PHASE 3 INITIAL DESIGN DEVELOPMENT AND HAZARD IDENTIfiCATION – 10%<br />

To develop initial design deliverables to Inter Discipline Review stage and identify key hazards.<br />

ACTIVITIES/DELIVERABLE DESCRIPTION DISCIPLINE SUPPORTING DOCUMENTATION<br />

1 Hazard Identification Perform hazard identification studies, as<br />

identified on <strong>Engineering</strong> Audit Schedule /<br />

Technical Safety Events Schedule.<br />

2 Environmental Issue<br />

(NEPA)<br />

Formal assessment of environmental aspects<br />

associated with a modification or a change, and to<br />

propose prevention or mitigating measures.<br />

3 System and Process<br />

Diagram<br />

Issue System and Process Flow / control<br />

Diagrams on formal Inter-Discipline Review.<br />

4 Plot Plans / Layouts Issue equipment Plot Plans / Layouts on formal<br />

inter-Discipline Review.<br />

5 Equipment List Create master project equipment list identifying<br />

all major items of tagged equipment, ie. vessels,<br />

pumps, motors, generators, chemical injection<br />

packages, electrical switchgear, control panels,<br />

etc.<br />

6 Mechanical Handling<br />

Strategy<br />

Develop Mechanical Handling Strategy including<br />

general approach / constraints, platform crane<br />

limits, installation philosophy, operation and<br />

maintenance, etc.<br />

Technical Safety<br />

Technical Safety<br />

Mechanical and<br />

Electrical<br />

Mechanical and<br />

Electrical<br />

Mechanical and<br />

Structural<br />

Develop or Reference: Environmental<br />

Impact Identification <strong>Engineering</strong> &<br />

<strong>Design</strong> Reviews manual<br />