10.07.2015 Views

Iso Floor Raised Floor System for Telecom Switches - Bergvik Flooring

Iso Floor Raised Floor System for Telecom Switches - Bergvik Flooring

Iso Floor Raised Floor System for Telecom Switches - Bergvik Flooring

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bergvik</strong> Seismic Frames are designed with a ”Power Arc” to harnessthe tremendous <strong>for</strong>ces of an major earthquake. <strong>Bergvik</strong>'s seismicframe <strong>for</strong> power and telecom cabinets, etc., in zones 3–4 is thesafest construction on the market.The <strong>Bergvik</strong> Seismic Frame is successfully used by leading telecomoperators around the world.NEBS seismic zone 0Areas with no or low seismic activity. Seriousearthquakes are very unusual.NEBS seismic zone 1–2Areas with higher risk <strong>for</strong> personal injuries and networkfailure. Shakes and earthquakes measuring5-7 on the Richter scale can occur.NEBS seismic zone 3–4Seismic areas with very high risk <strong>for</strong> personalinjuries and network failure. Shakes and earth -quakes measuring up to 9 on the Richter scalecan occur.Secure any OEM equipment – quick deliveryand fast serviceThe <strong>Bergvik</strong> raised floor product package also offers secure solutions <strong>for</strong>any OEM equipment installed in the central office. <strong>Bergvik</strong> will provide adesign proposal within three weeks following receipt of equipment drawings.After the order is approved, we can ship the custom seismic frameswithin four to five weeks.Proven mechanical strength<strong>Bergvik</strong> has developed and adapted a series of three different raised floordesigns to accommodate all seismic zones. To further verify all structuralcalculations, we submit the floor and bracing structures to dynamic fullscalelaboratory tests in accordance with NEBS GR-63 (IEC 68-2-57)and NEBS GR-2930.Color chart shows geographical areas divided into seismic activity zones


NEBS ZONE 0minimum risk of seismic activity<strong>Raised</strong> floors <strong>for</strong> areaswith minimum risk of seismic activityThe base model of <strong>Bergvik</strong>'s raised flooring is built from a stableframework of zinc-plated pre-fabricated steel that is bolted together, withoutwelding, <strong>for</strong> optimal flexibility. This floor system meets the requirements<strong>for</strong> non-seismic zones. The 800 mm panel depth allows <strong>for</strong> optimizedcabinets to line up back-to-back and be securelymounted on top of the floor.Pre-cut panels <strong>for</strong> cable intake, stepless brackets, and cable ladders arestandard options that expedite installation in the central office. <strong>Bergvik</strong>recognizes that time is money.4


Cabinets are tip-protected directly to the raised floorstructure. Unlike other types of raised floors, threadedrods anchored to the concrete sub floor are not needed.<strong>System</strong> Specifications• <strong>Floor</strong> heights 350 to 610 mm• Lx & Ly = 1200 mm at 7.4 kN/m 2• Lz = 800 mm <strong>for</strong> easy panel access• Deflection L/300 at point load 5 kNStandard pedestalPrimary steel sectionSecondary steel sectionLz••Ly•Lx5


NEBS ZONE 1–2higher risk of seismic activity<strong>Raised</strong> floors <strong>for</strong> areaswith higher risk of seismic activity<strong>Bergvik</strong>'s floor design <strong>for</strong> NEBS Zone 1–2 offers the same stableconstruction as our base model but with additional rein<strong>for</strong>cementsto accommodate a higher risk of seismic activity. Strengthened with a60x60 mm pedestal anchored to the sub-floor with steel plateconnections between primary and secondary steel sections, this modelfulfills the requirements <strong>for</strong> seismic reliability according to NEBS. Thefloor has passed both calculated stress as well as dynamic full-scale testsin accordance with NEBS GR-63 (IEC 68-2-57) and NEBS GR-2930from <strong>Bergvik</strong>.6


Cabinets are tip-protected directly to the raised floor structure.Threaded rods anchored to the concrete sub floor are not needed.<strong>System</strong> Specifications• <strong>Floor</strong> heights 350 to 610 mm• Lx = 1200 mm, Ly = 800 mm at 7.4 kN/m 2• Lz = 800 mm <strong>for</strong> easy panel access• Deflection L/300 at point load 5 kNStandard pedestalPrimary steel sectionSecondary steel section••LzLyLx•7


NEBS ZONE 3–4maximum risk of severe seismic activity<strong>Raised</strong> floors with integrated bracing frames <strong>for</strong> areaswith maximum risk of severe seismic activityThe <strong>Bergvik</strong> raised floor designed <strong>for</strong> NEBS Zone 3-4 is the most secure producton the market today. The addition of solid bracing frames anchored to the concretesub-floor provides the strength and stability to withstand severe seismic activity.This <strong>Bergvik</strong> raised floor system fulfills all the requirements <strong>for</strong> seismic reliabilityaccording to NEBS. The frames have passed both calculated stressas well as dynamic full-scale tests in accordance with NEBS GR-63 (IEC 68-2-57)and NEBS GR-2930.8


Our secure seismic bracing frames are designed with a power arc, sono tightening is needed following an earthquake.Cabinets are bolted directly to the seismic bracing frames,which in turn are anchored to the concrete sub-floor.<strong>System</strong> Specifications• <strong>Floor</strong> heights 350 to 610 mm• Lx & Ly = 1200 mm at 7.4 kN/m 2• Lz = 800 mm <strong>for</strong> easy panel access• Deflection L/300 at point load 5 kNon the floor and 15 kN on the bracingframesSeismic frameStandard pedestalPrimary steel sectionSecondary steel section•Lz••LyLx•9


OptionalAccessories<strong>Bergvik</strong> raised floor accessories allow <strong>for</strong> easy cable installation aswell as providing a functional, secure and attractive flooring solutionin the central office.Stepless cable ladder brackets <strong>for</strong> seismicpedestals are available <strong>for</strong> 200, 300, 400,600 and 800 mm wide ladders.Stepless cable ladder brackets <strong>for</strong> standard pedestalsare available <strong>for</strong> 200, 300, 400, 600 and 800 mmwide cable ladders.Panel lifting tool10


Guard Rail Kit•Border Fascia Panel Kit•••Step/stairPortable ramp <strong>for</strong> transportingequipment11


TECHNICAL DATA ISO FLOORThe floor system in generalGross weight: approx. 45 kg/m 2 (9.3 lbs/sf)Uni<strong>for</strong>m distributed load UDL:5-50 kN/m 2 (103-1030 lbf/sf) where 7.4 kN/m 2 (150 lbf/sf) is used as a standard valueFinished floor height FFH: 350-610 mm (14–24 inch)production: <strong>for</strong>slund.seLaminate floor panel specificationMaterial: High density particle board, V313 moist resistant quality is standardPanel sizes: 38 x 600/800/400 x 600 mm as standardSurface finish: <strong>Bergvik</strong> direct laminate as standardElectrical resistance: >500 kOhms and 6 according to EN 438-2:16 1991Weight: 10 kg (22 lbs) <strong>for</strong> floor panel 600 x 600 mmFlame spread classification: In accordance with ASTM E84Cleaning: Clean with vacuum cleaner or dry mop. For difficult panel stains usecitrus cleaner on a buffing pad.Central Office installation <strong>for</strong>GrameenPhone, Sylhet Bangladesh<strong>Bergvik</strong> is an innovative knowledge company specializing in raised floorsystems and seismic bracing solutions tailored to our customer's applications.Through close cooperation, we work with each customer to increase theirvalue chain and maximize their competitive strength.Central Office installation<strong>for</strong> Cingular Wireless, Renton, WA USA®<strong>Bergvik</strong> <strong>Floor</strong>ing ABBox 46 VannsätterSE-820 23 <strong>Bergvik</strong>, SwedenTel: +46 270 728 00Email: info@bergvik.comWebsite:www.bergvik.com<strong>Bergvik</strong> North America, Inc2040 Shipley Drive, Bldg. C-3Salisbury, Maryland 21801USATel: +1 (410) 548 1449Email: info@bergvik.comWebsite: www.bergvik.com© <strong>Bergvik</strong> <strong>Floor</strong>ing AB 2010. Subject to change without notice.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!