10.07.2015 Views

MW4/MW7 Tender Form - Municipal Corporation Jalandhar

MW4/MW7 Tender Form - Municipal Corporation Jalandhar

MW4/MW7 Tender Form - Municipal Corporation Jalandhar

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

www.mcjalandhar.in (Downloaded form)final) reasonable ground therefore, authorized extension of time, if any, asmay in his opinion be necessary or proper.FinalcertificatePayment onintermediatecertificate tobe regardedas advanceBill to besub-mittedClause 6: On completion of the work, the contractor shall befurnished with a certificate by the Trust/Muni./Corp. Engineer of suchcompletion, but no such certificate shall be given or shall work beconsidered to be complete until the contractor shall have removed from thepremises on which the work has been executed all scaffolding, surplusmaterials and rubbish and cleaned the dirt from all wood works doors,windows, walls, floors or other parts of any building in upon or about whichthe work is to be executed or of which may have had possession of thepurpose of the execution there or until the work shall have been measuredby the Engineer Inchrage whose measurements shall be binding &conclusive against the contractor. If the contract shall fail to comply with therequirements of this clause as to removal of scaffolding surplus materialand rubbish and cleaning of dit on or before the date fixed for thecompletion of the work, the Engineer Incharge at the expense of thecontractor remove such scaffolding surplus materials and rubbish anddispose of the same as he thinks it, and clean off such dirt as aforesaid andthe contractor shall forth with pay the amount of all expense so incurred andshall have no claim in respect of such acaiffelding or surplus materials asaforesaid except for any sum actually realized by the sale thereof.Clause 7: No payment shall be made for works estimated costless than rupees one thousand, till after the whole of the works shall havebeen completed and a certificate of completion given. But in the case ofworks estimated to cost more than rupees one thousand the contractorshall on submitting the bill thereof entitled to receive a monthly paymentproportionate to the part thereof then approved and passed by theEngineer-in-charge whose certificate of such approval and passing of thesuch so payable shall be final and conclusive against the contractor. But alland shall intermediate payments shall be regarded as payments for worksactually done and completed and shall not preclude the repairing of badunsound imperfect or unskillful work to be removed and taken away andreconstructed or re-erected or be considered as an admission of the dueperformance of contractor or any part thereof in any way the power ofEngineer-in-charge under these conditions or any of them as to be finalsettlement and, adjustment of account or in any other way very of affect thecontract. The final bill shall be submitted by the contractor, within onemonth of the date fixed for completion of the work otherwise the Engineerin-charge’scertificate of the measurement and of the total amount payablefor the work accordingly shall be final and binding on all parties.Clause 8: A bill shall be submitted by the contractor each monthon or before the date fixed by the Engineer-in-charge for all work executedin the previous month and the Engineer-in-charge shall take or cause torequisite measurement for the purpose of having the same certificate andthe claim so far as admissible, adjusted if possible before the expiry of tendays from the presentation on the bill. If the contractor does not submit thewww.mcjalandhar.in (Downloaded form) - 6 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!