18.11.2012 Views

(PAC-3 MSE) First 360-degree launch in November 2011

(PAC-3 MSE) First 360-degree launch in November 2011

(PAC-3 MSE) First 360-degree launch in November 2011

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

G:/Communications/M012-3127 per POF-5100-33575-OL, 20 March 2012<br />

CLEARED FOR PUBLIC RELEASE<br />

MEADS Program<br />

CLEARED FOR PUBLIC RELEASE<br />

Update<br />

August 2012<br />

MEADS International, Inc.<br />

P.O. Box 691749<br />

Orlando, FL 32869-1749<br />

www.meads-amd.com<br />

M012-3127-1


• Tri-national air and missile<br />

defense (AMD) program for<br />

German, Italian, and US<br />

forces<br />

• Designed to replace<br />

Patriot, Hawk, and Nike<br />

Hercules<br />

• $3.4B EUSD contract<br />

signed 28 September 2004<br />

• Tri-national contractor team<br />

<strong>in</strong>cludes Lockheed Mart<strong>in</strong>,<br />

MBDA Deutschland, and<br />

MBDA Italia 16.7%<br />

US<br />

G:/Communications/M128-2242, per POF-2505-27015-OL, 3 March 2009<br />

Germany<br />

25.0%<br />

Italy<br />

What Is MEADS?<br />

58.3%<br />

M012-3127-2


TARGET SET<br />

• Next-generation threats<br />

• Tactical ballistic missiles/UAVs<br />

• Cruise missiles and aircraft<br />

• Conventional/unconventional<br />

DEGREE OF PROTECTION<br />

• <strong>360</strong>-<strong>degree</strong> coverage<br />

• Defended area – ABTs, TBMs<br />

Key System Requirements<br />

TRANSPORTABILITY<br />

& MOBILITY<br />

• Strategic and tactical airlift<br />

• Cont<strong>in</strong>uous air and missile defense<br />

coverage for maneuver force<br />

• Cross-country mobility<br />

INTEROPERABILITY<br />

OPERATING CONCEPTS<br />

• Maneuver force protection<br />

• Area defense<br />

• Homeland defense<br />

• Weighted asset protection<br />

NETTED DISTRIBUTED<br />

ARCHITECTURE<br />

• Plug-and-fight<br />

• Open architecture<br />

• Non-proprietary software<br />

• Operational flexibility<br />

MEADS is the solution for challeng<strong>in</strong>g requirements<br />

not addressed <strong>in</strong> any s<strong>in</strong>gle previous AMD system<br />

G:/Communications/M059-2367 per T-POF-3613-28295-OL 22 September 2009 and POF-2505-28440-OL 15 October 2009<br />

• Designed for coalition warfare<br />

• Operational with a range of systems<br />

• Dramatic improvement <strong>in</strong> combat<br />

effectiveness and situational awareness<br />

M012-3127-3


HEU/C2 Systems<br />

(EO Only)<br />

Ground-Based<br />

ADS<br />

JTAGS/M3P<br />

Launcher<br />

G:/Communications/M059-2367 per T-POF-3613-28295-OL, 22 September 2009<br />

MEADS External Interfaces for Interoperability<br />

Airborne C3 Systems<br />

NATO<br />

ACCS<br />

JLENS<br />

TOC IRIS-T<br />

SR MFCR<br />

MEADS Plug-and-Fight Network<br />

Launcher<br />

MEADS Interfaces<br />

Demonstrated <strong>in</strong>teroperability with the NATO<br />

Air Command and Control System dur<strong>in</strong>g JPOW<br />

HEU/C2<br />

Systems (EO &<br />

FO)<br />

Launcher<br />

Ground-Based<br />

ADS TOCs<br />

Naval ADS<br />

M012-3127-4


• High firepower and mobility<br />

• <strong>360</strong>-<strong>degree</strong> <strong>launch</strong> capability<br />

• 8 ready-to-fire missiles per <strong>launch</strong>er<br />

• Can self-load flatracks us<strong>in</strong>g<br />

Palletized Handl<strong>in</strong>g System<br />

• Partial missile reload<br />

G:/Communications/M012-3127 per T-POF-3613-28295-OL 22 September 2009; CO-32-11061-OL 23 October 2001;<br />

POF-5100-31785-OL 26 January <strong>2011</strong>; and POF-5100-33088-OL, 4 <strong>November</strong> <strong>2011</strong><br />

MEADS Launcher<br />

Launcher demonstrated unprecedented over-the-shoulder <strong>launch</strong> of<br />

the <strong>MSE</strong> missile at White Sands Missile Range on 17 <strong>November</strong> <strong>2011</strong><br />

M012-3127-5


G:/Communications/M012-3107 per <strong>MSE</strong> Product Card, PA-4370-33505-OL 29 February<br />

2012, and POF-5100-33088-OL 4 <strong>November</strong> <strong>2011</strong><br />

MEADS Missile (<strong>PAC</strong>-3 <strong>MSE</strong>)<br />

• Hit-to-kill missile<br />

• Increased performance,<br />

greater altitude and range<br />

compared to <strong>PAC</strong>-3<br />

• Threat-driven upgrades to<br />

defeat the advanc<strong>in</strong>g threat<br />

set<br />

• Leverages improved<br />

acquisition capability and<br />

detection range of MEADS<br />

radars<br />

<strong>First</strong> <strong>360</strong>-<strong>degree</strong> <strong>launch</strong> <strong>in</strong> <strong>November</strong> <strong>2011</strong>; successful <strong>in</strong>tercept tests<br />

<strong>in</strong> February 2010 and March <strong>2011</strong> at White Sands Missile Range<br />

M012-3127-6<br />

M012-3127-6


<strong>First</strong>-time demonstration of <strong>360</strong>-<strong>degree</strong><br />

<strong>launch</strong> capability<br />

17 <strong>November</strong> <strong>2011</strong> –<br />

Successful <strong>360</strong>-Degree Flight Test<br />

• Hit-to-kill <strong>PAC</strong>-3 <strong>MSE</strong> missile has <strong>in</strong>creased<br />

performance, greater altitude, and range<br />

• Lightweight MEADS <strong>launch</strong>er defends<br />

larger area aga<strong>in</strong>st all threats from any<br />

direction<br />

• Able to engage and defeat targets attack<strong>in</strong>g<br />

from anywhere with a s<strong>in</strong>gle <strong>launch</strong>er<br />

Unprecedented over-the-shoulder <strong>launch</strong> of <strong>PAC</strong>-3 <strong>MSE</strong> missile<br />

G:/Communications/M032-3154 per POF-5100-33116-OL, 4 <strong>November</strong> <strong>2011</strong> and correspondence dated 9 March 2012<br />

M012-3127-7


G:/Communications/M012-3127 per T-POF-3613-28295-OL 22 September 2009; CO-2500-21269-OL 12 July 2006, POF-<br />

5100-32244-OL, 8 April <strong>2011</strong>;POF-5100-32952-OL, 29 September <strong>2011</strong>; and POF-5100-33088-OL, 4 <strong>November</strong> <strong>2011</strong><br />

MEADS Battle Manager<br />

• Network-centric open<br />

architecture<br />

• Controll<strong>in</strong>g node on network<br />

• Plug-and-Fight for<br />

sensors/shooters<br />

• Integrated Engagement and<br />

Force Operations<br />

• Enhanced Maneuver Force<br />

Protection<br />

• Interoperable with coalition,<br />

legacy, and future systems<br />

Battle manager supported successful <strong>360</strong>-<strong>degree</strong> flight test<br />

on 17 <strong>November</strong> <strong>2011</strong><br />

M012-3127-8


• Pulse Doppler<br />

multifunction phased<br />

array<br />

• X-band<br />

• High reliability digital<br />

design<br />

• Active Electronically<br />

Scanned Array (AESA)<br />

• <strong>360</strong>-<strong>degree</strong> coverage<br />

• Digital beamform<strong>in</strong>g<br />

• 0, 15, and 30 rpm<br />

rotation<br />

• IFF subsystem<br />

• Interceptor<br />

communication l<strong>in</strong>k<br />

MEADS Multifunction<br />

Fire Control Radar<br />

Near-field tests complete, system <strong>in</strong>tegration test<strong>in</strong>g<br />

cont<strong>in</strong>ues at Italian air force base<br />

G:/Communications/M012-3127 per PA-4370-33653-OL 10 April 2012, CO-32-11061-OL 23 October 2001, and PA-4370-34051-OL 8 August 2012<br />

M012-3127-9


• <strong>360</strong>-<strong>degree</strong><br />

coverage<br />

• Pulse Doppler<br />

radar<br />

• Active phased<br />

array antenna<br />

• Digital<br />

beamform<strong>in</strong>g<br />

• IFF subsystem<br />

• 0 and 7.5 rpm<br />

rotation<br />

MEADS Surveillance Radar<br />

Integration underway <strong>in</strong> Syracuse, New York<br />

G:/Communications/M012-3127 per GM Communication 26 September <strong>2011</strong> and CO-2500-21269-OL, 12 July 2006<br />

M012-3127-10


<strong>360</strong>-Degree Weapon<br />

• <strong>360</strong>-<strong>degree</strong> <strong>launch</strong><br />

with onboard<br />

navigation system<br />

• Lightweight<br />

• Modern flatrack<br />

missile self-load<br />

capability<br />

• Network capable<br />

• High rate of<br />

susta<strong>in</strong>ed fire<br />

• 8 ready missiles<br />

• Plug-and-fight<br />

• Truck-mounted<br />

• C-130 RO/RO<br />

<strong>360</strong>-Degree Surveillance<br />

• <strong>360</strong>-<strong>degree</strong> long-range<br />

TBM/ ABT surveillance<br />

and cue<strong>in</strong>g<br />

• Lightweight<br />

• Modern, active phased<br />

array antenna and<br />

electronics<br />

• Network capable<br />

• Digital beamform<strong>in</strong>g<br />

• Mode 5 IFF<br />

• Plug-and-fight<br />

• Pulse Doppler<br />

• Truck-mounted<br />

• C-17 transportable<br />

MEADS End Item Maturity<br />

MEADS End Items are modern, mature capability nodes – lightweight<br />

and <strong>360</strong>-<strong>degree</strong>/network capable – available near-term<br />

G:/BMIT/PRESENTATIONS/M012-3127 per POF-2505-28440-OL 15 October 2009,POF-5100-32922-OL 21 September<br />

<strong>2011</strong>, POF-5100-3201-OL 23 <strong>November</strong> <strong>2011</strong>, POF-5100-33740-OL 25 April 2012, and CO-2500-21269-OL 12 July 2006<br />

<strong>360</strong>-Degree Fire Control<br />

• <strong>360</strong>-<strong>degree</strong> fire<br />

control aga<strong>in</strong>st TBMs<br />

and ABTs<br />

• Lightweight<br />

• Modern, active<br />

phased array antenna<br />

and electronics<br />

• Network capable<br />

• Digital beamform<strong>in</strong>g<br />

• Mode 5 IFF<br />

• Plug-and-fight<br />

• Pulse Doppler<br />

• Truck-mounted<br />

• C-17 transportable<br />

Battle Manager<br />

• Modern networkcentric<br />

open<br />

architecture<br />

• Controll<strong>in</strong>g node on<br />

network<br />

• Integrated<br />

Engagement and<br />

Force Operations<br />

• Enhanced Maneuver<br />

Force Protection<br />

• Plug-and-fight<br />

• Interoperable with<br />

coalition, legacy, and<br />

future systems<br />

• C-130 RO/RO<br />

M012-3127-11


U.S. Secretary of<br />

Defense Leon Panetta<br />

U.S. Under Secretary<br />

of Defense for<br />

Acquisition<br />

Technology and<br />

Logistics Frank<br />

Kendall<br />

Full fund<strong>in</strong>g...would<br />

ensure that the United<br />

States receives...a<br />

data archival package<br />

for future potential<br />

use on other U.S. air<br />

and missile defense<br />

improvements.<br />

– June 2012<br />

Without the results of<br />

the Proof of Concept,<br />

DoD (and the other<br />

Participants)<br />

would…be forced to<br />

re-<strong>in</strong>vest at a later<br />

date to obta<strong>in</strong> the<br />

design, <strong>in</strong>tegration,<br />

performance and<br />

test<strong>in</strong>g <strong>in</strong>formation.<br />

– June 2012<br />

U.S. Leadership<br />

Commitment to MEADS<br />

Senator Richard<br />

Shelby (R-Alabama)<br />

U.S. Under Secretary<br />

of Defense for<br />

Acquisition<br />

Technology and<br />

Logistics Ashton<br />

Carter<br />

It is <strong>in</strong> our national <strong>in</strong>terest<br />

to support fund<strong>in</strong>g for<br />

MEADS <strong>in</strong> FY13, and that<br />

walk<strong>in</strong>g away…after<br />

<strong>in</strong>vest<strong>in</strong>g $2.7 billion would<br />

be an irresponsible waste<br />

of taxpayer funds.<br />

– June 2012<br />

Limit<strong>in</strong>g the rema<strong>in</strong><strong>in</strong>g<br />

fund<strong>in</strong>g for MEADS,<br />

…would have grave effects<br />

on our ongo<strong>in</strong>g capability<br />

development, our ability to<br />

build our partners' capacity<br />

<strong>in</strong> air and missile defense,<br />

and, potentially, on our<br />

current and future NATO<br />

commitments to missile<br />

defense.<br />

– June <strong>2011</strong><br />

M012-3127-12


Army Chief of Staff<br />

General Raymond<br />

Odierno<br />

Supreme Allied<br />

Commander Europe<br />

Admiral James<br />

Stavridis<br />

Requested FY2013<br />

fund<strong>in</strong>g enables the U.S.<br />

to obta<strong>in</strong> the technology<br />

it paid for and avoids<br />

potential negative<br />

impacts to other Air and<br />

Missile Defense<br />

programs.<br />

– June 2012<br />

This jo<strong>in</strong>t program will<br />

deliver a system with a<br />

<strong>360</strong>-<strong>degree</strong> capability<br />

which will, over time,<br />

compliment U.S. ballistic<br />

missile defense<br />

capabilities.<br />

– September <strong>2011</strong><br />

Senior Military<br />

Commitment to MEADS<br />

Vice Chief of Staff<br />

General Peter<br />

Chiarelli<br />

LTG Norbert F<strong>in</strong>ster<br />

Vice Chief of Staff,<br />

Luftwaffe<br />

Without full fund<strong>in</strong>g, the<br />

United States would<br />

<strong>in</strong>cur the significant<br />

costs associated with a<br />

unilateral withdrawal<br />

…planned Patriot<br />

System modernization<br />

may be affected.<br />

– September <strong>2011</strong><br />

We are deeply<br />

conv<strong>in</strong>ced that MEADS<br />

will offer the needed<br />

growth potential, to<br />

enable future<br />

enhancements.<br />

– December 2010<br />

M012-3127-13


German Member of<br />

the Bundestag Ernst-<br />

Re<strong>in</strong>hold Beck<br />

German M<strong>in</strong>ister of<br />

Defense Thomas de<br />

Maizière<br />

Current Congressional<br />

action…risks wast<strong>in</strong>g<br />

hundreds of millions of<br />

euros already <strong>in</strong>vested<br />

<strong>in</strong> Germany <strong>in</strong> a muchneeded<br />

air and missile<br />

defense capability.<br />

– June 2012<br />

For Germany and Italy,<br />

orderly completion of<br />

the MEADS project and<br />

the f<strong>in</strong>d<strong>in</strong>gs ga<strong>in</strong>ed from<br />

its “Proof of Concept”<br />

phase are an essential<br />

basis for our future air<br />

defense as well as for<br />

the European<br />

contribution to NATO<br />

Missile Defense.<br />

– July 2012<br />

Solid German and Italian<br />

Support for MEADS<br />

Italian M<strong>in</strong>ister of<br />

Defense Giampaolo di<br />

Paola<br />

Detlef Selhausen,<br />

National Armaments<br />

Director, German<br />

M<strong>in</strong>istry of Defence<br />

The D&D results are<br />

vital for Italy…and are<br />

fundamental to allow<br />

the Italian contribution<br />

to the NATO Integrated<br />

Air and Missile Defense.<br />

– June 2012<br />

Jo<strong>in</strong>t term<strong>in</strong>ation of the<br />

current MEADS<br />

development is not an<br />

option for Germany. It<br />

would, additionally, be<br />

difficult to reconcile any<br />

jo<strong>in</strong>t term<strong>in</strong>ation with<br />

German budgetary law.<br />

– July <strong>2011</strong><br />

M012-3127-14


Typical<br />

Weapon<br />

System<br />

How MEADS Saves Our Defense Budget<br />

Acquisition<br />

Cost (30%)<br />

Operations & Support<br />

(O&S) Cost<br />

(70%)<br />

• O&S costs represent >70% of the total life<br />

cycle cost for major weapons programs<br />

(http://www.gao.gov/products/GAO-12-340)<br />

• These costs occur once the system is<br />

procured and fielded, and cont<strong>in</strong>ue to rise<br />

– Personnel costs<br />

– Ma<strong>in</strong>tenance<br />

– Facilities<br />

• Acquisition costs represent


MEADS Operator/Ma<strong>in</strong>ta<strong>in</strong>er Concept<br />

MEADS Crewmember<br />

Ground Sensor Suite<br />

Reloader<br />

Launcher<br />

G:\MEADS\BMIT\PRESENTA\JULY2001\M101_443 per CO-42-13475-OL, 6 <strong>November</strong> 2002<br />

TOC Operator/Ma<strong>in</strong>ta<strong>in</strong>er<br />

System Support<br />

Vehicle<br />

Simplified design allows primary skills<br />

to be allocated to only two skill specialties<br />

Tactical Operations Center<br />

MEADS can be<br />

operated and<br />

ma<strong>in</strong>ta<strong>in</strong>ed us<strong>in</strong>g<br />

as few as 2<br />

functional skill sets<br />

M012-3127-16


MEADS provides superior battlefield capabilities<br />

with unprecedented flexibility<br />

• <strong>360</strong>-<strong>degree</strong> capability aga<strong>in</strong>st entire threat suite<br />

• Hit-to-kill <strong>PAC</strong>-3 <strong>MSE</strong> missile with <strong>in</strong>creased<br />

performance, altitude, and range<br />

• Enhanced strategic transportability and tactical<br />

mobility<br />

• Open architecture with plug-and-fight capability<br />

• Tailored/scalable battle elements with coalition<br />

<strong>in</strong>teroperability<br />

MEADS program is mak<strong>in</strong>g significant progress<br />

• CDR completed August 2010<br />

• System <strong>in</strong>tegration of radar, <strong>launch</strong>er, and battle<br />

manager underway<br />

• Successful <strong>360</strong>-<strong>degree</strong> over-the-shoulder flight<br />

test <strong>in</strong> <strong>November</strong> <strong>2011</strong><br />

• Intercept test planned <strong>in</strong> 2012<br />

World-class theater AMD system<br />

with dramatically reduced operation and support costs<br />

G:/Communications/M012-3127 per POF-2505-28192-OL 3 September 2009, POF-5100-30913-OL 10 September 2010, POF-5100-33088-OL 4<br />

<strong>November</strong> <strong>2011</strong>, POF-5100-33208-OL 2 December <strong>2011</strong>, PA-4370-33834-OL 30 May 2012, and PA-4370-33623-OL 5 April 2012<br />

Summary<br />

M012-3127-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!