28.06.2015 Views

Objective 1c. Given TOs 1F-16C-2-94GS-00-1, 1F-16C-34 ... - NCATT

Objective 1c. Given TOs 1F-16C-2-94GS-00-1, 1F-16C-34 ... - NCATT

Objective 1c. Given TOs 1F-16C-2-94GS-00-1, 1F-16C-34 ... - NCATT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Objective</strong> <strong>1c</strong>. <strong>Given</strong> <strong>TOs</strong> <strong>1F</strong>-<strong>16C</strong>-2-<strong>94GS</strong>-<strong>00</strong>-1, <strong>1F</strong>-<strong>16C</strong>-<strong>34</strong>-1-1, and <strong>1F</strong>-<br />

<strong>16C</strong>G-2-<strong>34</strong>GS-<strong>00</strong>-1, identify system operation of the EGI / INS with at<br />

least 80% accuracy.<br />

• Reading Assignment: TO <strong>1F</strong>-<strong>16C</strong>-2-<strong>94GS</strong>-<strong>00</strong>-1<br />

paragraphs 5-30 and 5-75.<br />

• TO <strong>1F</strong>-<strong>16C</strong>-<strong>34</strong>-1-1 page 1-136 paragraph 1.9 through page 1-<br />

141 paragraph 1.9.6, 1-152 through page 1-153 paragraph<br />

1.11.3.1.7, page 1-154 paragraph 1.11.3.1.11 and 1.11.3.1.12,<br />

page 1-154 paragraph 1.11.3.1.13 through page 1-155, page<br />

1-166 paragraph 1.12.1.6, page 1-168, page 2-254 paragraph<br />

2.23.6.3 and 2.23.6.4, page 1-156 paragraph 1.11.4 through<br />

page 1-165 fig 1-96, page 1-446 paragraph 1.29.7 through 1-<br />

448, page 1-450 and 1-451 paragraph 1.29.12, page 1-453,<br />

and page 1-455 paragraph 1.29.17 through 1-456 paragraph<br />

1.29.19<br />

• TO <strong>1F</strong>-<strong>16C</strong>G-2-<strong>34</strong>GS-<strong>00</strong>-1 paragraphs 3-8 through 3-12, 3-17<br />

through 3-19, 3-25, 3-26, 3-29 through 3-33, Tables 3-1<br />

through 3-4.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!