Ounces<br />

Tonnes<br />

Grade (/ (g/t<br />

Ounces<br />

Tonnes<br />

Grade<br />

Ounces<br />

(t) (g/t Au) Au (t) Au) Au (t) Au) Au (t) (g/t Au) Au<br />

Obenemase 1,297,000 3.43 143,000 1,081,000 2.88 100,000 2,378,000 3.18 243,000<br />

Asieye 1,500,000 0.80 38,581 1,500,000 0.80 38,581<br />

Kwakawkaw 344,000 4.31 47,673 344,000 4.31 47,673<br />

Nyabo East 540,000 1.03 17,939 540,000 1.03 17,939<br />

Patuo 43,000 1.60 2,212 122,000 1.42 5,565 165,000 1.47 7,777<br />

Kyereben West 124,000 3.10 12,359 124,000 3.10 12,359<br />

Atunsu North 164,000 4.49 26,165 164,000 4.49 26,165<br />

Aserewa 20,000 1.90 1,222 423,000 3.27 44,423 443,000 3.20 45,645<br />

Atunsu 14,000 3.10 1,395 146,000 4.32 20,275 160,000 4.21 21,670<br />

Apan 24,000 2.50 1,929 530,000 5.46 93,121 554,000 5.34 95,050<br />

Leopard Shaft 95,000 7.55 23071 95,000 7.55 23,071<br />

Boabedroo 30,000 2.82 2,720 2985972 1.59 152506 3,015,972 1.60 155,226<br />

Akyenase Central 58,000 4.00 7,459 96,000 8.80 27,161 154,000 6.99 34,620<br />

Santreso West 3,520,000 1.20 135,807 810,000 1.25 32,553 4,330,000 1.21 168,360<br />

Santreso South 340,000 1.16 12,682 340,000 1.16 12,682<br />

Santreso East 700,000 1.27 28,612 700,000 1.27 28,612<br />

Total 5,006,000 1.84 295,744 10,000,972 2.12 682,686 15,006,972 2.02 978,430<br />

The Mineral Resource presented in this table has been compiled and reviewed by Mr Bill Oliver from publically stated JORC-compliant information originally prepared in 2005 by RSG Global for Mwana Africa’s<br />

AIM-listing document with a 2006 resource update for the Obenemase Deposit and a 2008 resource update for the Boabedroo deposit. This information, in the opinion of Mr Oliver, complies with the reporting<br />

standards of the 2004 JORC Code. Mr Oliver is a Member of the Australian Institute of Mining and Metallurgy and the Australlian Institue of Geoscientists and has sufficient experience which is relevant to the<br />

style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australian Code for Reporting<br />

of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oliver is the Exploration Director of <strong>Signature</strong> <strong>Metals</strong> and consents to the inclusion of this table in the form and context in which it appears<br />

based on the information presented to him.


• 192km 2 of granted tenure<br />

(1 mining license,<br />

1 prospecting license).<br />

• Over 12 kilometres of<br />

mineralised strike along the<br />

world class Ashanti Gold<br />

Belt.<br />

• 16 known gold deposits<br />

within the project area.<br />

• Existing resources being<br />

updated and re‐evaluated<br />

evaluated


<strong>IN</strong>ITIAL DEVELOPMENT AREA<br />

• 5 deposits mined by open cut<br />

methods during a period where spot<br />

gold price was less than US$300/oz.<br />

• Eiti Existing haul road to plant.<br />

ASEWERA SOUTH PIT<br />

• Remanant resources below pits and<br />

along strike<br />

• Strike extensions not fully tested.<br />

• Open at depth


350KTPA CIL PLANT<br />

REMA<strong>IN</strong>S ON SITE


<strong>IN</strong>FRASTRUCTURE<br />

350ktpa CIL plant on site<br />

Lead time 6‐12 months if<br />

fast‐trackedtracked<br />

• Plant can be refurbished at a fraction of the cost of<br />

purchasing a new/2 nd hand plant<br />

• Significant ifi infrastructure t – access via sealed ldroads,<br />

project on national power grid, 50kms from Kumasi<br />

(regional centre with airport, support businesses)<br />

• Skilled workforce and mining contractors available<br />

g<br />

locally ‐ will reduce implementation times/costs.


CONSIDERABLE EXPLORATION UPSIDE<br />

• Potential for new<br />

discoveries i<br />

• Significant soil<br />

anomalies not drill<br />

tested<br />

OBENEMASE AREA<br />

KONONGO AREA<br />

• Numerous drill<br />

ready targets<br />

• Most exploration<br />

focussed on one<br />

mineralised trend


KONONGO AREA<br />

• Potential for further<br />

reefs and high‐grade<br />

shoots to be<br />

discovered.<br />

• Resources outside main<br />

development areas not<br />

tested deeper than 50<br />

metres.


OBENEMASE LONG SECTION<br />

Potential for further high grade mineralisation


WORK PROGRAMME<br />

• Resource review and re‐estimation estimation has<br />

commenced.<br />

• Resource updates to be released through 2009.<br />

• Exploration review has commenced.<br />

• Mining study to be completed by end 2009.<br />

• Exploration and resource drilling late 2009.<br />

• Review of plant refurbishment, infrastructure and<br />

stockpiles underway.


TARGETS FOR<br />

KONONGO <strong>PROJECT</strong><br />

• Assess potential for early cash flow from<br />

stockpiles and open pit mining<br />

• Early move to full feasibility study.<br />

• Move to first production in 2010/2011.<br />

• New high‐grade (+10g/t Au)<br />

g g ( g )<br />

Obenemase‐style discovery.


SUMMARY<br />

• Proven management team.<br />

• 1 Million ounce JORC Resource in the<br />

world‐class Ashanti Gold Belt of Ghana.<br />

• Market cap of $8.3M = $7.50 EV/resource oz<br />

• Considerable potential for resource growth.<br />

• Past production of 1.6 Million ounces at 11.8g/t<br />

gold.<br />

• 350ktpa CIL gold treatment plant on‐site<br />

site.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!