3. BSWS - FCPCMP - Figures.pdf - County of Imperial
3. BSWS - FCPCMP - Figures.pdf - County of Imperial
3. BSWS - FCPCMP - Figures.pdf - County of Imperial
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SITE<br />
VICINITY MAP<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
N<br />
FIGURE<br />
1
HOVLEY ROAD<br />
N. WESTERN AVE<br />
SITE<br />
BRAWLEY DUMP ROAD<br />
FREDERICKS RD.<br />
MESQUITE<br />
AVE.<br />
CHESTNUT<br />
BRAWLEY DUMP ROAD<br />
AVE.<br />
JONES ST.<br />
PECAN ST.<br />
ALAMO ST.<br />
WALNUT ST.<br />
NEW RIVER<br />
N. IMPERIAL AVE.<br />
SITE LOCATION MAP<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
111<br />
SHANK RD.<br />
FIGURE<br />
2<br />
N
830<br />
NEW NEW RIVER RIVER<br />
0<br />
SCALE IN FEET<br />
830<br />
CULTIVATED FIELD<br />
300'<br />
830<br />
870<br />
850860<br />
830<br />
840<br />
850<br />
LIMITS OF PRESCRIPTIVE R/W HOVLEY<br />
ROAD AS STAKED BY IMPERIAL<br />
COUNTY DEPARTMENT OF PUBLIC<br />
WORKS<br />
860<br />
870<br />
(4.42 ACS)<br />
B-WW-2<br />
APN 046-030-005<br />
RIVERVIEW<br />
CEMETERY<br />
830<br />
830<br />
APN 046-030-004<br />
(21.37 ACS)<br />
830<br />
840<br />
820<br />
830<br />
840<br />
850<br />
860<br />
850<br />
870<br />
BRAWLEY DUMP ROAD<br />
APN 046-030-013<br />
(10.90 ACS)<br />
B-WW-6<br />
860<br />
870<br />
840<br />
860<br />
870<br />
B-WW-3<br />
PARKSIDE ESTATES<br />
x<br />
x<br />
x x<br />
x x x x x x<br />
x x x<br />
x x x x x x x<br />
x<br />
x x<br />
x x x x x x x x x x x x x x x x x x x x x x x x x x x<br />
850<br />
x x<br />
x<br />
x<br />
x<br />
x<br />
x<br />
850<br />
(2.10 ACS)<br />
860<br />
APN 046-030-014<br />
870<br />
880<br />
APN 046-030-012<br />
(28.07 ACS)<br />
CHESTNUT AVE<br />
880<br />
x<br />
x<br />
830<br />
820<br />
820<br />
PECAN ST<br />
NOTE: APN'S 046-030-013 AND 014 REPRESENT PARCEL 1 OF<br />
PARCEL MAP No. M-1700 (PM 7/50)<br />
870<br />
880<br />
830<br />
860<br />
850<br />
840<br />
880<br />
870<br />
860<br />
850<br />
840<br />
N. N. IMPERIAL IMPERIAL AVE AVE<br />
0 40 80 120<br />
COMPILED BY PHOTOGRAMMETRIC METHODS<br />
JOB NUMBER:<br />
15839X<br />
DATE OF SURVEY:<br />
06/21/2010<br />
DATE OF PHOTOGRAPHY: 06/17/2010 TYPE:<br />
COLOR<br />
CONTOUR INTERVAL: 1,2 FT APPROX.PHOTO SCALE: 1"=300'<br />
BASIS OF COORDS: ROS 14-66<br />
BASIS OF ELEV: ROS 14-66<br />
HORIZONTAL DATUM: NAD83, CCS ZONE 6, 1991.35 EPOCH<br />
VERTICAL DATUM:<br />
x x<br />
DATE:<br />
BRAWLEY LANDFILL<br />
GRAPHIC SCALE 1"=40'<br />
NAVD88<br />
LEGEND<br />
MAP BOUNDARY<br />
BOARDRAIL FENCE<br />
FENCE GENERAL<br />
ASPHALT EDGE<br />
CONCRETE EDGE<br />
DIRT ROAD<br />
CURB<br />
GUTTER EDGE<br />
BRIDGE<br />
GUARD RAIL<br />
TRAVEL WAY (ST)<br />
LANE STRIPING<br />
A.G. SINGLE PIPE<br />
MISC UTILITIES<br />
UTILITY BOX<br />
HEADWALL<br />
WATER LINE<br />
CONCRETE DITCH<br />
BUILDING<br />
POOL/SPA<br />
PATIO/SHELTER<br />
PLAY GROUND<br />
TREE LINE<br />
BRUSH LINE<br />
TREE LINE CIRCLE<br />
HEDGE LINE<br />
CULTIVATED FIELD<br />
RIP RAP<br />
PILE<br />
INDEX CONTOUR<br />
INTERM CONTOUR<br />
DASH INDEX CONT<br />
DASH INTERM CONT<br />
DEP INDEX CONT<br />
DEP INTERM CONT<br />
DASH DEP IND CON<br />
DASH DEP INTERM<br />
DASH TREE CON<br />
TREE OPENING<br />
NORTH ARROW<br />
PROJECT NO.<br />
N<br />
HORIZ/VERT CONTR<br />
GRIDTICK<br />
GUARD POST<br />
STREET LIGHT<br />
SIGN (5')<br />
STORM DRAIN<br />
FIRE HYDRANT<br />
POWER POLE<br />
TRANSFORMER BOX<br />
UNDEF OBJECT RND<br />
VALVE UNIDENT<br />
MANHOLE UNIDENT<br />
WATER VALVE<br />
WATER METER<br />
ELECT VAULT<br />
TREE (10')<br />
TREE (5')<br />
SCALED PALM<br />
SPOT ELEVATION<br />
POST<br />
SITE PLAN<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
NOVEMBER 2011<br />
SC0531<br />
N<br />
FIGURE<br />
3
RIDGE PARK ESTATES<br />
RESIDENTIAL DEVELOPMENT<br />
SITE<br />
PARKSIDE ESTATES<br />
RESIDENTIAL DEVELOPMENT<br />
1000'<br />
DATE:<br />
PROJECT NO.<br />
S1GU OPEN SPACE, GEOTHERMAL, URBAN<br />
GS GOVERNMENT / SPECIAL PUBLIC<br />
A1 LIGHT AGRICULTURE<br />
A1U LIGHT AGRICULTURE, URBAN<br />
A1L2U LIGHT AGRICULTURE, LOT SIZE 2 AC MIN., URBAN<br />
A2 GENERAL AGRICULTURE,<br />
A2U GENERAL AGRICULTURE , URBAN<br />
A2G GENERAL AGRICULTURE, GEOTHERMAL<br />
A2GU GENERAL AGRICULTURE, GEOTHERMAL, URBAN<br />
A3G HEAVY AGRICULTURE, GEOTHERMAL<br />
M1G LIGHT INDUSTRIAL, GEOTHERMAL<br />
M1PE LIGHT INDUSTRIAL, PRE-EXISTING<br />
M1NU LIGHT INDUSTRIAL, NO RESIDENTIAL, URBAN<br />
M2GPE MEDIUM INDUSTRIAL, GEOTHERMAL, PRE-EXISTING<br />
M2GU MEDIUM INDUSTRIAL, GEOTHERMAL, URBAN<br />
C2U MEDIUM COMMERCIAL, URBAN<br />
R1U LIGHT RESIDENTIAL, URBAN<br />
SURROUNDING LAND USE<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
13<br />
35<br />
23<br />
43<br />
MELON AREA<br />
ALAMORIO AREA<br />
ROCKWOOD AREA<br />
BRAWLEY WEST AREA<br />
URBAN AREAS<br />
CITY OF BRAWLEY MUNICIPAL AREA<br />
STRUCTURE<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
4<br />
N
SITE<br />
PRE-LANDFILL TOPOGRAPHY<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
5<br />
N
N<br />
SITE<br />
APPROXIMATE LOCATION<br />
OF USGS DELINEATED<br />
BRAWLEY FAULT<br />
REGIONAL GEOLOGIC MAP<br />
BRAWLEY SOILD WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
6
AUGUST 2011 GROUNDWATER CONTOURS<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
7<br />
N
TENTATIVE CLOSURE IMPLEMENTATION SCHEDULE<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
8
3' MIN.<br />
0.25'<br />
0.5'<br />
2.5' MIN.<br />
VARIES<br />
0.7'<br />
VARIES<br />
2.5' MIN.<br />
NOTE:<br />
1. IN AREA OF WASTE RELOCATION<br />
OR EXCAVATION, A MINIMUM OF<br />
ONE FOOT OF INTERMEDIATE<br />
COVER SOIL SHALL BE PLACED<br />
AND COMPACTED BENEATH THE<br />
FINAL COVER SOIL.<br />
0.5'<br />
MSW<br />
TOP DECK SECTION<br />
SCALE: 1" = 2'<br />
VARIES<br />
1<br />
MSW<br />
SIDESLOPE SECTION<br />
SCALE: 1" = 2'<br />
TOP DECK EROSION PROTECTION<br />
LAYER (D 100 = 3")<br />
KAVG = 2x10 -5 FINAL COVER SOIL<br />
cm/s MAX.<br />
EXISTING INTERMEDIATE<br />
COVER, SEE NOTE 1<br />
SIDESLOPES EROSION PROTECTION<br />
LAYER (D 100 = 4")<br />
3" BEDDING LAYER<br />
KAVG = 2x10 -5 FINAL COVER SOIL<br />
cm/s MAX.<br />
EXISTING INTERMEDIATE<br />
COVER, SEE NOTE 1<br />
FINAL COVER SYSTEM CROSS SECTIONS<br />
BRAWLEY SOLID WASTE SITE<br />
IMPERIAL COUNTY, CALIFORNIA<br />
DATE:<br />
PROJECT NO.<br />
NOVEMBER 2011<br />
SC0531<br />
FIGURE<br />
9