THE HIGHLAND COUNCIL Agenda Item 6.7<br />

ROSS, SKYE & LOCHABER<br />

PLANNING APPLICATIONS COMMITTEE – 2 JUNE 20<strong>09</strong><br />

Report No <strong>PLR</strong>/<strong>073</strong>/<strong>09</strong><br />

08/00582/REMRC: ALBYN HOUSING SOCIETY LTD<br />

ERECTION OF 25 HOUSES AND FORMATION OF 39 SERVICED HOUSE PLOTS<br />

(ARM), LAND NORTH OF SELLAR PLACE, CONON BRIDGE, ROSS-SHIRE<br />

SUMMARY<br />

Report by Area Planning and Building Standards Manager<br />

Description : Erection of 25 houses and formation of 39 serviced house plots (ARM).<br />

Recommendation - GRANT planning permission subject to conditions.<br />

Ward : <strong>09</strong> – Dingwall & Seaforth<br />

Hearing : No Hearing Required.<br />

Reason for Committee : Minor Departure and number of objections received.<br />

1. PROPOSAL<br />

1.1 This application proposes the formation of 25 houses and the formation of 39<br />

serviced house plots on land which was previously the subject of an outline<br />

consent for housing development (07/00004/OUTRC) which remains extant. <strong>The</strong><br />

houses are to be finished in dry dash render, timber cladding and artificial stone<br />

together with concrete tiles. <strong>The</strong> house types comprise a mix of two and three<br />

bedroom single storey detached and two storey semi-detached houses, together<br />

with two storey flats. <strong>The</strong> house designs are of fairly contemporary design with 30 o<br />

roof pitches, include timber panelling at upper storey level and stone panelling on<br />

lower sections as features. All properties have two parking spaces and individual<br />

garden areas, including the flats.<br />

1.2 <strong>The</strong> houses are to be built on the north-eastern section of the site taking access<br />

from Riverbank Road to the west. A further 14 plots are to be serviced by this<br />

road. <strong>The</strong> remaining 25 plots are to be serviced by an extension of Windsor Place<br />

leading from the south.<br />

1.3 <strong>The</strong> site is bounded by semi-detached housing to the south-west, detached and<br />

terraced housing to the south-east, rough grazing to the north-east with the trunk<br />

road beyond and rough grazing land to the north-west.


1.4 <strong>The</strong> site is served by the public water main and sewer, surface water drainage will<br />

comply with the principles of SUDS and existing roadways will be extended as<br />

cul-de-sacs from two directions to service the site and link into the existing road<br />

network. <strong>The</strong> application is accompanied by a Sustainable Urban Drainage<br />

System which includes a detention basin, a safer routes to school plan,<br />

landscaping plans and a design brief for the serviced plots.<br />

1.5 Amended plans were submitted on 11 February illustrating minor amendments to<br />

the access improvements to Riverbank Road, on 24 March and 19 May illustrating<br />

minor amendments to the layout plan and the temporary footpath link between<br />

Wyvis Cresent and Sellar Place during construction works. Re- notification was not<br />

required due to the minor nature of the amendments.<br />

2. PLANNING HISTORY<br />

2.1 07/00004/OUTRC – Housing development – outline consent - 14 November 2007.<br />

3. PUBLIC PARTICIPATION<br />

3.1 Type of advertisement: Section 34 of the Act (21 days) & Article 18. Expiry Date:<br />

5.06.<strong>09</strong>.<br />

3.2 Thirteen letters of representation have been received, the points raised can be<br />

summarised as follows:<br />

Density:<br />

1. Sixty-four homes still too many for site - over-development of the area.<br />

2. Local Plan statement indicates maximum of 48 units - more in keeping with<br />

surrounding area of Riverbank Road and MacLeod Drive.<br />

3. Other developments in village at school road, the garden centre and the filling<br />

station will go a long way to fulfilling requirements.<br />

4. Decrease size/increase density of plots for sale is a false economy. Not<br />

likely to represent “best value” for sale of public asset. Increasing size of<br />

plots to realistic proportions would increase attractiveness/command better<br />

capital return. Proportion of capital receipt generated from disposal of such<br />

public assets should be ploughed back into local community-help offset its<br />

loss.<br />

Macleod Drive:<br />

5. Strongly object to number of properties proposed to front of MacLeod Drive.<br />

Will lose a lot of our privacy.<br />

6. Area initially zoned for 24 houses. Fourteen already built. Local Plan shows<br />

8 houses. Cannot understand how Albyn can submit plans for 20 houses in<br />

the area, more than double capacity shown on the Local Plan. Over<br />

development of the area. MacLeod Drive has only 9 houses in similar area.<br />

7. Concerned to see area in front of MacLeod Drive to be sold as house plots-


concerned about size and height of new properties.<br />

Access:<br />

8. Exit onto A835 trunk road would be far better - would reduce speed of traffic.<br />

9. Wyvis Cresent and MacLeod Drive are overloaded. Sometimes used at high<br />

speed - lot of noise especially at night. Congestion problems already if a car<br />

is parked in front of a house or repairs need to be done to road. Road to front<br />

of 11 Wyvis Crescent has subsidence problem - cars get damaged. Wyvis<br />

Crescent is a private housing estate with very little privacy. Have private and<br />

commercial vehicles, service and school buses. Do not think there is<br />

sufficient capacity to accommodate traffic generated by additional 25 houses.<br />

10. Construction traffic will make it more dangerous.<br />

11. TEC Services indicated need to provide build out along Riverbank Road to<br />

accommodate increased two-way traffic from development. Assessment of<br />

traffic movements appears to have been based on historical information<br />

contained in previous Local Plan likely to be in excess of 10 years old and out<br />

of date. Early need for mitigation measures such as build out indicates<br />

additional traffic flow would be detrimental to adjoining road network but no<br />

formal transportation assessment appears to have been carried out contrary<br />

to both local and national policy. <strong>The</strong> regulation and enforcement of keeping<br />

such a build out clear of parked vehicles seems to have been completely<br />

overlooked in area which is under parking pressure particularly when there<br />

are funerals or weddings at the local church. Again level of traffic generation<br />

from this development is associated with its increased density.<br />

12. Concerned regarding junction of Henderson Crescent/Nursery/Sellar Place.<br />

No need to interfere with this area. Lorries negotiate area with no problems.<br />

13. Residents greatly inconvenienced if 3 speed bumps be installed as proposed.<br />

14. Very concerned about increased traffic passing Macleod Drive. Speed<br />

bumps should be included through Wyvis Crescent and even zebra crossing<br />

in area of play park above Windsor Place – beneficial for children crossing.<br />

15. When house plots purchased in Wyvis Crescent from Ross & Cromarty<br />

District <strong>Council</strong> in 1978 were told continuance of the road from Wyvis<br />

Crescent to Windsor Place was only temporary and a separate road to<br />

Windsor Place would eventually be built leaving Wyvis Crescent on its own. If<br />

Albyn Housing wish to proceed with this development they should build a<br />

new road and not use Wyvis Crescent.<br />

Play provision/Amenity:<br />

16. <strong>Highland</strong> Play Strategy 2006-2010, page 21 states “<strong>Highland</strong> <strong>Council</strong> will<br />

develop policy to protect open and green space to allow more every day<br />

contact with nature and participation in play, sport and recreation.” Proposed<br />

plan does not display consideration of this. Large open green space in<br />

middle of field could be used as recreation space for residents to enjoy then


would not need to construct extra roads in field, would be no increase in<br />

traffic and pollution on Wyvis Crescent.<br />

17. Layout of proposed development and very low provision of amenity space are<br />

unacceptable. Contrary to both current best practice and also <strong>Highland</strong><br />

<strong>Council</strong>’s “<strong>Highland</strong> Play Strategy”. Can be social problems linked to high<br />

density housing not adequately serviced in terms of space and infrastructure.<br />

Conon Bridge already suffers from various forms of anti-social behaviour<br />

which do not need exacerbated. Again low provision of amenity space is<br />

directly associated with increased density of proposed development.<br />

18. Proposed play area very small and right next to a road, insufficient for<br />

amount of children in area.<br />

19. Provision of services for existing and growing population of Conon Bridge<br />

should be a priority. <strong>The</strong>re are no strategies in place for this at present.<br />

Other issues:<br />

20. Car park adjacent to Church of Scotland is <strong>Council</strong> owned. Concerned this<br />

may be made available for heavy goods vehicles/plant for the development.<br />

21. Church also concerned about noise if work taking place on a Sunday.<br />

22. Already problems with water pressure and drainage.<br />

3.3 All letters of representation can be viewed at Area Planning Office and for<br />

<strong>Council</strong>lors, will be retained within members lounge prior to Committee Meeting.<br />

4. APPLICANTS’ SUBMISSION<br />

4.1 Would respond to representations as follows:-<br />

1. Number of dwellings – site capacity stated in Local Plan for guidance purposes<br />

only. Site has outline consent which indicated 70 houses, current proposal for<br />

25 houses and 39 plots (64 units) represents significant reduction in numbers.<br />

2. With reference to density of adjacent existing houses – following submitted for<br />

comparative purposes:<br />

• Windsor Place – 100 houses in approx 2.5ha = 40 houses/ha;<br />

• MacLeod Drive – 9 houses in approx 0.85ha = 10 houses/ha;<br />

• Sellar Place – 65 houses in approx 2.7ha = 24 houses/ha;<br />

• Riverbank Rd/Henderson Cresent – 28 houses in approx 1.4ha = 20<br />

houses/ha;<br />

• Proposed development – 64 dwellings in approx 4.8 ha = 13 dwellings/ha.<br />

3. Riverbank Road - Proposed upgrade works to Riverbank Road developed in<br />

consultation with TEC Services and are in full accordance with condition 7 of<br />

outline consent. Works designed to alleviate existing on-street parking<br />

problem at Riverbank Road which reduces carriageway to single file.<br />

Proposals subject to road safety audit submitted with Reserved Matters.


4. With reference to comments regarding sustainable modes of transport; we note<br />

that Conon Bridge is relatively well served by public transport. Regular bus<br />

services to Dingwall, Inverness and Beauly with bus stops on Conon High<br />

Street, Leanaig Road and on the B9162 adjacent to top of Wyvis Crescent<br />

available. All approximately 500 metres (7½ minutes walk) from site. Also<br />

proposal to re-open a railway station in Conon Bridge at Station Road<br />

(approximately 15 minutes walk from site) has planning permission.<br />

5. Amenity/play space; density of proposed development approx 13 houses per<br />

hectare. Generally accepted anything below 15-20 houses per hectare is<br />

classed as low density. “<strong>Highland</strong> Play Strategy” cited by the objectors, cross<br />

refers to the <strong>Highland</strong> <strong>Council</strong> Supplementary Guidance on “open space<br />

provision in new residential development”. Note this document is still in draft<br />

format and has yet to be approved/implemented.<br />

6. Of total site area of 4.8 hectares, amenity space accounts for over 1 hectare<br />

(not including private gardens, or the holdback from Eil Burn). <strong>The</strong> draft<br />

guidance on open space provision sets out a requirement for 40 square metres<br />

green space per person. Working on basis of 3.8 persons per dwelling (UK<br />

average family size) we would require slightly less than 1 hectare of green<br />

space therefore consider proposed development is not contrary to either “<strong>The</strong><br />

<strong>Highland</strong> Play Strategy” or the Draft Supplementary Guidance.<br />

7. Proposed development includes childrens’ play area in accordance with<br />

condition 14 of outline consent. Extent of amenity area is as per outline<br />

consent. A landscaping layout has been submitted in accordance with<br />

condition 15 of outline consent.<br />

8. Plot size – this is not a legitimate planning objection. Demonstrated proposed<br />

layout could readily accommodate a typical building footprint of 80 square<br />

metres (note footprint of proposed affordable housing is typically 60-70 square<br />

metres).<br />

9. Condition 19 of outline consent requires financial contribution – understand this<br />

is to relate to new community school. Have been advised it is too early to<br />

confirm what contribution should be because it is not known what it will be<br />

used to enhance. Due to procedures relating to grant funding, level of<br />

contribution needs to be confirmed as soon as possible.<br />

10. It is not possible to complete the new footpath link between Wyvis Cresent and<br />

Riverbank Road as Bridge View will be closed off for construction works and<br />

there are Health & Safety issues with construction traffic and pedstrians. A<br />

plan has been submitted with an alternative path for when phases 1 & 2 are<br />

under construction.<br />

11. With regard to landscaping requirements we would ask that conditions 1 & 15<br />

of the outline consent are carried forward with this consent to enable the plan<br />

to be progressed with the Forestry Officer. <strong>The</strong> location of the play area has<br />

been adjusted to enable the existing trees to be retained. <strong>The</strong> tree survey can


e provided prior to development commencing and a condition would be<br />

acceptable.<br />

12. Within this development over 60% of the units will be for affordable housing (25<br />

in phase1, 14 in phase 2 and the remaining 25 being private). <strong>The</strong> proposed<br />

tenure and mix has been closely developed with the <strong>Council</strong>’s Housing<br />

Manager. <strong>The</strong> aim is to provide a balanced mix of tenures to enable current<br />

<strong>Council</strong> tenants to move into private ownership and to help create a better<br />

balance of tenures in the immediate area. <strong>The</strong> affordable element will contain<br />

a higher than usual percentage of Low cost Home Ownership (50:50). <strong>The</strong><br />

marketing strategy will advertise these units directly to <strong>Council</strong> tenants in<br />

Conon Bridge and then only if there is not enough demand will the houses then<br />

be more widely advertised. Phase 1 has a slightly higher weighting towards<br />

rented houses and phase 2 will contain more Low Cost Home Ownership.<br />

13. Maintenance of Landscaped Areas and Houses – Albyn Housing Society will<br />

be the factor for this site. We will prepare a Deed of Conditions to cover<br />

common landscaped areas, the play area and treated and painted timber to<br />

ensure it maintains its appearance in the long term. We no longer use<br />

untreated timber.<br />

14. Access to the burn to the north will be maintained via a gate to allow<br />

maintenance near the SUDS pond and at the other end of the site to allow the<br />

farmer direct access from his land.<br />

5. CONSULTATIONS<br />

5.1 Conon Bridge Community <strong>Council</strong> : <strong>The</strong>re is wide spread opposition from the<br />

community to the nature (in particular the density) of this development. <strong>The</strong><br />

following are the views that the local community have asked the Community<br />

<strong>Council</strong> to take forward.<br />

1. Number of units proposed far in excess of Local Plan statement which<br />

indicates a maximum of 48 units. Development of up to 48 units would be<br />

more in line with intended density and in keeping with surrounding area of<br />

Riverbank Road and MacLeod Drive.<br />

2. TEC Services indicated need to provide build out along Riverbank Road to<br />

accommodate increased two-way traffic generated from development.<br />

Assessment of traffic movements appears to have been based on historical<br />

information contained in previous Local Plan likely to be in excess of 10<br />

years old and out of date. Early need for mitigation measures such as build<br />

out indicates additional traffic flow would be detrimental to adjoining road<br />

network but no formal transportation assessment appears to have been<br />

carried out contrary to both local and national policy. <strong>The</strong> regulation and<br />

enforcement of keeping such a build out clear of parked vehicles seemed to<br />

have been completely overlooked in area which is under parking pressure<br />

particularly when there are funerals or weddings at the local church. Again<br />

level of traffic generation from this development is associated with its<br />

increased density. Development appears to do little to improve modal shift


away from the private car towards sustainable modes of transport, contrary<br />

to national policy (SPP 17).<br />

3. Layout of proposed development and very low provision of amenity space<br />

are unacceptable. Contrary to both current best practice and also <strong>Highland</strong><br />

<strong>Council</strong>’s “<strong>Highland</strong> Play Strategy” can be social problems linked to high<br />

density housing not adequately serviced in terms of space and infrastructure.<br />

Conon Bridge already suffers from various forms of anti-social behaviour<br />

which do not need exacerbated. Again low provision of amenity space is<br />

directly associated with increased density of proposed development.<br />

4. Decrease size/increase density of plots for sale appears to be false economy<br />

and most likely does not represent “best value” for sale of a public asset.<br />

Increasing size of a plot to realistic size would increase as attractiveness and<br />

infinitely and command a better capital return. Proportion of capital receipt<br />

generated from disposal of such public assets should be ploughed back into<br />

local community from where it has been taken to help offset its loss.<br />

5.2 Ferintosh Community <strong>Council</strong> : Although this is outwith our remit we feel<br />

increased traffic volume will affect and concern everybody. We have concerns<br />

regarding safety of cyclists and pedestrians crossing the A835.<br />

1. We fully support housing developments which go some way to meeting<br />

housing needs in Conon Bridge, especially providing homes for affordable<br />

rent and low cost sale.<br />

2. Conon Bridge has established itself as one of Ross-shire’s property hot spots<br />

in recent years thanks to its rural setting and close access to a main trunk<br />

road with quick access to Inverness (Ross-shire Journal 10 October 2008).<br />

Strongly believe before permission is granted for this and any future housing<br />

developments in this area, there is a need to conduct an Impact Assessment<br />

which will consider the effect of increased traffic on road safety at the road<br />

junction with the A835. This will identify appropriate steps which need to be<br />

taken to minimise the effect of increased traffic flow and therefore improve<br />

safety.<br />

3. Concern regarding a wide range of issues relating to safety of pedestrians<br />

and cyclists crossing A835 as follows:<br />

a) crossing road hazardous for pedestrians & cyclists due to volume and<br />

speed of traffic, multiple directions of traffic approaching any potential<br />

crossing point with the road including slip roads, recent erection of<br />

“pedestrians crossing” sign in recognition of this. Hazards not confined<br />

to carriageways – accidents at the junction lead to vehicles leaving the<br />

carriageway and draught from lorries travelling at speed can affect<br />

stability of people standing on verge;<br />

b) traffic using both A835 and junction have increased & is likely to<br />

continue, particularly given proposed housing developments at Braes of<br />

Conon and Alcaig;<br />

c) numbers of pedestrians and cyclists attempting to cross junction have<br />

increased. This is welcome and likely to continue to increase;<br />

d) no way for pedestrians and cyclists coming from Conon to join the new


community link that is not hazardous;<br />

e) safest solution would be to separate pedestrians and cyclists from<br />

vehicles by means of a bridge or underpass.<br />

4. Following options considered:<br />

a) An identified crossing at safest point, with associated pavement<br />

extension and dropped kerbs. Generally considered to be north of<br />

junction at narrower section of road with some protection from centre<br />

hatching. Concern whether it was safe to attempt to seek refuge on<br />

centre hatching and over exact positioning of safest point to cross due<br />

to lack of clear visibility of traffic emerging from B9163 on Conon side.<br />

b) Possible installation of railings to direct pedestrians and cyclists,<br />

construction of refuge island on existing centre hatching and vegetation<br />

clearance to attempt to improve visibility.<br />

c) Traffic lights and pedestrian crossing to stop traffic and allow safe<br />

crossing.<br />

d) Reducing traffic speed through lower speed limits.<br />

e) Reducing traffic speeds through enforcing existing speed limits – speed<br />

cameras and police action.<br />

f) Improved lighting to increase night visibility and alert drivers.<br />

5.3 TEC Services : Recommend approval subject to conditions.<br />

5.4 Housing Development Manager: Fully support planning application. Confirm in<br />

agreement with location of affordable housing within proposal.<br />

<strong>The</strong> waiting list figures for Conon Bridge are 471 new applicants and 97 transfer<br />

applicants.<br />

5.5 Director of Planning (Forestry Officer): To satisfy conditions imposed on outline<br />

consent a more detailed landscape plan is required. Particular attention should be<br />

given to highly visible embankment along northern boundary – provides good<br />

opportunity for extensive tree planting providing screening of development from<br />

main trunk road yet retaining a broken view to the north from the new houses.<br />

Planting should consist of native species, using a combination of more dense<br />

“woodland type” planting on the lower slope and groups of larger standards/half<br />

standards in more prominent locations. This type of planting should be replicated<br />

in the wetter area to the south of the SUDS detention basin.<br />

Two proposed footpaths currently terminate to the north of the SUDS detention<br />

basin. It needs to be clear where these link to, if at all. A path could be continued<br />

along the foot of the embankment to the west which would provide a short circular<br />

walk and preferably even link in with the existing path to the west of Bridge View to<br />

provide a longer circular route which follows the River Conon.<br />

<strong>The</strong>re are clear discrepancies between plan title “site survey showing trees to be<br />

removed or retained” and plan title “landscape plan”. Trees to south of 42 Windsor<br />

Place are shown for retention on the first plan, yet shown as a childrens’ play<br />

ground in the landscape plan. <strong>The</strong>re are various other trees shown for retention,<br />

which clearly cannot be retained with the proposed layout. An Arboricultural


Implications Assessment and Method Statement needs to be submitted for<br />

approval, along with a Tree Protection Plan, in accordance with BS5837: 2005<br />

(Trees in Relation to Construction).<br />

5.6 Access Officer: Size of development should have incorporated an Access<br />

Management Plan as per guidance to local authorities on the Land Reform<br />

(Scotland) Act 2003. <strong>The</strong> layout for Safe Routes to School goes some way to<br />

addressing this but does not cover all relevant issues.<br />

It is noted on the plan that the existing path route between Windsor Place and<br />

Bridge View will be removed and a link between two new roads will be created.<br />

Whilst this will be sufficient in the long term I note that the existing path will be<br />

obstructed in Phase I whilst the new path link is in Phase II. Given that there could<br />

be reasonable time difference between Phases I and II, the path obstruction is<br />

unacceptable under the <strong>Council</strong> statutory duty to uphold access rights. Prior to<br />

removal of existing non-vehicular paths, the new access path should be completed<br />

to comply with the <strong>Council</strong>’s statutory duty to uphold access rights.<br />

<strong>The</strong> path should be appropriate with construction for cycle use to encourage safe<br />

non-vehicle multi use.<br />

5.7 Scottish Water : No objection. Unable to reserve capacity in advance of formal<br />

agreement. Due to size of development necessary for Scottish Water to assess<br />

the impact new demand will have on existing infrastructure. Water and waste<br />

water treatment works currently have capacity to service proposed development as<br />

do associated networks. Proposal may involve building over or obstruct access to<br />

existing infrastructure which requires to be protected.<br />

5.8 SEPA : Foul drainage – no objection to connection to public sewer.<br />

Surface water drainage - proposed detention basin considered acceptable in terms<br />

of water quality – provides required level of treatment for surface water run off from<br />

development. SEPA has not considered water quantity aspect of this scheme.<br />

Comments from Scottish Water where appropriate, local authority Roads<br />

Department and local authority Flood Prevention Unit should be sought on the<br />

SUDS strategy in terms of water quantity/flooding and adoption issues.<br />

Flood risk – site boundaries and layout are same as previous application and<br />

pedestrian access will remain via Windsor Place and Wyvis Crescent. On this<br />

basis, SEPA is satisfied in terms of flood risk.<br />

6. POLICY<br />

6.1 <strong>The</strong> following policies are relevant to the assessment of the proposal<br />

<strong>The</strong> <strong>Highland</strong> Structure<br />

Plan: Policy G2<br />

Design for Sustainability<br />

Adopted Ross & Cromarty East Local Plan - Conon Bridge - area allocated for


housing development – paras 1,8 and 13<br />

6.2 <strong>The</strong> proposal also requires to be assessed against the following relevant Scottish<br />

Planning Policies (SPP); NPPG, and Planning Advice Notes PAN.<br />

• SPP 3 - Planning For Housing<br />

• PAN 74 - Affordable Housing<br />

• PAN 67 – Housing Quality.<br />

6. PLANNING APPRAISAL<br />

6.1 Determining issues - Section 25 of the Town and Country Planning (Scotland) Act<br />

1997 requires planning applications to be determined in accordance with the<br />

development plan unless material considerations indicate otherwise.<br />

6.2 <strong>The</strong> proposal requires to be assessed against both the appropriate policies of the<br />

Development Plan, supplementary guidance and National Planning Policy and<br />

Guidelines as referred to in the Policy section. In particular, the proposal requires<br />

detailed assessment of the following fundamental issues:<br />

� whether the principle of development is appropriate in terms of policy<br />

� whether the layout of development is appropriate<br />

� the impact on the amenity of the area and residents<br />

� other material issues raised by the objectors.<br />

6.3 Policy Appraisal<br />

<strong>The</strong> site is covered by Policies 1, 8 & 13 in the Conon Bridge section of the<br />

adopted Local Plan. Overall 2.6 hectares is identified for 48 houses.<br />

Policy 1 identifies 0.6 hectares at Teanahoun (below Macleod Place) with a<br />

capacity for 8 units. Vehicular/pedestrian link between Bridge View and Wyvis<br />

Crescent is to be facilitated and to be the subject of detailed consultation with<br />

residents. Safeguards for water and drainage infrastructure and an amenity<br />

setback of 10 metres from properties on MacLeod Drive required.<br />

Policy 8 identifies area below Windsor Place as a possible option for the relocation<br />

of the Conon Bridge/Maryburgh replacement primary school, also having potential<br />

for an alternative use as housing. <strong>The</strong> requirement for the site as an option for the<br />

new school is now superseded by the <strong>Council</strong> decision to build elsewhere.<br />

.<br />

Policy 13 identifies 2 hectares of <strong>Council</strong> land to the West of Windsor Place for 30-<br />

40 houses, including a proportion of affordable/low costs needs. Access should be<br />

taken from Riverbank Road and developers will be expected to contribute to “safer<br />

routes to school” and community facilities.<br />

Policy GSP9 states that where site capacity figures are indicated for specific<br />

developments, these are generally for guidance purposes. However, any proposal<br />

which exceeds the indicative capacity by 10% or more will be considered in relation<br />

to its location in the settlement, the level of affordable/low cost needs housing, the<br />

quality of layout and design, infrastructure capacity and the extent to which it


contributes to the sustainability objectives of the Plan and the Development Plan<br />

Policy Guideline Standards.<br />

An increase of 10% would allow for 53 properties to be built on the site. <strong>The</strong><br />

original outline application at 82 units was an increase of 29 units upon the Local<br />

Plan allowance plus 10%. <strong>The</strong> outline application was amended to 70 units, being<br />

17 houses above the Local Plan allocation plus 10%. In approving that<br />

development Members will recall declining to approve any numbers for the<br />

development or the indicative layout plan. <strong>The</strong> current application proposes 25<br />

houses and 39 serviced house plots, 64 units in total, 11 houses above the Local<br />

Plan allocation plus 10%.<br />

This application site is located to the North West of two former <strong>Council</strong> housing<br />

developments, Windsor Place and Riverbank Road/Seller Place. <strong>The</strong>se<br />

developments are characterised by semi-detached and terraced properties with a<br />

fairly high density of development. MacLeod Place is a development where the<br />

<strong>Council</strong> provided serviced feus for development by individuals which resulted in<br />

detached bungalows at a very low density. <strong>The</strong> current application for the<br />

development of mainly semi-detached units is in keeping with the adjacent<br />

developments.<br />

<strong>The</strong> applicants have stated that over 60% of the overall development will be for<br />

affordable development with 56% of phase 1 being for rent and 44% being for low<br />

cost home ownership (owners buy between 60-80% share of the property). In<br />

phase 2 the proportion of low cost home ownership will be increased slightly to<br />

achieve 50% over the whole site. <strong>The</strong> aim is to create opportunities for existing<br />

tenants to move into private ownership and to help create a better balance of<br />

tenures in the immediate area. <strong>The</strong> marketing strategy will advertise the low cost<br />

home ownership units directly to <strong>Council</strong> tenants in Conon Bridge in the first<br />

instance and if there is not enough demand from this area then the houses will be<br />

advertised widely. Accordingly, a higher proportion than standard of this<br />

development will be made available as affordable housing. This is in a context<br />

where there are 568 applicants on the <strong>Council</strong>’s waiting list for Conon Bridge,<br />

whilst the <strong>Council</strong>’s local housing strategy identifies Conon Bridge as a priority<br />

community. Accordingly, it can be seen that the development will help to address a<br />

demonstrable local need and provide an enhanced proportion of affordable housing<br />

whilst ensuring a considered mix of tenure. In addition the houses are to be super<br />

insulated which achieves a higher standard than required by Building Regulations<br />

and timer is to be incorporated within the design thus efforts are being made to<br />

contribute towards the <strong>Council</strong>’s sustainability goals in accordance with policy G2.<br />

As the layout is considered appropriate in relation to adjoining development<br />

patterns, the level of affordable housing provision is generous in a location with<br />

high levels of need, the site can be serviced using existing infrastructure and a high<br />

standard of sustainable development is proposed, the increased density of 11 units<br />

over the Local Plan density plus 10% is considered acceptable.<br />

6.4 Amenity Land: <strong>The</strong> Local Plan Policy illustrated an extensive area of amenity<br />

ground maintained between the Windsor Place development and the site identified<br />

for residential development. This has not been incorporated into the submitted<br />

application. <strong>The</strong> layout includes a 10 metre landscape buffer between the houses<br />

in MacLeod Place and the access road serving the new houses as required by


policy 1. <strong>The</strong> play area indicated on the original plan has been amended to an<br />

amenity area. A further 10 metre wide landscape strip is proposed below Nos 71-<br />

80 Windsor Place and an existing area of amenity space to be retained to the north<br />

east of the site, including existing landscaping, and a play area is proposed<br />

adjacent to existing open space within Windsor Place, separate from the road<br />

network. <strong>The</strong> Local Plan indicates land adjacent to the Eil Burn on the North West<br />

boundary being developed. However, SEPA has advised that development should<br />

be kept away from this area due to concerns relating to flooding, whilst there is a<br />

deep ditch along this boundary. <strong>The</strong> applicants have also indicated that they wish<br />

this development to integrate with the existing development around the site rather<br />

than being separated from it.<br />

6.5 Public Concerns and Road Safety<br />

A number of concerns are expressed by local residents and supported by the<br />

Community <strong>Council</strong> regarding the increase in vehicular traffic on the existing road<br />

networks, referring to existing problems with the structure of road, particularly in<br />

Wyvis Crescent and with traffic speeds. In relation to Riverside Road the proposed<br />

build out areas will effectively formalise residents’ on-street parking along the<br />

southern side of Riverbank Road and widen the road to the north to allow for two<br />

way traffic. Residents of Wyvis Crescent maintain that they were advised that this<br />

was to be a private access and would not be serving any additional development.<br />

However, the road at MacLeod Drive terminates in a hammerhead with part of the<br />

road at the entrance to the site clearly indicating an intention to serve further<br />

development. Traffic calming is proposed on Wyvis Cresent to slow vehicle<br />

speeds and any problems with the structure of the existing road surface will have to<br />

be addressed by the <strong>Council</strong> as this is an adopted road.<br />

<strong>The</strong> application has to be determined in relation to the suitability of the access<br />

arrangements on the basis of the advice of the Roads Authority. <strong>The</strong> Roads<br />

Section advise that they have no objection to the proposal subject to conditions<br />

noting that a Road Construction Consent will be required including road<br />

improvement works to Riverbank Road and Bridge View by means of road<br />

widening and formalisation of the existing parking arrangements and junction<br />

improvements whilst traffic calming measures are required along Wyvis Crescent.<br />

Amended plans for the road improvement works to Riverbank Road were<br />

submitted on 11 February and the Road Section has advised that they are satisfied<br />

with the details contained therein. <strong>The</strong>y have considered the submission from the<br />

Community <strong>Council</strong> and have responded by advising that the number of units in<br />

total does not trigger the requirement for a Traffic Assessment and this is even less<br />

the case as the traffic is split over two access roads which do not link.<br />

With regard to the views of Ferintosh Community <strong>Council</strong> it is understood that the<br />

issue of a pedestrian crossing point is currently the subject of discussion with the<br />

Trunk Roads Authority and the Community. Whilst it is accepted that this<br />

development may well generate more demand for this facility to a degree, this<br />

issue is an existing problem which requires to be addressed by the Trunk Roads<br />

Authority and the Planning Authority cannot require the developer to provide such a<br />

facility and it is unrelated to the proposal.


6.6 Impact on Existing Residents<br />

<strong>The</strong> layout as submitted incorporates a 10 metre amenity set back between the<br />

house boundaries on MacLeod Drive and the proposed access road whilst the<br />

houses will obviously be set further back. Since submission, the plans have been<br />

amended very slightly to adjust plot sizes. Sixteen units are proposed below<br />

MacLeod Drive which is double the number indicated in the Local Plan at 8 units. It<br />

is anticipated that these are likely to be developed as semi-detached units. This is<br />

in keeping with the development to the west of the site. As with all new<br />

development, the proposal will have an impact upon existing residents in terms of<br />

amenity and privacy. However, with the separation distances indicated and the<br />

fact that the land has been allocated for further residential development for a<br />

number of years, it is considered that this impact will not be so significant as to<br />

justify refusal, particularly as the proposed houses will be set down below the level<br />

of the existing houses to a degree.<br />

6.7 Amenity space and play area provision: <strong>The</strong> developers propose to provide a<br />

play area below Windsor Place. <strong>The</strong> site is within easy walking distance of the<br />

playing fields in the centre of the village and there is a zebra crossing available to<br />

cross the main road. <strong>The</strong> level of recreational facilities and public open space<br />

within and around the development complies with the approved Development Plan<br />

Policy Guidelines 2006 and is considered appropriate. As this is a Reserved<br />

Matters application and was submitted before the revised guidelines for open<br />

space within housing developments was approved by the PED Committee on 20<br />

May the case has to be considered under the 2006 Guidelines.<br />

<strong>The</strong> Forestry Officer requires further landscaping plans to be submitted in relation<br />

to this development and these can be secured through condition. <strong>The</strong> Access<br />

Officer wishes pedestrian access to be maintained through the site during<br />

construction. This is not possible for Health & Safety reasons and therefore an<br />

alternative route for pedestrians has been proposed and will be secured through<br />

condition.<br />

In relation to other issues raised by the objectors, Scottish Water has not objected<br />

to the application. <strong>The</strong>y have indicated that there are no known problems with the<br />

public water main or sewer or the associated networks. As with all developments,<br />

the applicant will have to liaise with Scottish Water to ensure the adequate<br />

provision of services and the proposal will not be allowed to adversely affect<br />

existing users. <strong>The</strong> layout of the site has had to take into consideration the location<br />

of a number of existing services.<br />

6.8 Hours of construction will be controlled to limit any noise nuisance to existing<br />

residents and address the concerns of the Church.<br />

6.9 <strong>The</strong> north-western boundary adjacent to the ditch will require to be adequately<br />

fenced in the interests of public safety and the developer will inherit the<br />

maintenance obligation from the <strong>Council</strong> once the land is within their ownership. A<br />

reasonable access is being retained for maintenance purposes.<br />

6.10 No concerns have been raised regarding the design, layout or finish of the 25<br />

houses proposed. However, the Planning Authority had significant reservations


egarding the design of houses type E and asked the applicants’ agent to amend<br />

this. Amended plans have now been submitted adjusting the roof and fenestration<br />

pattern and these are considered acceptable. Given this house type is in the centre<br />

of the development neighbour notification does not need to be re-served.<br />

7. CONCLUSION & DEPARTURE JUSTIFICATION<br />

7.1 In conclusion, it is accepted that the development represents a departure from the<br />

Local Plan in that the proposed density exceeds that indicated in the Local Plan of<br />

48 units by an additional 16 houses (reduced significantly from an additional 34<br />

units then further reduced to 22 houses at the outline stage). However, the<br />

amended layout plan adjacent to the existing mainly semi-detached and terraced<br />

units, the high percentage of affordable houses proposed with a variety of tenure<br />

mix, the high level of unmet housing demand within Conon Bridge which is a<br />

priority community in the local housing strategy, the proposed layout is considered<br />

acceptable, subject to conditions.<br />

RECOMMENDATION<br />

Subject to no new material issues being prior to the expiry of the advert period:<br />

Approve, subject to the following Conditions and Reasons:<br />

1. All surface water drainage shall comply with the principles of Sustainable Urban<br />

Drainage systems to the satisfaction of the Roads Authority, Scottish Water and<br />

the Scottish Environment Protection Agency before the first house is occupied.<br />

Reason : To reduce the risk of flooding and improve water quality.<br />

2. No development shall occur on site until the developer has entered into a design<br />

and build contract with Albyn Housing Association or equivalent to deliver a<br />

minimum of 40% affordable residential units within Communities Scotland<br />

benchmark costs and to be built to Communities Scotland Housing for Variable<br />

Needs standards. For the avoidance of doubt, the percentage of affordable<br />

houses within the overall development shall be at least 60% with a 50:50 ratio of<br />

affordable rented units to Low Cost Home Ownership.<br />

Reason : In order to ensure a supply of affordable housing in accordance with<br />

<strong>Council</strong> policy for Affordable Housing and in accordance with the Applicants<br />

stated intentions for the site.<br />

3. <strong>The</strong> safety reservation illustrated in the plans hereby approved shall be<br />

maintained from the north-west of the boundary of the site and nothing shall be<br />

built within the reservation at any time in the future. Any variation shall require the<br />

prior written approval of the Planning Authority in consultation with SEPA. <strong>The</strong><br />

Developer shall submit a safety risk assessment for the Eil Burn and thereafter<br />

safety measures shall be agreed in writing with the Planning Authority in<br />

consultation with Tec Sevices, and implemented prior to the occupation of the first<br />

house.


Reason : In order to reduce the risk of flooding.<br />

4. All roads and footpaths shall be constructed to the <strong>Council</strong>’s guideline standards<br />

and no work shall commence on site until a Road Construction Consent is<br />

obtained and a road bond lodged with the <strong>Council</strong>. Full details of Street lighting<br />

shall be provided to the satisfaction of the Roads Authority and shall be<br />

operational before the first house in any phase is occupied. Roads shall be 5.5<br />

metres wide with 2.0 metre footpaths and all driveways shall be surfaced for at<br />

least the first 6 metres with a gradient of no more than 2.5%. <strong>The</strong> design shall<br />

provide for a 20mph speed limit.<br />

Reason: In the interests of road safety.<br />

5. Traffic calming shall be provided on Wyvis Cresent, in consultation with the<br />

Community and the Roads Authority, and details shall be submitted as part of the<br />

Road Construction Consent and shall thereafter be implemented before the first<br />

house is occupied taking access from Wyvis Cresent. Traffic calming shall also be<br />

provided within the site. A 2.5 metre wide parking bay on the south side of<br />

Riverbank Road and a 5.0 metre wide carriageway by road widening to the north,<br />

shall be provided before any construction work commences on site. All to the<br />

satisfaction of the Roads Authority.<br />

Reason : In the interests of road safety.<br />

6. Prior to the commencement of any works including site preparation on any phase<br />

a management report shall be submitted detailing the methods and practices for<br />

on site construction including identification of the proposed compound and<br />

storage areas and the hours of operation and routing plan for construction<br />

vehicles which shall be submitted to and approved in writing by the Planning<br />

Authority, in consultation with the Roads Authority. <strong>The</strong> access roads leading to<br />

the site shall be maintained to the satisfaction of the roads authority with the<br />

surface being regularly cleared of mud from construction vehicles.<br />

Reason : In the interests of road safety.<br />

7. <strong>The</strong> houses shall be constructed at the finished floor level illustrated on the plans<br />

hereby approved and any variation shall require the prior written approval of the<br />

Planning Authority. <strong>The</strong> Reserved Matters applications for the plots shall include<br />

full sections through the site showing existing and proposed ground levels relative<br />

to a fixed and identifiable level off site, finished floor levels for each house and<br />

road levels relative to existing ground levels. <strong>The</strong> development shall be<br />

undertaken in accordance with these levels unless the prior written approval of<br />

the Planning Authority is obtained for any variation.<br />

Reason : In the interests of amenity as the site slopes and the level of<br />

developments must be controlled to ensure a satisfactory development.<br />

8. Operations for which noise is audible at the boundary of any residential property<br />

may only be carried out between 0800 hours – 1800 hours Monday to Friday;<br />

0800 hours – 1300 hours on Saturdays; and not at all on Sundays, unless prior


written consent is obtained from the Planning Authority.<br />

Reason : In order to reduce the risk of noise nuisance in the interests of<br />

residential amenity.<br />

9. <strong>The</strong> development shall proceed in accordance with the phasing plan hereby<br />

approved and the development shall be undertaken in compliance with the<br />

approved plan with 80% of any phase being completed before the next phase<br />

commences. Any variation shall require the prior written approval of the Planning<br />

Authority. <strong>The</strong> access road and footpaths within each phase shall be completed<br />

to at least basecourse standard and street lighting shall be operational, all to the<br />

satisfaction of the Planning Authority, in consultation with the Roads Authority,<br />

before the first house is occupied within each phase unless alternative<br />

arrangements have been formally agreed in writing.<br />

Reason : In the interests of road traffic and pedestrian safety and residential<br />

amenity.<br />

10. <strong>The</strong> individual house plots shall be developed in accordance with the Design Brief<br />

hereby approved.<br />

Reason : In the interests of amenity.<br />

11. <strong>The</strong> childrens’ play area shall be provided before the houses are occupied and<br />

the footpath links and the play area shall be to a standard suitable for adoption by<br />

the <strong>Council</strong>. <strong>The</strong> play area and any footpath links shall be maintained by Albyn<br />

Housing Society unless suitable alternative private maintenance arrangements, in<br />

perpetuity, all to the satisfaction of the <strong>Council</strong>, are agreed in writing.<br />

Alternatively, a developer contribution of an agreed sum shall be made to upgrade<br />

the existing council play area adjacent to Windsor Place before any development<br />

commences on site.<br />

Reason : In the interests of amenity.<br />

12. Prior to the commencement of development a detailed landscape plan shall be<br />

submitted for the written approval of the Planning Authority specifying the<br />

quantity, position, size, species and protection measures (tree shelters, stakes<br />

and ties) of all trees/shrubs to be planted together with an indication of how they<br />

integrate with the development in the long term. Particular attention should be<br />

given to the embankment along the northern boundary for extensive tree planting<br />

using native species with a combination of more dense woodland type planting on<br />

the lower slopes and groups of larger standard/1/2 standards in more prominent<br />

locations. This plan shall also include footpath links through the site linking in with<br />

existing paths and possibly providing a short circular walk.<br />

A maintenance programme (which shall include existing trees and hedging), shall<br />

be submitted for approval specifying weed control; adjustment/replacement of<br />

shelters, stakes & ties; formative pruning; and replacement of failures.<br />

All planting thereby approved shall be undertaken prior to first<br />

occupation/practical completion of the associated phase in accordance with the


approved phasing plan. Any plants which die, are removed or become seriously<br />

damaged or diseased within a five year period shall be replaced the following<br />

planting season to the original specification (unless otherwise agreed with the<br />

Planning Authority). All communal open spaces and their links shall be<br />

maintained by Albyn Housing Society, unless suitable alternative private<br />

maintenance arrangements, in perpetuity, to the satisfaction of the council, are<br />

agreed in writing.<br />

Reason : In the interests of amenity.<br />

13. A secure fence shall be provided along the north west boundary of the site<br />

adjacent to the ditch in accordance with the plans hereby approved with gated<br />

access at either end, before the first house is occupied, to allow for the ditch to<br />

the north west to be adequately maintained.<br />

Reason : In the interests of public safety and to reduce the risk of flooding.<br />

14. None of the existing trees on site shall be topped, lopped or felled without the<br />

prior written approval of the Planning Authority. Any trees proposed for removal<br />

to accommodate the development shall be clearly marked on site and require the<br />

prior written approval of the Forestry Officer prior to their removal. All trees to be<br />

retained shall be securely fenced and protected prior to the commencement of<br />

any works on site to the satisfaction of the Forestry Officer.<br />

Reason : In the interests of amenity.<br />

15. <strong>The</strong> development shall be undertaken in accordance with the terms of the<br />

sustainable design statement submitted in support of the application.<br />

Reason : To ensure that the development achieves a high standard of<br />

sustainability in accordance with the developers stated intention and to justify the<br />

increased density.<br />

16. Prior to the occupation of any part of the development, the developer shall lodge<br />

with the <strong>Council</strong> a financial contribution towards the provision of community<br />

facilities within Conon Bridge. This contribution shall be agreed with the Planning<br />

Authority before any development commences on site. No development may<br />

commence on any part of the site until evidence of this agreement and a<br />

programme of contribution has been lodged with the <strong>Council</strong>.<br />

Reason: In the interests of ensuring that new development in Conon Bridge<br />

provides adequate contribution to the provision of community facilities required as<br />

a result as such new development in compliance with Policy 13, Section 10 of the<br />

Ross and Cromarty East Local Plan.<br />

17. Prior to the commencement of development, the developer shall lodge with the<br />

Planning Authority a valid Bond of Cation, for such sum, in such terms and by<br />

such guarantor as shall have been approved by the Planning Authority,<br />

guaranteeing performance of (a) the obligations to construct, equip and maintain<br />

the play area as stipulated in condition 11 hereof; (b) the obligation to construct<br />

and maintain footpath links, stipulated in conditions 11 and 12; (c) the obligations


to maintain the landscaping required under condition 12 hereof.<br />

Reason : In order to ensure that the play area, footpaths and landscaping areas<br />

are provided and maintained timeously.<br />

18. Full details of all boundary treatments shall be submitted for the written approval<br />

of the Planning Authority for the 25 houses hereby approved and thereafter the<br />

development shall be completed in accordance with the approved details before<br />

the first house is occupied.<br />

Reason: In the interests of amenity.<br />

19. Communal satellite dishes shall be provided on the flatted units.<br />

Reason: In the interests of amenity and to avoid the proliferation of such dishes.<br />

20. Prior to the commencement of development a full schedule of the external<br />

finishes to be used on the houses shall be submitted for the written approval of<br />

the Planning Authority, including samples where necessary, and this shall include<br />

finishes to be applied to the timber panels, including colours. <strong>The</strong>reafter the<br />

development shall be completed in accordance with the approved details unless<br />

the prior written approval of the Planning Authority is obtained for any variation.<br />

Reason: In the interests of amenity.<br />

21. A temporary alternative footpath link between Wyvis Cresent and Sellar Place<br />

shall be clearly signposted for residents’ information, to the satisfaction of the<br />

Access Officer, to ensure a continued footpath link for residents during<br />

construction works. <strong>The</strong> new footpath link through the development shall be<br />

completed as soon as practicable, to the satisfaction of the Planning Authority.<br />

Reason: In the interests of residential amenity.<br />

Notes to Applicant:<br />

Planning Conditions: Your attention is drawn to the conditions attached to this permission. In<br />

particular, any pre-conditions (those requiring certain works, submissions etc. prior to<br />

commencement of development) must be fulfilled prior to work starting on site. Failure to meet<br />

these conditions may invalidate your permission or result in formal enforcement action.<br />

Flood Risk: It is important to note that the granting of planning permission does not imply there is<br />

an unconditional absence of flood risk relating to (of emanating from) the application site. As per<br />

Scottish Planning Policy 7: Planning & Flooding, planning permission does not remove the liability<br />

position of developers or owners in relation to flood risk.<br />

Scottish Water: You are advised that a supply and connection to Scottish Water infrastructure is<br />

dependent on sufficient spare capacity at the time of the application for connection to Scottish Water.<br />

<strong>The</strong> granting of planning permission does not guarantee a connection. Any enquiries with regards to<br />

sewerage connection and/or water supply should be directed to Scottish Water on 0845 601 8855.


Signature:<br />

Designation: Area Planning & Building Standards Manager, Ross, Skye & Lochaber<br />

Author: Julie Ferguson.<br />

Report Date: 20 May 20<strong>09</strong><br />

Background Papers:<br />

Relevant Plans: Plan 1 – Location Plan<br />

Plan 2 – Local Plan Extract<br />

Plan 3 – Layout Plan<br />

Plans 4 – 8 – House elevations

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!