PRAN vs. PRAH: THE PENETRON DIFFERENCE
PRAN vs. PRAH: THE PENETRON DIFFERENCE
PRAN vs. PRAH: THE PENETRON DIFFERENCE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
®T O T A L C O N C R E T E P R O T E C T I O NNational Road Bikeway Tunnel RehabilitationOver 100 years old, the National RoadBikeway tunnel was plagued by groundwaterinfiltration and damage. First built in1902 in an area of thinly bedded, faintlyporous, weak shale with significantgroundwater inflows, the main focus ofthe rehabilitation project was to controlwater infiltration and the subsequent icebuild-up and damage. The ability of the<strong>PENETRON</strong> technology to reduce thepermeability of the new shotcrete liner,even against high hydrostatic head pressure,exceeded the design team’s expectation.The ice and water infiltration problemwas wholly eliminated.Singapore ChangiAirport /Terminal 3More than an air transportationhub, theChangi Airport is asymbol of national prideand a benchmark forservice excellence.Terminal 3 featuresinnovative passengerfacilities and modernarchitecture. 140,000m³ of concrete wastreated with PEN-ETRON ADMIX ® , alongwith <strong>PENETRON</strong> ®slurry and PENECRETEMORTAR.6