Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants1/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)243242241240238236231230India - Karaikal - Phase 2 - Extension of bothbreakwaters at the port entrance by about 500m in deeper water in aligment of the existingbreakwatersLebanon - Summerland Marina - Phase I -Small marina for the Kempinski hotel andresort located on the Beirut seashore - Alimited number of 12 m³ ACCROPODEunits were placed for this temporaryconstruction phaseOman – Muttrah corniche repairs - Repairworks to Phet storm damage at Muttrahcornice - Dolos were replaced along 60 mstretch by 3m³ ACCROPODE unitsMorocco - Tanger Med II - New containerport located 35 kms East of Tangiers withbreakwaters of 2560 m and 310 m longarmoured with ACCROPODE unitsCyprus - Limassol Marina - Major marinanear Limassol South of Cyprus island, toprotect boats of 5m to 60m in length - Theprotection is ensured by two breakwaters of700 m long in total, most of it armoured withACCROPODECape Verde - extension of the SAL-REIharbour on the north west of the BoavistaIsland including a protection of approximately1 050 m length protected withACCROPODE units on 580 mIndia – Kattupalli - This new port is locatednorth of Chennai on the East coast of India -The total length of the breakwaters is over 2km , protected on their trunk withACCROPODE units and on theirroundheads with ACCROPODE II (secondgeneration) unitsLibya – Tripoli port - Complete newACCROPODE primary armour on top of thedamaged Tetrapod armour – Adapted repairdesign along the 3600 m long mainbreakwater3/4 2011 7.512 20103 2010 7.64/6.3/9 2010 24.02/4/5 2010 14.23/4 2011 12.02.5/4/6.3 2010 12.06.3/9 2009 12.0229Algeria – Arzew – Construction of a new LNGplant - Export loading facilities 4 - 6.3 2009 7.5226Oman – Shinas - modification of the existinglayout of the Shinas harbour at Oman in orderto integrate a new fast ferry facility3 2009 8.0224Tunisia – Skhira - New layout of water intakeof Skhira chemical plant0.8/1 2009 4.5CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants2/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)223 Libya – Al Mresa - Fishing harbour nearBenghazi - 1700 m of breakwaters2/2.5 2009 5.0222221218216214212211210208207Saudi Arabia – Shoaiba Power Plantstage 3 - Extension of the plant located onthe Red Sea - Protection of the newintake works north of the existing oneCape verde – Palmeira Port Phase 1Modernization of the commercial portlocated west of Sal Island - Breakwaterextension in 6 m of waterdepthBahrein – Muharraq sewage treatmentplant - STP square reclamation workssouth east offshore of the greater schemeprotected with 1.5m³ ACCROPODEunitsLibya – Tripoli Marina Phase 2 Secondstage of works protecting the marinaitself, including the main and leebreakwatersOman – Jalali – Complete repair of the300 m long revetment in front of the royalpalace, further to the failure of the hollowunits following Gonu hurricaneIran – Pars Flare Substructure –Protection of reclaimed land in shallowwater within the Pars project industrialareaUAE – Abu Dhabi – Khalifa – Extension ofthe existing commercial harbour – Worksinclude several kilometers of breakwatersand revetments extending out in the seaLibya – Tripoli Marina – New marinalocated just west of the capital – Firststage of works consisting of coastalprotectionSt Marteen – Phillipsburg – Extension ofthe ferry terminal located in the Dutch partof the island – The new breakwaterprotects the QE2 quayIndia – Karaikal – New private industrialharbour south of Pondicherry – 2breakwaters protect the entrance of theport constructed in land1.5/2 2008 3.02 2009 8.01.5 2009 9.72/4/6.3 2008 7.716 2008 17.31.5 2008 9.41.5/2.2 2008 12.42/4 2008 7.712/16 2008 13.52.5/3 2008 7.5CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants3/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)204203Western Arabian Gulf Coast - shoreprotection - housing and industrialproperty project - 2000 Ha of reclaimedland - ACCROPODE used for theeastern and northern seawall breakwatersand revetmentsIndia – Jaigarh port - Greenfield allweather port facility at Dhamankul bay inRatnagiri state (west coast) - Protection ofthe main breakwater (520 m)1.5 2008 11.09/12 2008 15.2199Italy - Ortona port extension phase II -East coast of Italy (Adriatic seaside) -Main breakwater extended by 500 ml4/6.3/9/12 2007 13.0198196Tunisia - Bekalta fishing Harbour -Extension works at Belkata near Monastir- Main breakwater : 140 ml (south)Secondary breakwater : 75 ml (north)Libya - Garabulli fishing harbour - Newport located 60 kms east of Tripoli - Mainbreakwater (500 ml) and roundhead of thesecondary breakwater1.5/2 2007 5.53/6.3 2007 7.5194Morocco - Tanger Roro plateform - Newspecialised terminal next to the containerport - Two breakwaters and shoreprotection are rubble-mounds armouredwith various ACCROPODE sizes4 / 6.3 / 9 /122007 20.0193192Qatar - Ras Laffan LNG port expansion -5 kms of protection of the deepeststretches of the northern and southernbreakwaters as well as the offshorebreakwater located in the entrance of thenew LNG portMartinique - Grand Rivière fishingharbour - Extension of the fishing harbourwith a completely new main breakwater3/ 4 / 5 2007 14.61.5 / 5 2007 5.7187Chile - Loma larga platform - Repair ofthe existing reclamation located nearValparaiso5 2006 3.0185179La Reunion -Sainte Suzanne antifloodingscheme - Construction of twoshort parallel breakwaters to frame theriver outlet channelTunisia – Hammamet marina – 150 mlong extension of the existing mainbreakwater2/3 2007 6.36.3 2006 6.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants4/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)178 La Reunion – Port est – Protection of thespur at the entrance of the port12 2006 17.5177India – Gangavaram port – The extensionof the commercial port requires theconstruction of two new breakwaters2.5/4/6.3/9/122006 15.0176175170169168Oman – Salalah container port – 3 kmlong breakwater to protect the newcontainer berths located in deeper waterYemen – Bal Haf LNG terminal –Construction of a new breakwater andshore protection of the LNG facilitiesItaly – Oneglia commercial port nearImperia city on the Ligiuria coast - Armourprotection of the main and lee breakwaterThailand – Map Ta Phut cooling waterintake lagoon - Second phase of worksinvolving the construction of an armouredprotection for intake worksItaly – Port of Ortona - 820m longextension of the existing northernbreakwater12 2006 23.01.5/2.5/4 2006 19.04.0/2.5 2005 10.02/2.5 2005 4.54/6.3 2005 10.0166Lebanon – Extension of the main jetty inTripoli 9/12 2005 10165159157156154Kuwait – Fintas Marine Center - Newharbour for Kuwait University on thesouth part of the country - Protection ofthe 520m long main breakwaterMorocco – New container port ofTangiers – Construction of the main andlee breakwatersItaly – Protection of Venetia againstflooding; construction of the off shorebreakwater at Chioggia entranceItaly – Protection of Venetia againstflooding; construction of the offshorebreakwater at the Malamocco entranceNetherlands Antilles – Rehabilitation ofthe main breakwater at the Fort BayHarbour on the Island of Saba2.5/3 2004 4.54/9/16 2003 20.06.3 2003 12.06.3/4 2003 12.04/6.3/9/16 2003 11.6151Malta – Extension of the existingbreakwater at the Cirkewwa ferry terminal 9/16 2002 12.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants6/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)126Monaco – Underwater slope protection infront of caissons of the Condamine Port4 2000 20.0125Japan – Second stage of marine works atthe Higashi-Dori power station4/6.3/9/12/14/182000 12.0124 Japan – Protection of the Southrevetment of Ohma nuclear power plant123 Seychelles – Repair of the breakwater fora yacht harbour on Fregate Island3/16 2000 9.02 2000 4.5121Tunisia – Construction of the Northbreakwater of the Rades intake canal0.8/1.5 1999 3.5119 Saudi Arabia – Intake works protection ofthe Shoaiba thermal power plant1.5 1999 21.5118116115114113112111110109108107France – Reinforcement of the South jettyof Gruissan previously armoured withstonesIndia – 1.2 km offshore breakwater for thenew Dabhol LNG terminalChile – Repair of the Loma Largaplatform protecting the water treatmentplant near ValparaisoNetherlands Antilles - Breakwaterprotection for access to new cruise linerjetty – St-MaartenFrance (Corsica) - Reinforcement of theNorth Jetty breakwater at BastiaLibya - New port at Sirte - Main andsecondary breakwatersFrance - Renovation of existingbreakwater at the Port of ArgelesJapan – Okinawa - Protection to areclaimed area of land at Kim Power PlantPoland - East training wall for mouth ofRiver Wisla SmialaTunisia - New marina at Hammamet-Sud- BreakwatersTunisia - Strengthening of a northernbreakwater at the commercial harbour ofLa Goulette4 1999 6.09/12 1999 9.75 1999 7.06.3 1999 14.54/6.3 1999 13.03/6.3/9/12 1998 10.04/6.3 1998 8.02.5 1998 6.01.5/2.5 1998 7.52.5/4/6.3 1998 7.52.5/4 1998 7.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants7/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)106Egypt - Detached submersible breakwatersfor shore protection works at Cleopatra inAlexandria1.5 1998 6.0105 Taiwan - Protection of landfill platform atChang-Hua104 France (Corsica) - Rehabilitation of TogaMarina breakwater near Bastia2 1998 6.09 1998 15.0103Lebanon - Protection for Beirut CentralDistrict project and Western Marinabreakwater4/6.3/9/14/161998 20.01009998Japan - Protection of landfill platformPhase 2 - Hitachinaka power station projectIndia - Breakwater protection works at EnnoreSatellite Port near MadrasJapan - External protection for reflectingcaisson structure in deep water at Haramachi12 1997 14.54/5/6.3 1997 13.06.3/9 1997 13.097Hong Kong - Protection for a reclamationarea and an offshore breakwater for thecontainer port - River Trade Terminal 382.5/3 1997 20.096Malaysia - Protection of groynes to assist inbeach nourishment at Dungun 0.8/1/2 1997 5.195Japan - Protection of reclaimed land area atHibikinada - Phase 2 4 1997 1394Japan - Protection of a roundhead structureat Shin Isogo Power Station 2 1997 10.593Japan - Breakwater protection works atHigashi Dori nuclear power station4/6.3/9/12/14/16/18/201997 12.092Lebanon - Port of Beirut further extension ofMain Breakwater 16/18 1997 21.091Thailand - Protection of reclaimed land atMap Ta Phut Industrial Port ( phase 2 ) 1/2/2.5 1997 10.090Tunisia - Construction of breakwaterextension to Beni Khiar fishing harbour 2.5/4 1997 8.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants8/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)89Tunisia - Construction of breakwaterprotection for El Haouaria fishing harbour1.5/2.5/4 1997 5.488 Philippines - Construction of breakwaterprotection to an outfall channel at Masinloc87 Japan - Protection of reclaimed land area atHibikinada86 St-Barthelemy - Erosion protection for asmall quay structure at Gustavia0.8/1.5 1997 9.34 1996 12.66.3 1996 6.185Malaysia - Protection of reclaimed land atChendering Fishery Harbour0.8/1 1996 3.684 Oman - Construction of new protectionbreakwaters for SUR Fishery Harbour2.5/4/6.3/9 1996 10.5838281807978Ivory Coast - Construction of a breakwater toprevent sand transportation near the port ofAbidjanTunisia - Extension of the protectionbreakwater for La Chebba Fishery HarbourTunisia - Construction of a new protectionbreakwater for Cap Zebib Fishery HarbourArgentina - Protection for reclaimed land atComodoro RivadaviaMalaysia - Construction of new protectionbreakwaters for Kuala Besut estuaryUruguay - Extension of the existingbreakwater of the Port of Piriapolis4/6.3 1996 201.5 1996 4.64 1996 6.81 1996 5.00.8/1.5/3/4 1996 5.02.5 1995 12.077 France - Extension of the breakwater for PortJoinville Marina on the Isle of Yeu2.5 1995 7.77675747372Oman - Construction of new protectionbreakwaters for Shinas Fishery HarbourOman - Construction of new protectionbreakwaters for Quriyat Fishery HarbourSpain - Construction of the new breakwaterfor Algeciras MarinaSpain - Construction of the new breakwaterfor Port Bou MarinaArgentina - Extension of the main breakwaterof the port of Comodoro Rivadavia1/2/3 1995 6.72/3/4 1995 4.06.3/9 1995 11.06.3/9 1995 15.06.3/9 1995 8.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants9/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)71Oman - Breakwaters of the new Al Nadi AlBahri marina3/5/6.3 1994 5.070 Tunisia - Reinforcement of the roundhead ofSousse Harbour69 France - Extension of the main breakwater inPalavas-les-Flots marina4 1994 5.92/3 1994 5.06867France - Rebuilding of the roundhead onSaint Nicolas jetty and the 8th berth in Bastiacommercial harbourItaly - Construction of the new mainbreakwater in Ciro Marina2.5/9/12 1994 13.012 1994 12.066 Oman - New jetty at Mina al Fahal oil terminalnear Muscat4 1994 4.065646362616059585756Japan - Protection of the landfill platform atthe new Nakaminato power plantSpain - Protection of the marina basin atMelilla (North Africa)Tunisia - Construction of the extension to themain breakwater in Ghar el Mehl fishingharbourFrench antilles - Construction of theroundhead on the main breakwater ofGalisbay commercial harbour in Saint-Martin(French West Indies)Comoro Islands - Protection of the newrunway extension at Pamandzi airport,MayotteGreece - Coastal protection at Ixia on theNorth of the Island of Rhodes by theconstruction of detached breakwaters built offshoreFrance - Coastal protection of a reclaimedplatform for building a new treatment plant atCap Sicié, near ToulonOman - Construction of a new dyke to protecta reclaimed land for container storage at MinaQaboos near Muscat HarbourFrance - Rehabilitation of the mainbreakwater (originally built with armour stone)of the Pointe Rouge Marina in MarseilleNew Caledonia - New port of We - Mainbreakwater12 1993 14.54 1993 9.02.5/4 1993 7.06.3 1993 5.02.5 1993 8.01.5 1993 5.06.3 1993 5.05 1993 11.54/6.3 1992 10.04/6.3 1992 12.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants10/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)55 Macau - New international Macau Airport -Protection of the entire reclaimed platform54 Thailand - New industrial Prachaup Port -Main breakwater0.8/4/6.3 1992 5.04/5 1992 11.05352Greece - Island of Rhodes - Plimiri Harbour -Extension of the main breakwaterFrance - Gruissan Harbour - Rehabilitation ofa roundhead (previously stone armoured) atthe entrance of the harbour6.3 1992 5.04 1992 6.051 New Caledonia - New Port of Tadine - Mainbreakwater2.5/3 1992 10.0504948Martinique - Shore protection - Supply ofblocks to protect several sites on the islandcoastlineFrance - Commercial Port of Sete - Dellonoffshore breakwater - Rehabilitation of theseaward roundhead (previously armouredwith Tetrapodes)Great Britain - Construction of the new Southpier at Hartlepool Marina1/1.5/2.5 1992 -20 1992 14.52.5/4 1991 2.447 France - Extension of East and West jettiesGravelines harbour46 Martinique - Consolidation of breakwater,Bellefontaine terminal45 Spain - Protection of the main breakwater,new marina at Palamos (near Barcelona)44 Japan - Protection of a thermal power plant atHaramachi43 Spain - Protection of the main breakwater,new marina at Mazagón (near Huelva)42 Netherlands Antilles - Rehabilitation ofbreakwater - Saba harbour2.5/4/6.3 1991 7.04 1990 8.09/12 1990 15.04/6.3/9/12 1990 10.02.5/4 1990 5.02.5/4/6.3 1990 3.041 Lebanon - Development of Beirut north shore 16/18 1989 10.540 France - Consolidation of main breakwater,Nice Harbour39 France (Corsica) - Extension to Toga fifllplatform 2nd stage38 Macau - Protection of an earthfillPlatform for oil tankers, port of Ka-Ho37 Great Britain - Restructuring of a roundheadPort of Tees and Hartlepool16 1989 8.09 1989 9.05 1989 7.32.5 1989 0.0CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants11/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)36 France - Frontignan fishing harbourNew breakwaters4 1989 5.035 France - New marina at Saint-Denis d'Oléron 0.8/1.5 1988 1.53433323130292827262524French antilles - Protection of Jeanne d'Arcquay on Saint-Barthélémy (French WestIndies)Uruguay - Punta Carretas - CoastalprotectionFrance (Corsica) - Extension of Toga fillplatform - 1st stageMorocco - Shore protection for the newHassan II mosque, CasablancaMartinique - Commune of Grand'RivièreCoastal protectionMartinique - Shelter for fishing boats atGrand'RivièreGreat Britain - New breakwater - Port of Teesand HartlepoolSouth Africa - Lynch Point marinaMain breakwaterLebanon - Portemilio marina - MainbreakwaterFrance - Breakwater in the estuary of the riverAudeFrance (Corsica) - New marina at Toga1.5 1988 4.01.5/2.5 1988 0.04/6.3 1988 9.06.3 1988 2.01.5 1988 0.01.5 1988 2.50.8 1988 2.74 1987 5.016 1987 11.52.5 1987 4.04/9 1987 8.52322212019Guadeloupe - Extension to the breakwater inBeauséjour harbour/La DésiradeMartinique - Coastal protection in thecommune of MarigotMorocco - Temporary protective breakwaterduring construction of new Hassan II mosque,CasablancaSpain - New marina and fishing harbour atLlança - Protective breakwatersLebanon - Beirut commercial harbourExtension of the main breakwater1.5 1987 2.01.5 1987 1.06.3 1987 2.06.3/9 1986 10.016/18 1986 8.5CLI Group August 11


Single-layer armouring- ACCROPODEList of <strong>References</strong> by CLI and its partner: Sogreah Consultants12/12ProjectN°SINGLE LAYER ARMOUR TECHNIQUEProjectsUnit sizeused(m 3 )YearWaterdepthh(m)18 Tunisia - New fishing port at MonastirMain and secondary breakwaters17 France - New sea outlet for the Rhone/Sètecanal near Sète - Eastern breakwater1.5/2.5/4 1986 5.04 1986 5.51615France (Corsica) - Ile Rousse commercialharbour and marina - Consolidation of themain breakwaterSpain (Canary Islands) - New marina atPuerto Colon - Main breakwater4 1986 6.56.3/9 1985 10.014 Martinique - Protection of the coastal road atSaint-Pierre1.5 1985 0.013France (Corsica) - Bastia commercial portConsolidation of the main breakwater2nd stage works6.3 1985 25.012 Martinique - Grand Rivière fishing harbour -Main breakwater11 France - Molène passenger harbour (Brittany)Consolidation of main breakwater10 France - Frioul marina - Consolidation ofmain breakwater9 France - Calais commercial port - Neweastern breakwater1.5 1985 2.512 1985 1.04 1984 2.64/6.3/12 1984 17.08France (Corsica) - Bastia commercialharbour Consolidation of main breakwater -1st stage4 1983 5.87 South Yemen - Al Mukallla commercial port -Main Breakwater6 Tunisia - Monastir marina - Breakwater atentrance to port5 Tunisia - New fishing harbour at Bizerte-Zarzouna - Main and subsidiary breakwaters4 Egypt - New commercial port at DamiettaEastern and western breakwaters5/6.3 1983 7.06.3 1983 4.04/6.3/9 1983 7.01.5/4/9 1982 7.03 Martinique - Bellefontaine terminal 4 1981 8.02 France (Corsica) - Toga fill platform 4 1981 3.51 France - Port of Sète - Eastern breakwater 4 1981 9.0CLI Group August 11