07.07.2015 Views

Indian Register Quality Systems Operational Procedures Manual ...

Indian Register Quality Systems Operational Procedures Manual ...

Indian Register Quality Systems Operational Procedures Manual ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Indian</strong> <strong>Register</strong> <strong>Quality</strong> <strong>Systems</strong> <strong>Operational</strong> <strong>Procedures</strong> <strong>Manual</strong>Issue No. 1 - Certification Scheme III IRQS - OPM : 09 : 01 Page 9 of 19ii.iii.iv.certification,reviewing any client's statements with respect to its operations (e.g.promotional material, website),requests to the client to provide documents and records (on paper orelectronic media), andother means of monitoring the certified client's performance.3.7.2 Surveillance audits are on-site audits, but are not necessarily full systemaudits, and shall be planned together with the other surveillance activitiesso that the certification body can maintain confidence that the certifiedmanagement system continues to fulfill requirements betweenrecertification audits. The surveillance audit programme shall include, atleasti. internal audits and management review,ii. a review of actions taken on nonconformities identified during theprevious audit, c) treatment of complaints,iii. effectiveness of the management system with regard to achieving thecertified client's objectives, e) progress of planned activities aimed atcontinual improvement,iv. continuing operational control,v. review of any changes, andvi. use of marks and/or any other reference to certification.3.7.3 Surveillance audits shall be conducted at least once a year. The date of thefirst surveillance audit following initial certification shall not be more than12 months from the last day of the stage 2 audit.The date of the second surveillance audit shall not be more than 24 monthsfrom the last day of the stage 2 audit.3.8. Recertification Audit:A recertification audit shall be planned and conducted on-site to evaluate thecontinued fulfillment of all of the requirements of the relevant management systemstandard or other normative document. The purpose of the recertification audit isto confirm the continued conformity and effectiveness of the management systemas a whole, and its continued relevance and applicability for the scope ofcertification.3.8.1 The recertification audit shall consider the performance of the managementsystem over the period of certification, and include the review of previoussurveillance audit reports.3.8.2 Recertification audit activities may need to have a stage 1 audit in situationswhere there have been significant changes to the management system, theclient, or the context in which the management system is operating (e.g.changes to legislation).3.8.3 In the case of multiple sites or certification to multiple management systemstandards being provided by IRQS, the planning for the audit shall ensureadequate on-site audit coverage to provide confidence in the certification.The recertification audit shall include an on-site audit that addresses the following:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!