ecojoist technical manual - construction studies
ecojoist technical manual - construction studies
ecojoist technical manual - construction studies
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 1<br />
Section 2<br />
p4 • Strongbacks: Bridging Detail<br />
p4 • Strongbacks: Nailer Block Detail<br />
p5 • Strongbacks<br />
p6 • Z Clip Detail<br />
p6 • Aperture Details<br />
p7 • Restraint Straps: Detail L (1)<br />
p7 • Restraint Straps: Detail L (2)<br />
p8 • Timber Frame Details<br />
p9 • Steel Beams: Detail J<br />
p9 • Steel Beams: Detail K<br />
p10 • Steel Beams: Detail K (1)<br />
p10 • Detail E<br />
p11 • Detail H<br />
p11 • Continuous Joist<br />
p12 • Joist Built into Wall<br />
p12 • Typical Top Chord Detail<br />
p13 • Use of Plastic Joist Seals<br />
p13 • Use of Mastic Sealant<br />
p14 • 2 Ply Ecojoist Connection<br />
p15 • 2 Ply Ecojoist Connection<br />
p17<br />
p18<br />
p21<br />
p24<br />
p26<br />
p27<br />
p28<br />
p29<br />
p32<br />
p36<br />
• Bearing onto Wall<br />
• Loads<br />
• Top Chord Support Detail<br />
• Site Handling<br />
• Floor Decking<br />
• Nailing Requirements for<br />
Solid Timber 2 Ply Trimmers<br />
• Metalwork<br />
• Span Tables<br />
• Fire Resistance<br />
• Sound<br />
August 2008