10.07.2015 Views

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cameron</strong> <strong>County</strong> <strong>Regional</strong> Mobility Authority <strong>Strategic</strong> <strong>Plan</strong>Outer Parkway Project (Cont.)The total construction cost is approximately $180 million. A corridor study is currently being prepared for the Project and an environmentalapproval is expected in <strong>2012</strong>. Construction is estimated to start in <strong>2012</strong>‐2013, and is expected to be completed in 2014‐2015.North <strong>Cameron</strong> <strong>County</strong> Rail RelocationThe North Rail Relocation Project will involve the relocation of the existing rail line system to a new location by‐passing the north area of thecities of Harlingen and San Benito. The proposed facility is expected to be a 32 mile single track railroad from FM 508 to U.S. 77 with switchyards at Olmito (complete in <strong>2012</strong>) and North <strong>Cameron</strong> <strong>County</strong>. The total project cost is approximately $110 million and Federal, State andLocal funding will be utilized for the Project. Environmental Due Diligence has been completed and negotiations are underway between<strong>Cameron</strong> <strong>County</strong>, City of Harlingen and Union Pacific Railroad.281 Connector ProjectThe 281 Connector Project is approximately 6.5 miles long and includes the construction of a four lane tolled divided highway from U.S. 281to U.S. 77/83. The total construction cost is approximately $140 million. TxDOT has performed previous studies for the Project and anenvironmental study will start in <strong>2012</strong>. An environmental approval is expected in <strong>2012</strong>‐2014, Right‐of‐Way Acquisition in 2014 andconstruction is estimated to start in 2014‐2015. Construction of the project is expected to be completed in 2015‐2017.A-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!