10.07.2015 Views

2008 Fire Master Plan - City of St. Catharines

2008 Fire Master Plan - City of St. Catharines

2008 Fire Master Plan - City of St. Catharines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FIRERESCUE6) <strong>Fire</strong> <strong>St</strong>ations and Facilities:Recommendation:• That 3 single pump stations be replaced over the next6 years in the following order.• <strong>St</strong>ation 4 in Merritton to be built in 2010 and to includea back-up Communications Centre.• <strong>St</strong>ation 2 on Linwell Road to be built in 2011.• <strong>St</strong>ation 3 on Pelham Road to be built in 2012.• <strong>St</strong>ation 1 at 64 Geneva <strong>St</strong>reet, the Headquarters for the <strong>Fire</strong> Service,hire an architect for major renovations in 2013.• Both <strong>St</strong>ations 2 and 3 have the necessary land that will allowfor the construction to be done on the same site without conductingany major disturbance. It would be our recommendation that the samebuilding design be built at both locations.64ST. CATHARINES, FIRE SERVICES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!