05.07.2015 Views

00sr008

00sr008

00sr008

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 3:<br />

Hazardous Spiral Look-Alikes<br />

Hazardous Spiral Look-Alike<br />

Incremental sequential waterfalls with<br />

significant COTS, user interface,<br />

or technology risks<br />

Sequential spiral phases with key<br />

stakeholders excluded from<br />

phases<br />

Risk-insensitive evolutionary or<br />

incremental development<br />

Impeccable spiral plan with no<br />

commitment to managing risks<br />

Insistence on complete specifications<br />

for COTS, user interface, or<br />

deferred-decision situations<br />

Evolutionary development with no lifecycle<br />

architecture<br />

Purely logical object-oriented methods<br />

with operational, performance, or<br />

cost risks<br />

Invariant<br />

Examples<br />

1 One Second Response Time<br />

Violation of Waterfall Assumptions<br />

2 Windows-only COTS<br />

Excluding Key Stakeholders<br />

3 Pre-ship Testing<br />

Risk Insensitivity<br />

Section 3.3: Risks of Evolutionary<br />

Development<br />

3 (special case of the above)<br />

4 Risk of Precise Specification<br />

5 Section 3.3: Risks of Evolutionary<br />

Development<br />

6 Logic-Only OO Designs<br />

CMU/SEI-2000-SR-008 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!