17.11.2012 Views

METER AND SERVICE GUIDE - City of Farmington

METER AND SERVICE GUIDE - City of Farmington

METER AND SERVICE GUIDE - City of Farmington

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

XII. MOBILE-HOME <strong>SERVICE</strong>S ON PRIVATE LOTS:<br />

(cont’d)<br />

7) Services will not be installed on manufactured<br />

homes with metal siding, without prior approval.<br />

8) Meter socket may be installed on modular homes<br />

constructed to UBC specifications and set on a<br />

permanent foundation with overhead service.<br />

4. <strong>City</strong> <strong>of</strong> <strong>Farmington</strong> electrical inspector's jurisdiction will terminate at the<br />

load side <strong>of</strong> the service disconnecting-means.<br />

5. All service lateral installations will meet all requirements <strong>of</strong> this Guide and<br />

State Code.<br />

- 22 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!