28.06.2015 Views

Download issue as PDF - LVI

Download issue as PDF - LVI

Download issue as PDF - LVI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the fActorY<br />

rybnik, polAnD<br />

rYBNik, PolAND<br />

1991 rettig starts negotiations with huta Silesia, a producer of panel<br />

radiators owned by the state of Poland.<br />

1992 huta Silesia obtained permission from the Polish Ministry of<br />

-1993 Privatisation and Ministry of internal Affairs to sign an agreement<br />

with rettig for the production of radiators in a joint venture<br />

structure. on March 1 st 1993 Newco Silesia started. in the second<br />

half of that same year, rettig purch<strong>as</strong>ed the remaining shares.<br />

1994 the factory in rybnik w<strong>as</strong> modernised and extended and the<br />

-1998 production of Purmo radiators started. A new leAS welding line<br />

and paint shop were introduced. Due to the incre<strong>as</strong>e in<br />

production, extra warehouse facilities were built.<br />

the<br />

Factory<br />

rYBNik, PolAND<br />

1999 investment in second welding line and warehouse.<br />

2002 in addition to radiators the rybnik factory starts production of<br />

rolljet insulation for underfloor heating.<br />

2006 New production facilities were completed (new hall of 10.000m 2 )<br />

-2007 and a new third modern leAS welding line w<strong>as</strong> installed for<br />

the production of high quality radiators.<br />

ryBnik Factory, pl<br />

We are welcomed by Franciszek pl<strong>as</strong>kura, who <strong>as</strong> managing director at rettig heating sp. is responsible for rettig icc’s factory<br />

in rybnik, poland. the factory in rybnik, where about 30 percent of the total number of radiators of the rettig group are<br />

produced, is a special one. at le<strong>as</strong>t, it is to Franciszek pl<strong>as</strong>kura, who in the early 90s w<strong>as</strong> responsible for the privatisation of<br />

this state owned company and still leads this totally renewed modern factory successfully today. everything that happens in<br />

rybnik consequently falls under his direct responsibility.<br />

franciszek Pl<strong>as</strong>kura is visibly proud of what he and his team have<br />

accomplished in the l<strong>as</strong>t two decades, which is why it’s no coincidence<br />

that we’ve chosen to highlight the rybnik factory in this <strong>issue</strong> of<br />

clever. “A total over 2 million radiators find their way from our factory<br />

in rybnik to customers in 15 different countries,” explains franciszek<br />

Pl<strong>as</strong>kura. “Nearly 400 highly motivated experts are on a daily b<strong>as</strong>is<br />

responsible for the production of about nine to eleven thousand<br />

radiators — depending on the type being produced. to accomplish<br />

that we have three shifts working at three extreme modern, well<br />

equipped and fully automated production lines.”<br />

stand out<br />

“the re<strong>as</strong>on for rybnik’s success is for sure the fact that we’ve managed<br />

to build a team that h<strong>as</strong> worked together for many years,” continues<br />

franciszek Pl<strong>as</strong>kura. “i wanted to build a team that fitted the brand.<br />

With the same DNA. Dedicated to its job and willing to conquer the<br />

world. We only hired the best people we could find. engaged in their<br />

field of expertise, but willing to cooperate with people in completely<br />

different fields. if you know what others are doing, and especially why<br />

they are doing this, you can build a team in which people respect, but<br />

also help each other, always. our engineers and technicians are >><br />

rettig icc manufactures radiators in fifteen production facilities, located in<br />

eleven different countries. in each <strong>issue</strong> of clever we highlight one of these<br />

factories. in this one, we turn the spotlight on the factory in rybnik, Poland.<br />

| 46<br />

47 |

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!