17.11.2012 Views

AirSupply Project - BoostAeroSpace

AirSupply Project - BoostAeroSpace

AirSupply Project - BoostAeroSpace

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 26<br />

Forecast collaboration<br />

4<br />

Collaboration View<br />

6<br />

5<br />

4 All materials are managed through LOGISTIC FAMILIES (LF). Airbus and the<br />

Supplier have to agree on the LF they will use for each material. The LF defines the<br />

duration of the 3 different horizons (Firm, ( , Flexible and Provisional) )<br />

5<br />

6<br />

Exceptions can be CRITICAL or MEDIUM depending on the material settings.<br />

Commit tuning: Commit tuning will be kept from the previous week if demand is<br />

stable (variation within tolerance), increasing exception accuracy.<br />

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.<br />

<strong>BoostAeroSpace</strong> Conference – Aéro-Club de France - May 25th, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!