05.07.2015 Views

Changes from Requirements Release 5.0 to 5.5 - TL 9000

Changes from Requirements Release 5.0 to 5.5 - TL 9000

Changes from Requirements Release 5.0 to 5.5 - TL 9000

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Modified Adders<br />

• 7.3.1.C.1 Project Plan<br />

– Added e) estimation of project fac<strong>to</strong>rs<br />

– Reworded l) and moved examples <strong>to</strong> new note<br />

7.3.1.C.1-NOTE 3<br />

• 7.3.1.C.2 <strong>Requirements</strong> Traceability - The<br />

organization shall establish and maintain a<br />

method <strong>to</strong> trace each documented requirement<br />

through design and test.<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!