10.07.2015 Views

PRAN vs. PRAH: THE PENETRON DIFFERENCE

PRAN vs. PRAH: THE PENETRON DIFFERENCE

PRAN vs. PRAH: THE PENETRON DIFFERENCE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

®T O T A L C O N C R E T E P R O T E C T I O NGardens by the Bay, MarinaBay, SingaporeThe distinctive waterfront gardensare an all-weather ‘edutainment’space, an architectural icon, ahorticultural attraction, and ashowcase of sustainable energytechnology – with large cooledconservatories replicating specificclimates to house an uncommonrange of flowers and plants. Theproject represented severe waterproofingchallenges as it is builtentirely on reclaimed land and rightnext to the ocean. 18,300 m³ ofconcrete were cast with PEN-ETRON ADMIX ® in the base slaband walls; PENEBAR SW-55 wasused in the construction joints andPENESEAL PRO ® on the mountainwalls.Corredor Duarte, SantoDomingo, DominicanRepublicThe Corredor Duarte Tunnel,the newest tunnel in theDominican Republic providesa rapid connection betweenSanto Domingo and the restof the country. About 1,200m (4,000 ft) in length, thetunnel plays a key role inrelieving chronic trafficcongestion in the capitol. Amuch thinner shotcrete layerwas applied immediatelybehind the tunnel boringmachine, creating a natural load-bearing ring and minimizing deformation of the surrounding layers of rock. PEN-ETRON ADMIX ® was used to reduce the permeability of the shotcrete walls. PENEBAR SW-55 was used toseal the concrete construction joints. In total, 45 tons of <strong>PENETRON</strong> ADMIX ® and 2,300 meters of PENEBARSW-55 were used.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!