10.07.2015 Views

Invitation of Tenders for supply of Class Uniforms - rgukt

Invitation of Tenders for supply of Class Uniforms - rgukt

Invitation of Tenders for supply of Class Uniforms - rgukt

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STATEMENT OF IMPORTANT LIMITS/VALUES RELATED TO BIDItemSubmission <strong>of</strong> SamplesEMDBid Validity PeriodEMD Validity PeriodWarranty PeriodDescriptionTwo samples <strong>of</strong> stretched material and one sample <strong>of</strong>fabric material ( <strong>for</strong> shirting 2 meters fabric and <strong>for</strong>suiting 1.5meter fabric) <strong>for</strong> PUC and Engineering Batchseparately need to be submitted accordingly to thespecification at the time <strong>of</strong> opening <strong>of</strong> technical bids.Rs.2,00,000/-365 days from the date <strong>of</strong> opening <strong>of</strong> commercial bid60 days from the date <strong>of</strong> opening <strong>of</strong> commercial bid6 monthsVariation in quantities +/- 40%Period <strong>for</strong> furnishing per<strong>for</strong>manceSecurityDelivery SchedulePer<strong>for</strong>mance security valuePer<strong>for</strong>mance security validity periodPeriod <strong>for</strong> signing the orderAcceptancePayment termsOn delivery at user siteMaximum Liquidated Damages <strong>for</strong>late deliveriesWithin 10 days from date <strong>of</strong> receipt <strong>of</strong> awardBidder shall deliver the goods in one single lot within45 days from the date <strong>of</strong> award <strong>of</strong> the contract.Further, the successful bidder has to depute tailors tothe IIITs under the RGUKT at the time <strong>of</strong> <strong>supply</strong> <strong>of</strong>uni<strong>for</strong>ms. If any alterations are required, the tailor willtake measurements and the bidder will <strong>supply</strong> altereduni<strong>for</strong>ms within 10 days.3% <strong>of</strong> contract value6 months from award <strong>of</strong> contractWithin 7 days from date <strong>of</strong> receipt <strong>of</strong> notification <strong>of</strong>award95% <strong>of</strong> contract value, within 15 days <strong>of</strong> acceptance <strong>of</strong>material. Balance 5% within 2 monthsNote: Acceptance <strong>of</strong> material will be only after receipt<strong>of</strong> uni<strong>for</strong>ms with alterations duly carried out whereverrequired and after receipt <strong>of</strong> reports <strong>of</strong> technical tests onrandom samples confirming adherence to tenderspecifications.3% <strong>for</strong> each week <strong>of</strong> delayed <strong>supply</strong>, maximum <strong>of</strong> 9%.If delay continues beyond two weeks, contract is liable<strong>for</strong> cancellation.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!