10.07.2015 Views

2008 Fire Master Plan - City of St. Catharines

2008 Fire Master Plan - City of St. Catharines

2008 Fire Master Plan - City of St. Catharines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FIRERESCUEThe following are the recommended timelines as set by theCommittee pending approval from Council:<strong>2008</strong>• <strong>Master</strong> <strong>Fire</strong> <strong>Plan</strong> completed and submitted to Council for approval;2009• Hire 4 additional <strong>Fire</strong>fighters for <strong>St</strong>ation 4 to increase complement to 4 firefighters per pump;• Purchase land and hire an Architect for the construction <strong>of</strong> a new <strong>St</strong>ation 4 with a completiondate in 2010 and provide a design for the replacements <strong>of</strong> <strong>St</strong>ations 2 and 3 on existing siteand the renovation <strong>of</strong> station 1;• Hire 2 additional Alarm Room Operators to increase our staffing levels to threeoperators during day time;• Promote 4 firefighter/shift instructors to supplement the Training Division;• Reassign Pump 1A to a rescue unit with 1 <strong>of</strong>ficer and 1 fire fighter• Redeploy 1 firefighter to a single station pump to get 4 firefighters on one pump• RFP for Heavy Rescue Unit2010• Hiring <strong>of</strong> 4 new <strong>Fire</strong>fighters(1per Platoon) in order to increase complement for<strong>St</strong>ation 3 to a 4 man pump;• Construction and completion <strong>of</strong> new <strong>St</strong>ation 4;• Hiring <strong>of</strong> an architect for the construction <strong>of</strong> 2 new stations at existing fire station locations (2-3);• Hire in <strong>Fire</strong> Prevention a Public <strong>Fire</strong> Safety Technician;2011• Hiring <strong>of</strong> 4 new <strong>Fire</strong>fighters(1per Platoon) in order to increase complement for<strong>St</strong>ation 2 to a 4 man pump;• Building <strong>of</strong> a new <strong>Fire</strong> <strong>St</strong>ation 2 on existing site;2012• Construction <strong>of</strong> a new <strong>St</strong>ation 3 on the existing site;• Hiring <strong>of</strong> 4 new <strong>Fire</strong>fighters(1 per Platoon) in order to increase complement for <strong>St</strong>ation 6 to a 4 man pump2013• Build an addition to <strong>St</strong>ation 6 enlarging the dormitory and building a roomfor gym equipment freeing up space on bay floor area;• Hire an architect for the completion <strong>of</strong> major renovations at <strong>Fire</strong> <strong>St</strong>ation 1;• Hiring <strong>of</strong> 4 new <strong>Fire</strong>fighters(1 per Platoon) in order to increase complementfor <strong>St</strong>ation 5 to a 4 man pumpMASTER FIRE PLAN <strong>2008</strong> 65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!