10.07.2015 Views

pdf download - trolley-project.eu

pdf download - trolley-project.eu

pdf download - trolley-project.eu

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

In recent years this busy hub was reconstructed extensively from different EU-funds. Thebus and <strong>trolley</strong>bus stop direction Újszeged was reconstructed from South Great PlainRegional Funds, using conventional layout in 2010. The tram stops and the tram tracks werereconstructed using Transport Operational Program (Cohesion Fund) in 2011. Here 30 cmhigh elevated platforms were used to give accessibility for disabled persons. The height ofthe platforms were in synch with the floor height of the new low-floor trams giving access forpeople in wheel-chairs without any external help.The <strong>trolley</strong>bus stop at Híd utca and the overhead catenary of the <strong>trolley</strong>bus was reconstructedas a part of the Central Europe Trolley <strong>project</strong> in 2011 as a pilot action of demonstrating highspeed <strong>trolley</strong>bus corridor elements. The stop was constructed with new elevated (20 cmhigh) platforms introducing special kerb elements to make the positioning of the <strong>trolley</strong>buseseasy. If a low-floor <strong>trolley</strong>bus uses its kneeling ability, a disabled person in a wheel-chair isable to access the <strong>trolley</strong>bus without help as well.Fig. 11 - Overhead construction plan, showing the <strong>trolley</strong>bus layout at Híd utca area as wellas the tram-<strong>trolley</strong>bus crossing at Széchenyi térAlso thanks to the EU co-funded <strong>project</strong>s, all overhead elements of the trams and <strong>trolley</strong>buseswere refurbished in recent years, making it possible to cross in every direction at highspeed, avoiding malfunctions and <strong>trolley</strong> derailments which often happened prior to thereconstruction. Six tram-<strong>trolley</strong>bus crossings, eight <strong>trolley</strong>bus switches and two <strong>trolley</strong>bus<strong>trolley</strong>buscrossings were built in, all high-speed elements. In case of any disturbance in<strong>trolley</strong>bus traffic, the reconstructed overhead loop makes it possible to reorganize the<strong>trolley</strong>bus routes from every direction.In the near future, traffic light influence will be introduced in order to enable the trams tocross the junction faster. All reconstructed stops obtained stylish stop signs which alreadyhave connection to the optical communication network of the public transport companySZKT. All these masts incorporate a place for digital information tables; furthermore a webterminalwas placed in the area for tourist information systems. These devices will be put inat the end of 2013.38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!