10.07.2015 Views

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

CCRMA Strategic Plan 2012-2016 - Cameron County Regional ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Cameron</strong> <strong>County</strong> <strong>Regional</strong> Mobility Authority <strong>Strategic</strong> <strong>Plan</strong>Value of System ProjectsVALUE OF SYSTEM PROJECTSOuter Parkway Toll$ 596 MillionWest Parkway Toll (On‐Hold)*($ 435 Million)*U.S. 281 Connector Toll$ 366 MillionSH 550 Toll$ 268 MillionSouth Padre Island 2 nd Access Toll$ 168 MillionDriscol By‐Pass Toll$ 100 MillionRiviera By‐Pass Toll$ 100 MillionTOTAL:$ 1.598 Billion($ 2.033 Billion)*Note: After deducting Construction and Operations and Maintenance and not including ROW, Utility Relocation, Design and ConstructionInspection. Deduction of an estimated 20% for these costs would result in a total (NPV (Low‐End) of approximately $1.28 (1.63)* Billion.* In March of <strong>2012</strong>, the West Parkway project was eliminated from the MTP by the Brownsville MPO Policy Committee. At that time, theEnvironmental Assessment for the Project was currently under review and the project is being placed on hold.A-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!