INSPECTION REPORT<br />

Name of the Officer<br />

Designation<br />

NIBIL ISWARARY, WBCS (EXE.)<br />

SECRETARY, SILIGURI MAHAKUMA PARISHAD<br />

Date of Visit 17/12/2011<br />

Name of the Block visited<br />

Name of the G.P. covered<br />

NAXALBARI<br />

UPPER BAGDOGRA<br />

Please Mark on the scale of 1 to 10<br />

Sl.<br />

Particulars / Point of reference<br />

Assessment<br />

No.<br />

(1 to10)<br />

1 Is Form – 27 of the P.S. up to date and expenses satisfactory ? 40% 5<br />

2 Are the Extension Officers well-versed with their work ? 6<br />

3 Relation / Liaison with Line Departments at Block Level ? 6<br />

4 If any scheme of the Panchayat Samity was visited by you ? if yes,<br />

name of the Scheme - Repairing of Black Top Road No. 1 at Stalin<br />

Nagar under Upper Bagdogra G.P. under 13 th F.C. Estmated Cost –<br />

6<br />

Rs. 1.50 lakhs and your assessment of the implementation of the<br />

Scheme:<br />

5 General Assessment / Opinion of public about Block Administration 6<br />

6 Resourcefulness of the G.P. Staff : 6<br />

7 Quality of File maintenance at G.P. level 6<br />

Form-26 of the Gram Panchayat – its quality and expenses are<br />

4<br />

8<br />

satisfactory or not? 21.57 %<br />

9 Schemes visited and your opinion on the implementation front: 7<br />

(a) Drainage and Irrigational Canal at Bhuttabari Mouza under<br />

MGNREGS – Rs. 1,64,685/- Mandays- 998<br />

(b) Repairing of road from Hospital More to Amulya Mondal’s<br />

House at Uttar Bagdogra Mouza - Rs. 2,13,880/- under 13 th<br />

F.C.<br />

(c) Construction of High Drain from Budha Mandir to Sambhu<br />

Barman house at Sukanta Nagar - Rs. 2,40,875/- under 3 rd<br />

S.F.C.<br />

(Continued to Page No. 2)


(Page-2)<br />

Sl.<br />

Particulars / Point of reference<br />

No.<br />

10 Quality of discussion and popular involvement in the evening meeting /<br />

interaction<br />

Public opinion on the following schemes :<br />

(a)MGNREGS-<br />

(b)Midday Meal<br />

©Sarva Siksha Mission works<br />

(d)ICDS<br />

11<br />

(e) SSK / MSK<br />

(f) Initiative of Health Department<br />

(g) R.S.B.Y<br />

(h) Drinking Water and Irrigation facilities<br />

(i) _______________________________________(any other scheme)<br />

Average marks scored out of 100<br />

Assessment<br />

(1 to10)<br />

6<br />

Positive<br />

Positive<br />

Positive<br />

Positive<br />

Positive<br />

Positive<br />

Not yet started<br />

Positive<br />

58<br />

12<br />

Remarks :<br />

(in details)<br />

The over all utilization of fund is 40 percent only which needs<br />

substantial improvement. Utilization of IAY is also 42.59 percent<br />

only. MGNREGS person days is 12.04 only and MIS 97.73<br />

percent. Major emphasis should be given to IAY, MGNREGS and<br />

overall expenditure. They are accordingly advised.<br />

Overall expenditure of Uper Bagdogra G.P. is 21.57 percent only.<br />

The quality of visited schemes is apparently satisfactory. More<br />

emphasis should be given to MGNREGS, IAY, TSC as there is a<br />

scope for substantial improvement. They are accordingly advised.<br />

The date of inspection being 4 th Saturday also attended 4 th<br />

Saturday Health Meeting at Gram Panchayet. The participation of<br />

the people and their response in the meeting was positive.<br />

( Nibil Iswarary)<br />

Signature of Inspecting Officer with date