10.07.2015 Views

How to do Business Investors' Guide Poland - Polish Agency for ...

How to do Business Investors' Guide Poland - Polish Agency for ...

How to do Business Investors' Guide Poland - Polish Agency for ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

structions, military, defence and security constructions,etc.). He also serves as the instanceof appeal against the decisions of the loweradministrative level.The above bodies supervise and audit thecompliance of projects with the ConstructionLaw. In other words, these bodies ensure thatthe plans envisaged con<strong>for</strong>m with the lawbe<strong>for</strong>e building permission or approval <strong>for</strong> aconstruction project is issued.Construction <strong>for</strong>mally beginsat the time when the prepara<strong>to</strong>rywork on the constructionsite commences.Construction <strong>for</strong>mally begins at the timewhen the prepara<strong>to</strong>ry work on the constructionsite commences (i.e. surveyor’s delimitation,levelling the site, establishment of theconstruction site, including construction oftemporary buildings and connection <strong>to</strong> theutility network <strong>for</strong> the needs of the constructionsite). No later than seven days be<strong>for</strong>e thestart, the inves<strong>to</strong>r is obliged <strong>to</strong> in<strong>for</strong>m boththe authority that granted the permissionand the supervising architect of the datewhen construction is due <strong>to</strong> begin. A writtenstatement signed by the construction managerand the inves<strong>to</strong>r’s inspec<strong>to</strong>r, who assumesresponsibility <strong>for</strong> managing the buildingprocess, should be attached.The people participating in the buildingprocess are:• the inves<strong>to</strong>r;• the inves<strong>to</strong>r’s inspec<strong>to</strong>r;• the architect;• the construction manager.The functions of the construction managerand the inves<strong>to</strong>r’s inspec<strong>to</strong>r must be per<strong>for</strong>medby separate individuals.The inves<strong>to</strong>r is obliged <strong>to</strong> in<strong>for</strong>m the appropriateauthority in the event of the replacemen<strong>to</strong>f the construction manager, theinves<strong>to</strong>r’s inspec<strong>to</strong>r or the chief architect,specifying the date of the change.Construction supervisors may include a clausein the building permission stating that aftercompletion of the building process, theinves<strong>to</strong>r must obtain building occupancy permission.In such a case, the inves<strong>to</strong>r is obliged<strong>to</strong> send the notification of completion of theconstruction works <strong>to</strong> the following authorities:• Environmental Protection Inspection Office;• Sanitary Inspection Office;• State Fire Brigade;• National Labour Inspec<strong>to</strong>rate.The above authorities are given 14 days <strong>to</strong>register any objections. If no response isreceived within that time, it is assumed thatthere are no objections.Documents which need <strong>to</strong> be included in thenotice of completion of the construction are:• the original construction logbook;• a statement by the construction manageron compliance of the construction designswith <strong>Polish</strong> standards,• regulations and permissions stating that theconstruction site is in a state of order (includingthe street and the neighbouring property,if used);• a statement that bordering areas are properlymanaged, if the use of the buildingrequires this;• reports of examinations and checks;• a post•works survey list;• confirmation of han<strong>do</strong>ver of connec<strong>to</strong>rs <strong>for</strong>use.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!