30.06.2015 Views

Node capacity and terminal management on Indian Railways

Node capacity and terminal management on Indian Railways

Node capacity and terminal management on Indian Railways

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.3 Proposed work at IIT Bombay: C<strong>on</strong>tinuing work at IIT Bombay is briefly discussed. A new<br />

project will focus <strong>on</strong> operating effectiveness of h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling traffic at c<strong>on</strong>gested nodes <strong>on</strong> the <strong>Indian</strong><br />

<strong>Railways</strong>. The project will try to achieve three major goals:<br />

1) An assessment of theoretical approaches to this problem from the available literature. A crucial part<br />

of this is to develop appropriate measurement norms for assessing node performance. The project will<br />

c<strong>on</strong>sider operating norms based <strong>on</strong> volumes of throughput (where relevant) <str<strong>on</strong>g>and</str<strong>on</strong>g> also time-based<br />

measures.<br />

2) Development of a computer based implementati<strong>on</strong> of an appropriate model for the purpose. This will<br />

use appropriate models drawn from the literature <str<strong>on</strong>g>and</str<strong>on</strong>g> practice, which are relevant for the effective<br />

modeling of railway operati<strong>on</strong>s.<br />

3) A comparis<strong>on</strong> of two or three nodes <strong>on</strong> the <strong>Indian</strong> <strong>Railways</strong> network to examine the infrastructure<br />

(e.g. lines <str<strong>on</strong>g>and</str<strong>on</strong>g> crossovers while entering the yard from different directi<strong>on</strong>s), c<strong>on</strong>trol administrati<strong>on</strong> (e.g.<br />

designati<strong>on</strong> of jurisdicti<strong>on</strong> for secti<strong>on</strong> c<strong>on</strong>trollers <str<strong>on</strong>g>and</str<strong>on</strong>g> area c<strong>on</strong>trollers), signaling <str<strong>on</strong>g>and</str<strong>on</strong>g> other c<strong>on</strong>trol<br />

strategies (e.g. twin single line working) <str<strong>on</strong>g>and</str<strong>on</strong>g> overall scheduling strategies to improve performance.<br />

It is anticipated that there will be the following three c<strong>on</strong>crete outcomes of the project.<br />

1) A c<strong>on</strong>crete, quantitative framework for estimating <str<strong>on</strong>g>terminal</str<strong>on</strong>g>/node <str<strong>on</strong>g>capacity</str<strong>on</strong>g> for different<br />

traffic/operating scenarios. This will be al<strong>on</strong>g the lines of the line <str<strong>on</strong>g>capacity</str<strong>on</strong>g> measures in use in the <strong>Indian</strong><br />

<strong>Railways</strong> as well as the modified, time-based measures proposed under the LRDSS framework.<br />

2) A prototype software model for simulating <str<strong>on</strong>g>terminal</str<strong>on</strong>g> operati<strong>on</strong>s for a selected class of operating<br />

c<strong>on</strong>diti<strong>on</strong>s. This model will be capable of representing node/<str<strong>on</strong>g>terminal</str<strong>on</strong>g> c<strong>on</strong>figurati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> movement<br />

patterns, various train <str<strong>on</strong>g>and</str<strong>on</strong>g> traffic profiles <str<strong>on</strong>g>and</str<strong>on</strong>g> some c<strong>on</strong>trol strategies as inputs <str<strong>on</strong>g>and</str<strong>on</strong>g> will provide reports<br />

<strong>on</strong> the desired performance measures.<br />

3) A quantitative <str<strong>on</strong>g>and</str<strong>on</strong>g> qualitative comparis<strong>on</strong> of some of the different c<strong>on</strong>trol strategies being used <strong>on</strong><br />

<strong>Indian</strong> <strong>Railways</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> which can be used for <str<strong>on</strong>g>terminal</str<strong>on</strong>g> <str<strong>on</strong>g>management</str<strong>on</strong>g>.<br />

7. C<strong>on</strong>clusi<strong>on</strong><br />

The <str<strong>on</strong>g>management</str<strong>on</strong>g> of freight <str<strong>on</strong>g>terminal</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> nodes (juncti<strong>on</strong>s) <strong>on</strong> the <strong>Indian</strong> <strong>Railways</strong> is of great<br />

significance from the operati<strong>on</strong>s <str<strong>on</strong>g>management</str<strong>on</strong>g> goal of effective utilizati<strong>on</strong> of resources as well as the<br />

commercial goal of adding value to services <str<strong>on</strong>g>and</str<strong>on</strong>g> customer benefit. It is a practically challenging<br />

problem with a number of dimensi<strong>on</strong>s to it, as well as a theoretically challenging problem in terms of<br />

modeling <str<strong>on</strong>g>and</str<strong>on</strong>g> computati<strong>on</strong>. Although we have not specifically discussed semi-automated support for<br />

node traffic <str<strong>on</strong>g>management</str<strong>on</strong>g>, it is an area where new developments are taking place, <str<strong>on</strong>g>and</str<strong>on</strong>g> where <strong>Indian</strong><br />

<strong>Railways</strong> should take the lead in technology <str<strong>on</strong>g>and</str<strong>on</strong>g> software development. Managerially, more awareness<br />

regarding <str<strong>on</strong>g>terminal</str<strong>on</strong>g> performance, definiti<strong>on</strong> of some performance measures <str<strong>on</strong>g>and</str<strong>on</strong>g> integrated analysis of<br />

opti<strong>on</strong>s to do with node <str<strong>on</strong>g>capacity</str<strong>on</strong>g> will go some way in addressing the issue.<br />

References:<br />

Ashok Kumar, “scheduling of trains <strong>on</strong> railway secti<strong>on</strong>s-M. Tech Project Report”(1999), IE&OR, IIT Bombay.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!