10.07.2015 Views

OPPENING A NEW BUSINESS FORM - the City of San Jacinto

OPPENING A NEW BUSINESS FORM - the City of San Jacinto

OPPENING A NEW BUSINESS FORM - the City of San Jacinto

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPENING A <strong>NEW</strong> <strong>BUSINESS</strong>IN SAN JACINTO(NON HOME OCCUPANCY)welcome to <strong>the</strong> <strong>City</strong> <strong>of</strong> <strong>San</strong> <strong>Jacinto</strong> Development Services Office. To assistyou, we have outlined below <strong>the</strong> basic procedures for obtaining <strong>City</strong>approval to open a new business, transfer ownership or relocate an existingbusiness.Step 1:Complete <strong>the</strong> <strong>City</strong>’s Certificate <strong>of</strong> occupancy application and return it to <strong>the</strong>Planning Division for review. As a part <strong>of</strong> this review, you need to talk toone <strong>of</strong> our planning staff members.Step 2:Set up and inspection <strong>of</strong> <strong>the</strong> premises with <strong>the</strong> Building Department. Call 24hours in advance <strong>of</strong> <strong>the</strong> inspection date you want at 487-7330. If <strong>the</strong>inspector writes a NOTICE TO CORRECT, make <strong>the</strong> necessarycorrections, and <strong>the</strong>n call for a reinspection. After <strong>the</strong> building inspector hasinspected your building area and signed <strong>of</strong>f your Certificate <strong>of</strong> Occupancypaperwork, you can apply for your business license and move to step 3.Step 3:If you need to file for a fictitious business name, you can obtain this formfrom one <strong>of</strong> <strong>the</strong> local newspapers. (Press Enterprise at (951) 658-4455.Bring a copy <strong>of</strong> <strong>the</strong> application to <strong>the</strong> <strong>City</strong> Administration Office along withyour business license application, showing pro<strong>of</strong> that you filed with <strong>the</strong>newspaper. You do not need to wait for <strong>the</strong> legal ad to run.Step 4:To do business in <strong>San</strong> <strong>Jacinto</strong>, a business license is required. Applicationsare available at <strong>the</strong> <strong>City</strong>’s Administrative Office, 248 E. Main Street. AState Board <strong>of</strong> Equalization number, workers’ compensation andcontractor’s license and expiration date may be required as a part <strong>of</strong> yourbusiness license application. To determine whe<strong>the</strong>r you need a State Board<strong>of</strong> Equalization number, contact <strong>the</strong>ir <strong>of</strong>fice at (951) 680-6400.


NanoBone ®Scientific DocumentationremodellingM. Kirchh<strong>of</strong>f, V. Bienengräber, S. Lenz, Th. Gerber, K.-O. Henkel:A new syn<strong>the</strong>tic bone replacement material with osteoinductive properties –in vivo investigationsAbstract, Biomaterialien 7(51) 2006W. Maas, V. Bienengräber, E. Wolf:Sicher Augmentieren – Splitmouth-Fallstudie zur Augmentation mittelgrosser KnochendefekteImplantologie Journal 5/2006Th. Gerber, G. Holzhüter, W. Götz, V. Bienengräber, K.-O. Henkel, E. Rumpel:Nanostructuring <strong>of</strong> Biomaterials – A Pathway to Bone Grafting SubstituteEur J Trauma 2006; 32 :132–140V. Bienengräber, Th. Gerber, E. Wolf, K.-O. Henkel:Biologische Grundlagen eines syn<strong>the</strong>tischen KnochenaufbaumaterialsImplantologie Journal 4/2006N. Chuchracky:NanoBone ® Augmentation Material and Bego Semados ® S-Implants:A Powerful Combination for Today‘s Dental Implantology Applications? Case ReportImplants 2006; 1: 6–8V. Bienengräber:Anforderungen an ein innovatives und praxistaugliches KnochenaufbaumaterialDentalmagazin 1/2006K.-O. Henkel, J.-H. Lenz, Th. Gerber, V. Bienengräber:Ein qualitativ neuartiges Knochenaufbaumaterial auf Hydroxylapatit-Xerogel-BasisZWR, 2005; 9 : 416-418K.-O. Henkel, V. Bienengräber, S. Lenz, Th. Gerber:Comparison <strong>of</strong> a New kind <strong>of</strong> Calcium Phosphate Formula Versus Conventional CalciumphosphateMatrices in Treating Bone Defects – A Long-term Investigation in PigsKey Engineering Materials 2005; 284–286 : 885–888K.-O. Henkel, Th. Gerber, P. Dörfling, K. H. Gundlach, V. Bienengräber:Repair <strong>of</strong> bone defects by applying biomatrices with and without autologous osteoblastsJournal <strong>of</strong> Cranio-Maxill<strong>of</strong>acial Surgery 2005; 33 : 45–49K.-O. Henkel, J.-H. Lenz, Th. Gerber, V. Bienengräber:Neuartiges Knochenaufbaumaterial auf Basis eines Niedertemperatur-HydroxylapatitsImplantologie Journal 5/2005K.-O. Henkel, Th. Gerber, W. H. Dietrich, G. Kundt, V. Bienengräber:Im Sol-Gel-Verfahren hergestellte Kalziumphosphatkeramiken. Ein Durchbruchin der Therapie von Knochendefekten? Eine tierexperimentelle Studie.Osteol 2004; 13 : 57–64K.-O. Henkel, Th. Gerber, W. Dietrich, V. Bienengräber:Neuartiges Knochenaufbaumaterial auf Kalziumphosphatbasis. Erste In-vivo- LangzeitergebnisseMundKieferGesichtsChir 2004; 8 : 277–281


EXITSAll exits must be free from obstructions and be unlocked during businesshours. Exits signs required over all exits with letters at least three-quarterinches (3/4”) wide and six inches (6”) high.HOUSEKEEPINGBuildings shall be maintained in good repair. Basements, floors, closets,attics and similar places shall be kept free from combustible litter or rubbish.Storage is not permitted in boiler rooms, mechanical rooms, electrical panelrooms, exits, passageways, stairways, corridors, etc.ELECTRICALExtension cords are prohibited in place <strong>of</strong> fixed wiring. Faulty or hazardouswiring is prohibited.NOTE:All Certificates <strong>of</strong> Occupancy applications are good for 180 days.Applicants that have NOT obtained all <strong>of</strong> <strong>the</strong> required inspections andapprovals must reapply.Without <strong>the</strong> Certificate <strong>of</strong> Occupancy and business license, <strong>the</strong> CodeEnforcement Division will not allow your business to operate until <strong>the</strong>required approvals are obtained.Planning, Building (951) 487-7330248 E. Main Street<strong>San</strong> <strong>Jacinto</strong>, CA 92583*************************************************************THANK YOU FOR YOUR INTERESTIN THE CITY OF SAN JACINTOWE HOPE YOUR <strong>BUSINESS</strong> IS PROSPEROUS*************************************************************

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!