17.11.2012 Views

Selected References - Pörner Ingenieurgesellschaft mbH

Selected References - Pörner Ingenieurgesellschaft mbH

Selected References - Pörner Ingenieurgesellschaft mbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 1 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

AMI Agrolinz Linz Austria<br />

2009<br />

Revamp of Melamine 3 plant inclusive salt melting supply<br />

boiler and decomposer<br />

Detail engineering for salt smelting piping from salt tanks and<br />

boiler to decomposer, including stress calculations and<br />

isometric drawings<br />

Spolchemie AG Usti nad Labem Czech Republic<br />

2008<br />

Expansion of the polyester and alkyd resin plant acc. to the<br />

RHE process<br />

Engineering, procurement, construction management (EPCM<br />

contractor)<br />

Followup contract to new installation in 2006<br />

OAO Metafrax Gubakha Russia<br />

2007<br />

Engineering support for a polyamide 6 plant Authority engineering, basic engineering, detail engineering<br />

Borealis Polyolefine G<strong>mbH</strong> Schwechat Austria<br />

2007<br />

Extension of a polyethylene plant with a black colouring General planning incl. Basic engineering, governmental<br />

approval procedure, estimation of iinvestment cost, Detail<br />

engineering over all disciplines, procurement, site supervision,<br />

commissioning support<br />

Borealis AG Münchsmünster Germany<br />

2007<br />

Engineering supoort for a HDPE plant including infrastructures Support for authority engineering, architectural review of all<br />

civil and steel structures, basic and detail engineering; for all<br />

underground systems<br />

2009<br />

2009<br />

2009<br />

2008<br />

2007<br />

681<br />

674<br />

671<br />

597<br />

670


<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 2 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

Spolchemie Usti nad Labem Czech Republic<br />

2005<br />

Installation of a production plant for unsaturated polyester and<br />

alkyd resin acc. to the RHE process<br />

General planning, procurement and supply of all equipment<br />

and material, site supervision, start-up assistance, training and<br />

documentation<br />

MBA Polymers Austria Kematen a.d. Ybbs Austria<br />

2005<br />

Installation of a recycling plant for production of 30.000 t pure<br />

plastics out of 40.000 t electronic scrap and wastes from car<br />

recycling<br />

General planning, detail engineering for mechanics,<br />

instrumentation / control & electrics, site supervision<br />

Capacity: 40.000 tpa<br />

Borealis Schwechat Austria<br />

2003<br />

Errection of a polyethylene-large-scale plant with the Borstarprocess<br />

Detail engineering for civil and steel structure, electric,<br />

procurement assistance, site supervision and coordination<br />

according BauKG<br />

Cyclics Europe Schwarzheide Germany<br />

2003<br />

Installation of a plastics refinement plant Detailed engineering, procurement, site supervision and startup<br />

assistance<br />

Radici Film Hungaria Tiszaiváros Hungary<br />

2002<br />

Increase of polypropylene foil production capacity Detail engineering (civil, piping, instrumentation, HVAC)<br />

2006<br />

2005<br />

2005<br />

2004<br />

2003<br />

552<br />

596<br />

542<br />

525<br />

538


<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 3 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

EREMA Freindorf Austria<br />

2001<br />

Provision of studies proving the profitability of PE/PET<br />

recycling (ink removal from plastic scraps by ethyl acetate)<br />

Preparation of two feasability studies for a pilot and a<br />

production plant, optimized for reduced investment costs<br />

NPC Fajr Petrochemical Company Bandar Imam Iran<br />

2001<br />

Turn-key supply of a waste water treatment plant for the<br />

disposal of oil contaminated effluents of a new petrochemical<br />

processing plant<br />

Detailed engineering mechanical equipment and piping, incl.<br />

pipe class design, site supervision and start-up assistance<br />

NPC Fajr Petrochemical Company Bandar Imam Iran<br />

2000<br />

General engineering, supply of material and site supervision<br />

for a river water treatment plant for the supply of a new<br />

petrochemical processing plant and public consumers with<br />

process and potable water<br />

Detailed engineering mechanical equipment and piping, incl.<br />

pipe class design, stress calculation, special part design and<br />

procurement assistance and documentation, site supervision<br />

and start-up assistance<br />

Paraffinwerk Webau G<strong>mbH</strong> Webau Germany<br />

2000<br />

Various plants process support and project management for various plants<br />

Rhodia Syntech G<strong>mbH</strong> Leuna Germany<br />

1999<br />

Extension of the latex production by one line, enlargment of<br />

tank storage, loading facility<br />

Authority engineering, detail engineering, procurement<br />

services, project management, site supervision, start-up<br />

assistance<br />

2001<br />

2001<br />

2001<br />

2001<br />

2000<br />

380<br />

390<br />

389<br />

351<br />

350


<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 4 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

BSL Schkopau G<strong>mbH</strong> Schkopau Germany<br />

1997<br />

Installation of a production plant for 129 kt/a polypropylene<br />

incl. infrastructure and logistics<br />

Pre-project incl. as built verification, plant layout,<br />

infrastructural effects, utility consumption, investment<br />

estimation<br />

Leuna Polymer G<strong>mbH</strong> Leuna Germany<br />

1997<br />

Optimizing of nitrogenconsumption of a HDpolymercompressors<br />

and reactors<br />

Basic engineering, detail engineering, tendering<br />

BSL (Dow Group) Schkopau Germany<br />

1996<br />

Environmental protection measures at a Polybutadiene plant,<br />

rubber D104 and demonomerisation SK Latex<br />

Site supervision for equipment, electrics and construction<br />

NUFARM G<strong>mbH</strong> Leuna Germany<br />

1996<br />

Installation of a methylphenol plant, tank yard and<br />

infrastructure<br />

Preparation of a feasibility study including cost estimation and<br />

basic engineerring<br />

PCK AG Schwedt Germany<br />

1995<br />

Installation of a flue gas desulphurization plant for a new<br />

power plant at PCK raffinery Schwedt: adsorption, redotherm<br />

claus 3 + 4, flue gas desulphurization, regeneration, waste<br />

water treatment, tank store<br />

Governmental approval procedure, detailed engineering,<br />

procurement, site supervision, start-up assistance<br />

1998<br />

1997<br />

1997<br />

1997<br />

1996<br />

355<br />

343<br />

360<br />

341<br />

568


<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 5 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

Leuna Polyolefine G<strong>mbH</strong> Leuna Germany<br />

1994<br />

Restoration and partly reconstruction of plant pilot stations in<br />

building 3608<br />

As built verification, engineering and turn-key delivery<br />

Leuna Tenside G<strong>mbH</strong> Leuna Germany<br />

1995<br />

Revamp and modernisation of parexparaffin refining and nmehyltaurin<br />

synthesis unit<br />

As built evaluation and revamp engineering inclusive authority<br />

engineering, detail engineering, site supervision and<br />

commissioning<br />

PCK AG Schwedt Germany<br />

1993<br />

Engineering and installation of a MTBE complex to converting<br />

of isobutene (contained in the FCC-C4 cut) into MTBE<br />

License (MTBE), process design (MTBE), governmental<br />

approval procedure, detailed engineering, procurement, site<br />

supervision, start-up<br />

Licenser: IFP and UOP<br />

PCD Polymere Schwechat Austria<br />

1991<br />

Installation of a polypropylen pilot plant as well as extension<br />

with a copolymerisation reactor<br />

Process design, detailed engineering, procurement assistance<br />

and site supervision for the process plant<br />

Process by Himont<br />

PCD Polymere Burghausen Germany<br />

1989<br />

Installation of a production plant for polypropylen (PP4) Governmental approval documentation, procurement<br />

assistance and site supervision for the process unit<br />

1996<br />

1995<br />

1994<br />

1992<br />

1991<br />

361<br />

363<br />

574<br />

75<br />

239


<strong>Pörner</strong> <strong>Ingenieurgesellschaft</strong> <strong>mbH</strong><br />

A-1050 Wien, Hamburgerstraße 9<br />

Tel. 01/58 990-0, Fax 01/58 990-99<br />

vienna@poerner.at, www.poerner.at<br />

<strong>Selected</strong> <strong>References</strong><br />

Petrochemistry<br />

A15W001A.MDB<br />

Seite 6 von 6<br />

05.10.2010<br />

Client Place Country Start End<br />

Project description Services and supplies by <strong>Pörner</strong> Remark<br />

PCD Polymere Schwechat Austria<br />

1989<br />

Extension of a production plant for Polypropylen with a<br />

copolymerisation reactor (PP3 COPO)<br />

Detailed engineering, procurement assistance and site<br />

supervision for the process plant<br />

Process by Himont<br />

PCD Polymere Schwechat Austria<br />

1988<br />

Extention of an existing polypropylen plant with a deodorizing<br />

unit (PP2 DEO)<br />

Detailed engineering, procurement, scheduling and<br />

inspection, site supervision<br />

Process by Himont<br />

PCD Polymere Schwechat Austria<br />

1985<br />

Installation of a production plant for Polypropylen (PP3) Detailed engineering, procurement assistance and site<br />

supervision for the process plant<br />

Process by Himont<br />

OMV Schwechat Austria<br />

1979<br />

Installation of a naphtenic alcaline splitting plant Detail engineering, procurement assistance, site supervision Process: Loba Chemie<br />

PCD Polymere Schwechat Austria<br />

Installation of an LDPE plant Piping detailed design of high pressure piping (PN 3600) as<br />

well as coolung water piping<br />

1990<br />

1989<br />

1987<br />

1981<br />

73<br />

85<br />

241<br />

97<br />

512

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!